VCM LEAK SURVEY -VINYL AREA- Page 1 of 6 DATE: , ?. y. 7f S- S 7? J- 7-7S' jTJL/> INSPECTOR: L&i_jL rt. ^X- 9- >79 f- LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Valve 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal m 2. 741 Condenser Bottom Seal 3. 741 Recovery Valve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Lenape Seal 10. 743 Condenser Bottom Seal ___________________ _____ 0 ______ ________ ________ _____ O ___ Q ________ ________ _______ Q ________ ___________________ Q ________ ___________________ Q ________ ________ ________ _______ ________ ________ Q _0 jBtk ________ _____ ________ / Q6 ________ ________ _____ ___Q_ ________ ________ ________ ___ ________ ________ ________ ___ q. > q _______ ________ ________ ___ _ ________ ________ ________ ___ g. ________ ________ ________ c/ ___ q. VAB.0001082092 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. TO_ of Condensors 1. * 2. 741 Condensor Seal 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 d cl Cl CL CL CL CL CL J2 CL CL CL J2 CL A a a o.__ CL__ ________ ________ f2_ ________ o__ ________ ^ VAB.0001082093 Page 3 of 6 New Reactor Area - Recewery Unit A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump ' Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal h' 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal m o 0_ <2_ n _____________ a ...0 ________________ O o o o n Q_________________ o_________________ o o o _.C> . ___ a VAB.0001082094 [I. New Reactor Area - Recovery Unit B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head I[I. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (Under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal . 4. West Recovery Compressor Seal rr\mnrp;<;nr Seal Page 4 of 6 h a a o Cl JL a _0 _Q_ JL A CL CL <L CL A _0 A. a a_ &___________ ________ ______ _______________________________ ________________________________________ o___ ------ d___ O ________ ------- i r------ttj--i- i--_ ___ VAB.0001082095 ________ ______ Page 5 of 6 Old Reactor Area - Reactor Module Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Top Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line (Area)* 6. Sweco Screener (Area) 7. Sewer (E. of Reactors) ___ Q 0 __ a_ - __ Q_ O . -Q . __ 0_ <L_ 0 -0 * _a_. 0 0 - 0 0 0 d t> J6 S'* * VAB.0001082096 VCM Tank Farm 1. #1 Compressor (North] 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 Q 0 o r? n ___Cl a a VAB.0001082097 VCM LEAK SURVEY -VINYL AREA- Page 1 of 6 DATE: INSPECTOR: ,OCAT I ON: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Valve 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery Valve 4. 741 Rinse Water Line S. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Lenape Seal 10. 743 Condenser Bottom Seal - - -- ------------ _ - o ____ Q_ Q- Q_ O- -Cl . 0 o .. jQ___ 0-. Q O O. . flu OL Q Cl. ___ O___ VAB.0001082098 Page 2 of 6 A B. Third Level (Top of Reactors) ((font.) 11. 743 Recovery Valve 12. 743 Rinse Water Line Q O 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors * _. Cl 0 _____________ 0 0 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal a - - 0 0 o 0 o 6. 743 Condensor Valve 7. 744 Condensor Seal 0 -Q 8. 744 Condensor Valve [I. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow . 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 90-h 5 Recovery Compressor Overflow 4* - .................................................................................................................................................. __________________________ p - 0 J/0 o a & _a. 0 si 0 Mm .> ifl k* y o 0 SE00010S2099 Page 3 of 6 II. New Reactor Area - Recovery Unit + A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) n ________ ________ ________ O 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) ________ ________ ________ ________ ________ ________ Q Q B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ +> 2. East VCM Storage Tank Top (Area) ________ * 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) ________ ________ _______ _____ ________ Q ___ Q 0 Q 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump F- Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal VAB.0001082100 Page 4 of 6 A New Reactor Area - Recovery Unit B. Ground Levil (Cont.) 20. West V31 Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III Old Reactor Area - Recovery A. Area West of V-1I 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) *h m 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (Under South Receiver) 8. East /CM Charge Pump Seal 9. West /CM Charge Pump Seal 10. Rec. /CM Filter Pack Head ~ 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head ________ 13. Blowdown Tank Relief Vent (Platform) ________ ________ 14. West VCM Return Pump Seal - 15. East VCM Return Pump Seal ______ ________ B. 1st Floor - V-ll (Area) C. 2nd Flooi- 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal * * 4. West Recovery Compressor Seal C^ ComnTf^SflOr ScrI Q_ Q_ O _0 o_ CL o_ O a. 0 0 Ao :__ a o_ a A% Q0 I Q -- O Q O ________ Q O 0 0 * o. ^2. O O -0O _ J? 0o * VAB.0001082101 p IV. Old Reactor Area - Reactor Module A. . Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8 D-400 Lenape Manway Seal- 9. D-500 Condensor Top Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve ! 3. D-500 Dump Valve 4. D-600 Dump Valve 5 VCM Charge Manifold Line (Area) _ ... 6. Swfeco Screener (Area) 7. Sewer (E. of Reactors) Page 5 of 6 ,V * h* 1 0 1 * 0 0 ___ 0 0. Ql 0 Q o a o 44 /OOP a a Ql O a_ O 4 + 0 p 0 0 0 0 0 6. > 1> 0 --Q. a -r . & *t -# 2 7--.%- 4 o v' ^ Vi w* ' '* _ 'n. ** - O * . ; v . " * 1 0. . ->*Va^ p mri- 0 + * V, ` * ** --- f VAB.0001082102 1 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station *m 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) . Page 6 of 6 A r * VAB.0001082103 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level .1 741 Charge valve 2. Direc:ly Under 741 3. 742 Ciarge Valve 4. Direc:ly Under 742 S. 743 C large Valve 6. Directly Under 743 7. 744 Ctarge Valve .8 Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom * 3. 741 Recovery Valve 4. 741 Rinse Water Line 5. 742 lenape Seal 6. 742 Condenser Bottom 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Lenape Seal 10. 743 Condenser Bottom Page 1 of 6 A 3-/ 7? 3 * 7? o o CL 0 A - CL ___ o__ a. . A- a o * VAB.0001082104 B. Third Level (Top of Reactors) (Cont.) 11. 12. 743 Recovery Valve \ 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve I;. New Reactor Area - Recovery Unit A. 2nd Floor .1 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal .0 905 Recovery Compressor Overflow 4 Page 2 of 6 XL A j0_ XL Q_ CL. Jl XL XL JL XL XL XL XL I. New Reactor Area - Recovery Unit A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator - Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal i 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 0 .Q ........................ 0 6 __ 0 J6 o 0 0 ____ 0 a 0 ________ ____ f0 6 0 a & o o O 6 o VAB.0001082106 11,, New Reactor Area - Recovery Unit * B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head II. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (Under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) V s m C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3- East Recovery Compressor Seal 4. West Recovery Compressor Seal Seal Page 4 of 6 k a & a. VAB.0001082107 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Top Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line (Area) 6. Sweco Screener (Area) 7. Sewer (E. of Reactors) TJ I Page 5 of 6 N VAB.0001082108 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A 0 dfcWc 0 /lUnrs* // /' // a a___ VAB.0001082109 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Valve 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery Valve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Lenape Seal 10. 743 Condenser Bottom Seal -- ! Page 1 of 6 A 0 k 0 0 a o 0 0 ha 0 a..- __ Q. e 0 o. _ 0. ___ 0... 0 0 VAB.0001082110 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal t 2. 741 Condensor Valve n- 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 90S Recovery Compressor Overflow Page 2 of 6 __L 0 0 _JL 6 _JL _j3_ 0 -JL. A _a_ A A A A A A A A A A VAB.0001082111 New Reactor Area - Recovery Unit A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) * 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal .9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 4 of 6 II. New Reactor Area - Recovery Unit HI** ! I M fcl, m ^ 11^ :! mi m, ^ rn I IW m I I 'I --' M B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 0 _______ 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III Old Reactor Area - Recovery ______________________________ a___ - A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 0 _____ _____ o ____ 2. Middle VCM Receiver, Bottom (Area) o 3. South VCM Receiver, Top (Area) .0. ________ ___ '_______ _______ a o.... ________ _______ 4. South VCM Receiver, Bottom (Area) 0 .____ _____ 6 _____ H 5. 401 Receiver, Top (Area) 0 ________ _______ 0 _______ 6. 401 Receiver, Bottom (Area) 0 _____ _____ o _____ 7. VCM Transfer Pump (Under South Receiver) * 8. East VCM Charge Pump Seal _J2...... .............. ........... 0__ . Q.. -_______ O: 9. West VCM Charge Pump Seal 0 ________ ________ q ________ 10. Rec. VCM Filter Pack Head ' 11. North, Fresh VCM Filter Pack Head 0 0 12. -h 13. South, Fresh VCM Filter Pack Head Blowdown Tank Relief Vent (Platform) _o_ Q __________________________ __________________________ ________ ________ __________________________ __________________________ <? _ _a_ a __________________________ ________ ________ 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal - Q-- _____ _____ o ________ . ..a... _____ ft ________ B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. p> 3. B (West) Vacuum Pump, Seal East Recovery Compressor Seal - Q-. _______ __ ________ .. 0.. _ 0 _j2_ o___________ o ________ _ii_ _______ 4. West Recovery Compressor Seal durwoTv rnmnressor Seal ---- ------------ ------------ -- a VAR.0001082113 17. Old Reactor Area - Reactor Module A. 122. of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Top Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal h" B Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line (Area) 6. Sweco Screener (Area) 7. Sewer (E. of Reactors) a 0 A 6 0 6 n <3 a ft O ft ft G 0 6 d L1 JO Page 5 of 6 4 ** _____________________________________________________ ___ 0 0 0 0 0 Ja o o o 0 6 0 6 0 _ ... 0 _ ft o 0 O ............................................................................................................................................................................................. 0 ISO VAB.0001082114 r VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station * 8. North VCM Charge Pump (S. of Sphere) + 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A VAB.0001082115 VCM LEAK SURVEY -VINYL AREA- Page 1 of 6 DATE : J7.y^ 7> INSPECTOR: J /J-7? J//7f _&l2f JL&Zt j LOCATION: New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge valve 2. Directly UndeT 741 3. 742 Charge Valve a___ 0 ________ ________ --Q a 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Valve 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) 0 ... a ... 0 . 0 .. . 0 ______ /a4 .... ...a _o o a J00 B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery Valve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7 . 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Lenape Seal 10. 743 Condenser Bottom Seal 0 _0 0 a __Q_ . 0.. o 0 - ____ 0 (?.... o _ p o o Q__ 0 O O _o o __ o_ VAB.0001082116 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. h 2. 741 Condensor Seal 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve * 7. 744 Condensor Seal 8. 744 Condensor Valve Ij . New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow * 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A 0 0 0 d 0 0 ....................................................... 0 0 o 0 0 0. 0_ 0 0 0 o 0 o _0 J/L- O o 0 a ____ _o, 0 0 0 0 0 o 0 o o o o ___ a o o a o 0 0 0 ............... o O VAB.000108211': II. New Reactor Area - Recovery Unit A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal * Page 3 of 6 o_ o_ o do a a __A a__ o a a a a. OL <2_ o_ o o_ o jZ 0_ <2,, a. 0 & VAB.0001082118 New Reactor Area - Recovery Unit B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll i. Middle VCM Receiver, Top (Area) 0 2. Middle VCM Receiver, Bottom (Area) 0_ 3. South VCM Receiver, Top (Area) 0 4. South VCM Receiver, Bottom (Area) _ .0___ 5. 401 Receiver, Top (Area) 0 6. 401 Receiver, Bottom (Area) __ Q___ 7. VCM Transfer Pump (Under South Receiver) 8. East VCM Charge Pump Seal .... a,,- 9. West VCM Charge Pump Seal &___ 10. Rec, VCM Filter Pack Head ... a. _ 11. North, Fresh VCM Filter Pack Head --0___ 12. South, Fresh VCM Filter Pack Head o 13. Blowdown Tank Relief Vent (Platform) O- 14. West VCM Return Pump Seal m 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor -A___ _l_ _ . Q_ 1. A (East) Vacuum Pump, Seal n> 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal O Qo 4. West Recovery Compressor Seal c Dorrwpt"v rnmnressor Seal 0 o r> 0 0 Page 4 of 6 O a o -------------------- ---------------- 0 o jQ- -fl-- _j2 o 0 m- 0 0 -Q. O 0 jO CD .0 __ ^JAB.0001082119 o Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Top Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line (Area) 4 6. Sweco Screener (Area) 7. Sewer (E. <of Reactors) Ql 0 0 a <2 a a o _> _Q_ 0 _J2_ O Page 5 of 6 A * L 6 O o m 0 o -JL0 o ___ CL- & _____________ -d- VAB.0001082120 Page 6 of 6 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) </o o 7 do do 0 3 So / So V0 o __ a__ 2` 1 /, 75 3# 3 5o 0 . L J? sa 6 Sly.. 0o __/ S'' 175 0 /5 o o a ..CL- VAB.0001082121 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: Atf 7 f 33-1? l-Jl-tf /-zASgf S-&-2S 1 Jl.tC JL\C- LOCA" ION: I. Jew Reactor Area - Reactor Module -- ! I -- ---------------- --------------- - .a. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6 * Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse IVater Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 0 _jfl___ 0 6 0 0 O 2/0 ___ ___ - A-- d ___ a___ 6_ d 6 ___ 0 o . o 0 o 0 JL /<? <7 _ a. 0 o o o o a. o o 0 VAB.0001082122 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5 . 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow age .. o: j A __0___ _4_ 0- 0 0 0_ 0 0 _ a.o a o 0 0 6 0 S* __ A 6 ' a _o 0 . 