Document rpRDJz3nEEbxngZKVKkao3Z0q

PLAINTIFF'S EXHIBIT rtainTeed El FLUID TRANSMISSION ASBESTO S-C EM EN T PIPE DESIGN & SPECIFICATION MANUAL CTD032871 FLUID TRANSMISSION (FT) ASBESTOS-CEMENT PIPE A practical lower cost way to transmit fluids over long distances preface Certain-teed Asbestos-Cement, Fluid Transmis sion, (FT) Pipe is designed and manufactured specifically for long distance transmission of fluids, such as water, under pressure, from a source to the point of distribution. Transmission systems normally operate under steady flow and pressure conditions as contrasted with distribution piping systems with complex hy draulics. That is why there isa range of Certain-teed FT piping systems offered for custom engineering of transmission systems at lower cost. The combined loading theory is utilized to design Certain-teed FT piping systems. Internal hydro static pressure and external loads are both con sidered. Proven fundamental practices of pipe design, con tained in this manual, will enable the engineer to select the most economical Certain-teed FT pipe to do the job. There are 9 pressure classes in sizes 8" through 24" and seven pressure classes in 6" to meet almost any service requirement. PROVEN IN USE There are hundreds of miles of Certain-teed Fluid Transmission Piping in service conveying fluids from far away sources to distribution systems or reservoirs. CTD032873 GENERAL INFORMATION FLUID TRANSMISSION (FT) ASBESTOS CEMENT PIPE DESCRIPTION Certain-teed FT Asbestos Cement Pipe is com posed of an intimate mixture of Portland cement, asbestos fiber and silica formed under pressure and heat cured by the autoclave process. The 13' long sections come complete with a factoryfurnished asbestos-cement coupling on one end of the pipe and two rubber gaskets to form a tight, flexible joint equivalent to or greater than the pressure rating of the pipe. Short, half section lengths are also available with coupled ends. CUSTOM DESIGNED FOR FLUID TRANSMISSION ECONOMY Certain-teed FT Pipe is available in 9 pressure ranges with corresponding wall thicknesses to answer the requirements of combined internal and external service loads at the most economical cost. Engineers can design transmission systems using known conditions without the restriction of built-in general-purpose-use safety factors. PERFORMANCE CHARACTERISTICS Certain-teed Fluid Transmission (FT) Asbestos Cement Pipe is continuously tested for quality consistency and performance. Dimensional toler ance checks are monitored in-line. Lab testing for burst, crushing loads, flexural strength chemical resistance are preformed before the Certain-teed mark goes on each section of pipe, coupling or fitting. Tests are performed to ASTM procedure and certified, if requested, or can be personally observed by the customer. SIZES AND PRESSURE RATINGS Certain-teed FT Pipe is available with nominal inside diameters of 6", 8", 10", 12", 14", 15", 16", 18", 20", 21" and 24". Pressure rating FT class numbers are based on one-tenth the minimum hydrostatic bursting test ratings in PSI. For instance an FT 30 pipe has a 300 psi minimum burst requirement. Classes of FT30, FT35, FT40, FT45, FT50, FT60, FT70, FT80 and FT90 are available in sizes 8" through 24" and Classes FT40, FT45, FT50, FT60, FT70, FT80 and FT90 in 6" size. Section: 1-1 CTD032874 pipe and coupling dimensions and weight Section: I- 2 13'- UNBELLED ID T Iff B PREBELLED Of pipe coupling NOM. PIPE SIZE (inches) I.D. 8 8.00 10 10.00 12 12.00 14 14.00 15 15.00 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 9.12 11.08 13.18 15.38 16.64 17.58 19.60 21.76 22.84 26.08 CLASS FT 30 COUPLING O.D. B B.O.D. 8.80 8.92 10.50 WGT. PRE- L BELLED 7.00 13.6 10.89 11.01 12.50 7.00 16.2 12.99 13.11 14.70 8.00 21.2 15.07 15.20 17.60 9.00 29.8 16.11 16.24 18.40 9.00 36.5 17.15 17.28 19.31 9.00 37.5 19.28 19.41 21.53 10.00 43.2 21.44 21.57 23.83 10.00 52.6 22.52 22.65 25.11 10.00 57.4 25.76 25.89 28.43 10.00 74.2 NOM. PIPE SIZE (inches) 8 10 12 14 15 16 18 20 21 24 I.D. 8.00 10.00 12.00 14.00 15.00 16.00 18.00 20.00 21.00 24.00 PIPE B.O.D. 9.26 11.18 13.27 15.44 16.82 17.94 19.60 21.76 22.88 26.08 CLASS FT 35 COUPLING WGT. PRE- 0.0. B B.0.0. L BELLED 8.80 8.92 10.50 7.00 15.2 10.89 11.01 12.75 7.00 17.8 12.99 13.11 15.00 8.00 22.9 15.07 15.20 17.60 9.00 30.9 16.11 16.24 18.40 9.00 40.3 17.15 17.28 19.80 9.00 46.1 19.28 19.41 21.77 10.00 43.6 21.44 21.57 24.01 10.00 53.0 22.52 22.65 25.24 10.00 58.8 25.76 25.89 28.65 10.00 74.8 NOM. PIPE SIZE (inches) I.D. 6 6.00 8 8.00 10 10.00 12 12.00 14 14.00 15 15.00 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 7.06 9.26 11.30 13.38 15.44 16.82 17.94 20.14 22.38 23.72 26.82 CLASS FT 40 COUPLING O.D. B B.O.D. 6.69 6.81 8.18 8.80 8.92 10.50 10.89 11.01 12.75 12.99 13.11 15.00 15.07 15.20 17.60 16.11 16.24 18.67 17.15 17.28 19.80 19.90 20.03 22.82 22.12 22.25 25.24 23.28 23.41 26.79 26.48 26.61 29.98 WGT. PREL BELLED 7.00 9.7 7.00 15.2 7.00 19.5 8.00 24.8 9.00 30.9 9.00 40.7 9.00 46.1 10.00 58.7 10.00 72.3 10.00 86.2 10.00 102.0 NOM. PIPE SIZE (inches) I.D. 6 6.00 8 8.00 10 10.00 12 12.00 14 14.00 15 15.00 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 7.06 9.36 11.46 13.70 15.75 17.05 17.99 20.14 22.38 23.72 26.82 CLASS FT 45 COUPLING O.D. B B.O.D. WGT. PRE- L BELLED 6.69 6.81 8.18 7.00 9.7 8.80 8.92 10.67 7.00 16.4 11.24 11.36 13.30 7.00 22.3 13.44 13.56 15.55 8.00 30.9 15.50 15.63 18.20 9.00 37.6 16.68 16.81 19.51 9.00 46.9 17.74 17.87 20.42 9.00 48.4 19.90 20.03 23.20 10.00 59.4 22.12 22.25 25.66 10.00 73.2 23.28 23.41 26.93 10.00 86.5 26.48 26.61 30.52 10.00 103.0 CTD032875 pipe and coupling dimensions and weight (con't.) NOM. PIPE SIZE (inches) 1.0. 6 6.00 8 8.00 10 10.00 12 12.00 14 14.00 15 15.00 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 CLASS FT 50 PIPE COUPLING B.O.D. | 0.0. B B.O.D. WGT. PREL BELLED 7.16 6.91 7.03 8.40 7.00 10.8 9.38 9.11 9.23 10.90 7.00 16.9 11.52 11.24 11.36 13.30 7.00 23.3 13.76 13.44 13.56 15.76 8.00 32.1 15.87 15.50 15.63 18.49 9.00 40.4 17.36 16.68 16.81 19.82 9.00 53.8 18.22 17.74 17.87 20.69 9.00 53.9 20.44 19.90 20.03 23.30 10.00 67.1 22.56 22.12 22.25 25.78 10.00 78.4 23.84 23.28 23.41 27.07 10.00 90.3 27.25 26.48 26.61 30.66 10.00 118.0 NOM. PIPE SIZE (inches) I.D. 6 5.80 8 7.80 10 10.00 12 12.00 14 14.00 15 15.00 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 7.12 9.32 11.85 14.11 16.41 17.81 18.65 20.94 23.26 24.44 27.96 CLASS FT 60 COUPLING O.D. B B.O.D. L 6.91 7.03 8.76 7.00 9.11 9.23 11.32 7.00 11.66 11.78 14.36 7.00 13.92 14.04 17.00 8.00 16.22 16.35 19.80 9.00 17.28 17.41 21.02 9.00 18.46 18.59 22.28 9.00 20.50 20.63 24.79 10.00 22.83 22.96 27.49 10.00 23.96 24.09 28.79 10.00 27.42 27.55 32.47 10.00 WGT. PREBELLED 12.1 18.6 28.9 39.6 53.2 65.5 66.3 82.8 102.0 112.0 147.0 NOM. PIPE SIZE (inches) I.D. 6 5.80 8 7.80 10 10.00 12 12.00 14 13.60 15 14.44 16 16.00 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 7.12 9.32 11.93 14.35 16.44 17.66 19.09 21.48 23.60 25.10 28.60 CLASS FT 70 COUPLING O.D. B B.O.D. WGT. PRE L BELLED 6.91 7.03 8.76 7.00 12.1 9.11 9.23 11.32 7.00 18.6 11.66 11.78 14.36 7.00 30.1 13.92 14.04 17.13 8.00 44.0 16.22 16.35 20.26 9.00 61.7 17.28 17.41 21.52 9.00 73.8 18.46 18.59 22.54 9.00 77.0 20.94 21.07 26.00 10.00 99.4 23.28 23.41 28.78 10.00 114.0 24.38 24.51 30.03 10.00 135.0 27.96 28.09 34.34 10.00 174.0 NOM. PIPE SIZE (Inches) I.D. 6 5.70 8 7.60 10 9.60 12 11.44 14 13.60 15 15.00 16 15.50 18 18.00 20 20.00 21 21.00 24 24.00 PIPE B.O.D. 7.36 9.46 11.88 14.11 16.50 18.43 18.95 21.92 24.36 25.60 29.22 CLASS FT 80 COUPLING O.D. B B.O.D. L 6.91 7.03 9.35 7.00 9.11 9.23 12.00 7.00 11.66 11.78 15.15 7.00 13.92 14.04 17.90 8.00 16.22 16.35 20.50 9.00 17.99 18.12 22.46 9.00 18.46 18.59 23.20 9.00 20.94 21.07 26.68 10.00 23.28 23.41 29.52 10.00 24.38 24.51 30.81 10.00 27.96 28.09 35.22 10.00 WGT. PREBELLED 15.7 23.3 35.7 49.3 63.3 81.7 85.3 112.0 139.0 153.0 199.0 NOM. PIPE SIZE (inches) I.D. 6 5.70 8 7.60 10 9.60 12 11.44 14 13.60 15 14.44 16 15.50 18 18.00 20 20.00 PIPE B.O.D. 7.38 9.62 12.34 14.52 16.92 18.28 19.52 22.60 25.16 CLASS FT 90 COUPLING O.D. B B.O.D. L 6.91 7.03 9.35 7.00 9.11 9.23 12.00 7.00 11.66 11.78 15.15 7.00 13.92 14.04 17.90 8.00 16.22 16.35 21.06 9.00 17.99 18.12 23.01 9.00 18.46 18.59 23.47 9.00 22.18 22.31 28.29 10.00 24.66 24.79 31.41 10.00 WGT. PREBELLED 15.9 25.2 42.6 56.5 72.8 90.0 99.3 135.0 168.0 CTD032876 SPECIFICATIONS FLUID TRANSMISSION (FT) ASBESTOS CEMENT PIPE Section 2 1 SECTION 1 - GENERAL Sec. 1.1 Scope -- This specification designates the requirements for Certain-teed Asbestos-Cement Fluid Transmission Pipe manufactured for use in transmission systems which carry water under pres sure. Certain-teed Asbestos-Cement Fluid Transmission Pipe will be designated as FT Pipe. Pipe manufactured in accordance with this specification will conform to ASTM C668 latest issue. SECTION 2 - GENERAL REQUIREMENTS Sec. 2.1 Sizes -- FT Pipe shall be manufactured with nominal inside diameters of 6", 8", 10", 12", 14", 15", 16", 18", 20". 21 "and 24". Sec. 2.2 Classes -- FT Pipe shall be manufactured in classes FT30, FT35, FT40, FT45, FT50, FT60, FT70, FT80 and FT90 in sizes 8" through 24" and classes FT40, FT45, FT50, FT60, FT70, FT80 and FT90 in size 6". Sec. 2.3 Lengths -- 2.3.1 The standard length of FT Pipe shall be 13 feet in all classes and sizes. A maximum of 15 per cent of the total footage of any one size or class for any one order may be furnished in random pipe lengths shorter 'han 13 feet but not less than 7 feet. The tolerance for the standard length of 13 feet is plus 0 or minus 1 inch. Random lengths are furnished in increments of 0.5 feet with a tolerance of plus or minus 1 inch. 2.3.2 Short Lengths -- Short lengths for use in making connections to valves, fittings and structures, and for making closures shall not exceed S'6". Standard lengths are Vi lengths (6'6" 1" or 6'0" 1") machined ends only (MEO) and '/ lengths (3'3" 1") fully machined (FM). Short lengths are available for all sizes and classes of FT Pipe. Sec. 2.4 Couplings -- Couplings shall be designed to provide tight joints when subjected to the same hydrostatic test as designated for the same size or class of pipe. One coupling of the same "composition as the pipe shall be furnished with each standard, random and short length of pipe. It shall consist of an asbestos-cement sleeve and two rubber gaskets suitable for use with the particular size and class of pipe with which it is supplied. CTDO32877 Sec. 2.5 Materials -- 2.5.1 Pipe and Couplings -- Asbestos-Cement FT Pipe and Couplings shall be composed" of an inti mate mixture of Portland cement, asbestos fiber and silica, and shall be free from organic additives. The material shall be formed under pressure and cured by autoclave process to meet the physical and chemical requirements of the specification. 2.5.2 Rubber Gaskets -- Rubber Sealing Gaskets shall conform to the requirements of ASTM D-1869 latest issue. The gaskets shall be fabricated from a properly vulcanized elastomeric compound as specificied by the manufacturer. SECTION 3 - DETAIL REQUIREMENTS Sec. 3.1 Pipe -- 3.1.1 Description -- Asbestos-Cement FT Pipe shall be made to the manufacturer's standard dimen sions and tolerances. The pipe shall be machined on each end to properly receive the coupling and gasket. 3.1.2 Hydrostatic Proof Test -- Each standard, random or short length of pipe and each coupling for the corresponding pipe shall withstand, without leakage, a hydrostatic proof test of not less than the pressure indicated in the following table when tested in accordance with Section 4.2.1. MINIMUM HYDROSTATIC PROOF TEST, PSI ALL PIPE SIZES FT30 225 FT35 262 FT40 300 PIPE CLASS FT45 FT50 FT60 337 375 450 FT 70 525 FT80 600 FT90 675 3.1.3 Hydrostatic Bursting Test -- In conjunction with the minimum hydrostatic proof test, certain lengths of pipe shall be subjected to and be able to withstand the minimum bursting pressure in dicated in the following table when tested in accordance with Section 4.2.2. MINIMUM HYDROSTATIC BURSTING TEST, PSI ALL PIPE SIZES FT30 300 FT35 350 PIPE CLASS FT40 FT45 FT50 400 450 500 FT60 600 FT 70 700 FT80 800 FT90 900 CTD032878 3.1.4 Crushing Strength -- Each pipe when tested shall have sufficient strength to support not less than the loads indicated in the following table when tested in accordance with Section 4.2.3. PIPE SIZE SIZES 6 8 10 12 14 15 16 ' 18 20 21 24 MINIMUM CRUSH STRENGTH, LBS/FT FT30 FT35 2000 2000 2000 2000 2300 2500 2500 2500 2500 2800 2400 2500 2500 2500 2800 3000 3000 3500 3500 3800 FT40 2400 2800 3000 3000 3000 3300 3500 4000 4500 4500 5000 PIPE CLASS FT45 FT50 3200 4000 3400 4000 3500 4000 4000 4300 4500 5000 4500 5200 5200 5500 5800 6500 5500 7100 5800 7300 6200 8100 FT60 4700 4800 5500 6400 7000 7400 7500 8500 9500 9700 11000 FT 70 5400 5500 7000 7800 8800 9300 9500 11000 12000 12500 15000 FT80 6700 7400 9000 10000 11000 12000 12400 14000 15000 16000 19000 FT90 9000 9300 11000 12200 13500 14500 15400 18000 20000 21000 24000 3.1.5 Flexure Proof Test -- Each pipe in sizes 6" and 8" shall have sufficient strength to withstand without failure the total applied load indicated in the following table when tested in accordance with Section 4.2.4. MINIMUM FLEXURAL LOADS, LBS. PIPE SIZE INCHES 6 8 FT30 2800 FT35 3300 FT40 1700 3800 PIPE CLASS FT45 1900 4300 FT50 2100 4800 FT60 2400 5200 FT 70 2800 5700 FT80 3000 6600 FT90 3700 7600 CTD032879 3.1.6 3.1.6.1 Workmanship Inside Surface -- Each pipe shall be uniform in quality and shall be free from bulges, dents, fractures, and tears on the inside surface which result in variation in diameter greater than 3/16 of an inch from that obtained on adjacent unaffected portions of the surface. The pipe shall also be free from excessive interior surface flaking and roughness. 