Document rpN1B6QG0nJ1K3MRM0e4adbar

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) August 9, 2024 Water NPDES Stormwater/ CWA 402 Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact 1: Facility Contact 2: Facility Contact 3: Facility Contact 4: Facility Contact 5: Turner Construction Company Deloitte (Project Star) East of J T Ottinger Rd & Deloitte Way Westlake, TX, 76262 8080 Park Ln, Suite 400 Dallas, TX 75231 Tarrant 214-721-8400 Joe Hudler Senior Project Superintendent jhudler@tcco.com, 972-670-1404 Frank Schautteet Senior Project Superintendent fschautteet@tcco.com, 214-687-1828 Michael McLaughlin Senior Project Manager mmclaughlin@tcco.com, 469-744-3779 Neil Brittain Project EHS Manager nbrittain@tcco.com, 972-880-5373 Jared Seago Business Unit EHS Director jseago@tcco.com, 214-608-8770 FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A TXR1592MU N/A 236220 1542 Personnel participating in inspection: Destinee Agwuna 6EN-WR Carol Johnson 6EN-WS Inspector/Enforcement Officer Inspector/Enforcement Officer EPA Lead Inspector Signature/Date DESTINEE AGWUNA Date: 2024.09.16 09:57:46 -05'00' Digitally signed by DESTINEE AGWUNA Destinee Agwuna Date Supervisor Signature/Date ANTHONY LOSTON Date: 2024.09.16 09:54:36 -05'00' Digitally signed by ANTHONY LOSTON Anthony Loston Date 6ENFORM-019-R8.2 (02/12/2020) 1 Section I - INTRODUCTION Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 PURPOSE OF THE INSPECTION U.S. EPA Region 6 inspectors Destinee Agwuna and Carol Johnson arrived at Deloitte (Project Star) in Westlake, TX on August 9, 2024, at approximately 10:30 AM for an unannounced Compliance Evaluation Inspection (CEI). The inspectors met with site representatives Joe Huddler, Frank Schautteet, Michael McLaughlin (Senior Project Superintendents), and Neil Brittain (Project EHS Manager) at the field office south of the intersection of Capital Parkway and Deloitte Way. We presented our credentials to the site representatives and informed them that a stormwater inspection was being performed to assess site conditions in response to a citizen complaint as well as to determine site compliance with the Texas Pollutant Discharge Elimination System (TPDES) program and the Construction General Permit (CGP), in accordance with the Clean Water Act (CWA). The generation of this report is based on observations made by the inspectors, information supplied by Turner Construction Company representatives (the permittee), and records and reports maintained by the permittee, the state of Texas, and the U.S. EPA. FACILITY DESCRIPTION Deloitte (Project Star) is a commercial construction site operated by Turner Construction Company (TCEQ permit: TXR1592MU). The site is located east of J T Ottinger Road and Deloitte Way in Westlake, TX, and totals 224.5 acres with approximately 72.44 acres of land being disturbed for construction activities (denoted in Aerial Image 1 below). Coordinates to the site are in the vicinity of Latitude 3258'45.4" North, Longitude 9712'19.1" West. The site discharges to the Tributary of Marshall Branch. 2 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 Deloitte Way Approximate Eastern Boundary Line Aerial Image 1: Deloitte (Project Star) construction site. The site is located within the boundary of West Dove Road, Ottinger Road, Deloitte Way, and the dashed blue boundary line (approximate) depicted above. Aerial photo is from Google Earth Imagery. Section II - OBSERVATIONS The following points of discussion are derived from on-site visual observations on August 9, 2024: The Large Construction Site Notice (CSN) (TXR1592MU) was posted at the construction entrance off Deloitte Way (approximately 150 feet west of the intersection of Capital Pkwy and Deloitte Way) (Appendix 1, Photos 1-2). A vehicle track-out control mat was installed at the construction entrance/exit (near the intersection of Capital Pkwy and Deloitte Way) (Appendix 1, Photo 3). Two (2) concrete washout areas were observed on-site (Appendix 1, Photo 4-5). No concerns regarding maintenance of the concrete washout areas were noted at the time of inspection. Mr. Hudler advised that the concrete washouts are serviced on an as needed basis. Roll off dumpsters were present on-site (Appendix 1, Photo 6). Construction crew personnel were observed picking up blowable trash at the time of the inspection (Appendix 1, Photo 7). Inlets throughout the site had BMPs installed (Appendix 1, Photo 7). Mr. Schautteet informed us that the inlets lead to a sediment pond on-site. 3 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 Silt fence and rock filter berm was observed along the perimeter of the site (Appendix 1, Photo 8). A natural vegetative buffer was also noted along the east perimeter of the site (Appendix 1, Photo 9). Culverts had BMPs (i.e. rock filter berms, silt fence, erosion control blankets) installed to filter stormwater (Appendix 1, Photo 10). Rock check dams were observed along ditches (Appendix 1, Photo 11). Some sediment track-out from vehicles and equipment was observed on the paved areas on-site (Appendix 1, Photo 12). Mr. Hudler advised that the site is swept daily. Fuel storage tanks on-site were either double walled or in secondary containment (Appendix 1, Photos 13). The Stormwater Pollution Prevention Plan (SWPPP) and site map were observed and reviewed on-site in the field