0 __ d__ .6. C__ a___ ___ a___ ___ 0 _ A__ A O _ Q__ --- --------~------- ------ ------- -.-- --------,---- -- ---i -- ----- -- * 0- __ (3___ --a 0-- .. _a. a. O O . <L 0 VAB.0001082123 Page 3 of 6 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) Q ________ ________ Q ________ _______ _ ft & 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 0 ir Q 2. East VCM Storage Tank Top (Area) 0 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top(Area) 5. West VCM Storage Tank Bottom (Area) ft Q ________ ______ ________ ________ _____ @ ft ft ft O ft 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (89 3) Rec. VCM Return Pump Seal ft____________ ft ____ ft___ 0 0 0 9. South (891) Seal Water Separator Pump Seal 0 _____ _________ 10. North (892) Seal Water Separator Pump Seal Q_________________ ft 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow ft ______ ________ ft___ ft ft____________ Q____________ 0 ft 0 0 ft 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Q ________ _____ Q ____________ ft____________ ____0__ ___ Q. (3 O z_ A VAB.0001082124 New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head Old Reactor Area - Recovery Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) . i 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Plat form) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. W'est Recovery Compressor Seal 5 . North Recovery Compressor Seal I ___ /J ___ (\ ___ Page 4 of 6 A _A 0 0 A A A A A A A A A A A A 6 a VAB.0001082125 & IV. Old Reactor Area - Reactor Module A. Top of Reactors 11.. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal Bottom of 1. D-300 2. D-400 3. D-500 4. D-600 5. VCM CC harge Manifold Line 6. VCM C (Area) 7. Sewer (E. of Reactors) Page 5 of 6 d o 0 0 6 d 0 0 d 0 a d 0 6 0,,. . - a -A u A VAB.0001082126 i Page 6 of 6 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 3. North VCM Charge Pump (S. of Sphere) K South VCM Charge Pump (S. of Sphere) -- -ZJ f -Jjo /6 $ ... 7S' 0 0 //<? / Vo t V/ 0 /<r* a 6 So --12 yo o jj * -12 * 4 0 A || VAB.0001082127 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCA" ION: i. lew Reactor Area - Reactor Module V. Ground Level 1. 741 Charge Valve ? 4p-* * Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal J,?7f 0 _ _ _JL Q._ 0 ........... . _ _ 0 _ 0 o-r ipr 0 n /da 0 a 0 ._ o a 0 jlL- - d_ m-- J1__ VAB.0001082128 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overfl ow 7. 904 Recovery Compressor Seal .8 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A 0 n_ _ jQ_ 0 __ _ 0 __ a __ o_ __ o_ __ o ___ i __ Q_ ___ (1 ___ (L l) JJZ d ___(L. Q O VAB.0001082129 II New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) * 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. IVest VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal IVater Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 Lt d 0 LL J*. LL LL Ll Li Ll (1 xi XL 0 a o VAB.0001082130 I II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) j 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal I Page 4 of 6 A j! JL VAB.0001082131 i\. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) 7. Sewer (E. of Reactors) I Page 5 of 6 A VAB.0001082132 VCM Tank F arm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 3 he yv o As rr ft * Q . ___ a___ VAB.0001082133 Page 1 of 6 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: k&Z.Zf A/7-77 LOC/ IION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) Third Level (Top of Reactors) _____ 0 0 0 3a 0 -JL- 6 0 o _ 0 0 0 0 d Ad 0 0 0 // 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 0 .M 0 _jG._ jD _ 0 0 0 6 a 0 0 0 0 0 0 0 VAB.0001082134 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recevery Valve 12. 7 43 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust c. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (Soul h) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Reco\ery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Conpressor Overflow i Page 2 of 6 JQ 0 6 _O 0 0 O 0 6 C 6 6 /oo O A 6 0 6 a 4_ a a 0 0 0 0 0 0 0 Q O " Q 0 6 a m t n a 0 /> 0 0 6 0 0 A Ii i i i | ! i i ! i j j i i i VAB.0001082135 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) r 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A Q0 Q0 00 0 0 0 00 0 ________ ___ _______ _ ________ ________ ________ ____ ____ ____ ____ ____ ____ -4L. ..tf- _____ ________________________________________________ ___ _ 0 _____ ___ 0_ 6_ _______________________________ ________ ___________ __________________ ____ ______ _______________________________ a___ __ ___ .6- _____ _ ___ M- _____ ___ ___ 0-- _______ _ ____ - 0 --_______________ 0 _____ ___ <2__ 6 _____ ___ VAB.0001082137 Old Reactor Area - Reactor Module A. lp of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) 7. Sewer (E. of Reactors) Page 5 of 6 A 30 % S' d 0 0 A a A 6 0 A Jr* 6 6 _ A__ 6 0 O 0 VAB.0001082138 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5 Railcar Connection, North Station 6. Railcar Connection, Middle Station 7 Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 o:: 6 /a* P AK go 31* o <L_ j* /d 6 /d* /4 6 -u: 2t*~ a 0 4V //<? doQ. 1$-- S6 60 0 0 * VAB.0001082139 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: Izlrll LJzll LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 6 0 ___ Q___ 0 ___ Q_ 0-- 0 ___ a___ Jj-- A VAB.0001082140 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust / Jf UJ frtbK. Jkr-* ^ C. Top of Condensors jL 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow ! c A o A A A a o Soo . 0_ 4_ ________ A 0 _j2 6 a j2 j1 j1 A A 0_ A A A A VAB.0001082141 f 11. New Reactor Area - Recovery Unit (Cont.) * . tL r n * * J A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) ________ _______ Q 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level p* .a 1. East VCM Storage Tank Bottom (Area) __________________ 2. East VCM Storage Tank Top (Area) 0 3. Middle VCM Storage Tank Bottom (Area) __________________ 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) __________________ 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal ____________________ 8. West (893) Rec. VCM Return Pump Seal __________________ 9. South (891) Seal Water Separator Pump Seal _______ ________ ___ q 10. North (892) Seal Water Separator Pump Seal ________ ___________ p 11. Seal Water Filter Pack Head ________ 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow _________________ 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow __________________ 16. Rec. VCM Filter Pack Head 17. East Rec.Charge Pump Seal 18. East VCM Charge Pump Valve Q p 19. West VCM Charge Pump Seal O Q Q 0 fi p p /) Q Q Q* Q Q q 0 VAB.0001082142 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve * 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery* * A. Area West of V-ll * 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) i 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal c \'nrth Recovery Compressor Seal Page 4 of 6 A VAK0001082143 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal m 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) 7. Sewer (E. of Reactors) Page 5 of 6 M a o 0 __0__ _______ <3 Or-*- 0 6 0 ___ a___ _ 6 O j0-- 0 _____________ u ___ Q_ .... J- ___ * _______________ ___ Q__ ____ cL_ 0 _____________ a. 00 ... c7 O 6 0 16 VAB.0001082144 Page 6 of 6 A VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Stat ion Y 8. North VCM Charge Pump (S. of Sphere) L* 9. South VCM Charge Pump (S. of Sphere) S' O c? / m 10 0 / ' c? <J Af i, T, \< /a * 5 <' s it goo jao /JLCC,1 /-ILL1 fV* a , < # _ O 0 _ _1 * J d (J 0 ____________ * VAB.0001082145 Page VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ------------------------------ ----------- ------------------------------------------------ ------ ---------- - 1 ---- ---- ------ - - . 1 A 6 0_ 0 0 Q0 0 a VAB.0001082146 _ np t_ 1 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal ______ _ ________ ________ ___ 2. 901 (South) Vacuum Pump Overflow Q, 3. 902 (North) Vacuum Pump Seal ________ ________ ________ ___ 4. 902 (North) Vacuum Pump Overflow ^ 5. 903 Recovery Compressor SEal ________ ________ _________ ___ 6. 903 Recovery Compressor Overflow ________ ________ ________ ___ 0_ 7. 904 Recovery Compressor Seal _______ ________ ________ ___ 8. 904 Recovery Compressor Overflow________ ____________ ________ ___ 9. 905 Recovery Compressor Seal ________ ____ ___ ________ ___ Q 10. 905 Recovery Compressor Overflow ________ ________ ___________________ k VAB.0001082147 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 $ o A a A A A A A A A VAB.0001082148 Page 4 of 6 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve m 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) r 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. W'est Recovery Compressor Seal 5. North Recovery Compressor Seal 4 r A A A Q__ _____ 0 a n 0 0 0 0 o __ 0 . 0 __D _ __ __ _ .. . _ . 0-- D _______________________________ --A 30 t) <3 d i)___ ________ 0 a_ __0 ____ L_ 0 0 e> ___ 0 _... a 6 -0/) _____ _____ _ ___n Q 0 __ Q ............... 0 -- ------------------^---------------- -- a _____ O __________----------------- ------- ,--------- 4^ ------------------ __ Q n 0 0 0 VAB.000108ZT49 IV. Old Reactor Area - Reactor Module Top of Reactors .1 East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors .1 D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) 7. Sewer (E. of Reactors) Page 5 of 6 VAB.0001082150 I Page 6 of 6 A VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) 3* ft + . /Aa a. /i , -4-- J 44 yj 71> / -y& o 2X1 3^> I#* J (? & (? * VAB.0001082151 LEAK PATROL SURVEY Page 1 of 6 7/17/79 A Ih/*\ 1 Li # INSPECTOR: LOCATION: I. Reactor Area - Reactor Module J. A. Ground Level 1. 741 Charge valve 2. Directly Under 741 3. 742-Charge Valve 4. Directly Under 742 S. 743 Charge Valve 6. Directly Under 743 7. 744 Charge; Valve 8. Directly Under 744 <f SjJeco (n A; 10. Sewcf! ( M. of mi) amt Cone. ppm 0 n 0 o .D.. o 0 Cone, Cone. ppm - ppm ' Cone. ppm k - - * B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal * 3. 741 Recovery Valve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve S. 741 Rinse Water Line 9. 743 Lenape: Seal 10. 743 Condenser Bottom Seal 50 (TAC-r * o n J2__ 0 _ Q.. 0 2>o wN & Cone. ppm - F * VAB.0001082152 I Page 2 of 6 7/17/79 B. Third Level (Top of Reactors) (Cont.) Cone. ppm Cone. ppm Cone. ppm Cone. ppm Cone. ppm I*-1^ 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal A * / ft 15. 744 Recovery Valve 4- 16. 744 Rinse Water Line it C. Top of Condensors 1. 741 Condenser Seal 2. 741 Condenser Valve 3. 742 Condenser Seal 4. 742 Condenser Valve 5. 743 Condenser S03.1 * 4 6. 743 Condenser Valve 7. 744 Condenser Seal 8. 744 Condenser Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (Soutji) Vacuum Pump Overflow 3. 902 (Nort n) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recover Compressor Seal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 005 Rprovnrv rnmnr^^^nr Ovnrflow o Zoo 0 a r, (J Q Q f) o Q 0 Q 0 n * VAB.0001082153 i + J New Reactor Area - Recovery Unit Cone. ppm A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condenser (Area) 13. West Recovery Condenser (Area) O 200 O B. Ground Level 1. East VCM Storage Tank Bottom (Area) 0 2. East VCM Storage Tank Top (Area) o 3. Middle VCM Storage Tank Bottom (Area) Q. 04. Middle VCM Storage Tank Top (Area) n5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 0 7. East (394) Rec. VCM Return Pump Seal + 8. West (393) Rec. VCM Return Pump Seal O 0 9. South (891) Seal Water Separator Pump Seal o 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec*. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow o n 0 14. West Rec. VCM Charge Pump Seal o o15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head Sin 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 0 0 19. West VCM Charge Pump Seal 0 Cone. ppm Page 3 of 6 7/17/79 Cone. Cone. Cone. ppm ppm ppm ( TXer#4) h . i i i I j I ! i | i VAB.0001082154 h New Reactor Area - Recovery Unit Cone. ppm Cone. ppm Page 4 of 6 7/17/79 Cone. ' Cone. Cone. ppm ppm ppm A B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head o_ o_ o Old Reactor Area - Recovery A. Area West of V-ll A 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (Under South Receiver) # m 8. East VCM Charge Pump Seal jD_ _j2_ _Q_ 0 O 0 O __ ______ _ ___ _ ____ _ ____ _ ______ _ 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Frssh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal _j2_ ____ _ ___ _ IQ (TACr fz) ___ _ ___ _ O ____ _ 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) j2_ O .____ _ C. 2nd Floor 1. A (East) Vicuum Pump, Seal 40 2. B (West) Vacuum Pump, Seal 3. East Reco/ery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal _JL -O_Cl _Cl 1 1 I 1 iI i 1 I 1 i 1 I VAB.0001082155 i i* Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condenser Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condenser Top Seal 7. D-400 Condenser Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condenser Top Seal 10. D-500 Condenser Bottom Seal 11. D-500 Lernpe Mamvay Seal 12. D-600 Condenser Top Seal 13. D-600 Concenser Bottom Seal 14. D-600 Lenape Manway Seal BH . Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 1 5. VCM Charge Manifold Line (Area) L \JCM Charge Maniwld Li^c 7. SeuJER (e. of s) Cone. PPm Cone. PPm Page 5 of 6 7/17/79 Cone. PPm Cone. PPm Cone. ppm 0- 0 7>oWfJ h n 0 o _Q_ 0 0 50 (TACt & t) * O . O o 0 D O . 400- i l i i i ! I j i i i i i i I i l l ! i VAB.0001082156 Page 6 of 6 7/17/79 I VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Comection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Cone. ppm 0 0 Cone. ppm Cone. PPm ________ Cone. ppm Cone, ppm \ l i i j i i i i i i i i i i ] i I I VAB.0001082157 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: lew Reactor Area - Reactor Module V. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco [Area) 10. Sewer (N of 741) B Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal VAB.0001082158 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6 * 903 Recovery Compressor Overflow^ 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A O O 0 H d d. // //* 0 0 0 0 rj a 0 0 <2. VAB.0001082159 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. UTest VCM Charge Pump Seal II. * n: factor Area - Ree< ti a~ Mill-- 4>?/ l!