During the recent styrene shutdown there were seme instances where asbestos was stripped or inadvertently knocked off by crafts other than insulators and not properly cleaned up. This has caused seme serious safety concerns among our insulators and points out a need by all hourly and supervision to raise our safety awareness when dealing with this hazardous material.
By way of this letter, I am asking each of you to hold a meeting with your foremen to assure that they and their craftsmen handle the material in the proper way as outlined in the letter of June 17, 1983 (attached).
Every effort should be made to make the party doing the stripping responsible for the clean up of the material. In cases where we knew that boilermakers or pipefitters have done stripping then their craft should be used to clean up the materials left behind. We don't want the insulators to become the clean up crew for the other crafts.
:rs Attachment
J. M. Gatewood
SC 16019
LAM024772
P. H. Siems/J<=4J^#g^fron, Texas City. Texas
June 17, 1983 ASBESTOS SAFETY
R. L. Hammond N. J. Broussard
R. T. Hammann
Maintenance Supervision Production Supervision
Due to the recent changes in the contract, many of our people will come in contact with insulation from time to time.
One of the insulating materials we still have in-service is asbestos. We no longer use asbestos, but there are areas where it is still in-service and will be replaced with another material as repairs are made or pipe and equipment are replaced.
Until all asbestos has been removed from our plant, every effort must be made to protect our employees from breathing and getting asbestos fibers on them.
Attached are two (2) procedures for identifying insulation that contains asbestos fibers. Also attached are the general rules and practices regarding the stripping and disposal of asbestos material at Monsanto, Texas City.
As stated in the Pabco bulletin using a propane torch is a positive way to identify asbestos fibers. We will have torches available at the Insulator Shop.
To make sure that this information is disseminated to all concerned supervision, please distribute the enclosed copies to your staff.
If problems in identification still arise that cannot be resolved during the day shift, contact the Environmental Group. During off-hours the Shift Maintenance Foreman and Night Supervisor have had special training.
Paul H. Siems /sr
SC 16020
PTB-48-7A February 15, 1979
Replaces PTB-48-7
ASBESTOS IDENTIFICATION IN OLD CALSIL INSULATION*
Because of the health hazards involved in working with asbestos, it is essential that old asbestos-containing calsil be properly identified to avoid accidental worker exposure during maintenance or removal procedures.
Prior to the early seventies, all calcium silicate insulation, and several other types as well, contained asbestos as the reinforcing fiber. Most of the asbestos used was chrysotile, but other types such as crocidolite and amosite were also used. All are hazardous to health.
Since the early seventies, all manufacturers have switched to either glass or organic fibers for reinforcement. Because of the refractory nature of asbestos fibers, they are not destroyed by the flame from a propane (Bernzomatic) torch. Rather, they glow as little incandescent rods in the propane flame. Since the newer fibers -- glass, rayon, polyester, cotton, etc. -- are destroyed by the propane flame, this provides an easy means of positive identification for asbestos.
The simple procedure is as follows.
1. Break a small piece of insulation off a section of calsil.
2. Heat the broken surface with the flame from a propane torch.
3. Observe. Figure 1 shows asbestos-containing material. The material in Figure 2 does not contain asbestos.
4. With some experience, a good worker can break off a chunk of insula tion and tell by eye whether or not asbestos is present. A small magnifier makes the process even simpler to carry out.
*NOTE:
Since December, 1978, the Pabco Division started to mark all of their Super Caltemp production with an identifying green stripe
that shows it is asbestos free.
SC 16021
L
'r^c tecnmcdl ojta shown ore consiaereo ny us rr, r.e i-vi rchoole f'O.vfver, no warranties express or i > ; lied, urn qivan '.r ntfooi J :> : -:nv' ^och w.rranti.'s are nmr.'svv n trhumeri "
LAM024774
I PABCO INSULATION DIVISION Louisiana-Pacific Corporation
1110 16 Road Fruita, Colorado 81521
PTB-48-7A Page No. 2
Figure No. 1 Appearance of asbestoscontaining insulation in propane flame. Asbestos fiber does not melt and shows up as little glowing rods in the flame.
Figure No. 2 Appearance of non asbestos insulation in propane flame. No rods.
sc
16022
(PajSu
^oven'ngr
4. On off-hours, if you are not sure, treat as asbestos, or call Shift Foreman (Ext. 3637) or Night Supervisor (Ext. 3346) who in turn may call Dan Campbell 945-9940 or Ray Moore 944-9489.
HGB:sr 6/13/83
SC 16023
LAM024776
GENERAL RULES AND PRACTICES REGARDING THE STRIPPING AND DISPOSAL OF ASBESTOS MATERIAL AT MONSANTO COMPANY, TEXAS CITY
I. PROTECTIVE EQUIPMENT, CLOTHING AND SHOWERS
1. Protective Equipment and Clothing must be worn at all time when stripping or cleaning up asbestos material. a. Protective Equipment Consists Of: (1) COMFO II custom dust respirator with type "F" filter (2) Plastic gloves (3) Rubber boots b. Protective clothing consists of re-usable cloth coveralls. Cold weather clothing includes cloth jacket and thermal underwear.