3.1.6.2 Ends -- Machined ends of the pipe that receive the coupling shall be free from dents and gouges that will affect the tightness of the joint. 3.1.6.3 Diameter -- The internal diameter of the pipe shall not vary from the manufacturer's standard diameter as approved, by more than the following: Diameter of Pipe 21 inch and smaller 24 inch and larger Permissible Variation in Diameter (Plus or Minus) 1/4 inch 5/16 inch 3.1.6.4 Wall Thickness -- The wall thickness at the machined portions of any pipe shall not be less than the manufacturer's standard by more than 0.08 inch for pipe 15 inches or less in diameter and 0.12 inch for pipe 16 inches in diameter and larger. Sec. 3.2 Couplings -- Asbestos-Cement Couplings shall be machined on the inside surface so that, the gaskets are retained in the proper position to make a tight seal. Sec. 3.3 Rubber Gaskets -- The Rubber Gaskets shall conform to the manufacturer's standard. Sec. 3.4 Chemical Requirements -- 3.4.1 Uncombined Calcium Hydroxide Test -- The Uncombined Calcium Hydroxide in FT Pipe and Couplings shall not be greater than 1 percent when tested in accordance with Section 4.2.5. SECTION 4 - INSPECTION TESTS AND REJECTIONS Sec. 4.1 General -- All material furnished under this specification shall be inspected and tested in accordance with this specification. All material shall be in a normal processed condition prior to test for con formance to the requirements stated in previous sections. When requested on his order, the purchaser may witness inspection and test procedures at his own expense. In lieu of this wit nessing, he may request the manufacturer to submit a certificate certifying the product meets the requirements of the specification. To insure the purchaser that all pipe purchased under this specification conforms to the standards herein required and for the convenience of the pur chaser or his representative, all tests must be conducted in the Continental United States. Sec. 4.2 Tests 4.2.1 Hydrostatic Proof Test -- Each pipe unit, each standard coupling, and all pipe used in fabrica ting bends, tees, and other fittings, shall withstand without leakage a hydrostatic proof test of not less than the pressure designated in the table in Section 3.1.2. Standard couplings may be tested with a rubber bladder inside of the coupling and, if so tested, each coupling shall have sufficient strength to withstand a hydrostatic proof test of 1.5 times the pressure designated in the table. Fittings not requiring the hydrostatic proof test shall be manufactured of the same materials and by the same method as used in manufacturing the pipe that is tested. The test shall be performed in accordance with ASTM C500. Any pipe length or coupling showing leak age, sweating or other defect shall be rejected. CTD032880 4.2.2 Hydrostatic Bursting Test -- A one foot or longer length of unmachined pipe shall be cut from a standard pipe unit and shall be subjected to and withstand the minimum bursting pressure des ignated in the table in Section 3.1.3. The test specimen shall be selected from each 300 standard lengths, or fraction thereof, of each size and class of pipe manufactured on each machine during each shift. The test shall be conducted in accordance with ASTM C500, except maintaining the 5 second dwell is not required. (This is an instantaneous test.) Specimens pass ing this bursting test may be included in the order, provided the specimen, when retested after machine, meets the hydrostatic proof load test. 4.2.3 Crushing Strength -- One foot lengths of pipe cut from unmachined portions of the pipe shall withstand the minimum crushing strength designated in the table in Section 3.1.4. On lots con taining more than 100 lengths of each size and class, the test specimen shall be cut from a standard pipe length selected from each 300 lengths, or fraction thereof, of each size and class of pipe manufactured on each machine during each shift. The test shall be performed in accord ance with ASTM C500. 4.2.4 Flexural Strength -- Flexure proof tests shall be conducted on each standard length of 6" or 8" diameter pipe. The tests shall be performed in accordance with ASTM C500. Each pipe shall support the applicable total load designated in the table in Section 3.1.5 without evidence of cracks or other defects. 4.2.5 Uncombined Calcium Hydroxide Test -- The manufacturer shall conduct periodic Uncombined Calcium Hydroxide Tests, the results of which must meet the requirements specified under Sec tion 3.4.1. The test shall be performed in accordance with ASTM C500. Sec. 4.3 Rejection -- 4.3.1 Hydrostatic Bursting Test -- In the event that a test specimen fails to withstand the hydrostatic bursting test specified in Section 3.1.3, the manufacturer will be allowed to test two additional specimens of the same size and class manufactured on the same machine during the same shift. If either of the two additional specimens fail to pass the test, the entire lot of pipe repre sented by the test specimen shall be rejected. 4.3.2 Crushing -- In the event that a test specimen fails to withstand the crushing strength specified in Section 3.1.4, the manufacturer will be allowed to test two additional specimens of the same size and class manufactured on the same machine during the same shift. If either of the two additional specimens fail to pass the test, the entire lot of pipe represented by the test specimen shall be rejected. SECTION 5 - MARKING Sec. 5.1 Pipe and Coupling -- Each length of pipe, each coupling and each tee, cross or bend shall be clearly marked with the size and class of pipe, name of manufacturer or trademark, and the date of manufacture. Sec. 5.2 Gaskets -- Each rubber gasket shall be marked with the manufacturer's identification, the size and year of manufacture. Sec. 5.3 Additional Marking -- When factory inspection is made by the purchaser, each pipe and each coupling may receive an additional special marking of no more than three letters as required by the purchaser. CTD032881 SECTION 6 - PREPARATION FOR SHIPMENT Sec. 6.1 General -- All pipe, couplings and gaskets shall, unless otherwise specified, be prepared for standard commercial shipment, so as to insure acceptance by common or other carriers. SECTION 7 - SUPPLEMENTARY DETAILS TO BE PROVIDED BY PURCHASER Sec. 7.1 General -- When purchasing FT Pipe under these specifications, it will be necessary for the purchaser to make specific statements for each lot of pipe. Sec. 7.2 Size -- The purchaser shall state the pipe size or sizes required. Sec. 7.3 Class -- The purchaser shall state the class or classes of pipe required. Sec. 7.4 Standard Lengths -- The purchaser shall state the total footage of 13 foot lengths required. Sec. 7.5 Short Lengths -- The purchaser shall state the total footage of 6'6" and 3'3" lengths required. Sec. 7.6 Inspection and Tests -- 7.6.1 7.6.2 7.6.3 Crushing Tests -- The purchaser shall state on his order when Crushing Tests are required. Uncombined Calcium Hydroxide Tests -- The purchaser shall state on his order when the Un combined Calcium Hydroxide Test is required. Certificate of Tests -- The purchaser shall state on his order when a certificate of tests in lieu of inspection is required. Sec. 7.7 Definitions -- Under these specifications the following definitions will apply: 7.7.1 Purchaser -- The person, firm, corporation or governmental subdivision entering into a contract or agreement to purchase pipe according to these specifications. 7.7.2 Manufacturer -- The person, firm or corporation who manufactures the pipe. 7.7.3 Inspector -- The representative of the purchaser, properly authorized and limited by the duties entrusted to him. 7.7.4 Performance Requirements -- The performance requirements of FT Pipe are developed jointly by the purchaser and manufacturer in accordance with the combined loading theory, utilizing as a basis of design the minimum hydrostatic burst and the minimum crush strength values speci fied in Sections 3.1.3 and 3.1.4 respectively. CTD032882 COMBINED LOADING CONCEPT FLUID TRANSMISSION (FT) ASBESTOS CEMENT PIPE Section. 31 SECTION 1 - INTRODUCTION Sec. 1.1 Definition -- A transmission system consists of pipelines which convey a fluid, such as water, from its source to a point of distribution or distributing reservoir. Transmission systems differ from distri bution systems. In comparison, a distribution system consists of numerous branches, connections and appurte nances. Large variations in flow and surge pressures can be expected in a distribution system due to the number of unknown factors involved. Transmission systems have relatively fewer branches and appurtenances and the unknown factors are reduced to a minimum. The hydraulic analysis is simpler, permitting reasonable con trol of surge pressures and the use of lower safety factors. Because of the better control, piping material can be selected to meet the specific requirements of the system, thereby reducing overall costs. Sec. 1.2 Design Principles -- The serviceability of Certain-teed Asbestos-Cement Fluid Transmission (FT) Pipe is its ability to withstand the combined stresses developed by internal hydrostatic pressure and external crushing loads. Typical stresses encountered are schematically shown in Figure 1 FIGURE 1 - COMBINED STRESS The net effect on the pipe resulting from the combined loading shown above can be mathemati cally determined by the Schlick Formula: Where P = the hydrostatic pressure in pounds per square inch that will burst the pipe when no external load exists. W = the external load in pounds per linear foot of pipe, in the three-edge bearing test, that will crush the pipe when no hydrostatic pressure exists. CTD032883 p.|. = the total internal pressure in pounds per square inch which, in combination with some external load, w , applied in three-edge bearing, will fracture the pipe. = the total external load in pounds per linear foot of pipe applied in three-edge bearing which, in combination with some internal pressure, p.p will fracture the pipe. Resolution of Eq. 1 will result in a parabolic curve as shown in Figure 2. This relationship shows the allowable internal pressure, p^, for a fixed external load, w^, or conversely the allowable external load, w^, for a fixed internal pressure, p^. FIGURE 2 - LOAD PRESSURE CURVE Once the design criteria is established for a particular pipe installation, it is possible by the utilization of the combined loading principle to select the proper class of FT Pipe. Combined loading curves for each size and class of FT Pipe are presented in Section IV. Each curve is based on the Schlick Formula, utilizing the hydrostatic burst value P and the crush value W desinated in Sections 3.1.3 and 3.1.4 of the specifications for that particular size and class of pipe. The internal pressure p^. and the external load will be taken from the design criteria. A more detailed explanation of p^.and is given in the following sections. SECTION 2 - DETERMINATION OF INTERNAL HYDROSTATIC PRESSURE (pT) Sec. 2.1 Introduction -- For the design of FT Pipe, the internal hydrostatic pressure.p^., is defined by the follow ing equation: Pj = <P0 + Ps ) S. F. (2) Where PT = the total internal pressure in pounds per square inch which, in combination with some external load, w^, applied in three-edge bearing, will fracture the pipe. Pq = the static or operating pressure in pounds per square inch defined by the design criteria. CTD032884 P = the surge pressure in pounds per square inch resulting from either water hammer or other incremental pressures over and above the normal operating pressure. Note: For the engineer's convenience, Section VI of this manual contains a discussion on operating static and surge pressures. S. F. = The design safety factor specified by the purchaser. Factors of safety are based on judg ment, past experiences and sound