- A %' I ^ + .h . V %. -,#r - * '- - b G. iinu Hvel (Font.) ^ 20. `vest VCM Charge f j n y <- i r. / J 21. North Fros'i VCM Fi 11 22. South FtrH VCM Filter Paek Head HI.*'bid Reactor Area Recovery A. Area West rf V 11_ "hi\ iM ' 1. Mi s -P Receiver, Top (Area) ?. Middle VCM Receiver, Bottom (Area) South VCM Receiver, Top (Area) A South VCM Receiver, Bottom (Area) 401 Receiver, Top (Area) 401 Receiver, Bottom (Area) VCM Transfer Pump (under South Receiver) ------------- 8. East VCM (barge Pump Seal 9. West VCM Charge Pump Seal -- --------- 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12.. South, Fresh VCM Filter Pack Head ---- --- ------ ----- -- 13. Blowdoivn `<'ank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal "-- ----*---- -- * B. 1st FIoor - V-ll (Area) C. 2nd Floor 1. A (Fast) Vacuum 'ump, Seal 2. B (We l) Vac ui >i Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor .Seat IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal D-&a r -- 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line I 6. VCM Charge Manifold Line (Area) 7. Sewer (E. of Reactors) + 4"H ............ * I . , . H. T..J ... ..J. p> ~-Vi. >Tn. 1 . Page 5 of 6 A 0 / & & & 9* VAB.0001082162 1 r --M i V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor ' 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) * Page 6 of 6 A f I % I- i ......................... y-p -1*4-**..+ 1. _ llfl'r-. '..p. 1AT--H * '* I-I 4 ' m- Mi T : " +*T*iC|<*trW'+ -! ** ^t*1! h *(***' -- -J i'i: f VAB.0001082163 -tr- ' VCM LEAK SURVEY -VINYL AREA- DATE: ATION: INSPECTOR .New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 V * .. I#** up* A a a. a a 0 <2 0 o 2 dL 0 d d d d a VAB.0001082164 f 4 1 B. Third Level (Top of Reactors) (Cont.) I- 11. 743 Recovery Valve 12. 743 Rinse Water Line W3 (hJut 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal r-- 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) -Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow I 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow,, 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow i| r * " ' > V T t h age o:: ** . A <2_ d d d_ <L d 3 ,nj-tijr y, T ' |- &. j d_ dL dL & d 7 VAB.0001082165 r 'i \ New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 t * 0 d_ 7 o a & & d d o "|r 'ku ' W i^ ,v f. VAB.0001082166 1\i- * II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head J22. South Fresh VCM Filter Pack -Head Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal |jf 15. East VCM Return Pump Seal tT %fB. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal .,1I I - .......... J.p 1- ' I |.r I ............................ i| . . ' <* ' h rti i> ..( . -n- kf iHI- i h* i +r -' f 4 I * -w - nil' .- f. up,. I, J2i2-- _2_ a a a o_ d __ d___ -JL2 <t JD _JL___ <2-- -A-- d a _ -JL___ __ ____ _ VAB.0001082167 d \ I r- - Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dunp Valve 4. D-600 Dump Valve 5. VCM Cl 6. VCM CCl harge Manifold Line (Area) 7. Sewer (E. of Reactors) Page 5 of 6 ** / a. /o0 <3 4 a a <3 <2 H I- - r;j- ,. TJ v: ,i.t ;F h^ ^ ***-*- i-W- V ^ * ghf!"H'1 HJ Hfr ftTi ' t-' ^ ! IHf -P -*M -P- W' ! ! h m 1-ki. ul VAB.0001082168 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middlei Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 0 tff. -* ___ 2a. S --------------------------------------- 6 214S/.D. A VAB.0001082169 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: ATION: New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 * 7. 744 Charge Vlave * 8. Directly Under 744 9. Sweco (Area) 10. Sewer (N of 741) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal I 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 \ _k A <3-/3- 7/ a a 0 A 0 0 3 A. A 0 0 A. A A 0 A .i VAB.0001082170 t B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 3 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust c. Tog_ of Condensors b 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve v * 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve \ II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow. 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow -1 l * 1I - \ 11 j.. Page 2 of 6 * S/0 0 > 0 0 * d w 0 0 <s 0 /0^- 0 0 0_ 0_ 0L J2d_ 0 VAB.0001082171 T- E * II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III.* Old Reactor Area Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) **> 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal \ 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A 6 0 6 d 0 O o 0 6 0 a a. a. o 6 /I a a. 6 & *T VAB.0001082172 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 0-So o w 12. D-600 'ondensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line r 6. VCM Charge Manifold Line (Area) 1 % 7. Sewer (E. <Df Reactors) Page 5 of 6 K d* 0 o 0 0 CL a cl a /is 0 O 0 0 0 a 0 1i K 4- ja. * . . a. , .1 - d . .-r, -n- + if|- ar ' 0 Li f i. -l : p i VAB.0001082173 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 O //o /s'o jLi.oJT .71 ct-ifT : "I " !f : \ '+ ; Li . 1. .M , T J- . . f- |,,|V. 1 ir iI p i VAB.0001082174 t t VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR ATION: New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve * 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco [Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal [ i ^ 6. 742 Condenser Bottom Seal * 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 74 3 Condenser Bottom Seal -V. - I4 f, ... .. . r-.p 1 .L t K i"1 i :l 'I * - ...................................................... i. + A a a o o o OL & a & 4 O _ __ o a_______ ________ o __ o __ a c o D VAB.0001082175 tt B. Third (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal p 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve -F- 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow,. ,li 7 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 r*VA . - - * 4 A a 0 o 0 0 0 0 0 0 17 JD. o o 0 0 a 0 0 e 0 0 0 i s h i i k I i 4 1 l i l I I VAB.0001082176 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A CL 0 a Jl CL d- <L CL a_ (L CL OL CL CL <L d ' I l H it . ? t t... VAB.0001082177 New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head y Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) m 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank'Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, 2. B (West)! Vacuum Pumpo. Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A ___ <2_ - a. ji A. a. o_ A a ___ ___ _______________ # //* ___ a___ a____________ __________ __ VAB.OOQ <5 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenaper Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal .10 D-500 Condensor Bottom Seal OS'#* 11. D-500 Lenape Manway Seal * r 12 D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line \ 6. VCM Charge Manifold Line (Area) I I-"* --f k C1 2 3 4 5 6 "" I -r^ V - * A a c c +^ a -LJ*- __ dL. 0 0 0 0 0 o o <2 0 4 0 0 0 0 'PPW fl-lp -1 . 'F'l ' I "f - * '"fn j hp - . .i , r' r. |t>#~ |,ir . , VAB.0001082179 *" 'I- 'I" V -.i ,n M I; p .r-:^ j . Ah ...... rllL--t. t VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A O 4 VAB.0001082180 * t VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: AT I ON: , New Reactor Area - Reactor Module t4 H ^ " 1 A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) l. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal \ 6. 742 Condenser Bottom Seal r' 7. 742 Recovery Valve 8. 74* Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal - j __ p * o _ 0 __ _J _ a o /g- d_ __ __ __ d d d d. _ 6 o a- A T t -i- n:i * n r i1 lj-1 * IH >1: H* |-r VAB.0001082181 \ I. B. Third Level (Top of Reactors) (Cont.) * 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Punrp Seal 4. 902 (North) Vacuum Pump Overflow A 5. 903 Recovery Compressor SEal 6. 903 Recovery Conpressor Overflow.*., 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Hlj ' * "HT'i-1- 1KJ H V1 '*1 | i- : jV!- -t i- 0 ___ 0-- ___ 0- 6 0 d 0 a a /3 5* // o o ______ ______ ______ ___ ^ ______ 0 ______ ______ ______ d_ ______ ___ ______ __________________________ CL VAB.0001082182 d 1*1 New Reactor Area - Recovery Unit, (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A _ ..... 4 0 a --------------- ------------------ ... <- - ________________________ a o . O 0 0 0 d _ 0 \ d 0 0 0-- ____________________ Pa 0 d d> -I E f*i :i 'vr ii' -I-................................ ! 'I"-- ..................... T I- * - I 'I VAB.0001082183 . New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head t22. South Fresh VCM Filter Pack Head Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) * 8. East VCM Charge Pump Seal h 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Plat form) 14. West VCM Return Pump Seal I 15. East VCM Return Pump Seal 1st Floor - V-ll (Area) 2nd Floor p 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A HA 4 * -* ,_____ ___ G_ _____ o_ ___ _____ CL a _____ ________ a. _____ ________ a _____ d _____ ___ ________ CL _____ ________ . . -O- _____ ________ ___ <2_ __ _ ___________________ _____ ________ i _____ ________ Cl Cl a a a-- &__ VABD001082 UR %f Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal * 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal T -Ofr 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve - 2. D-400 Dump Valve D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) l I' 'i ' + - j `K S ^ h -1 ' r ' ' 'f . : i i' 1 j a|i " 1 . j'-hJ"!': .-H p- i-S -p -t- _0 0 ^0 04*0-7^ - ___________________________________________________________________________________ _____ ___________ 0 v * * _m fl I ____ _ 0 - --- -V _____ ________ 0 ________ ____ ____________ >> * 0 _____ __ ____ _ 0 _____ 4L- _____ ________ _____ __________ _0 _____ ___________ _ d. _____ ___________ _ ___ 0 _ _____ ___________ _ 0- __x2L ,, -0 P'Jl * Hi- t VAB.0001082185 \ ;r Y * * I VP V. VCM Tank Farm 1. 2. } * 3. #1 Compressor (North) #2 Compressor #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A Q. O a Cl l pa,. i .! p . ....................................... - r.......................... . . I.. J i- VI..................... - ' ' I ' ' 1 1 f' -I If ' |1'. : j -i'rj.' :".i" " : 1 n(. 'H VAB.0001082186 fl VCM LEAK SURVEY A -VINYL AREA- DATE: * INSPECTOR: AT I ON: * -- ''New Reactor Area - Reactor Module t4 -" " 11 A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 __________________ _ ________ ______ _ ___D-__ _______ _ ________ ________ IV . / ___________________ ___________ ________ _______ _ ,, 0__ ._ ________ ___________________ ___________ __ 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) _______ _ ________ _______ ____________ __ ________ ________ ________ ________ 0 _______ _ ________ ________ ________ O ____________________ ________ ___________ ______ 0 _______ ___________ _______ _ ________ ___ O__ B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74& Rinse Water Line 9. 743 Leanpe Seal 0. 74 3 Condenser Bottom Seal ---.---------------,------------------------------------------------ --------------------------------------------------------------------------------- ------------------------------------------------------ _ a _ ^ __ & ^* #* -----------------------------------------*--------------------------- -_____------------------ -------------------------------------------- -- ------------------------------^ -- " -------------------------------------------------------------------------------- n <? .0. ... d VAB.0001082187 r B. Third Level (Top of Reactors) (Cont.) t 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal r 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve * New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow V j f 903 Recovery Compressor SEal % .6. 903 Recovery Compressor Overflow^ 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9: 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow T Page 2 of 6 r 9 V A 0 <7 <5> O d d d 0 0 0 d d d 0 d d VAB.0001082188 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal: a. *> 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 0 A A <L CL <L _d_ j2_ d. d d. o VAB.0001082189 t II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head IIIP Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) V 6. 401 Receiver, Bottom (Area) r 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal. 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 5T~ 14. West VCM Return Pump Seal (/ 15.' East VCM Return Pump Seal ^ B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 *< . w *1 4 1 A o d 0 0 d <2 0 0 y r a a o 0 <3 0 a <3 i i i I VAB.0001082190 Iv. 0Id Reactor Area - Reactor Module A. Top of Reactors Steam Jet Exhaust A. 2. West iSteam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal A 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Seal . 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal r 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal m 14. D-600 Lenape Manway Seal * '* B. Bottom of Reactors 1. D-300 Dump Valve-. 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line I 6. VCM Charge Manifold Line (Area) % 1 . 1 --------------------------------------------------------- " I. A # *V - * - d //*-- d d d d a * o 0 _d__ o d d d d 1 n -I . r ............. ---------------------a I i--------1 1 H T' r~ir *,-,1 WT >4 1 VAB.0001082191 t" VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A a o VAB.0001082192 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) i B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A 3-io 0 d 0. a 0 c 0 0 & O. 0 0 0 0 0 o O V i L i i 11 * VAB.0001082193 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line A M ^ 7V V KW---'jUUry.) 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A 0_ 0 0 on VP J2. a o A d. 0 0 0 a. a VAB.0001082194 Page 3 of 6 A II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) ________ ________ ________ ________ 00 12. East Recovery Condensor (Area) ________ ________ ________ _______ 0 13. West Recovery Condensor (Area) _______ . ________ ________ _______ B. Ground Level 1. East VCM Storage Tank Bottom (Area) _______ 0_ 2. East VCM Storage Tank Top (Area) 0) 3. Middle VCM Storage Tank Bottom (Area) ________ 0 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom(Area) ________ __________ 0 0 6. West VCM Storage Tank Top (Area) 0 7. East (894) Rec. VCM Return Pump Seal ________ 0_ 8. West (893) Rec. VCM Return Pump Seal ________ 0 9. South (891) Seal Water Separator Pump Seal ________ ________ ________ ________ ___ 0 10. North (892) Seal Water Separator Pump Seal ________ ________ ________ ________ 0 11. Seal Water Filter Pack Head 0 12. East Rec. VCM Charge Pump Seal 0 13. East Rec. VCM Charge Pump Overflow ________ ________ ________ ________ 0 14. West Rec. VCM Charge Pump Seal 0 15. West Rec. VCM Charge Pump Overflow ________ ________ ________ ________ 0 16. Rec. VCM Filter Pack Head 0 17. East Rec. Charge Pump Seal ________ ________ ________ ________ ___ 18. East VCM Charge Pump Valve 0 19. West VCM Charge Pump Seal 0 VAB.0001082195 "t r " II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head Ncutt +/Vet* feucJLfetU 11. North, Fresh VCM Filter Pack Head *dUc*-. 