office/construction trailer (Appendix 1, Photos 14-15). Copies of the site's inspection reports were not printed and stored in the SWPPP. Mr. Hudler advised that the inspection reports were managed electronically. Section III - AREAS OF CONCERN No areas of concern were observed during the Compliance Evaluation Inspection (CEI) on August 9, 2024. Section IV - FOLLOW UP The following information was received by the EPA after leaving the site on August 9, 2024: Upon request, a digital copy of the SWPPP, including an up-to-date site map and inspection reports were emailed by Mr. Jared Seago (Turner Construction Company Business Unit EHS Director) on August 19, 2024. The inspection reports provided were for June 5, 2024, through August 7, 2024. EPA followed up and requested additional inspection reports dating back to the beginning of construction. All inspection reports were provided by Mr. Seago on August 23, 2024. No areas of concern were noted upon reviewing the SWPPP, the site map, or the inspection reports. Section V - LIST OF APPENDICES Appendix 1 - Photo Log - 15 photos taken on 8/9/2024 4 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 Appendix 1 Photograph Log 5 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 1 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Construction entrance with the posted Construction Site Notice (CSN) located approximately 150 feet west of the intersection of Capital Pkwy and Deloitte Way. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 6 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 2 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: A close up photo of the Construction Site Notice (CSN) at the construction entrance near the intersection of Capital Pkwy and Deloitte Way. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 7 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 3 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: A yellow track-out control mat was installed near the construction entrance/exit. The photo depicts a concrete mixer truck driving over the track-out control as it exits the construction site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 8 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 4 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: One (1) of the two (2) concrete washout areas observed on-site. This concrete washout was located off the dirt road construction entrance. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 9 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 5 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: The second concrete washout observed on-site. This concrete washout was located near the southern property line of the construction site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 10 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 6 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Five (5) roll-off dumpsters observed near the construction entrance. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 11 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 7 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Construction crew member observed picking up blowable trash. Also pictured is an inlet with silt fence installed around it. Mr. Hudler advised that the inlet(s) tie to a sediment pond on-site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 12 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 8 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Silt fence observed along the eastern perimeter of the site. A natural vegetative buffer was located immediately outside of the silt fence. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 13 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 9 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Silt fence and a rock filter berm observed along the eastern perimeter of the site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 14 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 10 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Culvert with BMPs installed to filter sediment. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 15 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 11 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Rock check dam along a ditch. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 16 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 12 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: Sediment track-out on the pavement caused by equipment and vehicles. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 17 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 13 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: A double walled fuel container. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 18 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 14 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: The site map posted in the construction trailer/field office. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 19 Turner Construction Company / Deloitte (Project Star) Permit #: TXR1592MU Inspection Date: 08/09/2024 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Appendix 1: Photograph Log Photo no. 15 Location: East of J T Ottinger Rd & Deloitte Way City: Westlake County: Tarrant State: TX Description: The SWPPP maintained on-site. Date of Photo: 08/09/2024 Photographer: Destinee Agwuna 20