engineering principles. For FT Pipe design minimum safety factor of 2.0 is recommended. SECTION 3 - EXTERNAL LOADS (wT) Sec. 3. Introduction -- For the design of FT Pipe external loads, wT, are defined by the following equation: w = WE + ws S. F. T B. F. (3) Where Wj = the total external load in pounds per linear foot of pipe applied in three-edge bearing which, in combination with some internal pressure,p^. will fracture the pipe. =the total earth load in pounds per linear foot of pipe to which the pipe is subjected. The magnitude of this load is a direct function of the burial conditions encountered or specified (e g., trench, embankment, tunnel, etc.) Wg = the total superimposed load in pounds per linear foot of pipe transmitted through the burial environment to the pipe by factors other than the earth loads. These loads can be either of a static or dynamic character or combination of both. S. F. = the design safety factor specified by the purchaser. Factors of safety are based on judg ment, past experiences and sound engineering principles. For FT Pipe design, the factor of safety shall be chosen such that the ratio of safety factor shall not be less than unity n s. S.F. > it. However, in this computation, the safety factor itself shall never be less B.F. than 1.5. B. F. = the bedding factor which is a load factor correlating three-edge bearing test loads to field loads associated with specific bedding conditions. (For a more explicit explanation see Sec. 3.4.) Methods for determining W^, Wg and B.F. are given in the following sections Determina tion of S.F. is governed by the limitations previously discussed Sec. 3. Earth Loads (W^) -- Earth loads to which the pipe is subjected are a function of the soil density, the pipe diameters, depth of cover and the construction techniques employed in laying the pipeline. They depend on the interplay between the weight of the prism of earth directly over the pipe, called the interior prism, and the frictional shearing forces, plus or minus, transferred to that interior prism by the adjacent outside prisms of earth. The magnitude of earth loads vary with the construction technique employed There are two major con struction techniques normally encountered; namely, trench and embankment Another technique, the tunnel condition is not normally found, but nevertheless it has unique design methods which make it necessary to be included in this discussion Figure 3 shows these three construction techniques. CTD032885 Where FIGURE 3 - CLASSIFICATION OF CONSTRUCTION TECHNIQUES Trench Top natural ground Classification of construction conditions for determination of toads on conduits Embankment Tunnel Positive projecting i Top embankment Zero projecting i Top embankment Negative projecting I Top embankment Imperfect trench i Top embankment Top natural grounds ''Top natural pround for ''Top natural ground ^Top natural ground Reprinted from Fig. 59, Chapter IX, WPCF Manual of Practice No. 9, `'Design and Construe* tion of Sanitory ond Storm Sewers", prepared by A Joint Committee of the WPCF and the ASCE, 1966. For FT Pipe design, earth loads are calculated by the general form of Marston s Equation, given below. WE = C we B2 (4) = the total earth load transmitted to the pipe in pounds per linear foot of pipe. wg = the soil density in pounds per cubic foot. Soil densities range in value from 100 to 135 pounds per cubic foot. In the absence of accurate soil density information, a value ot 120 pounds per cubic foot is recommended for FT Pipe design. B = the trench width or pipe diameter measured in feet. The value chosen depends on the installation conditions employed in laying the pipe. C = a coefficient that is dependent on (1) ratio of the height of fill to the width of trench or pipe diameter; (2) shearing forces between the interior and adjacent earth prisms and (3) direction and amount of relative settlement between interior and adjacent earth prisms for embankment conditions. The calculations used to find the value of the coefficient will depend on the installation conditions employed in laying the pipe. To calculate earth loads by Eq. 4 for the above mentioned major construction techniques (trench, embankment and tunnel) values for B and C must be determined. The following sections describe the different conditions and explain the methods for finding the values needed to use Marston's equation for soil loading. CTD032886 3.2.1 Where Trench Condition -- Trench conditions are defined as those in which the pipe is installed in a narrow trench, generally less than two (2) pipe diameters in width, cut in undisturbed ground and backfilled to the original ground surface, as illustrated in Figure 3. For this application, Eq. 4 is rewritten as: VIT = C , w B (5) B = the width of the trench in feet, measured at the top of the pipe. H Cd = the load coefficient which is a function of the ratio Bd .where H is the height of the back fill in feet, measured to the top of the pipe and Bd is the trench width as previously defined. The values of Cd are obtained from Figure 4 in which curves A, B, C, D and E take into account the friction coefficient between the backfill and the sides of the trench for the various soil compositions likely to be encountered. Curve A is for granular materials without cohesion. Curve B is for sand and gravel. Curve C is for saturated top soil. Curve D is for clay. Curve E is for saturated clay. For the engineer's convenience, earth load selection tables for the trench condition are presented at the end of this section. Sec. 3.2.2. Embankment Condition -- Embankment conditions are defined as either that condition where the pipe is installed in a trench cut in undisturbed ground which is wider than two (2) to three (3) pipe diameters or that condition where the pipe is covered with fills above the original ground surface. Embankment conditions can be further subdivided into positive and negative projecting depending on the location of the top of the pipe relative to the original undisturbed ground. A special case, called the imperfect trench, where compressible material is used as a part of the backfill is also classified as an embankment condition. The various embankment conditions described above are diagrammaticafly presented in Figure 3. Sec. 3.2.2 (a) Embankment -- Positive Projecting Pipe -- Under embankment conditions, a positive projecting pipe is defined as either that condition where the pipe is installed in a trench cut in undisturbed ground which is wider than two (2) to three (3) pipe diameters or that condition where the top of the pipe is above the adjacent original ground surface and covered with fills above the original ground surface. For this condition, Eq. 4 is rewritten as: WE = Cc e B,,c 2 (6) Where Bc = the outside diameter of the pipe in feet. CTD032387 Values of Values of FIGURE 4. - VALUES OF C FOR TRENCH CONDITIONS d Reprinted from Fig. 61, Chapter IX, WPCF Mongol of Practice No. 9, "Design and Construction of Sonitory ond Storm Sewers*', prepared by A Joint Committee of the WPCF ond the ASCE, 1966. CTD032888 FIGURE 5 - VALUES OFCcFOR POSITIVE PROJECTING PIPES Values of 01234 56789 Values of coefficient Cc 10 Reprinted from Fig. 65, Chopter IX, WPCF Monuol of Practice No 9, "Design ond Construction of Sonitary ond Storm Sewers", prepored by A Joint Committee of the WPCF ond the ASCE, J966. CTD032889 a cc = the load coefficient which is a function of the ratio Bc_, the projection ratio p, and the settlement ratio rsd. The values of Cc are obtained from Figure 5. The projection ratio, p, is defined as the ratio of the distance that the top of the pipe projects above the original ground surface to the outside diameter of the pipe. (See Figure 5) For FT Pipe design the recommended value for the settlement ratio rsd is +0-7- Cc may also be obtained from Equation 7 when the following conditions exist simultaneously: (1) The ratio is greater than 1.3. (2) The product rsd x p = 0.7. C = 1.892 - 0.96 c Bc (7) Sec. 3.2.2 (b) Transition Width -- It will be noted from the preceding discussion that under construction condi tions where a trench is cut in undisturbed ground two methods of computing the earth load are available; namely, the trench condition and the positive projection embankment condition. The method chosen is dependent on the ratio of the trench width to the pipe diameter. As previ ously stated, when the trench width is less than two (2) to three (3) times the pipe diameter, earth loads are computed by the trench condition (Equation 5). When the trench width is greater than two (2) to three (3) times the pipe diameter, earth loads are computed by the positive pro jection embankment condition (Equation 6). The width of trench at which both methods of computations give equal loads is called the "transition width." The earth load computed at the "transition width" is theoretically the maximum external earth load that can be transmitted to the pipe lor any given depth of cover. For all widths of trench greater than the "transition width" earth loads are computed by the positive projection embankment condition (Equation 6). For a given depth of cover these earth loads are equal to the load resulting at the "transition width." For all widths of trench less than the "transition width," the earth loads are computed by the trench condition (Equation 5). See Figure 6: (c) -- trench width is the "transition width." Earth loads are computed by either Equation 5 or 6. (a), (b) -- Earth loads are computed by the trench equation (Equation 5), because the width of trench is less than the transition width. (d), (e) -- Earth loads are computed by the positive projection embankment formula (Equation 6). For a stated depth of cover the earth loads resulting from trench widths c, d and e are equal. The "transition width" is determined from Figure 7. The ratio of the "transition width" of trench to the outside diameter of pipe (-^) can be obtained from Figure 7 for any given ratio of . By multiplying the ratio ^ by the applicable outside diameter of pipe (Bc) the "transition width" is determined. For the engineer's convenience earth load selection tables for trench condition and positive projection embankment condition are given at the end of this section. The earth loads at the transition width for corresponding depths of cover are shown in bold type. CTD032890 FIGURE 6 Sec. 3.2.2 (c) Embankment -- Negative Projecting Pipe -- A negative projecting pipe is defined as that condi tion where the pipe is installed in a relatively shallow trench wherein the top of the pipe is at some elevation below the original ground surface. The trench is then backfilled and compacted and an embankment is constructed thereon to finished grade (Figure 3). For the negative pro jecting pipe condition. Equation 4 is rewritten as: WE=CnweBd2 (8) Where Bd = the width of the trench in feet. JH Cn = the load coefficient which is a function of the projection ratio p, and the settlement ratio rsd. The various values of Cn are obtained from Figure 10. The projection ratio, p, is defined as the ratio of the vertical distance from the original ground surface down to the top of the pipe to the width of the trench, Bd (See Figure 8). Bc FIGURE 7 - VALUES OF --AT WHICH THE TRENCH AND POSITIVE PROJECTING PIPE Equations give equal loads Ratio H /B , CTD032891 FIGURE 8 - PROJECTION RATIO (p) FOR THE NEGATIVE PROJECTION EMBANKMENT CONDITION For FT Pipe design the recommended value for the settlement ratio (rsd) is equal to zero. X. Projection Ratio = Bd When calculating earth loads under negative projecting embankment conditions, con sideration must be given to the "transition width" as defined in Sec. 3.2.2(b). For values of the ratio , less than those given in Figure 6, the load on a pipe is determined from Equation 8 for negative projecting pipes. However, as the trench width increases and consequently the ratio becomes greater than that given in Figure 7, the earth load should be determined from Equation 6 for positive projecting pipe. Adherence to the preceding rule will result in the most realistic earth loads for design purposes. Sec. 3.2.2 (d) Embankment -- Imperfect Ditch Condition -- The imperfect ditch condition occurs rather infre quently and is included in this design manual for the engineer's general information. The imperfect ditch condition refers to that construction technique wherein the pipe is first installed as a positive projecting pipe. A portion of the embankment is then built up to some elevation above the top of the pipe and thoroughly compacted as it is placed. A trench the same width as the pipe is then excavated directly over the pipe down to or near its top and subsequently back filled with loose, compressible material. The remainder of the embankment is then built up to final elevation (Figure 