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal I Page 4 of 6 A . . . tp-lit*' d Yd a a 0 0 0..- 0 -0 0 a /0O o 0o -0.. 0 0 0 CL <2. VAB.0001082196 Old Reactor Area - Reactor Module 1E_ of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor r# ***** vCtc y Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) r Page 5 of 6 A <3 & yy & & O & 0 <7 O <2 VAB.0001082197 VCM Tank Farm 1. #1 Compressor (North) n #2 Compressor * 3. #3 Compressor 4. #4 Compressor (South) Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A a & VAB.0001082198 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) Page 1 of 6 jZL jZ. <2_ B. Third Level (Top of Reactors) 1. 741 Lenape Seal t 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal t _____ a .. ... 2 D. _ _______ _ _ d ____ o d <7 d * VAB.0001082199 I B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve i II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5 . 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overfl ow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow i r- r - -f ! Page 2 of 6 A tL. d> _ d? d? 0 d> __ ,_____ _______ _____ ^ d_ d d _______ 0 _______ _______ d___ 0 _______ d VAB.0001082200 1 - \ II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 % A A c_ A A A _6_ A A 0 * j t i i i i j r \ i !i i i I 1 I I ! fi l i j 4 A A A A A A 0 0 ^ i t [ i i ii. i L. i- v 3 i i i i i 4 Page 4 of 6 A II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal ________ ________ ________ /* //tf ________ ______ _ ________ ______ ________ ________ ________ ^ # ^ ________ ________ ________ ________ ________ ^ ^ ^ ^ ________ ________ ________ ________ ________ ________ _____ /J 2 d? ________ ________ ________ ________ ______ ________ ________ ^ ^7 ^ ^ q \ 0 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 K^=y-\My 10. D-500 Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 \f 0 c? c? d k k k k k k I k f k k k f I j r i. t i- { i I I VAB.0001082203 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A G \ i ti i \ i <i 4 * VAB.0001082204 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) Page 1 of 6 A 4C3~2>/ C_ _ B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ________ ________ _____ _ ________ ___ q_ __ ... ___ g% ________ ________ ________ ________ ^ of.. D. 0 __ ________ ________ ________ ________ d ________ ________ ________ ________ ^ ^ VAB.0001082205 4 L B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A O 0 0 0 a 0 0 0 CL 0 0 0 VAB.0001082206 IX h h II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A <2- 2 2 a <2 dL j2 : i H' 'h- k i.-! -fr: 1 .-I fI -i: I VAB.0001082207 r II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal .10 Rec. VCM Filter Pack-itead /. . m\ km j&zi fazU. sdJuj 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 <_ o 0 0 0 0 0 C ________ O VAB.0001082208 _______ ______ <Z__ Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal .8 D-400 Lenape Manway Seal 9. D-500 Condensor Seal .10 D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dunp Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A j2j2L VAB.0001082209 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A <3 VAB.0001082210 ** j VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A d_ & d VAB.0001082211 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A 7 4? d d a 9# & d VAB.0001082212 m II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A h-1 t +- A d <3 d d a_ & a & & O. a a_ <5 VAB.0001082213 1* II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Puurp Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal +s'' If V Page 4 of 6 A Pa C2. & <2. & a & _ _____ <3 & & VAB.OOQK)22-14 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A <3 <3 o j2_ j2L o 2 r 1" t-f= 4t A ' ' I: F : | It ' r TM - Jr1* I I-- " t' VAB.0001082215 ft- . V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A So /Pa #/7Da #D #a * VAB.0001082216 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOGAT I ON: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ii ' s- 1 " I I II Page 1 of 6 A C?_ &L & 40 0 4o 0 0 JLd 4L_ VAB.0001082217 h B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow .... i H* h- -- -d'1 H' 1 "t r ..................... TII^K' J Page 2 of 6 A ... jf,. a a _______________ ^ ____________________ & _____________________ _____________________ _____________________ ^ _____ 0 _____ O _____ 0 VAB.0001082218 T* II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condenser (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 ............................................... it : - Hi-h----I ;*-fir.T lift:**. 1-1 - II i I : F - : r ....................................................................... I i s-tv J.. .-r !:. i .'fw. tt .n . ri A cl <L o A A A A A d_ O A A A A A A A A A VAB.0001082219 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A 6 ^2 6L & d o J2l JL o o &L L _j2_ <D So o VAR .0004^2220 <3 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West ;Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold Page 5 of 6 A d? d? d? d> dL d? d? d? d? d? d? <o a. <L a o +-1 =--^ r,s! ri--1 :.j^i ................ i-h `-h- IP l T f t '' ' ' T *'? !*' .-i J--\ I i**: . ................. VAB.0001082221 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A VAB.0001082222 * VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) Page 1 of 6 A ?/ CL cl CL CL _o CL CL Cl <2- B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74^-Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ ______ _ _______ _______ _______ _______ _______ _______ _______ _______ ______ _______ , _______ _______ _______ _______ & ^ & (2 rf r* I 1I I VAB.0001082223 1' * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal .2 901 (South) Vacuum Punrp Overflow 902 (North) Vacuum Pump Seal 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 904 Recovery Compressor Seal .8 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal .10 905 Recovery Compressor Overflow Page 2 of 6 A a 3 <3 _3_ 3 <3 <f 3 3 3 <3 <3 s :i |.. . | .r i ri . ' * <1 _____ d_ _____ ___ _____ ______________________ d d VAB.0001082224 -m r> I. fCa.pn % * II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) I 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 j2 (L d_ _ (L 4 J2. A. Al <2_ &_ A. -is.*!-. : ; i J -- -I T- : 1 < t : I r- t- = 1 fV '' -U VAB.0001082225 .........."V II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A d d //# JL o_ o o_ 0_ a_ <2 a. o A A & d a. O 3AB.00QHi%Z?6 c IV. Old Reactor Area - Reactor Module Top of Re 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Botfccm Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) .HI#. I I ! 1fK'lft --hl.p L .,,t * . . ri 1I 7P >' r * Page 5 of 6 A O Ql A jGL O o Q_ O & a & <3. <3 a. VAB.0001082227 v V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. Pump (S. of Sphere) Page 6 of 6 h & 4 I'- r }i -lEi .. |. .< - ............................................. - .. -Wi, ...... f-nn- 1^.,+ .,. ..... r ' -1.............. ' r | ' P' |s 1- |- 1 'ITVi" ^7" V-l ......... SI " 1 I 4 7|| -t. K H i- -.- S' *.! VAB.0001082228 4 4 1 4 VCM LEAK SURVEY LOCATION: -VINYL AREADATE: INSPECTOR: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) i i B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 14% Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ,. l K Page 1 of 6 A a L <7 a. jCZ. _2 <2. <7 7 j & <7 VAB.0001082229 1 1 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow 1 r r t i i1 ! i Page 2 of 6 A <7 t? CL <2. VAB.0001082230 t Page 3 of 6 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom(Area) __________ 4. Middle VCM Storage Tank Top (Area) ________ 5. West VCM Storage Tank Bottom (Area) _______ 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal * 8. West (893) Rec. VCM Return Pump Seal _______ 9. South (891) Seal Water Separator Pump Seal _______ _______ 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow ________ 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow ________ 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal ^ # ^ # sy g g ^ ^ & & & g? # # ^ ^ g? /y VAB.0001082231 i * II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A ^2 & o a d. L Jl. & J2. J2. O yd & CP _sZ c2- ___ <7 ____ cJ VAB.00010^a2 11 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A O. a VTT ^2___ & <2 o j2 j2 XL CL CL VAB.0001082233 * r 1 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 ir& |." ."I ---tl qir, ,-M 1' |J ; a | ], . I- " i* p'-h | vii . * - v:+ -- .r .i ! 4 rwf ft VAB.0001082234 /it VCM LEAK PURVEY -VINYL ^EADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) Page 1 of 6 & & & B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74^ Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ________ ________ ` ________ ________ _______ ________ ________ ________ _______ _______ _______ ________ ________ _______ t? ^ ^ ^ ^ ^ ^ VAB.0001082235 r B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensers 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow T 1I- ! -I -J.-K **> .. - ' ' .i l- r I ` Page 2 of 6 1^S! J! fl y - *i !.r -y ^.r & Li A A A A A -- _____ ____________________ ____ -0____0_ 6 ___ Q_ _____ ____ _____ ____<L_ _____ ____0_ ____ ___ 6_ ____ a ____ B VAB.0001082236 i II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) * 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 +"!1..................... ---i ii- f i--f" .....................f F - ':f|L I , i nr,.... rL f S 4 "l> ' I I' f- 1 *. I.+. IT ta *- . .p. I: /. Ik) ' ' *7 a L A A 0 1/0 A L L VAB.0001082237 II. New Reactor Area - Recovery Unit (Cont.) d B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) i 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Change* Pump Seal 10. Rec. VCM FilterI m 4f . Pacik Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal r i't i I H --- r -M- =-r-: ' Page 4 of 6 a jr_ <? a a a iTj-r. . rl;]rf ifcf |Lf. . p H-jfrtj- : -I* J VAB.0001^238 1 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold (Area) Page 5 of 6 A 0 0_ <2_ 0 yo 3 <3 0 <y_ 1 4M-"'- : ' ' ' ' ` 1 --'I xr-MT-'-^ar- 'i r ----J-t "-I If -V- V r ! i'r 1 :; V : J- --I- -I- d .. I- . . VAB.0001082239 It V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A o ' "t ' 1: = -;l r ' ' ................... V : ' v ^1 -K' ''t' -iir.-JiT.ns If. 'i--.- - : i ^ . . :> .. ii | i. . I i 'i. v. i j . ..... . _ l-..-5^.. pr-j r VAB.0001082240 r ^+*1 v | fy rtf' - . . h- h VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCAT I ON: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8 * Directly Under 744 9. Sweco (Area) - B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74Jr Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal ! '1...................... r-1 tf -i ' Y Page 1 of 6 A 0 a. o a o o o G O 6 d d 0 * & <0 VAB.0001082241 T-- * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow I- I-- .................. ... Ij l> u -1I t .......................... .................- ll t't- (-h y- . . i - i-i is- I ' a I !: M Page 2 of 6 o a a a o a. <? 0 4 o d O 0 0 c 0 o O' o f <3 VAB.0001082242 jV *i-m- * Page 3 of 6 A II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) ________ _______ ________ ________ 12. East Recovery Condensor (Area) ________ ________ ________ _______ ___ 13. West Recovery Condensor (Area) B. Ground Level ________ ________ _______ _______ 4 ___ <?_ 1. East VCM Storage Tank Bottom (Area) (f 2. East VCM Storage Tank Top (Area) 0 3. Middle VCM Storage Tank Bottom (Area) O 4. Middle VCM Storage Tank Top (Area) 0 5. West VCM Storage Tank Bottom (Area) * 6. West VCM Storage Tank Top (Area) 0 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 0 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal yp a 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow ____ O 0 ... <2. 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal a 0 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal 0 VAB.0001082243 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13 Blowdown Tank Relief Vent (Platform) 14 West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal .i i . r . i 5. North Recovery Compressor Seal i - ' '.i i -.-It--' t-- Page 4 of 6 A 0 0 .l'.iiji - .i ' *. ' '"'I - i fc/-' I- t* .............. p IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A it'-T * -W t*-f HJdr-r 4 ->...... f Hr "I- W-p -ft * p--' --|p p . P f r- ^,1. .VI*. -fc|-T-r,r * , . v* lr | VAB.0001082245 I c- r . 'i. i if'"i *tV'L.. r r*!! ijppni T< p - IK K v Bk V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A O a. a T. - 1 I "! ' .i-M -T i t '- ' +' I- L. 1\ p,' : | `Jpj'MIl'i'pjH Jr; .1 . I r .| |.. +q-.-{ I n ``i r. . 4 I'hM . I- I- 4!> Ij'lii- t. VAB.0001082246 ir,.. l-lflHl- I- 1 ................................., L VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCAT I ON[: I. New Reacto Area - Reactor Module A. Ground -.eve 1 1. 74 Charge Valve 2. Di sctly Under 741 3. 74 Charge Valve 4. Di 3>ctly Under 742 5. 74 Charge Valve 6. Di 3Ctly Under 743 7. 74 Charge Vlave 8. Di sctly Under 744 9. Sw :o (Area) B. Third *vel (Top of Reactors) 1. 74/ Lenape Seal 2. 7ft Condenser Bottom Seal 3. 7f\ Recovery VAlve 4. Rinse Water Line 5. 7f% Lenape Seal 6. 7f$- Condenser Bottom Seal 7. 7*4$ Recovery Valve 8. 7*j2~ Rinse Water Line 9. 74/i Leanpe Seal 10. 7*0? Condenser Bottom Seal :: I .:I i ir.--- =:.1wr i- f 'fi -1 !*+ "H A a___ j2___ & a. 0 & o 0 l 0 - cJ O VAB.0001082247 t" B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow 1 -r* 1 ' |...........................................................t i -J ':-i Page 2 of 6 A a. g__ o_ a. CL o_ o J2-- J2O a a. a CL CL a a & & VAB.0001082248 -|" p-.lj. -.p 4 f - r ' t r| 4i r Page 3 of 6 A 4 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) ________ _______ ________ ________ & 12. East Recovery Condensor (Area) ________ ________ ________ _______ & 13. West Recovery Condensor (Area) ________ ________ _______ _______ Q B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ ________ _______ ________ 2. East VCM Storage Tank Top (Area) ________ ________ ________ ________ ___ 3. Middle VCM Storage Tank Bottom (Area) ________ ________ ________ _______ ___ 4. Middle VCM Storage Tank Top (Area) _______ ________ ________ ________ ? 