Mr. R. P. Wooldridge Unde Division Speedway Factory 4801 West l6th Street Indianapolis* Indiana
Mr. J. E. Bertrand Mr. H. L. Phillips Mr. L. 0. Seulter Mr. R. M. Seary Dr. J. J. Welsh Dr. X. S. Lane
46224
October l8, 1974 Medical Department
Dear Mr. Wooldridge: The ten air samples taken during September that you sent on the 30th
hare been evaluated using phase contrast microscopy with the following results.
Eumbers 1* 4* and 5 all had less than one fiber per milliliter that were 5 microns or greater in length. Ro fibers were detected in any of the remaining seven samples taken at various operations.
Very truly yours*
Leo J. LaFrance Industrial Hygienist
UL;eg
UCC 009399
A2 1 692
INTERNAL CORRESPONDENCE
LINDE DIVISION
speedway tactory
asoi west ;6tr, street, speedway. Indianapolis. Indiana 45224
To (Nairs) Division Location
Mr. L. J. LaFrance UCC; Linde Division Medical Dept., 4th Floor New York Office
Copy to
Mr. J. E. Bertrand Mr. H. L. Phillips Mr. L. G. Suelter
Date September 30, 1974
Originating Dept. Acetylene Cylinders Quality Assurance
Answering letter date
Subject
Air Samples - September ----------------------------------------------------
^
K' & A
Ten air samples were taken for the month of September at various work stations throughout the Acetylene Cylinder Operations. The following is a list of samples taken and the pertinent data:
1. Operation of cutting open a cylinder with filler material. The air sam pler was worn by the bandsaw operator. Time interval was 23 minutes at a flow rate of 1 liter/minute. Date taken 9/11/74.
2. Operation of cutting filler material sample blocks. The air sampler was worn by the bandsaw operator. Time interval was 17 minutes at a flow rate of 1 liter/minute. It was noted that due to draft conditions in the build ing, the majority of the dust generated by the operation appeared to be drifting away from the operator. Date taken 9/11/74.
3. General area of the Partec Room. Time interval was 30 minutes at a flow rate of 1 liter/minute. Date taken 9/19/74.
Asbestos Shredder Room (with exhaust blower operating). The air sampler was worn by the operator during the shredding operation. Time interval was 6 minutes at a flow rate of 1 liter/minute. Date taken 9/26/74.
General area of Asbestos Shredder Room (with exhaust blower operating). Time interval was 13 minutes at a flow rate of 1 liter/minute. Date taken 9/30/74.
6. Top of Mix Tank. Time interval 12 minutes at a flow rate of 1 liter/minute
Date taken 9/30/74.
7. Valve well drilling operation. The air sampler was worn by the operator.
Time interval was 10 minutes at a flow rate of 1 liter/minute. The operation included the removing of the autoclave fitting, drilling well, and vacuum clean up. The most dust appeared to be generated by removing the autoclave fitting. Date taken 9/24/74.
8. Undercutting operation. The air sampler was worn by the operator. Time
interval was 10 minutes at a flow rate of 1 liter/minute. Date taken 9/16/74.
UCC 009400
A2 1 693
Mr. L. J. LaFrance
2- -
September 30, 1974
9. Department 511 general area. Time interval 30 minutes at a flow rate of 1 liter/minute. Date taken 9/19/74.
10. General air - top of power cabinet below old rest-room. Time interval of 45 minutes at a flow rate of 1 liter/minute. Date taken 9/19/74.
Enclosed are the ten samples to be evaluated. If you have any questions or comments, please call.
RPW:gh Enclusure
UCC 009401
A2 1 694
i