3). For the imperfect ditch condition. Equation 4 is rewritten as: WE = cn we Bc2 (9) Where Bc = the outside diameter of the pipe in feet. H Cp = the load coefficient which is a function of bc. the projection ratio p, and the settlement ratio, rsd. The various values of Cn are obtained from Figure 10. The projection ratio, p, is defined as the ratio of the vertical distance from the top of the excavated trench down to the top of the pipe to the diameter of the pipe (See Figure 9). For FT Pipe design the rec ommended value for the settlement ratio rsd, is equal to -0.3. CTD032892 FIGURE - PROJECTION RATIO (p) FOR THE IMPERFECT DITCH CONDITION Projection Ratio = X. B,, Sec. 3.2.2 (e) Tunnel Conditions -- There are two types of tunnel construction encountered in normal pipe laying operation. The first type, which is the most frequently encountered, occurs when a sleeve of a larger diameter than the specified pipe is first "jacked" through an embankment. The pipe is then placed into the sleeve without becoming an integral part of the tunnel construction. In this instance the sleeve supports the entire earth load and the pipe contained therein Is not sub jected to crushing loads. When selecting the required class of pipe for this condition, only the internal pressures need to be considered for design. The second type of tunnel condition is rarely encountered in transmission work, but is included in this design manual in event of its occurring. It is that condition wherein the pipe itself must carry the entire load. The area through which the pipeline must pass is bored and braced with the necessary supports. The pipe is then placed in the tunnel and the void between the pipe and tunnel braces is backfilled with compacted earth, grout or concrete. Once this operation is completed, the earth load automatically transfers from the tunnel supports to the pipe itself. For this condition Equation 4 is rewritten as: Where WE = CT Bt (we Bt - 2c) By = the maximum width of the tunnel excavation in feet, (10) c = the coefficient of cohesion in pounds per square foot. Cy = the load coefficient which is a function of the coefficient of internal friction for the material of the tunnel and of the ratio T, where H is the distance from the ground surface to the top of the tunnel in feet and Byequais the width of the tunnel excavation in feet. Values of Cy for different types of soils are obtained from Figure 11. If the value for the coefficient of cohesion is not available from laboratory tests, the follow ing recommended safe design values are to be used: Material Clay, very soft Clay, medium Clay, hard Sand, loose dry Sand, silty Sand,dense Top Soil, saturated Values 40 250 1000 0 100 300 100 CTD032893 Values of FIGURE 10 - VALUES OF Cn FOR NEGATIVE PROJECTING PIPES AND IMPERFECT DITCH CONDITIONS 012345678012345678 Coefficient C,, Rprim.d from Fig. 68, Choptor IX, WPCF Monuol of Procfie. No. 9, "Do.ign ond Construction of Sonitory ond Storm S.wors proporod by A Joint Commit!** of th* WPCF ond th* ASCE, 1966. CTD032894 FIGURE 11 - VALUES OF C,FOR TUNNEL CONDITIONS Values of coefficient Cf Reprinted from Fig. 71, Chapter IX, WPCF Manual of Practice No. 9, "Design and Construction ol Sonitary ond Storm Sewers*', prepored by A Joint Committee of the WPCF ond the ASCE, 1966. CTD032895 When in tunnel construction, the excavation becomes excessive, or when the void surrounding the pipe or tunnel lining is not carefully filled, or when the cohesion of the undisturbed material above the tunnel construction is destroyed by soil saturation or vibration, the earth load should be calculated by Equation 5 for trenching conditions. Since it can be exceedingly difficult to either predict or assess whether the tunnel excavation is excessive, it is recommended for safe FT Pipe design that Equation 5 be used for most installations. It should be pointed out that the preceding discussion was based on the premise that the tunnel would be constructed in homogenous soils which do not create unusual pressures and stresses. If the tunnel is constructed through materials which tend to squeeze or swell, such as some types of clays or shales, or through blocky and seamy rock, methods other than tunnel construction must be utilized. The method of installation used is the responsibility of the engi neer in charge of construction. Sec. 3.3 Superimposed Loads (W,) -- Superimposed loads are external loads other than the normal earth loads transmitted to the pipe. There are two types of superimposed loads; namely, concentrated W$ ^ and distributed Ws2, as illustrated in Figure 12. Superimposed loads are frequently referred to as live loads. FIGURE 12 - SUPERIMPOSED LOADS Concentrated Superimposed Load Vertically Centered Over the Pipe Distributed Superimposed Load Vertically Centered Over the Pipe Roprintod from Pig. 72, Chaptor IX, WPCF Manual of Practice No. 9, "Design ond Construction of Sonitary and Storm Sewers", prepared by A Joint Committee of the WPCF ond the ASCE, 1966. Sec. 3.3.1 Concentrated Loads -- A concentrated load is a load caused by a single force which may be either static or dynamic in nature. In normal pipe design vehicular wheel loads are the most frequently encountered concentrated loads. The magnitude of the force produced by concentrated loads is determined by the following equation: Where Ws1 = CsfsJl L <"> W 1 = the force on a pipe caused by a concentrated superimposed load in pounds per fOot of pipe. Pg = the concentrated load in pounds. The AASHO* design manual gives loads for various sizes and types of vehicles. F = the impact factor. AASHCT recommended values for vehicular wheel loads are as follows: CTD032896 Depth of Cover 1.0-2.0 feet 2.0-3.0 feet 3.0 feet or greater Impact Factor (F) 1.2 1.1 1.0 Impact factors vary from one locale to another and values should be chosen which are consist ent with local, state and federal specifications. 'American Association of State Highway Officials L = the effective length of the pipe in feet. For pipe less than three (3) feet, use the actual length of the section. For all other pipe lengths, use an effective length of three (3) feet. Cs = the load coefficient which is a function of the depth of cover to the top of the pipe and the nominai inside diameter of the pipe. Values of Cs are obtained from Table 1. TABLE 1 - VALUES OF C$ FOR CONCENTRATED SUPERIMPOSED LOADS VERTICALLY CENTERED OVER THE PIPE. Depth of Cover to Top of Pipe PIPE DIAMETER (INCHES) (feet) 6 8 10 12 14 15 16 18 20 21 24 2.0 2.5 3.0 4.0 . 5.0 6.0 8.0 10.0 12.0 16.0 20.0 . .147 .191 0.237 0.279 0.317 .336 0.354 0.391 0.422 .437 0.478 .106 .137 0.174 0.202 0.232 .247 0.259 0.289 0.316 .328 0.362 .078 .102 0.129 0.153 0.175 .186 0.197 0.221 0.241 .250 0.280 .046 .061 0.078 0.092 0.106 .114 0.121 0.136 0.150 .156 0.177 .031 .041 0.052 0.062 0.071 .077 0.081 0.092 0.102 .106 0.120 .023 .029 0.037 0.044 0.050 .054 0.057 0.066 0.073 .076 0.087 .013 .017 0.022 0.025 0.030 .032 0.034 0.038 0.042 .043 0.050 .008 .010 0.013 0.016 0.018 .020 0.021 0.025 0.027 .029 0.033 .006 .008 0.009 0.011 0.013 .015 0.015 0.017 0.019 .021 0.022 .003 .004 0.006 0.007 0.008 .008 o;oo9 0.010 0.011 .012 0.013 .002 .003 0.0035 0.004 0.005 .005 0.005 0.006 0.007 .007 0.008 For the engineer's convenience concentrated superimposed loads resulting from a 10,000 pound wheel load are presented at the end of this section. Also included are conversion factors for other frequently encountered wheel loads. CTD032897 Sec. 3.3.2 Distributed Load -- A distributed load is a load caused by a uniform force distributed equally over a given area; the load may be either static or dynamic in nature. In such cases, the following equation is used; Ws2 = CsPsFBc <12) Where Ws2 = the force on a pipe caused by distributed superimposed load in pounds per foot of pipe. Pg = the intensity of the distributed load in pounds per square foot. F = the impact factor as explained in Section 3.3.1. Bc = the diameter of the pipe in feet. Cs = the load coefficient which is a function of the ratioyp and-j^. H is the height of the fill from the top of the pipe to the ground surface in feet and D and M are the width and length respectively of the area over which the distributed load acts, in feet. Values of Cs are obtained from Table 1. Sec. 3.4 Bedding Factor (B.F.) -- The bedding factor is a load factor which is defined as the ratio of the crush ing strength of the pipe under field bedding conditions to the crushing strength as determined by the three-edge bearing test. Because the crushing strength of a pipe in the field is influenced by the bedding condition and the lateral support exerted on the sides of the pipe, it is necessary to use this load factor to correlate field loads to three-edge bearing test loads. This relationship is expressed as the external field load equaling the load factor times the three-edge bearing load. An illustration of the different bedding conditions is shown in Figure 13. Recommended load factors for various bedding conditions are given in Table 2. TABLE 2 CORRELATION OF BEDDING CONDITIONS, PIPE SIZES, AND LOAD FACTORS Bedding Condition (Class) Description Pipe Size Inches Load Factor A Gravel or Sand Base - Backfill Tamped B Same as A, But Backfill Not Tamped C Pipe Laid on Earth Mounds or Pipe Barrel on Flat Trench Bottom With Excavated Coupling Holes - Backfill Tamped 6 -12 14-20 21, 24 6-24 6- 12 14-20 21, 24 1.7 1.8 2.0 1.5 1.3 1.4 1.5 D Same as C, But Backfill Not Tamped 6-24 1.1 CTD032898 Fig. 13 Bedding Conditions Illustrated -- Class A bedding conditions are shown in (a) and (b). Class C condi tions are shown in (c) and (d). In all four diagrams, the lightly shaded area represents approved backfill, not frozen and free from lumps, large stones, boulders, or other unsuitable substances. The heavily shaded areas represent approved backfill, carefully tamped in 4 in. layers. In (a), a minimum of 2 in. of sand is placed in a shaped bottom under the pipe. In (b), the pipe is bedded in a gravel base. In (c), the pipe barrel rests on earth mounds. In (d), the pipe barrel is resting on the flat bottom of the trench. Class B condition is the same as Class A, and Class D is the same as Class C except that the backfill is not tamped in B or D. CTD032899 6 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover TYPE OF SOIL V9" GRANULAR MATERIAL SAND GRAVEL V saturated top soil CLAY 230 SATURATEO CLAY GRANULAR MATERIAL 2*6" SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 300 sand a GRAVEL 3' SATURATED TOP SOIL CLAY 370 SATURATED CLAY GRANULAR MATERIAL SAND a gravel 4' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL S10 SAND A GRAVEL 5' SATURATED TOP SOIL CLAY 640 o CO 6' T i` r 10' 12' 14' 16' 18' 20' SATURATEO CLAY GRANULAR MATERIAL SAND a gravel SATURATED TOP SOIL 700 750 CLAY 780 SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL ____750 SATURATEO TOP SOIL BflO CLAY SATURATED CLAY 920 GRANULAR MATERIAL 790 SAND A GRAVEL 880 SATURATED TOP SOIL 920 CLAY SATURATED claY GRANULAR MATERIAL 990 1050 830 SAND A GRAVEL 920 SATUPATED TOP SOIL 970 CLAY 1030 SATURATED CLAY GRANULAR MATERIAL 1110 860 SAND a gravel 950 SATURATEO TOP SOIL 1020 CL AY 1100 SATURATED CLAY GRANULAR MATERIAL 1210 890 SAND A GRAVEL 1000 SATURATED TOP SOIL 1070 CLAY 1180 SATURATEO CLAY 1320 GRANULAR MATERIAL 920 SANO A GRAVEL SATURATED TOP SOIL 1040 1120 CLAY 1230 SATURATED CLAY GRANULAR MATERIAL . 1400 930 SANO A GRAVEL 1070 SATURATED TOP SOIL 1160 CLAY 1310 SATURATEO CLAY 1450 GRANULAR MATERIAL 940 SAND A GRAVEL SATURATED TOP SOIL 1080 1180 CLAY SATURATED CL AY 1330 1490 GRANULAR MATERIAL 945 SAND A GRAVEL 1090 SATURATEO TOP SOIL 1190 CLAY 1350 SATURATEO CLAY 1510 2'0" 780 920 990 1050 1030 1130 1190 1060 1180 1270 1330 1130 1270 1350 1470 1590 1180 1320 1420 1560 1730 1200 1350 1460 1630 1820 1220 1390 1510 1680 1880 12 30 1410 15 30 1730 1940 2'3" 1050 1190 1280 1330 1370 1520 1600 1430 1610 1730 1870 1490 1670 1790 2010 2150 1520 1700 1890 20^0 2310 1550 1730 1910 2130 2340 2`t" 79" 3'0" WIDTH OF TRENCH 3'3" 3'6" 3'9" 4'0" 1330 1600 1730 1870 1870 1790 2010 2150 2110 2150 2150 18 30 2060 2240 2420 1880 2110 2290 2550 2690 2180 2420 2210 2520 2690 2420 2600 2690 2690 1 Bold-foce numbers represent EARTH-LOAD of the transition width. Refer to Sec. 3.2.2 (b) Transition Width fur detoiled explanation. CTD032900 8 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover 2' 2'6" 3' 4' 5' 6' 7' 8' 9- 1012' 14' 16' 18' 20' TYPE OF SOIL GRANULAR MATERIAL SAND ft GRAVEL saturated TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND 8 GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND & GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOPSOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 2'0" 2'6" 2'9" 290 370 460 640 170 820 820 o CD CO 6*0 890 960 1000 910 1010 1060 1110 1150 990 1060 11)0 1200 1270 1050 mo 1200 1270 1350 1060 1180 1270 1550 1440 11 JO 1270 1550 1470 1590 1180 1520 1420 1560 17*0 1200 1 550 1460 1650 1820 1220 1590 1510 1680 1250 H10 1550 1750 1940 1000 1090 1150 1180 1180 1150 1280 1540 1360 1250 15*0 H30 1520 1530 1280 1400 1520 1610 1700 1370 1520 1640 1730 1910 1430 1610 1730 I860 2070 1490 1670 1790 2010 2220 1520 1700 1890 2070 2310 1550 1730 1910 2130 2340 13*0 1430 1530 1540 1650 1710 1650 1800 1950 2060 2070 1730 1940 2060 2210 2420 1790 2010 2150 2330 2590 1830 2060 2240 2460 2720 I860 2110 2290 2550 2840 3*0" 3'3" 3'6" WIDTH OF TRENCH 3*9" 4'0" 4'3" 4'6" 1530 1710 1910 2070 2070 2020 2270 2410 2420 2110 2360 2540 2720 2780 2180 2450 2630 2890 3140 2210 2520 2700 3000 3290 2320 2420 2420 2450 2700 2780 2780 2540' 2860 3030 3140 2920 3140 2600 2930 3130 3450 3490 2980 3350 3490 3140 34)0 3490 3490 Bold-face numbers represent EARTH-LOAD at the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detoiled explanation. 