Document reZZGXgQxx71191L02x0M30mJ
Vufa CHenvcci Co.-racny
Icke Charles VCM Plant VCM Plant Rd,, P.O. Sox 605
CERTIFIED MAIL =059 203 918 RETURN RECEIPT
February 10, 1986
Wesriake. Louisiona 70669 Phone ^lol 494-5000
V4652
Gus VonBodungen Air Quality Division Department of Environmental Quality P O Box 44096 Baton Rouge, LA 70804
Dear Mr. VonBodungen:
We are informing your office of one incinerator bypass of greater than one hour duration occurring at the Vista Chemical Company VCM Plant. This notice is in accordance with the discharge reporting requirements of Sections 77.9(a) and 76.18(c) of the Louisiana Emissions Standards for Hazardous Air Pollutants (LESHAP).
On February 3, 1986 an incinerator bypass, which lasted
from 1700 hrs. to 2130 hrs. occurred.
The bypass was
initiated by a flame failure indication caused by an
operational upset in the main plant. Anaccumulated
emulsion layer in the Wet Crude Tank registered as the
EDC/Water interface on the tank's level gauge.
As a
result, emulsion instead of wet EDC was fed to the Light
Ends Column causing an operational upset.
To prevent
getting water in the EDC purification process downstream
of the Light Ends Column three steps were taken:
1) The Light Ends Column make was diverted to the EDC wash section.
2) The Light Ends Column feed was reduced.
3) The Heavy Ends Column make was diverted to the EDC wash section.
The increased flow to the wash section caused the Wet EDC
Pump to overload on high amperage. The subsequent high
levels in the EDC Wash System caused liquid carryover in
the wet vent header prompting the bypass. Based on the
VCM Plant modernization material balance, approximately
36 lbs. of vinyl chloride was vented.
The bypass
exceeded cne hour because the standby unit was down for
maintenance and instrumentation problems developed while
restarting the on-line unit.
While the incinerator was
down production rates were reduced to minimize the vinyl
chloride emissions.
CUH 000005907
V4653
To prevent such future occurrences the following measures are under consideration. 1) Maintain the "true" EDC interface in wet Crude Tank
level sight glass. 2) Revise operating procedures for Light Ends Column
UDsets This letter supplements the immediate notification made February 3, 1986 in accordance with LESHA? 76.18(b). If you have any questions please contact George Hopkins, Chief Process Engineer at (318) 494-5062. Sincerely, R. A. Conrad Plant Manager br cc: W. Coltrin - DEQ bcc: RTF, RAC, GEH, MLA, SCR, UTS, VMF, MGH, WLM, JCL
CUM 000005908