5. West VCM Storage Tank Bottom (Area) ________ ________ ________ ________ 6. West VCM Storage Tank Top (Area) ________ ________ _______ ________ d 7. East (894) Rec. VCM Return Pump Seal ________ ________ _______ ________ 8. West (893) Rec. VCM Return Pump Seal ________ ________ ________ ________ ___ 9. South (891) Seal Water Separator Pump Seal _______ ________ ________ _______ 10. North (892) Seal Water Separator Pump Seal ________ ________ _______ ________ & 11. Seal Water Filter Pack Head ________ ________ ________ ________ & 12. East Rec. VCM Charge Pump Seal & 13. East Rec. VCM Charge Pump Overflow ________ ^7 14. West Rec. VCM Charge Pump Seal & 15. West Rec. VCM Charge Pump Overflow ________ ________ ________ ________ 16. Rec. VCM Filter Pack Head ________ ________ _____ _______ 17. East Rec. Charge Pump Seal ________ ________ ________ _______ ___ 18. East VCM Charge Pump Valve ________ _______ _______ ________ ___ 19. West VCM Charge Pump Seal ________ ________ _______ ________ i pi , i, -ivsr-K J <-4 ris. |i- j- ' i | i - " :--r- i '' : i ^ ^IL I' II |* *=!: I. M *rl *' ' r > : - ..................1- ri -- ..............-if--" -1 .j . v. i v VAB.0001082249 r,Hf-P- -- H II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 0 0. 0 YABiJOO 1QS225Q , . .. .) _j_. -| Oji'H" n ! H -1 KB (Al' IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condenser Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A ft iftr >r t rf is. i +'i i: i-.r |- ' I- I# 4F* :ra * !'! I -i- fcK-H-pi h >iri- -I . hJ1-- -S- : VAB.0001082251 'V"' if VCM Tank Farm 1. #1 Compressor (North) o^ * #2 Compressor J .ry #3 Compressor 4 * #4 Compressor (South) 5. Railcar Connection, North St at i on 6 * Railcar Connection, Middlei Station n i Railcar Connection, South St at i on * 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 *I t 1- .............. . I- i :k* L:: ' < " ~ r,: >|UI^|*|l.<v/ .(;f|| uv WT .|C.r-,n. .,*( . .-;..n 4- -S VAB.0001082252 hi. , - iHlVl' i*-.--|v,W- 'r' f!" VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave + 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 745 Rinse Water Line 9. 743 Leanpe Seal * 10. 743 Condenser Bottom Seal 2 2 & VAB.0001082253 4 * * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve . DddJL 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow I 'l Page 2 of 6 <L a a. & o <7 <7 VAB.0001082254 * t II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 0 0 0 <0 0 0 0 0 a 0 <2. A 0 mm mT PMV m VAB.0001082255 t T 4 % Page 4 of 6 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal _______ _______ _______ _______ _______ g a VAB.0001082256 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) * Page 5 of 6 VAB.0001082257 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 h <2. VAB.0001082258 -r VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal <2. j2 a e. a a O O o o o 't a o i* * i r i-, VAB.0001082259 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) VVaacuyupmi FPump Seal 9u^y: 4* 1?**. 4. 902 XNorth) Vacuum' Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 0 a 0 0 3 3 0 <0 0 n a a. VAB.0001082260 II. New Reactor Area - Recovery Unit (Cont.) 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 4 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 / * 0 a o a o a o o 0 0 0 0 0 O 0 O o O. _____________________ VAB.0001082261 t II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal / / 1 // 10. Rec. VCM Filter Pack Head .11 North, Fresh VCM FlyileleryrPtPaacckk Heeaa.d // 12. South, Fresh VCM Fiilltteer rack Head''"* 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Punp Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 * O VAB.0001082262 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold Page 5 of 6 __ h a * * d 0 0 4 0 0 VAB.0001082263 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 0 4_ 0 VAB.0001082264 7 ` L,-,+f+1' V's* ,,7"L';\4^* ; . .fe ** -* %1 ** * \ t w VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module * A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 m 3. 742 Charge Valve P 4. Directly Under 742 * 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave r 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal i 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74i Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 4 Page 1 of 6- 'S-& a o o o_ o & i' & * yd & 0 <7 * VAB.0001082265 I t B. Third Level (Top of Reactors) (Cont.) \ 11. 743 Recovery Valve r 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal p- 6. 743 Condensor Valve * 7. 744 Condensor Seal 8. 744 Condensor Valve h II. New Reactor Area - Recovery .Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Conpressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow h 9. 905 Recovery Conpressor Seal 10. 905 Recovery Conpressor Overflow * Tmm V NH Page 2 of 6 ________ ________ & &1 <r & 4* & & & <?> 0 </ a ____ .. (7 . VAB.0001082266 II. New Reactbr Area - Recovery Unit (Cont.) - j A. 2nd Floor (Cont.) * 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) * B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal i V H 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal m w 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 4 * & VAB.0001082267 % \ II. New Reactpr Area - Recovery Unit (Cont.) B. Ground11 L1 evel-- (Cont.) 20. West VCM Charge Pump Valve .21 North Fresh VCM Filter Pack Head .22 South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver,'Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head * 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) % 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal /* // 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal "r Page 4 of 6 * 0 a k 0 a 0 if 4L 0 A 6 0 & 0 VAB.00010^268 if m # IV. Old Reactor Area - Reactor Module A. Top off Reactors w 1. East Steam Jet Exhaust 2. Nest Steam Jet Exhaust i 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal f\ /^^U^rs 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal CUT#* 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve * 2. D-400 Dump Valve 3. D-500 Dung> Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 r _ m JO. a O Q. _____________________ <? y 1 Tm VAB.0001082269 * \ I V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) a Page 6 of 6 Vf / jns^oA VAB.0001082270 II \ VCM LEAK SURVEY I -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 m 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) j + B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 745-* Rinse Water Line m 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6- a. * i 9- a 4 a c i /A" o VAB.00(BO82e?l B. Third Level (Top of Reactors) (Cent.) 11. 743 Recovery Valve -t p 12. 743 Rinse Water Line m 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors m 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6 . 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow ^ * 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Conpressor SEal 6. 903. Recovery Conpressor Overflow 7. 904 Recovery Compressor Seal I 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal % 10. 905 Recovery Conpressor Overflow 4 Page 2 of 6 A tl A d i > id r' VAB.0001082272 Mew Reactbr Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11 VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Con dens / K/& 3 . Ground Level * (Area) 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) h 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal * m' 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal * 11. Seal Water Filter Pack Head 1, 12. East Rec. VCM Charge Pump Seal *m 13. East Rec. VCM Charge Punp Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Change Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 a 0 0 0 A__ VAB.0001082273 4 l II. New Reactor Area - Recovery Unit (Cent.) a B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery V&s**** t A. Area West of V-ll 1. Middle VCM Receiver, Top (Are) 2. Middle VCM Receiver, Bottom (Area) 3 South VCM Receiver, Top (Area) 4 South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head .12 South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Punp Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Punp, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal t T Page 4 of 6 T * 0 6 VAB.0001082274 Old Reactor Area - Reactor Module A. Top cff Reactors 1 East Steam Jet Exhaust 2 West Steam Jet Exhaust 3, D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal S D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal D-400 Lenape Manway Seal 9* D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dunp Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 b * VAB.0001082275 \ / * m VCM Tank Farm < D 1* #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 3. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South.Station *8. North VCM Charge Pump (S. of Sphere) 9* South VCM Charge Pump (S. of Sphere) Page 6 of 6 % A f VAB.0001082276 1 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) UN B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 743- Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A 0 0 0 0 0 0 0 0 0 0 2< -- Jl__ 0__________ d 0 VAB.0001082277 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 3 10. 905 Recovery Compressor Overflow Page 2 of 6 0 0 0 0 Jl a. 0 2< - L 4 m* VAB.0001082278 4 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 i TI V mm A d 0 d_ j2. a. & VAB.0001082279 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) j 2. Middle VCM Receiver, Bottom (Area)j 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Plat form) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal __ __ __ __ __ __ __ __ __ __ __ __ __ __ 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal ----------- - --.................................... .. __ Page 4 of 6 A id 0 dL di 0 dL 6_ jL 6_ d- 0_ d_ J ___ 4 VAB.0QQ1Q^28Q ____ O Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A _______ _______ _______ _______ _______ _______ i 0 0 <0 _______ _______ 0 _______ _______ &O 0 0 0 bbBB^BBBBP^BBB ^BBHAfeBfllivBB^^BBHBB 0 f) 0 ^0 a 0 BB^^^^B^^^PfeB^pB^Bk <S*Q + _______________________________ _______________________________ _______________________________ __________________________ 0 0 0 0 0 0 _^_ VAB.0001082281 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South St at i on 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A % VAB.0001082282 1 uT VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 744"'Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 itF i\ m o_ iL d_ a 0 o x2 & 4 VAB.0001082283 T ii` 1 1 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal * 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow ii m m* T * Page 2 of 6 CL A VAB.0001082284 ir Page 3 of 6 ft II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) _______ _______ 12. East Recovery Condensor (Area) _______ _______ 13. West Recovery Condensor (Area) _______ _______ B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) _______ _______ 4. Middle VCM Storage Tank Top (Area) _______ _______ 5. West VCM Storage Tank Bottom (Area) ______ 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal _______ _______ 9. South (891) Seal Water Separator Pump Seal _______ _______ 10. North (892) Seal Water Separator Pump Seal _______ _______ 11. Seal Water Filter Pack Head _______ _______ 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow A 14. West Rec. VCM Charge Pump Seal ________ 15. West Rec. VCM Charge Pump Overflow ________ _______ 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal _______ _______ 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal _______ _______ _______ ___________ f) _______ _______ _______ _______ _______ _______ _______ _______ , _______ _______ _______ _______ _______ _______ _______ _______ _______ 0 0 Q Q p p q Q ^7 ^ # p ^ p p & *^^**^PI**l<lWliWIBMllllllllipPWlllllllIIIIWBWWW<MPWllW^MIIMIIIIIIIIWilll^^ VAB.0001082285 i 11 .............. ................................................... 44 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal mm Page 4 of 6 K d d 0 A d A A o A d d A d VTtBroooroszm & i 4 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A 6 A A A A 0 & <0 A <7 A A <0 VAB.00010822^7 * VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 9 O CL * VAB.0001082288 f VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. b ,, ' k, 4 Sweco (Area) b B. Third Level (Top o>f Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741- Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 VAB.0001082289 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Conpressor Overflow Page 2 of 6 A A A A A A A 0 ___ 0_ ___ A 0 0 ..A A A A A A A A A A 0 VAB.0001082290 I II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A L 0 a. H1 Tm VAB.0001082291 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) * 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A d_ d 74 & d_ tL d__ d 0_ d 4 d ___ d ___ ___ ___ 0 VAB.0091Q&92 d IV. Old Reactor Area - Reactor Module Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor dk7it~feapni Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 O a & o -$L 4 4 <2. & (2 1 4 <4 <2 4 4 4 VAB.0001082293 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 * & y> Sa VAB.0001082294 VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level J* 1. 741 Charge Valve 2. Directly Under 741 d*r? -- 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 Jjk t . i . - .* 9.** Sweco (Area) B. TTiird Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 23BP Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 4 i B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal ****** r 6. 