4'9" 5'0" CTD032901 10 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Covor r 2'6" 3' 4' 5' 6' V 8' 9' 10' 12' 14' 16' 18' 20' TYPE OF SOIL granular material SAND s GRAVEL SATURATED TOP SOIL CL At SATURATED CLAY GRANULAR MATERIAL SANO S GRAVEL SATURATED TOP SOIL clay SATURATED CLAY granular MATERIAL SAND S GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR material SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAr SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TO^ feOIL clay SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOPSOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAV EL SATURATED TOP SOIL CLAY SATURATED CL AY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY oo 2'0" 340 450 560 650 700 720 790 770 B20 040 B70 890 840 890 960 1010 1060 910 1010 1060 1110 1150 990 1060 1150 1200 1270 1030 1130 1270 1350 1060 1180 1270 1350 1440 1130 1270 1350 1470 1590 1160 1320 1420 1560 1730 1200 _ 1350 1460 . 1630 1820 1220 1390 1510 1680 1880 1230 1410 1530 1730 1930 2'r 2'6" 790 880 940 970 1010 1000 1060 1120 1150 1240 1090 1150 1250 1310 1330 1150 1280 1340 1400 1460 1250 1340 1430 1520 1610 1280 1400' 1520 1610 1700 1370 1520 1640 1730 1910 1430 1610 1730 1680 2070 J490 1670 1790 2010 2220 1520 1700 1890 2070 2310 1550 1730 1910 2130 2340 1010 1160 1240 1280 1J70 1460 1390 1460 1560 1640 1690 1430 1580 1650 1730 1800 1540 1650 1760 1880 1990 1650 1800 1950 2060 2210 17 30 1940 2060 2210 24 20 1790 2010 2150 2330 2590 1830 2060 2240 2460 2710 1880 2110 2290 2550 2840 2'9" 3'0" 3'3" WIDTH OF TRENCH 3'6" 3'9" 4`0" 4'3" 1240 1460 1590 1690 1690 1710 1820 1890 1910 1910 1910 1770 1910 2020 2140 1910 2090 2220 2360 2520 2020 2270 2410 2570 2800 2110 2360 2540 2720 3000 2100 2450 2630 2890 3180 2210 2520 2700 3000 3290 2030 2140 2140 2210 2380 2540 2470 2580 2580 2320 2660 2570 2920 2750 2920 3030 3030 2450 2810 2700 2920 3090 3320 3120 34QQ _ -- 2540 3480 2920 2860 3250 3030 3290 3620 3490 3740 3930 2600 2980 2930 3350 3130 3610 34 50 3800 39 30 4320 2580 3030 3150 3480 3480 3310 3680 3930 3710 3930 3930 3410 38 20 3090 4380 3830 4220 4380 4260 4380 4380 Bold-foce numbers represent EARTH-LOAD of the tronsition width. Refer to Sec. 3.2.2 (b) Transition Width for detailed explanation. CTD032902 12 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover TYPE OF SOIL GRANULAR material SAND ft GRAVEL 2' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 2'6" SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY granular material SAND ft GRAVEL 3' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 4' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL 5' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 6' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL V SATURATED TOP SOIL CLAY SATURATED CLAY oranular MATERIAL. 1ANO 4 ORA VII S' SATURATED TOR IOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO 4 ORAVEL 9* SATURATED TOR SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 10' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 12' SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 14' SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 16' GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL 18- SATURATED TOP SOIL 20' CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURAT EO TOP SOIL CLAY SATURATED CLAY 2'0" 370 460 480 510 560 560 600 630 640 650 700 720 770 800 770 820 840 870 890 840 890 960 to 10 1060 910 1010 1060 1110 1150 990 1060 1130 1200 1270 1030 1130 1200 1270 1350 1060 1180 1270 1350 1440 1130 1270 r 1350 1470 1590 1180 1320 1420 1560 17)0 1200 1350 1460 1630 1820 300 1510 1680 1880 1410 1530 1730 1940 2'3" 790 820 850 880 910 880 940 970 1040 1070 1000 1060 1120 1150 1220 1090 1150 1250 1310 1370 1150 1280 1340 1390 1460 1250 1)40 14)0 1520 1610 1280 1400 1520 1610 1700 1370 1520 1640 17)0 1910 1430 1610 17)0 1880 2060 1490 1670 1790 2010 2220 1700 1890 2070 2310 1730 1910 21)0 2)40 2*6'' 9run0 1010 1090 1130 1180 1160 1240 1300 1350 1390 1280 1)70 1440 1500 1560 1)90 1460 1560 1640 1690 14)0 1580 1650 1730 1800 1540 1650 1760 1880 1990 1650 1800 1950 2060 2210 1730 1940 2060 2210 2420 1790 2010 2150 2)30 2590 2060 2240 2460 2720 2110 2290 2550 2840 2'9" 1180 1)20 1410 uso 1450 1540 1630 1690 1710 1590 1700 1790 1B60 1950 1710 1820 1920 2020 2100 1770 1910 2020 2130 2220 1910 2090 2220 2)60 2520 2020 2270 2410 2570 2800 2110 2)60 2540 2720 3000 2450 26)0 2890 31B0 2520 2700 3000 3290 3'0" 3'3" WIDTH OF TRENCH 3-4" 3`9" O" 4'3" 1450 1630 1710 1710 1780 1890 1980 1980 1890 2000 2160 2250 2030 2160 2300 2410 2520 2210 2380 2540 2700 2860 2320 2570 2750 2920 3130 2450 2700 2920 3120 3400 2160 2250 2280 24)0 2520 2470 2670 1850 2980 3050 2660 2920 3110 3)00 3520 2810 3090 3320 3550 3803 2250 2520 2790 3000 3050 3010 32)0 3460 3590 3150 3460 3680 3940 4130 3050 3)20 3590 3510 3850 4080 41X 3590 3940 4130 4130 2860 3030 3290 3620 2930 31)0 3460 3800 3250 3490 3740 4080 3360 3610 3930 4320 3680 3930 4190 4560 3820 4090 4410 4620 4050 4390 4640 4660 4220 4560 4880 5200 4510 4660 4710 5050 5200 4660 5190 Boldfoce number* represent EARTH-LOAD at the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detoiled explanation. 4`6" 4*9' CTD032903 14 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover TYPE OF SOIL 2' 2'6" GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 3' SATURATED TOP SOIL CLAY SATURATED CLAY GR ANUL A R MATERIAL SAND ft GRAVEL 4' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL S' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 6' saturated TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft gravel 7' SATURATED TOP SOIL. CLAY .SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL 8' SATURATED TOP SOIL "21 AY SATURATED CLAY ORANULAR MATERIAL SANO ft GRAVEL 9' SATURATED TOP SOIL cLat SATURATED CLAY GRANULAR MATERIAL 101 SAND ft GRAVEL SATURATED TOP SOlL CLAY SATURATED CLAY 12' granular material SAND . ORAVEL SATURATED TOP SOIL CLAY SATURATED CLAY ORANULAR MATERIAL 14' SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 16' 18' SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 20' SAND ft GT.AVEL SATURAT ED TOP SOIL CLAY SATURATED CLAY 2'3" 410 520 560 640 670 690 720 790 820 . .850 880 910 B80 940 970 1040 1070 1000 1060 1)20 1150 ) 220 1090 1150 1250 1310 1370 1150 1280 1340 1390 1460 1250 1340 1430 1520 1610 12B0 1400 1520 . 1610 1700 1370 1520 1640 1730 1910 1430 1610 1730 1880 2070 1490 1670 1790 2010 2220 1520 1700 1890 2070 2310 1550 1730 1910 2130 2340 2'6" 2'9" 3'0" 560 690 720 720 900 940 980 1000 1040 1010 1090 1130 1200 1240 1160 1240 1300 1350 1390 1280 1370 1440 1500 1560 1390 1460 1560 1640 1690 1430 1580 1650 1730 1800 1540 1650 1760 1880 1990 1650 1800 1950 2060 2210 1730 1940 2060 2210 2420 1790 2010 2150 2330 2590 18 30 2060 2240 2460 2720 1880 21)0 2290 2550 2840 1000 1040 1180 1230 1270 1320 1330 1320 1410 1450 1540 1590 1450 1540 1630 1690 1740 1590 1700 1790 1860 1950 1710 1820 1920 2020 2100 1770 1910 2020 2130 2220 1910 2090 2220 2360 2520 2020 2270 2410 2570 2800 2110 2360 2540 2720 3000 2160 2450 2630 2890 3180 22)0 2520 2700 3000 3290 1040 1330 nso 1460 1570 1620 1660 1630 1750 1840 1910 1970 1780 1690 2000 2080 2150 1890 2000 2160 2270 2380 2030 2160 2300 2410 2520 2210 2380 2540 2700 2860 2320 2570 275lO 2920 3130 2450 7700 2920 3120 3400 2540 2860 3030 3290 3620 2600 2930 3130 3450 3820 3'3" 3'6" WIDTH OF TRENCH 3'9" 4`0" 4*3*. 4 1350 1660 1840 1970 1970 1990 2120 2240 2290 2160 2280 2410 2510 2600 22BO 2430 2570 2700 2810 2470 2670 2850 2980 3170 2660 2920 3110 3300 3520 2810 3090 3320 3800 2920 3250 3490 3740 4080 2980 3360 3610 3930 4320 2210 2290 2400 2530 2600 2560 2710 2850 2920 2790 3000 3190 3350 3480 3010 3230 3460 3680 3900 3150 3460 3680 3940 4200 3310 3680 3930 4190 4560 3410 3820 4090 4410 4820 2290 2600 2780 2920 2920 3120 3290 3510 3540 3320 3630 3850 4050 4160 3510 38 50 4080 4390 4640 3710 40 50 4390 4640 4980 3830 4220 4560 4880 5320 3360 3540 3650 4030 4160 3940 4220 4510 4790 4130 4510 4800 5090 5420 4260 4710 5050 5380 5820 3540 4080 4160 4 290 4660 4790 4530 4940 5 200 5420 47 JO 5200 5570 5920 6040 4160 4620 4790 4980 5350 5420 5180 5600 6040 Bold-foce numbers represent EARTH-LOAD at the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detailed explanation. 4'9" 5'0" 4790 5420 5630 6040 6040 CTD03290* 15 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover TYPE OF SOIL GRANULAR MATERIAL SAND ft GRAVEL 2' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 2'6" SATURATED TOP SOIL clay SATURATED CLAY GRANULAR material SAND ft GRAVEL 3' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 4' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL S' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL ftSAND GRAVEL 6' SATURATED TOP SOIL CLAY SATURATED CLAY granular material SANO ft GRAVEL 7' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 8' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 9' SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL 10' SATURATED TOP SOIL CLAY SATURATED CLAT GRANULAR MATERIAL 1 2' SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 14' 5AND A GRAVEL saturated TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL 16' SATURATED TOP SOIL CLAY SATURATED CLAY granular material SANO ft GRAVEL 18' SATURATED TOP SOIL CLAY saturated cl ay granular material 20' SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 2'3" 2'6" rr 3'0'' 3'3" 420 520 550 550 570 590 640 67 0 690 710 730 700 820 850 880 910 BBO 940 970 1040 1070 1000 1060 1120 1150 1220 1090 1150 1250 1510 1570 1150 1280 1540 1590 1460 1250 1540 1450 1520 1610 1280 1400 1520 1610 1700 1570 1520 1640 1750 1910 14 JO 1610 mo 1880 2070 1190 1670 P90 2010 2220 1520 1700 1890 2070 2510 1550 mo 1910 2150 2540 S90 690 760 740 760 900 940 9B0 1000 10)0 1010 1090 1150 1200 1240 1160 1240 1500 1550 1590 1280 1570 1 4*0 1500 1560 1390 1460 1560 1640 1690 1450 1580 1650 1750 1800 1540 1650 1760 1880 1990 1650 1800 1950 2060 2210 P)0 1940 2060 2210 2420 1790 2010 2150 2550 2590 1850 2060 2240 2460 2720 1880 2110 2290 2550 2840 760 760 1000 1090 1180 1230 1270 '< 1)60 1)20 1410 1450 1520 1590 1450 1540 16)0 1680 1740 1590 1700 1790 1860 1950 1710 1820 1920 2020 2100 1770 1910 2020 2160 2220 1910 2090 2220 2)60 2520 2020 2270 2410 2560 2800 2110 2)60 2540 2720 3000 2180 2450 26)0 2860 3180 2210 2520 2700 3000 3290 1090 1330 1430 1460 1570 1620 1750 1700 1650 1750 1840 1910 1980 1780 1890 200C 2080 2150 1890 2000 2160 2270 2580 20)0 2160 2500 2410 2520 2210 2)80 2540 2700 2860 2320 2570 2750 2920 )l)0 2450 2700 2920 ) 1 20 )400 2540 2860 3030 3290 3620 2600 2930 31)0 3450 3800 1430 1650 1710 1770 1840 1970 2060 1990 2120 2240 2320 2410 2160 2280 2410 2510 2600 2280 2430 2570 2700 2810 2470 2670 2850 2980 3170 2660 2920 3190 3300 3 520 2810 3090 3)20 3550 5800 2920 5250 3490 3740 4080 2980 5560 5610 39)0 4320 3'6" WIDTH OF TRENCH 3'y 4'0" 4*3" 4*6" 4'9" 5*0" 5*3" ! 