2. 16024
Protective Clothing and Shower Procedure a. Protective clothing will be issued by the Insulation Craft Foreman
or Maintenance Shift Foreman on off-hours. b. Protective clothing will be stored in the "CLEAN" room of the
asbestos shower facility. c. Persons working with asbestos must use the Asbestos Shower Room
for cleanup. People entering this facility must use the door marked "DIRTY" if they are contaminated with asbestos. d. At NO TIME should a contaminated worker enter the "CLEAN" room until he has been cleaned off all asbestos. This is accomplished ^y removing and washing both rubber boots and clothes preceded by a shower. e. Respirators are to be collected and return to Safety Supply after being sealed in a bag labeled "USED IN ASBESTOS". The collection bag will be located in the "DIRTY" room.
LAM024777
I. PROTECTIVE EQUIPMENT, CLOTHING AND SHOWERS
Page 2
2. Protective Clothing and Shower Procedure (cont'd.)
f. At job completion or before any meal time workers handling
asbestos must use the cleaning procedure described in the above
steps.
II. PROCEDURE FOR WORKING WITH ASBESTOS MATERIAL AND ITS DISPOSAL
1. Preparation For Work
a. The area must be barricaded off with black and yellow tape at a
distance that would prevent exposure.
b. Warning signs must be displayed around the barricaded areas so
that they are visible from all points of access.
c. The area within the barricade should be kept wet at all times, if
possible.
d. All asbestos material to be stripped must be hosed down and kept
wet until it is placed into the disposal bags.
e. Protective clothing and equipment must be worn at all time within
the barricade.
2. Disposal of Asbestos Material
a. All asbestos material must be placed in .006 thickness plastic
bags labeled "WARNING ASBESTOS MATERIAL". The bags must be sealed.
b. , Only asbestos material should be placed in he bags. Broken
glass, jagged metal, etc. could puncture the bag creating a dust
hazard.
c. The maximum full bag weight should not exceed forty (40) pounds.
Excessive bag loading could result in bag breakage.
d. Bags of asbestos will be carried by truck to the special asbestos
material dumpster located South of the Main Gate Locker Building.
ONLY ASBESTOS MATERIAL PROPERLY BAGGED AND LABELED SHOULD GO IN
THIS DUMPSTER.
v>C 16025
LAM024778
II. PROCEDURE FOR WORKING WITH ASBESTOS MATERIAL AND ITS DISPOSAL
Page 3
2. Disposal of Asbestos Material (cont'd.)
e. Bags should be handled with care at all times to prevent bag
rupture.
f. When the job is completed, the area within the barricade must be
cleaned by washing or vacuuming.
III. PIPE AND EQUIPMENT GOING TO SHOP OR SALVAGE 1. Insulation containing asbestos should be removed (according to our asbestos procedures) prior to the piping or equipment being taken to the Shop for repairs or to Salvage. If for any specific reason, it is desirable not to remove the insulation, it must be handled as an exceptional case and will require special considerations, such as, warning labels and certain notification to the receiver of the equipment. The hauling of piping or equipment containing loose asbestos insulation is PROHIBITED, either in or out of the plant. 2. The transporting of piping or equipment out of the plant containing asbestos insulation can be done provided it fits within the following guidelines: a. The items are to be labeled as containing asbestos using standard labels (Sect. g. (2), ii). b. There can be no loose insulation. All cut edges must be contained by covering and/or taping. c. The transporter and receiver of the equipment must be made aware that asbestos is involved and that he assumes responsibility. This should be done by memo, with copies of regulation attached, if appropriate.
SC *6026
LAM024779
IV. DISMANTLING OF UNITS
Page 4
When major dismantling occurs involving large amounts of asbestos, EPA
requires prior notification. This is usually done by the dismantler
contracted to do the job. The OSHA requirements (and Plant requirements)
for stripping, bagging, etc. will be the same as normal Plant Procedure.
GENERAL: In cases where there is some question whether the insulation contains asbestos, it shall be treated as asbestos until the results of a sample analysis is obtained. The Industrial Hygiene Group can make rapid determination in most cases by microscopic examination of a small sample.
Questions relating to this subject, not covered in this procedure, should be
referred to
or V. A. Mapes.
6/13/83
SC 16027
LAM024780
1. All asbestos insulation will be stripped by insulators on day shift.
2. Any MINOR asbestos or other stripping on off-hours will be done by the craftsman involved following the General Rules and Practices regarding the stripping and disposal of asbestos material. Job MUST be cleaned up by craftsman involved.
3. All flanges and valves containing asbestos MUST be stripped completely, and also the pipe leading up to the flange or valve must be stripped back 34" each way from face of flanges and valves.
4. All non-asbestos material on flanges, valves, and lines will be identified by insulators using a new embossed aluminum metal jacket material.
46028 SC
LAM024781
GENERAL RULES AND PRACTICES REGARDING THE STRIPPING AND DISPOSAL OF ASBESTOS MATERIAL AT MONSANTO COMPANY, TEXAS CITY.