743 Condensor Valve 7 > 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow ,7 - * Page 2 of 6 A O- 4L a. Jt jL <L 0 A a a a VAB.0001082296 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) * 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Punip Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator ifr Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A O ___ (L __JL ___ ___ 0_ ___0L * 0 Tpn NpMMMpMMMMpf VAB.0001082297 4 * II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal .. .... . ...... HI Page 4 of 6 A tk CL d_ jL _d_ a d <L. d_ d _a -- &-- VAB.000tfi&2298 IV. Old Reactor Area - Reactor Module Top of Re 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold 4 Page 5 of 6 0_ 0 mm mm* , VAB.0001082299 A VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) ,JL Page 6 of 6 A * VAB.0001082300 * VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve sry* 8. in Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal / m* m * Page 1 of 6 A 1 a o 0 0 4Sp 0 0. a ........................................................................................................................................................................................................................................ 0 dr VAB.0001082301 H * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve >< i 7. "744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A _ if ^0 0 fl ip j2-- Zjl. ___ -A -A -A 0 ___d_ __ <L VAB.0001082302 4 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCETReturn Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator `".S' V Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal 4 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) "8. *East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) \ 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal 1st Floor - V-ll (Area) 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal wm f I I PI* Page 4 of 6 A d A & <L it d _ <L d _______________ <2--______________ VAR 4. IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-SOO Lenape Manway. Seal 12. D-600 Condensor Top Seal 13. U < 14. D-600 Condensor Bottom Seal D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold Page 5 of 6 A <2 d. (2 6L. dL 0_ 0 2 0 * VAB.0001082305 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) i Page 6 of 6 A 0 a * VAB.0001082306 t VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve i 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 ^ r ' i- : Sweco (Area) -AtTLStiL* B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 7*2- 8. j&r Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 4 <L j4L jL a a _a_ -4. 4 VAB.0001082307 *. 4 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 741 Condensor Seal 741 Condensor Valve 742 Condensor Seal 742 Condensor Valve 743 Condensor Seal 743 Condensor Valve 744 Condensor Seal 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A (7 <7 (7 # <_ <7 7 S3 a &D a 2-- \ (2-- (2-- ___ a ___ o ___ o VAB.0001082308 H J- 1 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) .2 East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator 1f Vfr.+^A,-. - Y Pump Seal i North (892) Seal Water Separator Pump Seal Seal Water Filter Pack Head East Rec. VCM Charge Pump Seal East Rec. VCM Charge Pump Overflow West Rec. VCM Charge Pump Seal West Rec. VCM Charge Pump Overflow Rec. VCM Filter Pack Head East Rec. Charge Pump Seal East VCM Charge Pump Valve West VCM Charge Pump Seal * Page 3 of 6 A 0 _ o_ O & o & a <2. & & O <L o VAB.0001082309 i II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7 VCM Transfer Pump (under South Receiver) 8 East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal mf 40 Page 4 of 6 A d_ 0 <2 & AB.0001QgS310 0 CM IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal S . r\ 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold Page 5 of 6 tf6 ___ 0_ _jL _1_ d a a -d- d <L d_ _ d d_ d l_ A a. , VAB.0001082311 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle\ Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A * VAB.0001082312 Page 1 of 6 VCM LEAK SURVEY -VINYL AREA- DATE : INSPECTOR: _______ * LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 Iweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal d & A 6 6 A A 6 VAB.0001082313 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve j if-. 5. 743 Condensor Seal 6. 743 Condensor Valve **^'>7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Conpressor Overflow Page 2 of 6 A o a 0 tf d g_ 6 VAB.0001082314 w II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) i 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VC5T Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal.**; * - : * 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow Charge Pump 15. Pump Overflow 16. Head^^*""* fadtoJ) 17. East Rec. Charge Pump Seal 0 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 A i 0 6_ o A A A A A Ql 0 a ___ i -A --A ___ o ___o_ 0 *w T VAB.0001082315 h II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North,^r^sit VCM Filter, Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Puinp Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A 0 & -------VAB.0001^3.16 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal * 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway..Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal K 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A 0 I T VAB.0001082317 4L V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A 0 ft VAB.0001082318 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module* * A. Ground Level 1. 741 Charge Valve * n 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A A JL A A A A A A <7 A A A A A VAB.0001082319 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5 743 Condensor Seal 6. 743 Condensor Valve 7. v 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Punrp Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow - Page 2 of 6 * r ______________________________________________________ A i- 0 0 S* 0 0 % * 0 0 . OAK. 'd d OL <L o 0 O. 0 d a <L 0 <L VAB.0001082320 i New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCPT Return Pump Seal 8. West -{893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator ^ Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 4 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Punp Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 w A <L 0 0 0 0 VAB.0001082321 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) t ***& m East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A d_ A o_ & o 4 4 4 -JL _ 4 . J ... 6 __ 4 -- --4-- iZAB.0001^2322 4 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway-Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve S. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) 4 Page 5 of 6 h. * Pd 0 0 0 d 0 0 0 0 a a d 0 0 d 0 0 d 0 VAB.0001082323 * r* V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A AT* A 4 VAB.0001082324 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 .j * i * , -- 9.' Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74l- Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A SL l 0 a L a d A /! . -A- VAB.0001082325 t B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensers 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve k. n - 7, 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A <L 0_ <L 0 0 0 0 a 0 e_ 0 VAB.0001082326 t II New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condenser (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator v Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 * mm I A 0 d_ . o 0 A. o_ A JL A AL a_ a_ a VAB.0001082327 1 * II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) ******* j8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head * 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A 0_ 0 0_ 0 0 <0 <2. a Jc<2- 0 T AB.0QQlraai28 0 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold Page 5 of 6 \ 0 a & 0 d /a VAB.0001082329 I VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Avi * : Page 6 of 6 A & L d * mmmmm mmmmm . VAB.0001082330 * * rt-. J * VCM LEAK SURVEY / -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve h 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave * 8. Directly Under 744 9. Sweco (Area) t * % B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74j Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal M*l-r rf Page 1 of 6- s A a s r _ _ __ s d if d d d d d d Sdd VAB.0001082331 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal IS. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. -743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery .Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 90S Recovery Compressor Seal l 10. 90S Recovery Compressor Overflow Page 2 of 6 A a. <? 4 <L a <L 0 0 0 0f VAB.0001082332 * 4 m II. New React6r Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) #- 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) t m " 13. West Recovery Condensor (Area) * B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 4 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal * 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal * w 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal * 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 4 19. West VCM Charge Pump Seal Page 3 of 6 mm <? S2. <3 & VAB.0001082333 4 \ II* New Reactpr Area - Recovery Unit (Cont.) w B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver,'Top (Area) * 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. YCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head * 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) h 14. West VCM Return Punp Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal mV T * Page 4 of 6 A d 0 0 0 0 0 _ ___ a ___ 0 VAB.0001QS2334 d * IV. Old Reactor Area - Reactor Module l A. Top df Reactors * 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve * 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) I mm Page 5 of 6 A d d dm d d * r - v _ d d& ^ d d d d 4<J d d d d a d d i VAB.0001082335 4 \ I v. VCM Tank Farm * 1. #1 Compressor (North) 2. #2 Compressor * 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 % * A VAB.0001082336 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 4 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) a* Page 1 of 6- s B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. . 741 Recovery VAlve 4. 741 Rinse Water Line 4 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal mm A ___d 0 _ Jl 0 VAB.0001082337 V B. Third Level (Top of Reactors) (Cont.) * \ 11. 743 Recovery Valve w 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal i 0 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. -743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal \ 10. 905 Recovery Compressor Overflow Page 2 of 6 % A <L 0 d. % O V _ Jil _rl hl- d d d d d d a VAB.0001082338 II. New _ Reactbr A rea - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 4 ' 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal + 9. South (891) Seal Water Separator Puny Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal m * 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal % 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 VAB.0001082339 r \ 1 II. New Reactor Area - Recovery Unit (Cont.) * B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal .9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head ** 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) % 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal ...................................miw- 4. West Recovery Compressor Seal 5. North Recovery Compressor Seel I 4 4 Page 4 of 6 4 A 0 _a\ IV. Old Reactor Area - Reactor Module \ A. Top olf Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 4 12. D-600 Condensor Top Seal * 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) w - W * N v Page 5 of 6 A * . * * - r 0 0 o 0> f* & _ __ a 0 _____ m * 0 O VAB.0001082341 t t \ I r- V. VCM Tank Farm p 4 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 ` % A d & d nft VAB.0001082342 * J 1 \ I + * VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 * 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) * _______ * B. TTiird Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line m 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6* \ f mmm A <2 <2 0 <2 VAB.0001082343 1t * + B. Third Level (Top of Reactors) (Cont.) * l 11. 743 Recovery Valve # 12. 743 Rinse Water Line . 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal * _ Page 2 -of 6 % 15. 744 Recovery Valve ____ 16. 744 Rinse Water Line _______ _______ _______ 17. Steam Jet Exhaust _______ _______ _______ C. Top of Condensors 1. 741 Condensor Seal _______ _______ 2. 741 Condensor Valve _______ - 3. 742 Condensor Seal 4. 742 Condensor Valve _______ 5. 743 Condensor Seal r _______ 6. *743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal _______ _______ \ k * *> _______ _______ 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal _______ _______ _______ 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Conpressor SEal ____ BlMMiBBPBfeaeRM _______ BBHeBBBwpMqa _______ _______ 6. 903 Recovery Conpressor Overflow _______ _______ _______ 7. 904 Recovery Compressor Seal _______ _______ _______ 8. 904 Recovery Conpressor Overflow* _______ 9. 905 Recovery Conpressor Seal _______ _______ 10. 905 Recovery Conpressor Overflow * _______ __________ A <? d 4 dL d_ dt d d? VAB.0001082344 4 II. New Reactbr Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) * 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Punqp Seal m % * 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal i* 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal % 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal T Page 3 of 6 M * A 0 0 0_ 0 0 a 0 A. o 0 0 * VAB.0001082345 * 1 II. New Reactpr Area - Recovery Unit (Cont.) i B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal H 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head % 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) * 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal ....... .......... .......................... ....... 4. West Recovery Compressor Seal * 5. North Recovery Compressor Seal Page 4 of 6 A _^ --j _^ VAB.0001(g346 d * Old Reactor Area - Reactor Module m \ A. Top o Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal * * 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) a Page S of 6 A m\ Y t 0 0 0 d d> 0 d d 0 i wmrnmmtm mmm VAB.0001082347 l I V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor * 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South.Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A //c " /*Q CL VAB.0001082348 m % \ VCM LEAK SURVEY I VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve * 2, Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. . 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74* Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6- f-//-?