1770 2060 1 2210 2)50 2440 2440 2400 25)0 2680 2760 2780 2560 2710 2850 2970 5090 2790 3000 3190 5)50 5480 3010 52)0 5460 5680 3900 3150 3460 3680 5940 4200 3310 3680 39)0 4190 4560 3410 3820 4090 4410 4820 2780 2780 2950 3110 3110 5120 5290 5510 5680 3790 3 320 36)0 3850 4050 4250 3510 3850 4080 4)90 4640 3710 4050 4)90 4640 4980 58)0 4220 4560 4880 5 360 5550 3790 3650 40)0 4220 4420 4460 5940 4220 4510 4800 5090 4130 4510 4600 5090 -H70 4260 4710 5050 5)00 20 5250 3790 3790 4080 4)40 4460 4460 4290 4660 4960 SI 40 4620 5100 5U0 5140 45)0 4940 5200 5570 MI0 47)0 5200 5570 5920 60 4980 5)50 5120 5810 5420 5810 5180 5600 6080 6440 _44SJL_ 56)0 6170 6480 5790 5610 6120 - 6480 6480 Bold-foce numbers represent EARTH-LOAD at the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detailed explanation. i CTD032905 16 inches--pipe size EARTH LOAD (Ibs./iin. ft.) Depth of Cover 2' 2'6" 3' 4' 5' 4' r 8' 9' 10' 12' 14' 14' 18' 20' TYPE OF SOIL granular material SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL clay saturated clay GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL clay SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY saturated CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL saturated top SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY oranular material SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 2'3" 430 2'4" 2'9" 3'0" 3'3" 3*6" WIDTH OF TRENCH 3'9" 4'0" 4'3" 44" 520 550 550 570 580 640 670 690 710 730 790 820 850 880 910 880 940 970 1040 1070 1000 1060 1120 1150 1220 1100 1150 1250 1310 1370 1150 1280 1340 1390 1460 1250 1340 1430 1520 1610 1280 1400 1520 1610 1700 1370 1520 1640 1730 1910 1430 1610 1730 1880 2070 1490 1670 1790 2010 2220 15 20 POO 1890 2070 2310 1550 1730 1910 2130 2340 610 690 720 740 780 900 940 980 10d0 1030 1010 1090 1130 1200 1240 1160 1240 1300 1350 1390 1280 1370 1440 1500 1560 1390 1460 1560 1640 1690 1430 1580 1650 1730 1800 1540 1650 1760 1880 2000 1650 1800 1950 2060 2210 1730 1940 2060 2210 2420 P90 2010 2150 2330 2590 1830 2060 2240 2460 2720 1880 2110 2290 2550 2840 780 1000 1040 1090 1130 1180 1230 1270 1320 1360 1320 1410 1450 1540 1590 1450 1540 1630 1690 1740 1590 1700 1790 1860 1950 1710 1820 1920 2020 2100 1770 1910 2020 2130 2220 1910 2090 2220 2367 252 * 2020 22*'6 2410 2570 2800 2110 2360 2540 2720 3000 2180 2450 2630 2890 31B0 2210 2520 2700 3000 3290 1110 1130 1330 1380 1440 1490 1460 1570 1620 1730 1780 1630 1750 1840 1910 1980 1780 1890 2000 2080 2150 1890 2000 2160 2270 2380 2030 2160 2300 2410 2520 2210 2380 2540 2700 2860 2320 2570 2750 2920 3130 2450 2700 2920 3120 3400 2540 2860 30 30 3300 3620 2600 2930 3130 3450 3800 11X 1460 1490 1490 1650 1710 1780 1IS0 1840 1970 2030 2160 2300 1990 2120 2240 2320 2410 2160 2280 2410 2510 2600 2280 2430 2570 2700 2810 2470 2670 2850 2980 3P0 2660 29 20 3110 3300 3520 2810 3090 3320 3550 3800 2920 3250 3490 3740 4060 2980 3 360 3610 3930 4320 1850 1990 2130 2200 2200 2210 2350 2470 2560 2450 2560 2400 2530 2680 2760 2850 2560 2* 10 2850 2970 3090 2790 3000 3190 3350 3480 3010 3230 3460 3680 3900 3150 3460 3680 3940 . 4200 3310 3680 3930 4190 4560 3410 38 20 4090 4410 4820 2620 2780 29 W 2780 2950 3120 2260 3120 3290 3510 3680 3800 3320 3630 38 30 4050 4250 3510 3850 4080 4390 4640 3710 4050 4 390 4640 4980 3830 4220 4560 48B0 5320 2560 2880 2910 3070 3260 3360 3550 38 40 3970 3650 4030 4220 4420 4610 3940 4220 4510 4800 5090 4130 4510 4800 5090 5470 4260 4710 5050 5 380 5820 2910 3360 3750 3970 4080 4340 4620 4680 4290 4660 4960 5200 5390 4530 4940 5200 5570 5960 4730 5200 5920 6350 3970 4370 4620 4680 4620 5100 5350 5390 4980 5350 5720 6080 6100 5180 5600 6080 6440 6800 Bold-lace numbers represent EARTH-LOAD ot the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detoiled explanation. 4'9" 4680 5090 5390 5420 5820 6100 5630 6170 6530 6600 5'0" 5390 5790 6100 6120 6620 6800 S'3" 5'4" tlM 1 6620 6800 6600 CTD032906 18 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover TYPE OF SOIL r 2'6" 3' 4' 5' 6' V GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL Saturated top soil CLAY SATURATED CLAY GRANULAR MATERIAL Sand t gravel 8' 9' 10' 12' 14' SATURATED TOP SOIL CLAY SATURATED CLAY ORANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL 14' 18' CLAY SATURATED CLAY ORANULAR MATERIAL SAND ft ORAVEL SATURATED TOP SOIL CLAY SATURATED CLAY Oft ANUL AN MATERIAL SAND ft ORAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL 20' SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 2'6" 440 2'?" 3'0" 3'3" 3'" 3'?" WIDTH OF TRENCH A'O" 4'3" 4*6'' 4'9* 620 640 640 690 770 720 740 630 790 ISO 900 1000 940 1040 980 1090 1000 1120 10)0 1150 1010 1180 1090 12)0 11)0 1270 1200 1320 1240 1360 1160 1240 13W 1410 MOO 1450 1350 1540 1390 1590 1280 1450 1)70 1540 1440 16)0 1500 1690 1560 1740 1)90 1590 1460 1560 1700 1790 1640 1860 1690 1950 1430 1700 1580 1820 1650 1920 17)0 2020 1800 ~| 2100 1540 1770 1650 1760 1910 2020 I860 2130 1990 2220 1650 1910 1800 2090 1950 2220 2060 2210 2)60 2520 1730 1940 2060 2210 2020 2270 2410 2570 2420 2800 1790 2110 2010 2360 2150 2540 23)0 2590 IB 30 2060 2720 3000 2180 2450 2240 2630 2460 2720 2890 3180 1880 2210 2110 2520 2290 2550 2700 3000 2840 3290 8 1110 1170 1210 1230 1330 1)80 1440 1480 15)0 1460 1570 1620 1730 1780 16)0 1750 1840 1910 1980 1780 1890 2000 2060 2150 1890 2000 2160 2270 2)80 2030 2160 2)00 2410 2520 2210 2380 2540 2700 2860 2320 2570 2750 2920 3130 2450 2700 2920 3120 3400 2540 2862 30)0 3300 3620 2600 29)0 3130 3450 3800 1200 12X 1230 1460 1560 1630 1620 1650 1710 1780 1840 1900 1840 1970 20)0 2160 2220 1990 2120 2240 2320 2410 2160 2280 2410 2510 2600 2280 2430 2570 2700 2810 2470 2670 2850 2980 3170 2660 2920 3110 3 300 3520 2810 3090 3320 3550 3800 2920 3250 3490 3740 4080 2980 3)60 3610 39)0 4320 1850 1910 2000 2020 1990 2130 2210 2)50 2420 2210 2350 2470 2570 2660 2400 25)0 2680 2760 2850 2560 2710 2850 2970 3090 2790 3000 3190 3)50 3480 3010 3230 3460 3680 3900 3150 3460 3680 3940 4 200 3)10 3680 3930 4190 4560 3410 38 20 4090 4410 4820 2020 2240 2360 2420 2420 2450 2510 2700 2780 2810 2620 2780 2920 3040 3120 2780 2950 3120 3260 3360 3120 3290 )510 3680 3800 3320 3630 3850 4050 4250 3510 3850 4080 4 390 4640 3V10 4050 4 390 4640 4980 38 30 4220 4560 4880 5 320 2590 27B0 2810 2880 3010 3170 3200 3070 3260 3)60 3460 3550 3)60 3550 3840 40)0 4220 3650 4030 4220 4420 4610 3940 4220 4510 48 00 5090 4130 45 30 48 0 0 >090 5470 4260 4710 5050 5380 5820 2810 3140 3200 3320 3510 3400 3750 3970 4180 4340 4390 4080 4 340 462Q 48 30 5050 4 290 4660 4960 5200 5480 45 30 4940 5200 5570 5960 4'30 5 200 5570 5920 6)50 3200 3520 3600 4010 4250 4390 4)70 4620 4980 S180 4620 5100 5)50 5590 58 30 4980 5)50 5720 6080 6440 5180 5600 6080 6440 6850 3600 4390 4790 5090 5180 5090 54-0 5820 5970 5420 5820 02)0 6500 6760 56)0 6170 65)0 6960 *'450 Bold-fo ee numbers represent EARTH-LOAD at the transition width. Refer to Sec. 3.2.2 (b) Trontition Width for detailed explanation. S'0" 5100 5180 5490 58 50 5970 5~90 6)00 6060 6760 6120 6620 7080 7)00 7550 5'3" 5180 5950 5970 6280 6760 60 20 " 180 7550 5*6" 5970 6760 7080 7550 5'9" 4'0" CTD032907 20 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover T 2'6" 3* 4' 5' 6' V 8' 9' 10' 12' W 16' 18' 20' TYPE OF SOIL GRANULAR material SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY saturated CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND t ORAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY ORANULAR MATERIAL SAND s ORAVEL SATURATED TOP SOIL CLAY SATURATED CLAY ORANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY ORANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 2'9" 450 670 770 020 8 30 830 880 1000 1040 1090 1120 1150 1180 1230 1270 n2o 1360 1320 1410 UVD 1340 1390 1430 1340 1630 1690 1740 1390 1700 1790 I860 1930 1710 1820 1920 2020 2100 1770 1910 2020 2 I'30 2220 1910 2090 2220 2360 2520 2020 2270 2410 2570 2800 2110 2 360 2540 2720 3000 Z180 2450 2630 y> 3 ISO 2210 2520 "TOo 3000 3290 3'0" 3'3" 3'4" 3'9" 4'0" WIDTH OF TRENCH 4'3" 4*6'' 4'9M 5'0" 880 1110 1170 1210 1240 1300 1330 1380 1440 1480 1530 1460 1570 1620 1730 1780 1630 1750 1840 1910 1980 1780 1890 2000 2080 2150 1890 2000 2160 2270 2380 2030 2160 2300 2410 2520 2210 2 36C 2540 2700 2860 2320 2570 27 50 2920 3130 2450 2700 2920 3120 3400 2540 2860 3030 3300 3620 2600 2930 3130 3450 3000 1200 1270 1100 1320 1460 1560 1610 1650 J710 1650 1710 1780 1840 1900 1840 1970 2030 2160 2220 1990 2120 2240 2320 2410 2160 2280 2410 2310 2600 2280 2430 2570 2700 2810 2470 2670 28 50 2980 3170 2660 2920 3110 3300 3520 2810 3090 3320 3550 3800 2920 3250 3490 5740 4080 2980 3360 3610 3930 4 320 1320 1620 1690 1760 JB50 1910 2000 2060 2100 WO 2130 2210 2350 2430 2210 2350 2470 2570 2660 2400 2530 2680 2760 2850 2560 2710 2850 2970 3090 2790 3000 3190 3350 3480 3010 3230 3460 3680 3900 3150 3460 3680 3940 4200 3310 3680 3930 4190 4560 3410 3820 4090 4410 48 20 1740 1760 2030 2110 2200 2240 2360 2410 2480 2560 2450 2570 2700 2700 2900 2620 2780 2920 3040 3120 2780 2950 3120 3260 3360 3120 3290 3510 368 0 3800 3320 36 30 3850 4050 4250 3510 3850 40B0 4390 4640 3710 4050 4390 4640 4980 3830 4220 4560 4880 5320 1760 2200 2460 2550 2640 2590 2780 2880 3080 2880 3010 3170 3320 3420 3070 3260 3360 3460 3550 3360 3550 3840 4030 4220 3650 4030 4220 4420 4610 3940 4220 4510 4800 5090 4130 4510 4800 5090 5470 4260 4710 5050 5380 5820 2640 2930 3040 3080 3140 3250 3450 as io 3320 3510 3690 3860 3950 3750 3970 4180 4 340 4510 4080 4340 4620 48 30 5050 4290 4660 4960 5200 5480 4530 4940 5200 5510 5960 4730 5200 5570 5920 6350 3080 3280 3510 3520 3770 3890 3950 4010 4 250 4500 4620 4830 4370 4620 4980 5230 5470 4620 5100 5350 5590 1830 4980 5340 5720 6080 6440 5180 5600 6080 6440 6850 3510 3930 3950 3950 4390 4660 4830 4650 4830 4790 5090 5390 5630 5700 5090 5470 5820 6090 6360 5420 5820 6230 6500 6900 5630 6170 6530 6960 7450 5100 5490 5700 5490 5850 6240 6540 6580 5790 6300 6660 6990 7290 6120 6620 7080 7500 -''950 Bold-face numbers represent EARTH-LOAD ot the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detoiled explanation. 5'3" 4830 5460 5700 5950 6350 6580 6200 6750 7100 7460 6620 7100 7610 8000 8330 S'f 5.9" t'O" 6'3" i _______i_______ !_________ ii i ' 1 5700 6390 6580 6S80 67 50 7 190 7460 7260 7460 7460 7080 7620 8100 8330 7620 8130 S3X *8120 8330 8330 CTD032908 21 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Cover 2' 2'6" 3' 4' 5' 6' T 8' 9- 10' 12' 14' 16' 18' 20' TYPE OF SOIL GRANULAR MATERIAL SANO & GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY saturated CLAY GRANULAR MATERIAL sand s gravel saturated top soil CLAY SATURATED clay granular material SAND A GRAVEL saturated top soil CLAY SATURATEO CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATEO CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATEO CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATEO CLAY GRANULAR MATERIAL sand a gravel SATURATEO TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO A GRAVEL SATURATEO TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND t GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND A GRAVEL SATURATED TOP SOIL CLAY SATURATED CL AY GRANULAR MATERIAL SAND t GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 3'0" 450 690 920 1110 U70 1210 1240 1)00 1)30 1)60 1440 1460 13)0 1460 1 570 1620 17)0 1760 16)0 17)0 1640 1910 1980 1780 1690 2000 2080 21)0 1890 2000 2160 2270 2)60 2030 2160 2300 2410 2)20 2210 2)80 2)40 2700 2860 2320 2570 27)0 2920 31)0 24)0 2700 2920 3120 )400 2540 2860 3030 3300 )62Q 2600 29)0 31)0 34)0 3800 3'3" 3'4" 1200 |0 1)00 1390 1460 1)60 luiC 1650 1710 1650 1710 1780 1640 1900 1640 1970 2030 2160 2220 1990 2120 2240 2320 2410 2160 2280 2410 2510 2600 2280 2430 2570 2700 2810 2470 2670 2850 2980 3170 2660 2920 3110 3)00 3)20 2810 3090 )320 35)0 3800 2920 3250 3490 3740 4080 2980 3360 3610 )930 4)20 1310 1380 1620 1690 1760 1810 16S0 1850 1910 2000 2060 2100 1990 2130 2210 2)50 24)0 2210 2)50 2470 2570 2660 2400 2530 2680 2760 28)0 2)60 2710 2850 2970 3090 2790 3000 3190 33)0 3480 3010 32)0 3460 3680 3900 3150 3460 3680 3940 4200 . 3310 3680 39)0 4190 4560 3410 )820 4090 4410 4820 3'9" 4'0" 8*3*' WIDTH OF TRENC H 4'4" 4'9'' 5'0" 5'3" S`6" 5'9" '(>' 6'3" -JlH___ 1380 1740 1820 1850 1950 2(130 2120 2190 2240 2330 2440 2360 2410 2480 2580 2450 2570 2700 2780 2900 2620 2780 2920 3040 3120 2780 2950 3120 3260 3360 3120 3290 3510 3680 3800 3320 46)0 3850 40)0 4250 3)10 3850 4080 4)90 4640 3710 4050 4)90 4640 4980 38 30 4220 4560 48 80 5320 2210 2320 2460 2550 2630 2750 2790 2590 2780 2880 3070 1170 2880 3010 3170 3)20 3420 3070 3260 3)60 3460 3550 3)60 3550 3840 40 30 4220 3650 40 30 4220 4460 4610 3940 4220 4)10 4600 5090 41)0 4510 4800 5090 5470 4260 4710 3050 5380 5820 2320 2640 27)0 2790 2790 2930 3160 3260 3040 3140 3260 3210 3760 3140 32)0 34)0 3280 ),?n 36)0 3660 3730 3)80 3690 3)20 3510 3730 3)20 3770 39 30 4060 3690 3860 3970 37)0 38 90 4130 4200 4010 4200 4390 3970 42)0 4660 4100 4 340 4)00 4620 4910 *i060 4510 4080 4060 4370 5140 4790 4 340 4620 48 30 50)0 4290 4660 4620 4980 5 230 5470 4620 5100 5090 5390 5630 5820 5090 5470 4960 5 350 5820 5200 348Q-_ _ 030 4940 5 590 181 4980 5340 6090 6360 5420 3820 5200 5510 5960 47 30 5 200 5720 6230 6080 6500 6440 , 6900 5180 56 30 5600 6170 5570 6080 6530 5920 6350 6440 68 50 6960 7450 3730 40)0 4200 4200 4650 4950 5140 4960 5140 5140 5100 5490 5760 6000 6080 5490 5850 6240 6540 67 50 1290 6)00 6660 .m 7290 6120 6620 7060 7500 2910 5460 5790 6080 5810 6080 5950 6350 6710 | 7020 6390 6790 7020 .6280 67 50 ?iao 7540 7840 6620 7180 7610 0000 8500 . 