Document rpN1B6QG0nJ1K3MRM0e4adbar
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Date(s): Media Program: Regulatory Program(s)
August 9, 2024 Water NPDES Stormwater/ CWA 402
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number Facility Contact 1:
Facility Contact 2:
Facility Contact 3:
Facility Contact 4:
Facility Contact 5:
Turner Construction Company
Deloitte (Project Star)
East of J T Ottinger Rd & Deloitte Way
Westlake, TX, 76262
8080 Park Ln, Suite 400
Dallas, TX 75231
Tarrant
214-721-8400
Joe Hudler
Senior Project Superintendent
jhudler@tcco.com, 972-670-1404
Frank Schautteet
Senior Project Superintendent
fschautteet@tcco.com, 214-687-1828
Michael McLaughlin
Senior Project Manager
mmclaughlin@tcco.com, 469-744-3779
Neil Brittain
Project EHS Manager
nbrittain@tcco.com, 972-880-5373
Jared Seago
Business Unit EHS Director
jseago@tcco.com, 214-608-8770
FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC:
N/A TXR1592MU N/A 236220 1542
Personnel participating in inspection:
Destinee Agwuna
6EN-WR
Carol Johnson
6EN-WS
Inspector/Enforcement Officer Inspector/Enforcement Officer
EPA Lead Inspector Signature/Date
DESTINEE AGWUNA Date: 2024.09.16 09:57:46 -05'00' Digitally signed by DESTINEE AGWUNA
Destinee Agwuna
Date
Supervisor Signature/Date
ANTHONY LOSTON Date: 2024.09.16 09:54:36 -05'00' Digitally signed by ANTHONY LOSTON
Anthony Loston
Date
6ENFORM-019-R8.2 (02/12/2020)
1
Section I - INTRODUCTION
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
PURPOSE OF THE INSPECTION
U.S. EPA Region 6 inspectors Destinee Agwuna and Carol Johnson arrived at Deloitte (Project Star) in Westlake, TX on August 9, 2024, at approximately 10:30 AM for an unannounced Compliance Evaluation Inspection (CEI). The inspectors met with site representatives Joe Huddler, Frank Schautteet, Michael McLaughlin (Senior Project Superintendents), and Neil Brittain (Project EHS Manager) at the field office south of the intersection of Capital Parkway and Deloitte Way. We presented our credentials to the site representatives and informed them that a stormwater inspection was being performed to assess site conditions in response to a citizen complaint as well as to determine site compliance with the Texas Pollutant Discharge Elimination System (TPDES) program and the Construction General Permit (CGP), in accordance with the Clean Water Act (CWA).
The generation of this report is based on observations made by the inspectors, information supplied by Turner Construction Company representatives (the permittee), and records and reports maintained by the permittee, the state of Texas, and the U.S. EPA.
FACILITY DESCRIPTION
Deloitte (Project Star) is a commercial construction site operated by Turner Construction Company (TCEQ permit: TXR1592MU). The site is located east of J T Ottinger Road and Deloitte Way in Westlake, TX, and totals 224.5 acres with approximately 72.44 acres of land being disturbed for construction activities (denoted in Aerial Image 1 below). Coordinates to the site are in the vicinity of Latitude 3258'45.4" North, Longitude 9712'19.1" West. The site discharges to the Tributary of Marshall Branch.
2
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
Deloitte Way
Approximate Eastern
Boundary Line
Aerial Image 1: Deloitte (Project Star) construction site. The site is located within the boundary of West Dove Road, Ottinger Road, Deloitte Way, and the dashed blue boundary line (approximate) depicted above. Aerial photo is from Google Earth Imagery. Section II - OBSERVATIONS The following points of discussion are derived from on-site visual observations on August 9, 2024:
The Large Construction Site Notice (CSN) (TXR1592MU) was posted at the construction entrance off Deloitte Way (approximately 150 feet west of the intersection of Capital Pkwy and Deloitte Way) (Appendix 1, Photos 1-2).
A vehicle track-out control mat was installed at the construction entrance/exit (near the intersection of Capital Pkwy and Deloitte Way) (Appendix 1, Photo 3).