/ - - e _ d J A m <L A VAB.0001082349 * B. Third Level (Top of Reactors) (Cont.) * 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal * 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve r 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Conpressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal I 10. 905 Recovery Compressor Overflow Page 2 of 6 * 4 d 4 d _______ ___ ____ _______ d a d 0 0 VAB.0001082350 II. New Reactbr Area - Recovery Unit (Cont.) 7 A. 2nd-Floor (Cont.) 11 VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8 West (893) Rec. VCM Return Pump Seal * 9 South (891) Seal Water Separator Pump Seal 10 North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 4. ft 14. West Rec. VCM Charge Pump Seal * 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Punp Seal Page 3 of 6 A O O A A 2* 0 0 JL a a & VAB.0001082351 1 \ New Reactpr Area - Recovery Unit (Cont.) a B. Ground Level (Cont.) 20. Nest VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) + 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head * 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) % 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal * B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal * 4. West Recovery Compressor Seal % Page 4 of 6 A d_ 0 0_ 6 y 6 d 6 dm o VAB.0001082^52 1 Old Reactor Area - Reactor Module * A, Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4, D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A 0 a a & 4 0 d 6 <L 6 VAB.0001082353 l / r VCM Tank Farm * 1. #1 Compressor (North) 2. #2 Compressor * 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 * A VAB.0001082354 ll r i r \ / - VCM LEAK SURVEY -VINYL AREA- DATE: INSPECTOR: LOCATION: * I. New Reactor Area - Reactor Module * A. -G--r-o-u1-n--d---L--e--v--e--l 1. 741 Charge Valve 2. Directly Under 741 * 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) Page 1 of 6- v r B. TTiird Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74jL Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal _______ 9 _______ _______ _______ _______ _______ _______ _______ _______ _ _______ _______ _______ _______ _______ _______ _______ _______ f * Ao 0-- Cl a 0 0 0 VAB.0001082355 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal A 6. -743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve 4 II. New Reactor Area - Recovery .Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow * 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Couqpressor Overflow 9. 905 Recovery Compressor Seal % 10. 905 Recovery Compressor Overflow + Page 2 of 6 0_ 0_ 0 o_ a a o_ a & <? 0 0 o 0 O 0 _____ 0 VAB.0001082356 i II New Reactbr Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) * 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West Tank 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East VCM Charge Pump 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal % 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 m a 0 0 0 0 0 0 0 0 0 0 VAB.0001082357 \ II. New Reactpr Area - Recovery Unit (Cont.) M B. Ground Level (Cont.) m 20. West VCM Charge Pump *Valve 21. North Fresh VCM Filter Pack Head .22 South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver,*Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head m 12. South, Fresh VCM Filter Pack Head 13 Blowdown Tank Relief Vent (Platform) % 14 West VCM Return Pump Seal IS. East VCM Return Pump Seal B. 1st Floor - V~11 (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal 4 Page 4 of 6 A < 1 r O 0 0 0 d--......... 0. & d a <2. a. <? d <? VAB.000108^58 0 f IV. Old Reactor Area - Reactor Module Ii A. Top off Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. DD--S5O0O0 Condensor Bottom Seal 11. D-500 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 * A - i 0 0 a 0 0 .0 0 0 0 0 VAB.0001082359 4. \ I V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 % A e? A f * VAB.0001082360 ...................... ..............1------- 'M--ill^ Jl II li I II P' ' . Jiri.ii`.n HP ^ --.N* ----------- II Ii -------------- -----------I....... ..............I------- > Him !-- II - |. -------.1 1 vcm ui .'i: Hllli T'-p* .. ij . . -M !HlnihimiM ............... L~A-K cz>u~R-\ji?y VAB.0001082361 * ir 4 \ VCM LEAK SURVEY f -VINYL AREA- DATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) * B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 742 Condenser Bottom Seal 742 Recovery Valve 74% Rinse Water Line * 743 Leanpe Seal 743 Condenser Bottom Seal * 4 % 4 fc-* ri m T Page 1 of 6- <7 ,H ; A, VAB.0001082362, a t4 ** B. Third Level (Top of Reactors) (Cent.) i 11. 743 Recovery Valve p 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors * 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal . 6. -743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Conpressor SEal 6. 903 Recovery Conpressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Conpressor Seal 10. 905 Recovery Conpressor Overflow % 4 mm T Page 2 of 6 A 0 0 <2. a. <L ___ 0 ___ 0 ___ 0 ___ 0 ___ a ___ 0 s ___ 0 VAB.0001082363 Ft II. New Reactbr Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal * * 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 lT A <2 i2 0 VAB.0001082364 M \ II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve .21 North Fresh VCM Filter Pack Head .22 South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, To 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head * 12. South, Fresh VCM Filter Pack Head 13 Blowdown Tank Relief Vent (Platform) * 14 West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A a a VAB.0001082365 * Old Reactor Area - Reactor Module i A. Top off Reactors ji 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condenser Top Seal 4. D-300 Condensor Bottom Seal 5. 0-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal * 9* D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 % * _______ ,, # ____ _______ _______ _______ _______ _______ ______ _______ _______ ' _______ _______ _______ _______ t _______ _______ _______ ' _______ _______ _______ _______ _______ _______ _______ _______ _______ A I + VAB.0001082366 a d \ f VCM Tank Farm 1. #1 Compressor (North) * 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South .Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 h. _______ _______ __ _______ _______ __ _______ _______ __ _______ _______ __ _______ _______ __ _____ _______ _______ _____ __ _______ _______ __ _______ _______ i h 4 t VAB.0001082367 1 \ VCM LEAK SURVEY f -VINYL AREA- DATE: INSPECTOR: m LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. .741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741- Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 MB mm * C a <2. 6. a VAB.0001082368 > * 1 B. Third .l 11 Recovery (Cont.) 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow * mmm Page 2 of 6 A 0 l 0 0 0 /t e 4 <L <2 6 4 0 VAB.0001082369 * i II. New Reactbr Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) m 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 4 ' 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal * 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Punp Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Punro Seal /' /* Page 3 of 6 PP ! mm mm A ___ - C7 ___ o ___ a _ * _ fo f-/? d" o </. D, VAB.0001082370 J* h \ II, New Reactor Area - Recovery Unit (Cont.) * B. Ground Level (Cont.) * Page 4 of 6 4 A 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery 0 o A. Area West of V-ll , 1. Middle VCM Receiver, Top (Area) ^ 2. Middle VCM Receiver, Bottom (Area) h 3. South VCM Receiver, Top (Area) -k 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. YCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head m 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Punqp Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal VAB.0001082371 -k. 5. North Recovery Compressor Seal Old Reactor Area - Reactor Module i A. Top off Reactors * 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 4 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal i B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 % VAB.0001082372 J w \ I m V. VCM Tank Farm t 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) d 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 A <2 i VAB.0001082373 f- i,,P"' t VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal # 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 744 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal 7f3 3" V* Page 1 of 6 * 0 a & a <7 <7 <Z <7 . c7 <7 & VAB.OOO^lj/p? B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve d 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A a 0 0 _________________________________________________________ ___________________________________________________________________________ & 0 <T C7 0 * <3 0 d VAB.0001082375 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 <9 0 (9 <0 0 0 0 a 0 0 O 0 VAB.0001082376 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ 4. West Recovery Compressor Seal _____ 5. North Recovery Compressor Seal _____ m .. ............................if...... ... hi......................... miim--m Page 4 of 6 \ii Ji &ijd i 4iiii x- d d_ i i < <r a 0 c? & 0 * 4. 0 a 0 4. 0 <2. 0 VAB.0001082077 -------- ~.i Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal 10. D-500 Condensor Bottom Seal JL l D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold (Area) Page 5 of 6 A VAB.0001082378 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 h a VAB.0001082379 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74l-Rinse Water Line * 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 A 0_ 0. & 0 0 0 d Xo .a 0 0 0 0 <0 d d O a d o o 0 VAB.0001082381 Page 3 of 6 A II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) _______ _______ 12. East Recovery Condensor (Area) _______ _______ 13. West Recovery Condensor (Area) _______ _______ B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ 2. East VCM Storage Tank Top (Area) _______ _______ 3. Middle VCM Storage Tank Bottom (Area) _______ 4. Middle VCM Storage Tank Top (Area) % 5. West VCM Storage Tank Bottom (Area) _______ ________ 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal _______ ________ 8. West (893) Rec. VCM Return Pump Seal _________ 9. South (891) Seal Water Separator Pump Seal _______ _______ 10. North (892) Seal Water Separator Pump Seal _______ _______ 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow _______ 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow _______ 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal _____ _______ _______ _______ _______ _______ _______ _______ _______ ^ _______ % _______ _______ _______ _______ ___ Q_ Q # Q Q_ ___ Q Q_ Q_ Q_ ___ q_ n ___ Q_ Q_ q_ q_ q_ Q_ fl Q_ 0_ O VAB.0001082382 ............... ... ....... .................................1----------- --------------------------------- ----------------- 0 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal m Page 4 of 6 A a a c. a a Q c a. a. o CL a o VAB.000108^83 O Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5.- D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor Bottom Seal I 10. D-500 Condensor Bottom Seal i 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 A VAB.0001082384 * V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 * a VAB.0001082385 % 4 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: V I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) \V 1. 741 Lenape Seal ) 2. 741 Condenser Bottom Seal a 3. 1h 4- 741 Recovery VAlve l. 741 |Linse Water Line ^5. 742 Lenape Seal 6- 742 Condenser Bottom Seal iw\ 8. 742 Recovery Valve 74&- Rinse Water Line CS 9. 743 Leanpe Seal A 10. 743 Condenser Bottom Seal Page 1 of 6 j2_ JL _j2 JL. _a_ J2- c? C a Q. (7 VAB.0001082386 K B. Third Level (Top of Reactors) (Cont.) Id 11. 743 Recovery Valve 12 743 Rinse Water Line 744 Lenape Seal 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line V-1517. Steam Jet Exhaust C. 1T4op of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Punrp Seal 2. 901 (South Vacuum Pump Overflow ft! V 3. 902 (North Vacuum Pump Seal 4. 902 ) yacuum Pump Over 'D 903 Recov ompressor 9903 Recovery Compressor Overflow 904 Recovery Compressor Seal 904 Recovery Compressor Overflow 905 Recovery Compressor Seal lJ 905 Recovery Compressor Overflow *2* jlJl. 9a s' Page 2 of 6 A 0 0 0 0 0 0 0 a o y.a __0L o (2 0 <2 0 0 0 0 0 vAB.oood>a6ag*'N 9 ojt . Page 3 of 6 t' A II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) ________ 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) _______ 4. Middle VCM Storage Tank Top (Area) _______ 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal ________ 9. South (891) Seal Water Separator Pump Seal _______ _______ 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow ________ 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal t p * _______ _______ BBtaBMrtBMiW 0 O 0 0 /j 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 VAB.0001082388 II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal West VCM Charge Pump Seal u) ,/vr. Rec. VCM Filter Pack Head / 'WFC'. North, Fresh VCM Filter Pack Head South, Fresh VCM Filter Pack Head i Blowdown Tank Relief Vent (Platform) l West VCM Return Pump Seal i East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal PMMfn -* -i r Page 4 of 6 JL C_ CL. ___ o ___ a VAB.00010^389 O 4 dfrt IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 --/ ~-aM- Seal 10. D-500 Condensor Bottom Seal 11. D-500 12. D-600 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold f Page 5 of 6 a <2L CL a VAB.0001082390 m V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Charge Pump (S. of Sphere) 9. South VCM Charge Pump (S. of Sphere) Page 6 of 6 k VAB.0001082391 / ' VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal m*T F * I A a. a. a. J2 CL d <2 VAB.0001082392 mT \i' it B. Third Level of Reactors) (Cont.) .11 Recovery i 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve p 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors * k 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 7/ST. 901 (Sou^)^^^pmi Pump Seal ar/ 901 (South) Vacuum Pump Overflow %r. 902 (North) Vacuum Pump Seal J 902 (North) Vacuum Pump Overflow Jir: 903 Recovery Compressor SEal 7 903 Recovery Compressor Overflow A 904 Recovery Compressor Seal 7-87 904 Recovery Compressor Overflow /905 Recovery Compressor Seal ,//--905 Recovery Compressor Overflow Page 2 of 6 A a a o A o a4' o Q o a a. a o a yVo C3L a CL a a o o VAB.0001082393 m r* II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Rec A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13 Blowdown Tank Relief Vent (Platform) 14 West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 55.. North Recovery Compressor Seal Ml . H w Page 4 of 6 A a a a a a. o a a a a a ____________________ CL-______________ _____ ___ o_ VAB.Onm 082&)5 a 01 Old Reactor Area - Reactor Module Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor TTntfom Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) Page 5 of 6 a 0 0 a 0 f VAB.0001082396 m* V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM (S. of Sphere) 9. South VCM Pump (S. of Sphere) Page 6 of 6 A o a x* t VAB.0001082397 VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: r I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 741 Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 O 0 a 0 0 0 _o 0 --a___ a 0 d a VAB.0001082398 T B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condenser Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Compressor Overflow 7. 