6750 2190 ! _762Q_ 7950 7080 7620 0100 0530 8890 6000 6750 7020 7020 2260 7700 79 SO 7780 7950 7620 - 8120 8130 8640 8650 8890 8890 7950 8670 8890 8890 Bold*foce numbers represent EARTH*LOAD ot the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detailed explanation. CTD032909 24 inches--pipe size EARTH LOAD (Ibs./lin. ft.) Depth of Giver r 2'6" V 4* 5' 6' V 8' 9' io12' 14' 16' 18' 20' TYPE OF SOIL GRANULAR material SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CL AT GRANULAR MATERIAL SANO & GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURA TEO TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL clay SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL Saturated top soil CLAY SATURATED CLAY granular material SAND ft GRAVEL saturated TOP SOIL CLAY SATURATED CLAY granular material SANO t GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SANO ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY GRANULAR MATERIAL SAND ft GRAVEL SATURATED TOP SOIL CLAY SATURATED CLAY 3'4" 3'9" 430 700 960 mo 1370 14 10 M40 1470 1620 1690 1760 1810 18S0 1850 1910 2000 2060 2100 1990 2130 2210 2350 2430 2210 2350 2470 2570 2660 2400 2530 2o80 2760 2850 2560 2710 2850 2970 3090 2790 3000 3190 3350 3480 3010 3230 3460 3680 3900 3150 3460 3680 3940 4200 3310 3680 3930 4190 4360 3410 3820 4090 4410 4820 1430 14S0 1740 1820 1890 1940 2020 2030 2120 2190 2240 2310 2240 2360 2410 2480 2580 2450 2V0 2700 2780 2900 2620 2780 2920 3040 3120 2780 2950 3120 3200 3 360 3120 3290 3510 3680 3800 3320 3630 3850 4050 4250 3510 3580 4080 4390 4640 3710 4050 4 390 4640 4980 3830 4220 4560 4880 5 320 4'0" 4'3'' 4'6" 1480 1820 1920 2020 1950 2020 2020 2210 2300 2400 2500 2550 2460 2550 2630 2~50 28 00 2590 2780 2880 3070 3170 2880 3010 3170 3320 3420 3070 3260 3300 3460 3550 3360 3550 3840 4030 4220 3650 40 30 4220 4420 4610 3940 4220 4510 4800 5090 4130 4510 4800 5090 5470 4260 4710 5050 5380 5820 or- C7 I-T 2340 24*'0 2550 2640 2750 2880 2050 3040 2930 3040 3140 3210 3340 3140 3250 3450 3580 3690 3320 3510 3690 3860 397 0 3750 4180 4340 4510 4080 4340 4620 48 30 5050 4290 4660 4960 5200 5480 4530 4940 5200 5570 5960 4730 5200 5570 5920 6350 2500 2550 2820 2990 3070 3160 3280 3400 3520 3600 3280 3520 3650 3890 4010 3520 3*70 3890 4130 4250 4010 4250 4500 4620 4860 4370 4620 4980 5230 54*0 4620 5100 5350 5590 58 30 4980 5350 5720 6080 6440 5180 5600 6080 6440 6850 4'9" WIDTH OF TRENCH 5'0" 5'3" 5'4" 5'9" 2550 3030 70 3070 3330 34*0 3600 3600 3660 3700 3930 4010 4120 3930 4060 4310 44^0 4600 4 390 4660 4930 5060 5230 4*90 5090 5390 56 30 58 20 5090 54',0 5820 6090 6360 54 20 5820 62 30 6500 6900 5630 6P0 6530 6960 7450 3900 4080 4120 4050 4350 4500 4640 4650 4950 5190 5400 5550 5100 5490 5760 6000 6240 5490 5850 6240 6540 6750 5790 6300 6660 6990 7290 6120 6620 7080 7500 7950 4120 4 500 4640 4960 5 290 5560 5700 5460 5790 6120 6280 6620 5950 6350 6710 7050 7 260 6280 6750 7180 7540 7840 6620 7180 7610 8000 8500 4640 5260 56 30 5700 5810 6170 6530 6750 6390 6790 7150 7440 7810 67 50 7190 7620 7990 8 350 7060 7620 8100 8530 8890 56*0 5700 6190 6550 6750 6750 7140 7540 7810 7260 7700 8130 8530 8860 7620 8130 8650 9130 9520 Bold-fa ce numbers represent EARTH*LOAD at the transition width. Refer to Sec. 3.2.2 (b) Transition Width for detailed explanation. 6'0" 6'3`* 4'4" 4'9" ________ !_______ i i ________ _______ 1 5700 6520 6750 6660 6750 71 30 7600 78 10 7500 7810 7760 78 10 7780 8210 8640 8860 8120 8640 9200 9630 9910 8160 8670 8860 8670 9140 97 50 9910 8620 8770 8800 6860 9130 97 30 9910 9400 9910 70" 8860 9920 CTD032910 CONCENTRATED SUPERIMPOSED LOADS (LBS/LIN. FT) SINGLE WHEEL LOAD = 10,000 LBS* 70 30 70 20 40 30 Selection Table by the desired Impact Value. 06 o-.s O CM m OO a>CO CM 8 oo 8 in o- CM Oo N. r- Oo ooO oOo O o coT" 0> CM in in m O) r- M* CM CM O oo m CM V--O CM O in o o o co oo m o Tf co o 'MCM o oO CD xr O CM oo CD r--o o O m CM CO <3> CO CM OOO o O r-CO 00 CD CO CM CO CD tu X o z GC UJ in K UJ 2 < Q UJ 0. a oo CD CD 00 CD o oO o r- o> CM T* T-- oo OOo CM CO CM oo CO 8 in CM oo r- o oo Ooo CD O N- oo r*. m mco CM r*. T" oO O o Is- in CO T-- ooo o in CO 1--oo O CD o M' o CO O CM O CM O CM CM o CO O) oo h T" CD in oOo T" in CO CM oOo o 00 in CM O T-- O T* ' oo> N. S8 in o Oo CO h- CM CM 9 o CO o oo CD tJ- oO O M- oo CD rf CO CM oOo o o CD CO CO T" o oo OOo CD o> m CD to O 00 rr CO CM T1-- Ooo o O' CO CM T~ o o 5 Q. O *m o 1 CO 1 Oi o t VCM CM CO m o 1 ooo 1I 0 1 0 1 CD 00 b CM CD o T~ CM -<CD c -(o0 o<0 Cl 3 *o "oa5>* c0 c o c .0e) o CO o Q o CO CQ0. E 8 c .CcO co o TCCJOO o o c oc o O 28 g So'-'LL II II II 11 Is (0 -- o ~~ > o s =o- CM Tf 9. CTD- # CO3aO>' oco O CQO. co *o .a S ^ c o ~ o , CO CTD032911 EXAMPLES OF PRACTICAL SYSTEM FLUID TRANSMISSION (FT) ASBESTOS CEMENT PIPE Section 41 TYPICAL DESIGN EXAMPLES Example 1 Select the proper class FT Pipe to satisty the following conditions. Pipe size -- 24 inch Operating pressure -- 100 psi Surge pressure -- 50 psi Type of soil -- Clay Depth of cover -- 5 feet Width of trench -- 3.5 feet Bedding -- Class C Safety factor (Hydro) -- 2.0 Safety factor (Crush) -- 1.5 Solution NATURAL GROUND SURFACE (a) Solve ratio Bd/Bc Bd = 3.5 feet Be is unknown* 'Note -- When Be is unknown for FT design problems, use the B.O.D. for Class FT70 as initial assumption. Therefore, Be = 28.22 = 2.35 Bd/Bc = (L5 = 1.49 12 2.35 from Figure 7, Section 3.2.2(b) determine the transition value of Bd/Bc where H/Bc = _5_= 2.13 2.35 p = 2.35 =1.0 2.35 rsd = 0.70 (assumed) (rsd) P = 0.70 Answer Bd/Bc =1.75 Since the actual value (1.49) is less than the transition value (1.75) the trench condi tion prevails. Use Equation 5. (b) Determine earth load (W^) from Equation 5 Section III, Page 7. WE = Cd % Bd2 CTD032912 From Figure 4 Section 111 determine Cd for clay where H/Bd =j>_ = 1.42 3.5 Answer Cd = 1.23 WE = 1.23 x 120 (3.5)2 WE = 1808 lbs./ft. Note: Steps (a) and (b) can be eliminated by using the earth load table in Section III for 24inch pipe and clay soil. The value given in the table is 1810 lbs./ft. * (c) Determine Wy from Equation 3 Section III. WT = (WE + WS) s.F. B?R From Section 111 Table 2 for Class C Bedding and 24-inch Pipe B. F. = 1.5 WT = (1808 + 0) 1.5 1.5 WT = 1808 lbs./ft. (d) Determine pyfrom Equation 2 Section III. PT = (P0 + P8> s- FPy = (100 + 50) 2.0 Pj = 300 psi (e) From the combined loading curve for 24-inch FT Pipe, determine the point of intersection for the values of pT = 300 psi, and WT = 1808 lbs./ft. Select that class of FT Pipe whose combined loading curve is above this point of intersection. The answer is FT40. Note: Since the B.O.D. for the FT Pipe selected is less than the value of B.O.D. assumed in step (a); i.e., 2.23 ft. < 2.35 ft., the design calculation is acceptable. If it had been greater than the assumed value, the design would have to be recalculated utilizing the B.O.D. of the selected Class FT40 pipe. (f) The actual safety factors resulting from the selection of FT40 Pipe for the above example are as follows: Hydrostatic Pressure -- From the combined loading curve the maximum pressure (py) = 345 psi for an external load (Wy) = 1808 lbs./ft. Therefore S.F. = 345 = 2.30 150 Crush -- From the combined loading curve, the maximum allowable crush (Wy) is 2500 lbs./ft. when the total internal pressure (py) = 300 psi. Therefore S. F. = Wy x B. F. (WE + ws) S. F. = 2500 x 1.5 (1808 + 0) S. F. = 2.07 CTD032913 Example 2 Select the proper class FT Pipe to satisfy the following conditions. Pipe size -- 14 inch Operating pressure -- 100 psi Surge pressure -- 50 psi Type of soil -- clay Bedding -- Class C Trench Width -- 4 feet Depth of cover -- 6.0 feet Wheel load - 10,000 lbs. Impact factor -- 1.0 Safety Factor (Hydro) -- 2.0 Safety Factor (Crush) -- 1.5 Solution (a) Solve ratio Bd/Bc Bd = 4.0 feet Be is unknown Use B.O.D. for Class FT70 as initial assumption. Therefore Be = 16.41 = 1.37 12 Bd/Bc = 4.0 - 2.92 1.37 From Figure 7, Section 3.2.2(b) determine the transition value of Bd/Bc where H/Bc - 6.0 - 4.38 1.37 p = T37 = 1.0 1.37 rscl = 0.70 (assumed) (rsd) P = 0.70 Answer Bd/Bc = 2.21 Since the actual value (2.92) is more than the transition value (2.21), the positive projecting embankment condition prevails. Use Equation 6. (b) Determine earth load (WE) from Equation 6 Section III where WE = Cc we Bc2 Since rsd is 0.70 and H/Bc > 1.3, use Equation 7 for Cc where Cc = 1.892 H/Bc - 0.96 Cc = 7.33 WE = 7.33 x 120 x (1.37)2 WE = 1651 lbs./ft. CTD032914 Note: Steps (a) and (b) can be eliminated by using the earth load in Section III for 14-Inch pipe and clay soil. The value given in the table is 1660 lbs./ft. (c) Determine superimposed load (W$). In this instance Ws = Wsi From Equation 11 Section III. ws = wsl = cs jv. L L = *3.0 feet 'Note -- For FT Pipe design the effective length (L) is always equal to 3.0 feet. From Section III Table 1 determine Cs where Bc/2H = T37 = .114 12 L/2H = 3_= .25 12 Answer Cs = .051 ws = Wgi = .051 x 10,000 x 1.0 3 Ws = Ws1 = 167 lbs./ft. Note: Step (c) can be eliminated by using the concentrated load table in Section III. The value given in the table is 170 lbs./ft. (d) Determine W-p from Equation 3 Section 111 WT = (WE + ws) S. F. bTr From StJtion ill Table 2 for Class C Bedding and 14 inch pipe B.F. = 1.4 WT = (1651 + 167) 1.5 1.4 WT = 1948 lbs./ft. (e) Determine pT from Equation 2 Section III. PT = <po + Ps> s-pp-p = (100 + 50) 2.0 p-p = 300 psi (f) From the combined loading curve for 14 inch FT Pipe determine the point of intersection for the values of p-p = 300 psi and Wj = 1948 lbs./ft. Select that class of FT Pipe whose com bined loading curve is above this point of intersection. The answer is FT45. (g) The actual safety factors resulting from the selection of FT45 Pipe for the above example are as follows: CTD032915 Hydrostatic pressure -- From the combined loading curve the maximum pressure (Py) = 337 psi for an external load (WT) = 1948 lbs./ft. Therefore S. F. = 337 = 2.25 150 Crush -- From the combined loading curve, the maximum allowable crush (Wy) is 2300 lbs./ft. when the total internal pressure (PT) = 300 psi. Example 3 Therefore S. F. = WT x B. F. (WE + Wg) S. F. = 2300 x 1.4 (1651 + 167) S. F. = 1.77 Select the proper class FT Pipe to satisfy the following conditions. Pipe Size -- 10 inch Operating Pressure --100 psi Surge Pressure -- 50 psi Type Soil -- Clay Depth of Cover -- 5.0 feet Bedding -- Class C Impact Factor -- 1.0 Safety Factor (Hydro) -- 2.5 Safety Factor (Crush) -- 2.0 150 LBS/SQ FT CONCRETE PAD 16' x 32' CENTERED VERTICALLY OVER THE PIPE ORIGINAL GROUND SURFACE 10" DIA Solution (a) Determine earth load from Equation 6 Section III for embankment condition. WE = Cc we BC2 Bc = 11.85 (FT70 assumed) = .99 12 from Equation 7 C. = 1.892 J- 0.96 C Bc Cc^-892 *^-0-96 Cc = 8.60 WE = 8.60 x 120 x (.99)2 WE = 1011 lbs./ft. Note: Step (a) can be eliminated by using the earth load table in Section III for 10 inch pipe, clay soil and embankment. The value given in the table is 1010 lbs./ft. CTD032916 (b) Determine superimposed load (Wg). In this instance Wg = Wg2 from Equation 12 Section III. WS - WS2 ~ CS ps F Bc From Section III Table 1 determine Cs where D = 16 = 1.60 2H 2x5 M = 32 = 3.20 2H 2x5 Answer - Cg = .910 Wg2 = .910 x 150 x 1.0 x .99 Wg2 = 135 Ibs./ft. (c) Determine WT from Equation 3 Section III Wt = (vvE + ws) s. f. B.F. From Section III Table 2 for Class C bedding and 10 inch pipe B.F. = 1.3 WT = (1011 + 135) 2.0 1.3 WT = 1763 Ibs./ft. (d) Determine P jfrom Equation 2 Section 111 PT = (P0 + Ps> S. F. PT = (100 + 50) 2.5 P-p = 375 psi (e) From the combined loading curve for 10 inch FT Pipe, determine the point of intersection for the values of P-p = 375 psi and W-p = 1763 Ibs./ft. Select that class of FT Pipe whose com bined loading curve is above this point of intersection. The answer is FT 50. (f) The actual safety factors resulting from the selection of FT 50 pipe for the above example are as follows: Hydrostatic Pressure -- From the combined loading curve the maximum pressure (P-p) = 420 psi for an external load (Wj) = 1763 Ibs./ft. Therefore S. F. = i^O = 2.80 150 Crush -- From the combined loading curve, the maximum allowable crush (W-p) is 2250 Ibs./ft. when the internal pressure (P-p) = 375 psi. Therefore S. F. = W-p x B. F. <WE + Wg) s. F. = 2250 x 1,3 (1011 + 135) S. F. = 2.55 CTD032917 CERTAIN-TEED COMBINED LOADING CURVES FOR 6 INCH FT PIPE CTD032918 CERTAIN-TEED COMBINED LOADING CURVES FOR 8 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032919 CERTAIN-TEED COMBINED LOADING CURVES FOR 10 INCH FT PIPE CTD032920 CERTAIN-TEED COMBINED LOADING CURVES FOR 12 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032921 CERTAIN-TEED COMBINED LOADING CURVES FOR 14 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032922 CERTAIN-TEED COMBINED LOADING CURVES FOR 15 INCH FT PIPE C1D032923 CERTAIN-TEED COMBINED LOADING CURVES FOR 16 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032924 CERTAIN-TEED COMBINED LOADING CURVES FOR 18 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032925 CERTAIN-TEED COMBINED LOADING CURVES FOR 20 INCH FT PIPE