American Society of Heating and Ventilating Engineers Guide, 1935--'
respect to the building and should be designed, for a maximum of natu
light. The space in front of the boilers should be sufficient for firin
stoking, ash removal and cleaning or. renewal of . flues, and should be ^
least 3 ft greater than the length of the boiler firebox.
at
..A space of at least 3 ft should be allowed on at least one side of everv boiler for convenience of erection and for accessibility to the variou dampers, cleanouts and trimmings. .The space, at the rear'of the boileS
should, be arrtple for the chimney connection and for cleanouts, and with large boilers the rear clearance should be at least 3 ft in width. '.
The boiler-room height should be sufficient for the location of_.b0iler accessories and for proper installation of piping. In general the ceiling height for small steam boilers should be at least 3 ft above the normal
boiler water line: With vapor heating, especially, the.height above the boiler water line is of vital importance.
. When steel boilers are used, space should be provided for the removal and replacement of tubes.
' ^
CONNECTIONS AND FITTINGS
The velocity of flow through the outlets of low.p.ressure steam heating boilers should not exceed 15 to 25 fps if fluctuation of the water line and undue entrainment of moisture, are to be avoided. Steam or water outlet connectioris preferably should be the full size of the manufacturers' tapping and should extend vertically to the maximum height available above, the boiler. For gravity circulating steam heating systems, it is recommended that a Hartford Loop, described'in Chapter 32, be utilized in making the return connection. -
Particular attention should be given to fitting connections to secure con formity with the A.S.M.E. Boiler Construction Code for Low Pressure Heating Boilers. Attention is called in particular to pressure gage piping, water gage connections and safety valve capacity.
Steam gages shoiild be fitted, with a water seal.and a shut-off consisting of a cock .with either, a tee or lever handle which is parallel to the pipe when the cock is open. Steam gage connections should be of copper or brass when smaller than 1 in. I.P.S.9 if the gage is more than,5 ft from the boiler connection, and also in any case where the connection is less than M in. I.P.S.
Each steam or vapor. boiler should have at least one water gage glass and two or more gage cocks located within the range of the visible length of the glass.'' The water gage fittings or gage cocks may be direct connected to the boiler, if so located by the manufacturer, or may be mounted on a separate water column. No connections, except for combustion regu lators, drains or steam gages, should be placed on the pipes connecting the water column and the boiler. If the water column or gage glass is con nected to the boiler by pipe and fittings, a cross, tee or equivalent, in which a cleanout plug or a drain valve.and piping may be attached, should be placed in the water, connection at every right-angle turn to facilitate cleaning.. The water line in steam boilers should be carried at the level specified by the boiler manufacturer. .
:
A-S.Af.fi.'Code, Identification of Piping'Systems.
416
Chapter 25--Boilers
Safely valves should be capable of discharging all the steam that can be erated by the boiler without allowing the pressure to rise mqre than |e|h above the maximum allowable working pressure of the. boiler. This
hould be borne in mind particularly in the case of boilers equipped with echanical stokers or oil burners where the. amount of grate area has - significance as to the steam generating capacity of the boiler.
Where a return header is used on a cast-iron sectional boiler to distribute
the returns to both rear tappings, it is advisable to provide, full size
nlueged tees instead f elbows where the branch connections enter the -return tappings._This facilitates cleaning.sludge from.the bottom of the
boiler sections through the large plugged openings. An equivalent clean out plug should be provided, in the case of a single return connection.
Blow-off or drain connections should be made hear the boiler and k> arranged that the entire system may be drained of water by opening the drain cock. In the case of two or more boilers separate blow-off connec tions must be provided for each boiler on the boiler side of the stop valve
on the main return connection.
Water service connections must be provided for both steam and water boilers, for refilling and for the addition of make-up water to boilers. This connection is usually of galvanized steel pipe, and is made to the return main near the boiler or boilers.
For further data on pipe connections for. steam and hot water heating systems, see Chapters 32 and 33 and the A.S.M.E. Boiler Construction
Code for Low Pressure Heating Boilers.
Smoke Breeching and Chimney Connections. The breeching or smoke
pipe from the boiler outlet to the chimney should be air-tight and as short and direct as possible, preference being given to long'radius and 45-deg instead of 90-deg bends. The breeching entering a brick chimney should not project beyond the flue lining and where practicable itr should be grouted up from the inside of the chimney. A thimble or sleeve grout usually is provided where the breeching enters a brick chimney/
Where, a battery of. boilers-is, connected into a. breeching each boiler
should be provided with a tight damper. The breeching for a battery
of boilers should not be reduced in size as it goes to the, more remote
boilers. Good connections made to a good chimney Will usually.resuit in
a rapid response by the boilers to demands-'for-heat.-
;- - : "
ERECTION, OPERATION, AND MAINTENANCE
The directions of the boiler manufacturer always should be read before the assembly or installation of any boiler, is started, even though the
contractor may be familiar, with, the boiler.,. All. joints, requiring boiler putty or cement which' cannot be reached' after assembly, is complete
must be finished as the assembly progresses. . i
:
The following precautions should be taken'in all installations to, prevent
damage to the boiler:
, . : .' , ...... ' '
r-1. There should be.provided proper and convenient'drainage; connections for.use if the boiler is not in operation during freezing weather.
. ,2. Strains on.the boiler due to movement of piping during expansion should-- be
prevented by suitable anchoring of piping and by.profier provision for pipe, expansion
end contraction.
>' '
: - . y-:.;
417