Two (2) concrete washout areas were observed on-site (Appendix 1, Photo 4-5). No concerns regarding maintenance of the concrete washout areas were noted at the time of inspection. Mr. Hudler advised that the concrete washouts are serviced on an as needed basis.
Roll off dumpsters were present on-site (Appendix 1, Photo 6). Construction crew personnel were observed picking up blowable trash at the time of the inspection (Appendix 1, Photo 7).
Inlets throughout the site had BMPs installed (Appendix 1, Photo 7). Mr. Schautteet informed us that the inlets lead to a sediment pond on-site. 3
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
Silt fence and rock filter berm was observed along the perimeter of the site (Appendix 1, Photo 8). A natural vegetative buffer was also noted along the east perimeter of the site (Appendix 1, Photo 9).
Culverts had BMPs (i.e. rock filter berms, silt fence, erosion control blankets) installed to filter stormwater (Appendix 1, Photo 10).
Rock check dams were observed along ditches (Appendix 1, Photo 11). Some sediment track-out from vehicles and equipment was observed on the paved areas on-site
(Appendix 1, Photo 12). Mr. Hudler advised that the site is swept daily. Fuel storage tanks on-site were either double walled or in secondary containment (Appendix 1,
Photos 13). The Stormwater Pollution Prevention Plan (SWPPP) and site map were observed and reviewed
on-site in the field office/construction trailer (Appendix 1, Photos 14-15). Copies of the site's inspection reports were not printed and stored in the SWPPP. Mr. Hudler advised that the inspection reports were managed electronically.
Section III - AREAS OF CONCERN
No areas of concern were observed during the Compliance Evaluation Inspection (CEI) on August 9, 2024.
Section IV - FOLLOW UP
The following information was received by the EPA after leaving the site on August 9, 2024: Upon request, a digital copy of the SWPPP, including an up-to-date site map and inspection reports were emailed by Mr. Jared Seago (Turner Construction Company Business Unit EHS Director) on August 19, 2024. The inspection reports provided were for June 5, 2024, through August 7, 2024. EPA followed up and requested additional inspection reports dating back to the beginning of construction. All inspection reports were provided by Mr. Seago on August 23, 2024. No areas of concern were noted upon reviewing the SWPPP, the site map, or the inspection reports.
Section V - LIST OF APPENDICES
Appendix 1 - Photo Log - 15 photos taken on 8/9/2024
4
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
Appendix 1 Photograph Log
5
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 1
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Construction entrance with the posted Construction Site Notice (CSN) located approximately 150 feet west of the intersection of Capital Pkwy and Deloitte Way. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
6
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 2
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: A close up photo of the Construction Site Notice (CSN) at the construction entrance near the intersection of Capital Pkwy and Deloitte Way. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
7
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 3
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: A yellow track-out control mat was installed near the construction entrance/exit. The photo depicts a concrete mixer truck driving over the track-out control as it exits the construction site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
8
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 4
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: One (1) of the two (2) concrete washout areas observed on-site. This concrete washout was located off the dirt road construction entrance. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
9
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 5
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: The second concrete washout observed on-site. This concrete washout was located near the southern property line of the construction site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
10
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 6
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Five (5) roll-off dumpsters observed near the construction entrance. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
11
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 7
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Construction crew member observed picking up blowable trash. Also pictured is an inlet with silt fence installed around it. Mr. Hudler advised that the inlet(s) tie to a sediment pond on-site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
12
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 8
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Silt fence observed along the eastern perimeter of the site. A natural vegetative buffer was located immediately outside of the silt fence. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
13
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 9
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Silt fence and a rock filter berm observed along the eastern perimeter of the site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
14
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 10
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Culvert with BMPs installed to filter sediment. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
15
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 11
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Rock check dam along a ditch. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
16
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 12
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: Sediment track-out on the pavement caused by equipment and vehicles. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
17
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 13
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: A double walled fuel container. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
18
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 14
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: The site map posted in the construction trailer/field office. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
19
Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU
Inspection Date: 08/09/2024
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Appendix 1: Photograph Log
Photo no. 15
Location: East of J T Ottinger Rd & Deloitte Way
City: Westlake
County: Tarrant
State: TX
Description: The SWPPP maintained on-site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna
20