W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) CTD032926 CERTAIN-TEED COMBINED LOADING CURVES FOR 21 INCH FT PIPE 5,000 10,000 W-MINIMUM CRUSH STRENGTH-LBS./FT. (3 EDGE BEARING) 15,000 CTD032927 CERTAIN-TEED COMBINED LOADING CURVES FOR 24 INCH FT PIPE CTD032928 HYDRAULICS, WATER HAMMER AND CONTROL FLUID TRANSMISSION (FT) ASBESTOS CEMENT PIPE Scction:6-1 INTRODUCTION To design a hydraulic system there are a number of conditions to be determined. These conditions are: (a) Flow rate (b) Pipe size (c) Velocity (d) Pressures (operating, static and surge) (e) Friction loss (f) Elevation Most of the conditions are commonly determined by the Hazen and Williams Formula V = 0.0131 CH0-54 d0-632 Q = 0.0103 CH0'54 D2-63 Where V = velocity of the fluid in the pipe, feet per second C = roughness coefficient of the pipe. For Asbestos-Cement Pipe, C = 140. H = head loss due to friction, feet per 1,000 feet of straight pipe. D = diameter of pipe, feet. O = rate of flow, cubic feet per second The Hazen and Williams Formula is difficult to use for ordinary calculations, therefore, a nomograph of the formula is presented in figure 1, page 61. It is based on the roughness coefficient (C) for Asbestos-Cement Pipe, equal to 140. By proper utilization of the nomo graph the following may be determined. (a) Loss of head (H) and velocity of flow (V) for a known pipe size (D) and fixed rate of flow (Q). (b) Pipe size (D) for known values for both loss of head (H) and rate of flow (Q). OPERATING PRESSURE Operating pressures are pressure heads which occur in normal piping systems under steady operating conditions. They occur in both gravity flow systems and pumped systems. For deter mining these normal pressure heads the general energy equation, better known as Bernoulli's theorem is utilized, which is as follows: h^ + z^+V^ 2 = h2 + z2 + V22 + hf 2g 2g" (eq. 1) CTD032929 Where hf = pressure head at reference point 1, ft. z-| = elevation head at reference point 1, ft. Vi = velocity of flow at reference point 1, ft./sec. 9 = acceleration due to gravity, 32.2 ft./sec.2 h2 = pressure head at reference point 2, ft. Z2 = elevation head at reference point 2, ft. V2 = velocity of flow at reference point 2, ft./sec. hf = friction head, ft. Example: As shown in figure 2 water is flowing by gravity from a reservoir at a rate of 3500 gallons per minute to a distribution system. The required pressure at point 2 is 100 psi (230'). Determine the size of pipe required. CTD032930 Solution: Determine allowable head loss 300' - 230' = 70' Allowable head loss per 1000 ft. of pipe = 2 ft./1000 ft. 35' Enter nomograph figure 1 using a head loss of 2 ft./1000 ft. and C of 140. From the nomo graph it is found that 20-inch pipe is required. FIGURE 2 STATIC PRESSURE Static pressure is the pressure at a point in the undisturbed stream of a liquid. The static pres sure is usually calculated from a datum or reference line and is a function of height and specific weight of the liquid. The datum is usually a point in the stream where the pressure is known. Static pressures are calculated from the equation p2 - pi =7h or p =7h 144 144 (eq. 2) Where p = pressure difference, lbs./in.7 T = specific weight of the liquid, lbs./ft.3 h = elevation, feet (commonly referred to as pressure head, expressed as feet of water, inches of mercury, etc. Example: Assume in figure 2 a valve at point 2 is closed and the water is in static equilibrium. Determine the pressure at point 2 Using eq 2 P 2 -- P1 = I1 144 p2 - 0 = 62.4 x 300 144 P2 = 130 psi SURGE PRESSURE OR WATER HAMMER Surge pressure, commonly called water hammer, is a pulsation of pressures above and below the operating or normal pressure, resulting from rapid deceleration or acceleration in the velocity of a liquid flowing through a pipeline. Surge pressure is of large magnitude and short CTD032931 duration. The main causes of water hammer or surge are the quick opening or closing of valves or gates and the sudden starting, stopping or variation in speed of pumps. The effect of water hammer is increased stress on pipe walls and fittings, which is in excess of the stress caused by the normal operating pressure. Like any mass in motion, water flowing through a pipeline possesses both static and kinetic energy. Any change in the velocity of a moving mass will produce a force. If both the pipeline and the water are assumed to be incompressible, a change in velocity relative to time, the acceleration or deceleration of the mass, would produce a force equal to F = MA, Where F = the force. M = the mass of the material. A = the change in velocity relative to time or the acceleration or deceleration of the mass. Since neither the water nor the pipe are actually incompressible, the formula F = MA is not ac curate for determining the force created by surge pressures. Factors such as the elasticity and frictional resistance of the material must be incorporated into an equation that will give the actual force or increase in pressure caused by water hammer. Because there are so many variables involved in solving for the actual value of water hammer, a number of empirical equa tions have been formulated for different conditions. An actual theoretical equation involves such factors as the speed of sound waves in the liquid, roughness factors and elasticity of materials and are not practical for normal engineering use. However, for the determination of water hammer in most systems, the elastic wave theory has been proven to be the most accurate, yet still being relatively easy to use. A discussion of the elastic wave theory is given below. ELASTIC WAVE THEORY The maximum increase in pressure due to the change in velocity of water is equal to h Where h a v g the increase in pressure (feet of water). the velocity of pressure wave in ft./sec. the velocity of flow during normal conditions in ft./sec. acceleration due to gravity (32.2 ft./sec.2). ay 9' When interference is placed in a flowing line or the velocity is changed in some manner, a pres sure wave is induced in the line. The velocity of the pressure wave is the speed of sound in water, damped by the physical characteristics of the pipeline. The actual velocity of the pressure wave (a) is equal to 4660 ft./sec. 1 + Kd Where Ee 4660 = the speed of sound in water in ft./sec. K = the modulus of compression for water (300 x 103 psi). d = the internal diameter of the pipe in inches. E = the modulus of elasticity of the pipe material (3.4 x 106 psi for A-C Pipe), e = the wall thickness of the pipe in inches. As the above formula may become cumbersome for repeated use, pressure wave velocities for various ratios of pipe diameter to wall thickness d are given in Table 1. CTD032932 d/e Pressure Wave Velocities 5 3883 10 3400 15 3054 20 2807 25 2603 30 2440 Table 1 -- Pressure Wave Velocities for Corresponding ratios of Pipe Diameter to Wall Thickness (|). The pressure wave travels along the pipeline until It reaches a reflection boundary such as a reservoir and is reflected back to its initial or starting point. If by the time the reflected wave reaches its starting point, flow is completely stopped, maximum water hammer occurs and, as was stated above, is equal to ^-.The total length of time it takes for the wave to travel to the reflecting surface and back to its initial point is simply 2L_, a Where L = the distance between the initial point and the reflecting surface in feet, a = the wave velocity in ft./sec. This time is called the critical time. If flow stoppage is obtained within this time, maximum water hammer will occur. By regulating the time it takes to stop flow, the maximum water hammer can be proportionately reduced. There are charts and graphs available for determining the length of time necessary to stop flow for various valves and flow conditions that will give a calculated acceptable water hammer value. Given below is a graph which can be used to find the minimum time required for flow stoppage to obtain a given percent of the maximum water hammer force ^-.To use the graph a value for K, the pipeline constant must be obtained. The formula for K is given below: k = |V 2gho Where K = pipeline constant. a = velocity of the pressure wave in the line (ft./sec ). V = velocity of flow under normal conditions (ft./sec.). ho = operating pressure in the line under normal conditions (feet of water) g = acceleration due to gravity (32.2 ft./sec.2). Figure 3 - At right. Approx imate tests of various types of valves showing the flow vs the time of valve stem travel (tr> Open ime -- ( Tf ) * Effective For Full Cot Off Uniformly ot Monffigm Rote Full Areo Go t a . Tt 39 2 b-- Reduced Areo Globe, 51 7 % Tt------*| |-------- Full Areo Cone, s *8 67Tt----' -j Percent Time of Valve Stem Trovfl - Tt Cloeed P e rc e n t o f >> o V/g (ln t o n to n e o u * C lo s u re ) P ercent F u ll Flow (Reprinted from May, 7958 Issue, Consulting Engineering) CTD032933 The desired allowable surge pressure is then computed as a percentage of the maximum surge pressure. Entering the graph with the pipe factor K and the percentage of the maximum surge pressure desired the effective time of valve closure can be found. The effective time is given in units of so the value obtained from the graph must be multiplied by the critical time, 2k to get the total effective time in seconds. A The actual closing time for valves is approximately twice the effective time. Manufacturer's data for a particular valve should be checked to obtain the accurate relationship of effective closing time to actual closing time. As was previously stated, the common causes of water hammer are the sudden opening or closing of valves, and the starting or stopping of pumps. By controlling the time in which valves are opened or closed, and pumps started and stopped, the rate of velocity change can be con trolled so that no great force is imposed on the pipeline or appurtenances. Control of pumps and valves is necessary if water hammer is to be minimized. There are, however, control devices such as check valves and air chambers which can be incorporated into the line to compensate or alleviate the force created by water hammer. A description of the more common devices for alleviating the forces associated with water hammer are given below. The use of control devices as opposed to strengthening pipe and fittings is an economic decision based on appropriate costs. CONTROL Relief Valves -- Relief valves are actuated by a slight increase in pressure. They open wide in a few seconds in order to discharge water to waste to relieve an increase in pressure. Air Inlet Valves -- Used to control negative surges. They are designed to open at a slight pres sure, below normal, to admit air and avoid the creation of a partial vacuum. Air Chambers -- Used to relieve either positive or negative surge pressures. They must be filled with air at the time they are called on to function; therefore, they should be set on a high point on the pipeline to permit the accumulation of air in the chambers. Surge Tower -- Used for either positive or negative surge. They are connected to a pipeline to take water from it in the event of positive surge or to deliver water to it during negative surge. Flywheel on a Pump -- Water hammer or surge resulting from the sudden cutting off of power from a pump may be diminished by increasing the inertia of the moving parts of the pump so that, acting as a flywheel, the pump is brought more slowly to a stop. Reversal of Pump -- When a pump stops operating, if it is able to reverse itself without damage, the positive surge pressure set up will be lessened. Since there are many appurtenances and varying flow conditions associated with a pipeline system, the calculations for determination and control of water hammer can be quite complex. Analysis and treatment of the problem must be based on experience and judgment. Included in this section was a discussion of the elastic wave theory, one of the most common methods for determining the magnitude of water hammer. The discussion of the elastic wave theory was limited to its application to lines containing valves and gates. The determination of water hammer for lines containing pumps or turbines is very complex and cannot be adequately dis cussed within the scope of this manual. CTD032934 CertainTeedH CertainTeed Regional Sales Offices Eastern Regional Sales Office 750 Swedesford Rd P.O. Box 860 Valley Forge, PA 19482 (215) 341-6820 TWX: 510-668-1912 Mountain Regional Sales Office 5500 S. Syracuse Circle Suite 114 Englewood, CO 80111 (303) 773-2760 TWX: 910-935-0880 Pacific Regional Sales Office 2100 Avalon Street P.O. Box 1389 Riverside, CA 92502-1389 (714) 369-0520 TWX: 910-595-2672 Southwest Regional Sales Office 4151 Southwest Freeway Suite 670 Houston, TX 77027 (713) 960-1470 TWX: 910-881-1652 FT-1071 () cTD032935 Printed In U.S.A.