Document reyRKqM00RbxnZwd43oRJDBR0
FILE NAME State of the Art Literature SAL
DATE 1958
DOC SAL064
DOCUMENT DESCRIPTION Special Hazards Survey - Inspection Report from Owens Kaylo Division N.J.
ISSUED
DIRECTION UNDER
HONORARYHONORARY MANAGINGMANAGING COMMITTEE
JANUARY
Keppel Street W.C.1 W.C.1 W.C.1
2
eal
A e
bal
So
ob
aie
Sheer
inte 3 4 Aas
; Naas doe
I
te cn
ee
SPECIAL HAZARDS SURVEY
ELET COSTLY
L L
|
|
; PREPARED FOR
.
|
-MORS
EAULO DIVINA
BY
F. X. 50 C1
Je Me ODEON
sa
2 PLAINTIFF'S
168
April and 1kg 2 19SO
ANOTHER SERVICE FROM THE
PICTON PICTON CASAHAUGE CASAHAUGE OFFICE OF
Engineering DepartmeDntepartment
ome
s.
ATNA LIFE AFFILIATED COMPANIES
Hartford Connectic
Peete o /
Pm
O23] ine Bors
ONES ILLUNDIS ILLUNDIS 74 KADZIDOIIVISIONVISION og.
PERLIN 25 anq +
,
we
. .
.
. .
_
e-
ey
re3
suet YS3 to c:Ase dn Torpos Of thts yrs, .
purpose was determine determine employes
ss
visit this
determine
the employes empelxopyoessurv
.
to exposurv
dust production production
74
eope erations ant tha ve
W. :
the smiter smiter
ContacCtontsacts contacted Preiffer .
ContactsContacts
Mr.
Schl
W.
and
Preiffer PreiPffrereiPfrfeieffrer
smiter e
Manager
Justice Director Ve
Mr.
Personnal
Director Director Mr. Mr. CasuaricCasuaric
Assistant Assistant
15.4mia PersonnaAlssistant Personnal Superintonient Manager
15.4mia
Production
Production
Production Production Production
Production
Superintonient
Superintonient
Superintonient Mr.
Superintonient
Personnal
present
GardnGearrdnegr trait
ONS Alsopresent fir 15.4mia and
15.4mia
SafelySirector SafelySirector
Superintonient and Mr.
Gardner
Grens linois Gardner Bhoc linois Safety the
and Mr. BhocBhocAna
Safety
ranar,
Safety services services
plut this PrBeuggsinesering
Buginering
plut
Buggineering Buggineering
Representative
.
~.
6
Sieas5t
Promitment camples taken Promitment
Promitment Air
camples
were
.
using both
both the
Promitment
Air camples
taken
using
Promitment Promitment were alechol inpinger impinger Promitment
impinger
and
the
the
using isopropyl
isopropyl field alechol the collecting the were following precollectingSmith
collecting mandi
counts counts
made
isopropyislopropyl light light
ffieildeld following
ffolloowinlg lowintg ho
United Health the , mandi
Dust
United States
on
Public
field
HealSthervice
Service procedure
United States
wit Service
== o
~
Health
Public Service procedure Mealy
M =: 2
,
fey
ci a .
er
: _
;
AaSye
million -3
particles particles
particles
por
Aan
Air
,
Sample
M.
HytropapeHrytHryotrpopaappeerrHytropaper
Hytropaper
tototo to
right
right
Charging
Asbestos
his at left side
side
on
~
his left side,
tha
Presthing
mbic foot of air
Hytropaper
ievel Hytropaper Charging
operator
operator
opopereator rator
right the operator
, ,
ththee
brosths
Beene
-
Air _ Ba. as
acl
Air
91.6
Sample Sample No.
Horizontal
3
of of
operator
operatoroperator supporating the
operator who
un
taken
supporating taken
the the
pieces
pieces
ser
ththrroouugghh
through
through
between and the gay
un taken between
the
_
between eats 2s
taMelrtSeeln
foot air ee
th
ey
operator
Sa: n
particles particles eats
Cinas
1
.
level level
o off of
operater operater
Loot
reading
Charging
ac,
Charging
_ or
|
Ar
LL o3
Air :
.
46.3
Sample Sample ~
cubic level of Oparabes
ofair foot of wars
million
me eS
partCiLclCeSs
Dur
Finishing
Finishing
nunovar nunovar nunnuno ovarvar
No. t ' breathing breathing
breathing
breathing
taken at brant leuk,
to tha tri
^'
es
ros
breathing operater -
pe level pan
;
: imey
Se particles per
of cubic
a Bb MsEOE ~ tieyion at
ze 9 ma .9.55
se
pa: Steles
nur
sible
2
aCS%
*
at
of ain,
aorSample
41.5 Aly 11.5
No. 6
riliton million mil ion ~
Pasrariyy = Toten at breathing
Packaging - Taken at
breathing midway midway
breathing breathing
pervislas por cubic foot air .
eee.
