CHEMICAL MANUFACTURERS ASSOCIATION
GERALDINE V. COX, Ph.D. Vico President Technical Oirector
January 30, 1985
BY HAND
Mr. Carlos Tellez Mr. Rick Otis Office of Management and Budget Office of Information and
Regulatory Affairs New Executive Office Building Room 3228 726 Jackson Place, N.W. Washington, D.C. 20503
Re: EPA Information Collection Request #1199
Dear Messrs. Tellez and Otis:
The Chemical Manufacturers Association has taken an active interest in EPA's various regulatory initiatives concerning PCBs and has been an active participant in the most recent Agency proposal to impose additional controls on PCB transformer use. CMA thus has a significant interest in the Agency's Information Collection. Request (ICR) sent to OMB in connection with its PCB transformer proposal. 49 Fed. Reg. 47330 (Dec. 3, 1984).
CMA is seriously concerned that EPA's submission sub stantially understates the burden of compiling PCB Smoke Spread Reduction Plans (SSRPs). The Agency indicates in section 12 of its submission that total resources to. prepare SSRPs will be but four man hours of work at each of 60,000 transformer locations (estimated to cost $12 million). To the contrary, for many, if not most, PCB transformer owners, much more substantial costs will be incurred in employment of the trained personnel necessary to compile an SSRP. Moreover, EPA has substantially underestimated the number of transformer locations likely to require SSRPs.
Pormerly Manufacturing Chemists Association--Serving the Chemical Industry Since 1872. 2501 M Street, NW Washington, OC 20037 Telephone 202/887-1260 Telex 89617 (CMA WSH)
0754804
TOWOLDMON0059703
Messrs. Tellez and Otis January 30, 1985 Page Two
As EPA's guidelines for SSRP preparation indicate, the plan must "be [] carefully thought out," "prepared in accordance with good engineering practices," and have "the full approval of management." The plan must identify all pathways through which smoke from a PCB transformer fire would reasonably be expected to travel. The plan must also describe what systems have been adopted to block all pathways and, moreover, explain "why" these measures have been adopted. Finally, as EPA recognizes, the plan must consider the impact various ventilation blocking steps have on equipment cooling.
Development of such a plan cannot reasonably be expected to be completed in four hours. Each transformer must be carefully assessed, its location carefully surveyed, and all possible smoke prevention methods considered and costed. Complicated judgments about electrical and ventilation systems will be posed. Transformer owners would be foolish to presume that such decisions and development of a plan could be accomplished, and management approval obtained, with three hours of engineer review and drafting and one hour of typing.
EPA has further underestimated the costs of SSRP preparation by ignoring many transformers that may fall within its proposed new controls. EPA's estimate is based on the assumption that the only transformers covered are those 120,000 Askarel (i.e., 60% to 70% PCB) transformers in buildings (with two transformers per location). However, the rule also covers all such transformers "in or near buildings," and EPA has previously estimated there are in total 140,000 Askarel transformers. Second, the rule would also cover mineral oil transformers contaminated with PCB concentrations above 500 ppm, as such transformers are by regulation also considered "PCB transformers." 40 C.F.R. 761.3 ("PCB Transformer" definition). EPA has not in cluded in its estimate for OMB the number of such trans formers. In its 1981 survey of transformers in the chemical industry, however, CMA found almost 40% of the PCB trans formers at responding companies were mineral oil transformers contaminated with PCBs at levels above 500 ppm. A survey at the same time found more than 1 percent of the more than 20 million existing utility mineral oil transformers were contaminated with more than 500 ppm PCBs. 47 Fed. Reg. 17426, 17428 (April 22, 1982). A substantial number of these contaminated mineral oil transformers could also be impacted by the rule.
0754805
[
TOWOLDMONOQ59704
Messrs. Tellez and Otis January 30, 1985 Page Three
In sum, development of an SSRP is, almost by definition, a much more expensive undertaking than EPA suggests in its submission to OMB and is likely to be required at many more locations than the Agency estimates. Furthermore, develop ment of the plan is but the first requirement to be imposed by EPA's recent proposal. 49 Fed. Reg. 39966 (Oct. 11, 1984). The smoke prevention measures identified in the plan must then be implemented -- measures that even EPA estimates will cost approximately $500 million. 49 Fed. Reg. at 39985.
EPA's underestimate of the cost of compiling an SSRP is but a small part of the big problem posed by its proposal for additional controls on PCB transformer use. As CMA's comments to the Agency detailed, EPA has proposed very expensive new controls to address a very slight risk that it has only poorly identified.
To assist OMB in understanding the overall Agency proposal, and to help put the ICR into context, I am enclos ing copies of.the comments CMA filed on both the Agency's advanced notice of proposed rulemaking and its proposed rulemaking, as well as the remarks of the Panel's chairman. Dr. John Craddock, at the Agency hearings last week. Robert J. Fensterheim of my staff (202) 887-1189 would be ' glad to answer any questions or supply any additional information that would be of assistance in OMB's review of the EPA proposals.
Sincerely
Vice President and Technical Director
Enclosures
cc w/ encs:
Brian Mannix
cc w/o e`ncs. :
Denise Keehner TSCA Public Information Office
Nanette Liepman (EPA)