904 Recovery Compressor Seal 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal 10. 905 Recovery Compressor Overflow Page 2 of 6 _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ ______ _______ _______ _______ _______ _______ _______ ____ _______ _______ _______ _______ _______ _______ _______ _____ _______ _______ _______ _______ ______ _______ O 0 <2 _ jg_ . JL (L <7 <? <y % 1 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Water Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal Page 3 of 6 <7 a o & O & o o 2_ 2_ VAB.0001082400 4* II. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head III. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 4 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal 4. West Recovery Compressor Seal 5. North Recovery Compressor Seal Page 4 of 6 A d_ & a 0 0_ 0_ 0_ 0 0_ 0 VAB.0001082401 3 Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 4. D-300 Condensor Bottom Seal 5. D-300 6. D-400 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold (Area) Page 5 of 6 a o a o <7 CL d CL d jOL VAB.0001082402 V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM 4fc^pPump (S. of Sphere) 9. South VCM Pump (S. of Sphere) Page 6 of 6 * VAB.0001082403 4* r VCM LEAK SURVEY -VINYL AREA- DATE: LOCAT I ON: INSPECTOR: I. New Reactor Area - Reactor Module A. Ground Level n' 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74A- Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal h -71 m wm Page 1 of 6 A o 0 a a o a a AB.00(^)824 04 C7 y B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line j 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal * 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor H 1. 901 (South) Vacuum Pump Seal 2. 901 (South).Vacuum Pump Overflow &.(/ 902 (North)'Vacuum Pump Seal 902 (North) Vacuum Pump Overflow 903 Recovery Conq?ressor SEal 0.? 903 Recovery Compressor Overflow 904 Recovery Compressor Seal + * 904 Recovery Compressor Overflow p/f 90S Recovery Compressor Seal t 4-'> 0 v Page 2 of 6 0 . ____ Q-- o o 0 0 0 0 0 0 a VAB .000^82405 _ ___<2__ t * *' s i .V . ^ <k t i ** * II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) -VCM Collection Tank (Area) / East Recovery Condensor (Area) West Recovery Condensor (Area) B. Ground Level 1 East VCM Storage Tank Bottom (Area) 2 East VCM Storage Tank Top (Area) 3 Middle VCM Storage Tank Bottom (Area) 4 Middle VCM Storage Tank Top (Area) 5 Tank 6 West VCM Storage Tank Top (Area) 7 8 West \ Return Pump Return Pump 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Wateir Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec.VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal i . < *- '- Page 3 of 6 4' 'm* _ i A 0 & d? d? d? d? d? d? d? d? d? & d? d? <? df VAB.0001082406 mmmm V <4 f 1' 4i - t^ * I 1` HL. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head EEL Old Reactor Area - Recovery A. Area West of V-ll w -----------^ - - -- -- 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal (Tv -i- r * * V '/*lr I ^ii- , s- 1iv "*V . \^j, -i * Page 4 of 6 A ____________ ^ <2 0 0 0 <> 0 0 ________________________________ _____ __________________________ & & <0 <3 VAB.0001082407 h r A * < IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor 7"Qp Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) > 4* ** V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM 'Tfat+Jh Pump (S. of Sphere) 9. South VCM Pump (S. of Sphere) t INSPECTOR: LOCATION: i I. New Reactor Area - Reactor Module A. Ground Level +' 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74^-Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal *-- Page 1 of 6 A f < jL d_ <2. & a 0 0 <? <? ______________________________ <? > VAR0001082410 o * J* 0 f wm +- , t- r * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 HLinse Water Line &Fp/ 744 Lenape Seal >47/ 744 Condenser Bottom Seal 744 Recovery Valve iIffy 744 Rinse Water Line Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal m 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Con^ressor Overflow 7. 904 Recovery Compressor Seal * * 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal \*1 ** iT' " ,k % % / 4* * Page 3 of 6 New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. -VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor fArea) /# C B. 5^5^ pauJtx*. B . Ground Level 1. East VCM Storage Tank Bottom (Area) * * 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal \ 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Watef Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal * f ., V* v? ' + * L 0 &D 0 a 0 o 6 o_ d 0 0 <2 0 VAB.000108241 ** F % r i* * * ' v> -a-; * . iM ` , L. #* * *.,. ' j- >',- pi III.. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head EET. Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal m 4: * - '*F /l"* * 4, \ Page 4 of 6 I o o 0 a. v IV. Old Reactor Area - Reactor Module Top of Reactors .1 Hast Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal .6 D-400 Condensor Top Seal * ** 7. D-400 Condensor Bottom Seal .8 D-400 Lenape Manway Seal 9. D-500 Condensor T&P Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Pump (S. of Sphere) 9. South VCM 7**+*/* Pump (S. of Sphere) Page 6 of 6 /S' yy * y VAB.0001082415 VCM LEAK SURVEY -VINYL AREA- DATE: LOCATION: INSPECTOR: * I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74^-Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal *V * * ) > *' * _1 I * ** J -- 1 ,, B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Conpressor Overflow 7. 904 Recovery Conpressor Seal t 8. 904 Recovery Conpressor Overflow 9. 905 Recovery Compressor Seal 10. mm w /- , -V 9 r * VJ ^* * Page 2 of 6 * 0 0 a 4 +* s. % I II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. -VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) * k 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal \ % 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Watet Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal -/ Page 3 of 6 . I* l 0 A A A A & a A 1u ' + / r *. * ri + - h. **P .- ; *-* . * V -- T III. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head Old Reactor Area - Recovery A. Area West of V-ll * r 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum P , Seal JL--A fs*/*? 3 B (West) Vacuum Pump, Seal East Recovery Compressor Seal I - W '# * IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor p Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve < 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Sfat+Jh Pump (S. of Sphere) 9. South VCM Pump (S. of Sphere) Page 6 of 6 z~z? c~ 0 d_ o_ VAB.0001082421 -I** r / / VCM LEAK SURVEY -VINYL AREA- * LOCATION: DATE: INSPECTOR: I. New Reactor Area - Reactor Module A. Ground Level * 1. 741 Charge Valve 2. Directly Under 741 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74^-Rinse Water Line 9. 743 Leanpe Seal 10. 743 Condenser Bottom Seal Page 1 of 6 A a a (2 ____________________ ____________________ & & VABD001082^22 0 rr, - / V d' t 'i *r .i ^* r ^- * B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 744 Lenape Seal /J^IAi 744 Condenser Bottom Seal 744 Recovery Valve /^-KrT^ 744 Rinse Water Line Steam Jet Exhaust C. Top of Condensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal 4. 742 Condensor Valve 5. 743 Condensor Seal 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal 6. 903 Recovery Conpressor Overflow 7. 904 Recovery Conpressor Seal 8. 904 Recovery Compressor Overflow 9. 90S Recovery Conpressor Seal Page 2 of 6 A 0 Q___ O VAB.00(3t082423 d 6 IP 9 .< .*r< I > / # * * * Page 3 of 6 \* II New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. -VCM Collection Tank (Area) 12. East Recovery Condensor (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) VCM Storage Tank (Area) 7. East (894) Rec. VCM Return Pump Seal \ 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Watef Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Pump Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal 4 ff K 0 0 a a o_ & d 0 0 0 0 0 0 0 0 - d VAB.0001082424 * f. vv i- p /. #-w * * * -# h i r IH.. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh VCM Filter Pack Head CUE. Old Reactor Area - Recovery A. Area West of V-ll r I MM TM i I. r 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) * 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Pump Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal f - t , .? . ' 1 ' ' > ' -- IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal i ' 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor 7'op Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dunp Valve 3. D-500 Dunp Valve 4. D-600 Dump Valve 5. VCM Charge Manifold Line 6. VCM Charge Manifold Line (Area) * - ' . ' *' v <y r Page 5 of 6 A ;t - v O 0 XL o t tr VAB.0001082426 VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Pump (S. of Sphere) 9. South VCM Pump (S. of Sphere) m Page 6 of 6 <5^P VAB.0001082427 4^ -' r /* . a VCM LEAK SURVEY -VINYL AREADATE: INSPECTOR: LOCATION: I. New Reactor Area - Reactor Module A. Ground Level 1. 741 Charge Valve 2. Directly Under 741 * 3. 742 Charge Valve 4. Directly Under 742 5. 743 Charge Valve 6. Directly Under 743 7. 744 Charge Vlave 8. Directly Under 744 9. Sweco (Area) B. Third Level (Top of Reactors) 1. 741 Lenape Seal 2. 741 Condenser Bottom Seal 3. 741 Recovery VAlve 4. 741 Rinse Water Line 5. 742 Lenape Seal 6. 742 Condenser Bottom Seal 7. 742 Recovery Valve 8. 74- Rinse Water Line 9. 743 Leanpe Seal ," 0. 743 Condenser Bgreihu Seal Page 1 of 6 A #S-2 _ -4- _ ______________________________________ ^ ________ Z ______________________________________ ^ a_ A A J if if ___. a ________________________ s` . > . A VAB.0001082428 B. Third Level (Top of Reactors) (Cont.) 11. 743 Recovery Valve 12. 743 Rinse Water Line 13. 744 Lenape Seal 14. 744 Condenser Bottom Seal 15. 744 Recovery Valve 16. 744 Rinse Water Line 17. Steam Jet Exhaust C. Top of Conaensors 1. 741 Condensor Seal 2. 741 Condensor Valve 3. 742 Condensor Seal * 4. 742 Condensor Valve 5. 743 Condensor Seal * 6. 743 Condensor Valve 7. 744 Condensor Seal 8. 744 Condensor Valve II. New Reactor Area - Recovery Unit A. 2nd Floor 1. 901 (South) Vacuum Pump Seal 2. 901 (South) Vacuum Pump Overflow 3. 902 (North) Vacuum Pump Seal 4. 902 (North) Vacuum Pump Overflow 5. 903 Recovery Compressor SEal * 6. 903 Recovery Conpressor Overflow 7. 904 Recovery Compressor Seal m I 8. 904 Recovery Compressor Overflow 9. 905 Recovery Compressor Seal eco lau Page 2 of 6 6_ 6_ d. d_ d r" 1 II. New Reactor Area - Recovery Unit (Cont.) A. 2nd Floor (Cont.) 11. VCM Collection Tank (Area) 12. East Recovery Condenser (Area) 13. West Recovery Condensor (Area) B. Ground Level 1. East VCM Storage Tank Bottom (Area) 2. East VCM Storage Tank Top (Area) 3. Middle VCM Storage Tank Bottom (Area) 4. Middle VCM Storage Tank Top (Area) 5. West VCM Storage Tank Bottom (Area) 6. West VCM Storage Tank Top (Area) 7. East (894) Rec. VCM Return Pump Seal \ 8. West (893) Rec. VCM Return Pump Seal 9. South (891) Seal Water Separator Pump Seal 10. North (892) Seal Water Separator Pump Seal 11. Seal Watet Filter Pack Head 12. East Rec. VCM Charge Pump Seal 13. East Rec. VCM Charge Pump Overflow 14. West Rec. VCM Charge Pump Seal 15. West Rec. VCM Charge Pump Overflow 16. Rec. VCM Filter Pack Head 17. East Rec. Charge Punp Seal 18. East VCM Charge Pump Valve 19. West VCM Charge Pump Seal * Page 3 of 6 A A A A A A A A A A A 0 0 VAB.0001082430 *\ * .* ,, !* <, IH.. New Reactor Area - Recovery Unit (Cont.) B. Ground Level (Cont.) 20. West VCM Charge Pump Valve 21. North Fresh VCM Filter Pack Head 22. South Fresh yCM Filter Pack Head Old Reactor Area - Recovery A. Area West of V-ll 1. Middle VCM Receiver, Top (Area) 2. Middle VCM Receiver, Bottom (Area) 3. South VCM Receiver, Top (Area) * 4. South VCM Receiver, Bottom (Area) 5. 401 Receiver, Top (Area) 6. 401 Receiver, Bottom (Area) 7. VCM Transfer Pump (under South Receiver) 8. East VCM Charge Pump Seal 9. West VCM Charge Pump Seal 10. Rec. VCM Filter Pack Head 11. North, Fresh VCM Filter Pack Head 12. South, Fresh VCM Filter Pack Head 13. Blowdown Tank Relief Vent (Platform) 14. West VCM Return Puiq} Seal 15. East VCM Return Pump Seal B. 1st Floor - V-ll (Area) C. 2nd Floor 1. A (East) Vacuum Pump, Seal 2. B (West) Vacuum Pump, Seal 3. East Recovery Compressor Seal M' Page 4 of 6 4 4 4 4 & O 4 0 4 a O 0 0 4L <2L 0 VAB.0001082431 17 * 4 IV. Old Reactor Area - Reactor Module A. Top of Reactors 1. East Steam Jet Exhaust 2. West Steam Jet Exhaust 3. D-300 Condensor Top Seal 4. D-300 Condensor Bottom Seal 5. D-300 Lenape Manway Seal 4 + 6. D-400 Condensor Top Seal 7. D-400 Condensor Bottom Seal 8. D-400 Lenape Manway Seal 9. D-500 Condensor yb/3 Seal 10. D-500 Condensor Bottom Seal 11. D-500 Lenape Manway Seal 12. D-600 Condensor Top Seal 13. D-600 Condensor Bottom Seal 14. D-600 Lenape Manway Seal B. Bottom of Reactors 1. D-300 Dump Valve 2. D-400 Dump Valve 3. D-500 Dump Valve 4. D-600 Dump Valve 5. VCM Charge Manifold 6. VCM Charge Manifold 4 s. * * V. VCM Tank Farm 1. #1 Compressor (North) 2. #2 Compressor 3. #3 Compressor 4. #4 Compressor (South) 5. Railcar Connection, North Station 6. Railcar Connection, Middle Station 7. Railcar Connection, South Station 8. North VCM Pump (S. of Sphere) 9. South VCM Pump (S. of Sphere) Page 6 of 6 * 0 mm T P! VAB.0001082433