I. PROTECTIVE EQUIPMENT. CLOTHING AND SHOWERS
1. Protective Equipment and Clothing must be worn at all times when stripping-or cleaning up asbestos material.
A. Protective Equipment Consists of:
(1) Comfo II custom dust respirator with type "F" filter
(2) Plastic gloves
(3) Rubber boots
B. Protective Clothing consists of re-usable cloth coveralls or disposable coveralls. Cold weather clothing includes cloth jacket and thermal underwear.
2. Protective Clothing and Shower Procedure
A. Protective clothing will be stored in the "Clean" room of the asbestos shower facility.
B. Person's using asbestos shower facility should sign in with Shift Office and obtain key.
C. Person's working with asbestos must use the asbestos shower room for cleanup. People entering this facility must use the door marked "Dirty" if they are contaminated with asbestos.
D. At NO TIME should a contaminated worker enter
the "Clean" room until he has cleaned off all asbestos. This is accomplished by vacuuming off and washing rubber boots, clothes, hard hat and hat liner, preceded by a shower.
E. Respirators are to be collected after removing filter and washing mask then sealed in a bag labeled "Used In Asbestos". The collection bag will be located in the dirty room.
F. Personnel should not enter control rooms, shops, unauthorized smoke areas or any building when contaminated.
SC 16029
LAM024782
G. At job completion and before any meal time workers handling asbestos must use the cleaning procedure described in the above steps.
H. Portacans, drinking water and smoking areas will be provided.
I. Industrial Hygiene should be called each time for air monitoring and verification of material if in question. Call 3978 or 3628.
PRODEDURE FOR WORKING WITH ASBESTOS MATERIAL AND ITS DISPOSAL
1. Preparation For Work
A. The area must be barricaded off with black and yellow tape at a distance that would prevent exposure, use wind speed and direction as guide for roping area.
B. WARNING SIGNS must be displayed around the
barricaded areas so that they are visible from all points of access. (Signs and barricade tape must be washed off before returning to areas)
C. The area within the barricade should be kept wet at all times. If not possible to wet down, super visor should determine other means of containing asbestos.
D. All asbestos material to be stripped must be hosed down and kept wet until it is placed into special asbestos bags, all exposed ends of asbestos material must be sealed off, with mastic before job is com plete - MCC #120145.
E. Protective clothing and equipment MUST be worn by
anyone inside barricaded area at all times -
NO EXCEPTIONS.
2. Disposal of Asbestos Material
A. All disposed asbestos material must be placed in a .006 thickness plastic bag labeled "Warning Asbestos Material", and sealed, the bags are stored in Warehouse A - MCC #060978.
B. Only asbestos material should be placed in bags. All other material should be washed down and disposed of.
16030
LAM024783
C. The maximum full bag weight should not exceed forty (40) pounds.
D. Bags of asbestos will be carried by truck to special asbestos material dumpster located one block south of insulator shop next to Phenol
tank 010.33T202). -ONLY ASBESTOS MATERIAL
Properly Bagged and Labeled Should Go In This Dumpster.
E. People stripping asbestos must not ride in cab of truck. After unloading of bags the truck must be washed out. Only properly dressed people can handle bags.
F. Bags should be handled with care at all times to prevent bag rupture.
G. When the job is completed, the area within the barricade must be cleaned by washing or vacuuming only.
H. All areas must supply personnel with protective equipment (respirators, signs, bags, barricade tape, gloves.)
PIPE AND EQUIPMENT GOING TO SHOP OR SALVAGE
1. Insulation containing asbestos should be removed (according to our asbestos procedure)[all other piping or equipment should be stripped according to normal procedure] prior to the piping or equipment being taken to shop for repairs or to salvage. If for any specific reason, it is desirable not to remove the insulation, it must be handled as an exceptional case and will require special consider ations, such as, warning lables and certain notifi cation to the receiver of the equipment. The hauling of piping or equipment containing loose asbestos
insulation is PROHIBITED, either in or out of the
plant.
2. The transporting of piping or equipment out of the plant containing asbestos insulation can be done provided it fits within the following guidelines:
A. The items are to be labeled as containing asbestos using standard labels.
SC 16031
LAM024784
B. There can be no loose insulation. All exposed edges must be contained by applying mastic.
C. The transporter and receiver of the equipment must be made aware that asbestos is involved and that he assumes-responsibility. This should be done by memo, with copies of regula tion attached, if appropriate.
DISMANTLING OF EQUIPMENT When major dismantling occurs involving large amounts of asbestos, EPA requires prior notification. This is usually done by the dismantler contracted to do the job. The OSHA requirements (and plant requirements) for stripping, bagging, etc. will be the same as normal plant procedure. GENERAL: In cases where there is some questions whether the insula tion contains asbestos, it shall be treated as asbestos until the results of a sample analysis is obtained. The Industrial Hygiene Group can make rapid determination in most cases by microscopic and propane torch examination of a small sample. Questions relating to the subject, not covered in the procedure, should be referred to your supervision.