Document repGGbp1bq0BdOo39yeyeV33G
1
t>. Church/R. Brant J. Kureachak/R. Watt J. Uiffe/0. Cook M. Reilly G. Stoevef/C. Burik D. Drumraond/J. Moelich
1392
jsssxsm
In Attendance: D. Church/ J. Ruxemchak, J. buffs, G. Stoever, R. Brant, Moelich, and R. Matt. *J. Vichieh from the haw Department attended in place of M. Reilly.
Also attending by invitation: X. Kreuer, M. Brown, C. Edge.
Mssrs. Kreuer, Brown and Edge made Che presentation for the
cross-group R&D QAT. Kreuer reguested revisions to the Records
Retention Manual.
Discussion centered on the QAT's
recommendation to keep 'permanent" technica1/laboratory/project
reports. The committee was adamant that a definite number of
years should define the retention period. Periodic review was
suggested to ensure adherence to the policy. This suggestion
i was considered impractical by Edge and Brown, given the unique
character of these records and hard-to-define need Cor periodic
resort to such background data. The "default* time for
miscellaneous R&D documents also merited significant
discussion. The committee decided to take up the RAD qat
proposal at its next regularly scheduled meeting.
t>. Church reported that the Manufacturing QAT will have its first meeting on July 17, 1992.
J. Kuzemchak briefly discussed the Record Center budget during
which he stated that PPG*s lease with Rational Underground is expiring in April, 1993. Rational Underground's first proposal reflects their current charge for space of $4.95 per square foot as opposed to the $1.38 per square foot PPG currently pays as a result of a 30-year lease. Increased costs are projected and the paper recycling operation which, commencing this month, requires PPG to pay $0.Q4/pouud to dispose of records. He indicated that the 1992 expenses should approximate $85,000 versus a budget of $151,651. Part of this surplus is due to the sublease of 10,000 square feet to Wesfcinghouse. The 1993 budget is projected at $116,000.
WV-11040
, .Matt and R. Brant reported on the Ratriura trip of-June 24. The visit resulted in a Tstep-up -in "the destruction of many of the plants documents. --However,-strict accountability does not appear well-defined given that the each department appears to be responsible for destroying its own documents (the Controller's Manual denotes the CFO at each location to have records retention responsibility). The next meeting is scheduled for August 19, 1992 at 1:30 in the 9S Conference room.
J. J. Vichicb cc: D. M. Bailey
R. D. Duncan R. w. LeBoeuf R. M. Rompsla G. A. Zoghby
Bb 196