Eouter ~ tatan the the
Router - taken at the discharge at the broathing broathing
lovel
applying cloth wrapping the the
.
16.3 milisen particles per cubic foot air air
Air 16.3 million g Molded Pipo
Molded Pipo as he fed
Al>
del million particles per cubic foot of air
Samilg No, Sample
9 + Tubular Mold = taken
Tubular and slitting
at breathing
sawD
level
between
tho
705 million particles
per cubic foot of air
Air
.
Sample
10.2
Sample 1C- No. 2
Stripping Line - taken at
on right side of line to the
breatthe hing first
left of the first opsratos,
million particles
par cubic foot of air
Air
Sample
20.0
Sample
No. 11 Box Car
Unloading = taken
level level men piling Kenite
onto pallets pallets .
onto pallets
milll milll particlos per cubic foot of air
breathing
Air Sample Sample No. 12 Hising
Air
Hising Tubular weighed weighed out mixed
while operator
mixed caplato
weighed out and tye up two
batches
'
cCazplota
75 million particles particles cubic foot foot air,
above Discussion Discussion assist assist in
We we would like to point
interpretation acceptable acceptable acceptable consentration
ef of the dust which
out silica silica asbestos
million
is of air we know
million
particles particles per cubic foot free silica silica 100 that cust cust here
siderably siderably less than generally has
asbestos asbestos therm therm particles particles
acceptable acceptable generally type With been established established million
fcr for operation operation of show
reference to the
that
above the
froa from the sampling sampling show
number the counts are above
the tho a murdoes of tin
~~ ceunty are abeyyg
~2-
mistingoperations limits and several
1 2 and 12 which
Sample No. 8
are
are closely
are the
are acceptable as is also
did While
Air Sample No.
we
1
taking quite web in fast come were
did note that the bagged asbestos was
siderably actually dripping to keep the amount of asbestos
. This wouldwould helpcon-
discussing matter we found that this
asbae sbestossast besto os s asbestosasbestos dust dem
In discussing
-
this
and it was
plant had received a large shipment of asbestos
necessaryto wot this material
store this outsouitdsiede so tthhaatt the rains had thoroughly
thoroughly If it would be possible to wat dom all
thoroughly
and before it is opened
missed we feel that the dust
bagged asbestos
mizding operations would be
exposure in the
bo considered
greatly reduced We would suggest that this
a Air Sample No. 3 choirsa
pieces dangerously band here high two which is the splitting of flat
count In the operation
separates the
ware
pieces
on band
sair
the
man
removing
the
handling the ware
The
band
cox
itself
and does
the
dust
is
due
tothis
of
equipped it is
with a dust collectdoeesrnot creais te too great a problem as
which We fool that an exhaust
system should be is working quite effectively
system this excessive dust fromthe
installed which will remova
breathing this operator was not wearing a
area of the ran We notedthat
should respirator this operationshould
be mandatory
Use ofa respirator for
Air Samplo lic
shows a high
in the above
high cunt
also
As
the
in
paragraph rather to
the dust is not due to a ccasatisngting oporation
of handling handling flat The waro operator to a
handling
of the
flat
the
waro
oporation but
placing
stirs flat ware on the lino up considerable operator placing
itsalfappears to be working
working exhaust system should be
offoctively Here again we feel that an
breathing level of this considered for romoval of the dust from the
man
vas voaring respirator and
At the time of this visit this operator
a we feel that this is essential for
. work
I
Recentlnyoto leaves litmhiitss connected The results of Air Sample No. 5 are
Atthis
point
a man turns
over over
the
approaching the
flat
threshold
The rubbers are a
ware so it
the No. 1 rubber
carding operation which smooths offthe fint
brushwas installed on the No. 1 rubber to
waro
from the top surface after carding This
runove loose dust
We did
that there had
appears to be quite effectiveeffective
belt of the No. 1 rubber andbetehnisonwa esxhnaoutst hookup at the end of the
commeated we feel that the dust
up If cuch woro
might be reduced still further
working herreespirator The manman man
here was using a respirator respirator and we feel
is a desirable practice
that this
Ns
HAP
SDs No. wyn5 vekan
pa mS Ware
No. was taken
at tho
packaging flat wars Here
Here Air smple No. placing
at packaging packaging flat flat wars
twotwo
the mon were placing
ware cartons Again Again
the
the
duo duo
handling operation operation would
suggest d fuurtsht er further studies
minly recoding dust fromtia
would suggest comes off the No. 2 rubber
be made for additionaladditional
aliminate brushes here
varo
nest nest thisdust Chorubber
respirators Perhaps the
wearing respirc ator oopuerlatdionaliminate would to see both bothCio
mon wearing wearing respirators was for ot
No. Our Sample
tho
discharge end taken at
of
router
applying the router discharge end where three men were applying applying
discharge
threshold this covericng limit three sample here above
but
. Our Our
but ount due to the adhesive
the tthrhesrhoeldsholdthreshold applied
the
count counting counting
spray spray
being
being
applied
appliedapplied
pieces our counting
wo counting the a that
particles particles
terduney to burch burch together together togetherwhich which
would would indicate that
spray was elpo
together
,
which
count the adhesive
count overly concerned
mooring the
For
with the results hore hore
25 tubular is StashSaspelepielseMow 9 wag taken at
mold
finishing on is
9 wastaken operates two
Thisocperoatilon lectors
No.there performal performal
one on
who
cars Resides the machines
also the ccarar
fan in back of the
smallwhaust fan we
This
test The during
our
not
respirator during our wearing wearing respirator
With exhaust fan in operator here counts counts
With respirator to bere might reduced
to that
operation would notneed
a man workingworking here
would =,
not nee
AirSample Sample foot ablo hero Sample No. was taken on the No. 2
No. million million
strippinsg tripping line col
count count in only amount dust
particles per cubic
We
col
greater hero tothat set up
equipment equipment
than shoumi
were not
general
our
breathing to set up all
equipment
equipment get get here
a
true
sample
of the
general breathing excessive excessive
working There broken amount Of level stirred stirred when when
broken open be and
has ware of dust stirred We were that molds are broken
been given
renovad
eesewnS. Ss.
been frofromm
from
system
mazfe or
consideration consideration consideration that
consideration consideration consideration
much like
toarmst
operation system system but
this operation
. would respirators rreespsirpatiorrs ators
see and installed installed
should to in meantime meantime feel
worn here
should None were Here being used at time
respirarteosrpsirators should
be wom? hore, Lona
In = w~n In
the
the
box
~ unloading box bay
unloading aATTbags Konito
Gust
is
to This considerablo Bote? dust here due
Konito the of used the arrangements in bronking voy
bronkbrionnkigng
would leakproof 20 be madewith
.
that use broken stack in in the car sosuppliers suppliers
by 22 The non hero vero
wearing
ott
4
all
all operation operation
all times for operation
Sample free silica silica silica There There
form
shipper shipper and
duo
desirable
use should anddesirable arrangements arrangements arrangements could
leakproof bag
notuse
and
car
wearing respirators respirators
the revmenrtevment the
and
and they should be worn
1 respirators an}Mey whould bo
car,
SOI at
program rook Giecked cn the
MAS nth
on
Soupdratos
the respirator
-
POI
program
ah thtg plant
find that it at
respirator He checked the respiratoOwrens Owens Illima
this We are provided
does respirators but with respirators respirators
Illima
they change
standards standards filtern
their filtern filtern desk
provided
the mising mmisingising
found respirator respirator in
in quite quite a
deperbunt Tho cover tight
carton cunt could seep
dusby contaminating area
fitting
in respirator
.
recommending the respirator respirator
that the respirator
respirator contaminating
purpospeurpose recommending recommending up to Oms Illimis
Illimis
discussing the rays .t: for other standado
. U <M-ray
In discussing
program in find that that
to dust given ray program program year findthat
production workers
all
exposed
every Trido ars two years
rays once year year and
rays rays a ment
employees once Trido Jeramic Jeramic for siliensis
has interpretation interpretationinterpetaion
There
no reported reported cases other other
interpretation siliensis
:
:
| . i
:
.
lot subestosis sre a og
Attached Attached are a lot
recommendations which be feel
oof f recommendations decrease the
would prove
,
occupational disease
exposure
a
.
se
,
:
Here Jalukobinfston Jalukobinson Jalluukkoboibnisonnson
.
Va
er,
a LS
7
ae
'
ee,
,
a
: t
i
4
.
t
|
i
i
ot ,
CHERS
ILLINOIS ILLINOIS
KANKLO DIVESION
KORLIN N. Jo
RECOMMENDATIONS RECOMMENDATIONS
standards 1. A review should be made of the
to bring it up to Cans present respirator programprogram program program in order Illinois and should include the
respirators provided A. Two respirators
should be
to dust so that one respirator
for each employee exposed
sterilized while the other is can be cleaned checked and
being used
should 2 A clean free cabinct should
be provided for storage
storage of
respirators at some convenientconvenient place when not in
use
Someone C. Someone should be
basis possibly thneuspilgannetd mtourhsaendle this cleaning on daily
D. Respirators should be worn in all dust
producing include takeat the
areas which
splitter unloading box cars molied
charging of flat ware line
flat ware line and paskagingpaskaging ofsftlraitppwianrge between rubbers on
exdraust installing possibility 2. A study should be
made in regard to the
possibility
possibility possibility of
whereorder order order order to to remove
remove tthheethe excess
from the
fat ware
operations finisihisrnegtoundfrom operator's operations charged on the finishing operations
the splitter where
and on the No. 1 and No.2
The 3.
section of exhaust should be
the No. 1 rubber .
connectedconnected up at the end of the belt
cleaning 4. Would suggest that consideration
consideration be given for
system to eliminate handbrown
providing providing a vacuua
of overhead
sweeping and blowing blowing dam