Document re0r7KM1MpVopyVqLn5QvpjvE

* Blodcgrariatlon-Ruabon (Hainprize A^odden) Improvement in analytical technioues using capillary column GLC has yielded further results on degradation residues which sug gest that MCS 1016 may be a bigger improvement over Aroclor 1242 than we had previously estimated. We have also had access to other workers* results v.'hich have enabled better identification of chromatogram peaks to be made. We also have some results of feeding trials which show that degradation of many isomers in ` animal organs is different from that induced by' micro-organism of the types we have so far studied. On the basis of these re sults we conclude that residues from HCS 1016 would be very small and our present view is that HCS 1016 does provide a very sig nificant improvement over Aroclor 1242 from*the environmental viewpoint. Further work is planned to substantiate these views during the next few weeks. . . Aroclor Pollution Study-Anniston (l. Ransaw) Carbon Ads orption Study . *. PR&D Report No. 2 covering the evaluation of Aroclor removal from waste streams by carbon adsorption was issued under Job 446-514. (copy attached) .. Pilot Clarification Study _ The pilot clarification unit has been operating since March 15 with minimum mechanical difficulties. Initial test runs were made with optimum coagulant concentrations -- 15 ppm of bentonite clay and 1.5 Betz polye1ectrolyte 1170 (determined in lab by jar test) - at a 5 gpm flow to the . clarifier. Results (Table I) indicate that the floe is not consistent in reducing the Aroclor level to 10 ppb, although the expected solids level is realized. Of interest here is the fact that solids in the plant effluent averaged approximately 50 ppm during the test period. These levels are considerably lower than the 100 to 1000 ppm values recorded when this study was initiated. As a result, more bentonite clay is being added to pro vide more surface area for Aroclor to be adsorbed. Table II contains the results of the study in'which the clay con centration in the food was increased to'30 ppm without.a significant reduction in the Aroclor levels. At this point it was felt that a close approximation of the optimum clay concentration could be realized in a less time-consuming, batch type adsorption operation in the premix tanks, (i.e., whose walls were believed to be saturated with Aroclor from continuous exposure). This effort proved- fruitless except there were some indications that clay would reduce the Aroclor level to the desired value. 2 DEPOSITION 0007138 WATER PCB-00055478 - oo - . TABLE 1 AROCl.On REMOVAL BY FLOCCULATIOH ClAHI FI CAT I Oil . Test Conditions: . Clay cone, in feed - 15 ppm Polymer cone, in feed - 1.5 ppm Flow through clarifier - 5 gpm 0 Avq. Influent Concentration s Volume Treated (qol .) 9,600 16,800 25,800 Sus A-1260 pended or Solids A-1221 A-1242 A-1254 446 240 70 22 16 "7 210 60 * * . Avo. Effluent Con cen tra t-i on Sus pended Solids (ppm) A-1221 31 A -1242 11 A-1254 6 15 23 ' -- NDA 1 41,600 29 100 14 J 48,800 196 38 -- 52,400 52 146 30 __ 57,600 40 560 . 7 - - 64,800 14 105 28 -- 18 . 72 100 2 110 11 66 2 58 8 ** 10 - * 12 -- 6 -9 -- ryr. r I'M* itH`'a/*`-Ai'vla-"'? t*i 9a 0007139 WATER PCB-00055479 TABLE II AROCLOR REMOVAL BY ADSORPTI OH-FLOCCULATION \ Test Conditions: Avg. flow . - 5 gpm Bentonite cTay concentration in feed - 30 ppm Betz polymer 1170 in feed , - 1.5 ppm * Volume Treated (qal. ) 1,500 13,200 20,400 Avq. Influent Concen t r a t i o n ' Sus pended Solids (ppm) A-1221 A-1242 A-1254 ' 24 46 314 86 320 236 18 40 117 ---- Avq.Effluent Concentration Sus pended Solids (ppm) A-1 221 A-1242 A-1 254 ' 50 7 8 41 7 -64 5 -19 15 -- 27,600 . 65 146 54 . - - 34,800 42,000 13 290 160 . -- 9 154 10 49,200 38 73 25 - - . 10 3 5 22 63 7 88 7 17 4 25 4 --- 0007140 WATER PCB-00055480 TABLE III AROCLOR REMOVAL BY ADSORPTI ON-FLOCCULATIOM Test Conditions: Clay concentration in feed - 120 ppm Polymer concentration in feed - 1.5 ppm Avq. Inif 1 u e n t Concentration Avq. Effluent Concontration Volume T rea ted JLgai ) . Sus pended Solids (ppm) A -1221 A-1 24 2 A -- 1254 ' Sus pended , Solids ` (ppm) A-1221 A- 1 24 2 A-12 54 0 8 1 .1,650 480 380 -- . 80 .8;850 210 13 -- 6 2-- 16,050 52 . 42 , 11 9 -- 0007141 WATER PCB-00055481 RESEARCH AND DEVELOPMENT REPORT ANNISTON PLANT ~ OTHER LOCATIONS GENERAL OFFICE *W. G. Engnan - WGK *P. 0. deGarmo - So. 2nd *A. E. Leisy - WGK *A. Rasmussen - WGK *L . S. Tucker - So. 2nd D. Danna (2) *P. B. Hodges *F. J. Holzapfel R. M. Kountz *W. B. Papageorge *W. R. Richard . *J. R. Savage NC}/WM I HU, s i . Job No.A16 - 5 1 4 Onto April 15. 1971 ANNISTON PLANT J. T. Bell . J . L. Corde r J. L. Etheredge V. R. Haupt G. L. Jes see J. C. Landwehr/W'. F. Taffee G. W. Miller /E. G. Wright Title: Arocl or Pollution Study <' . Personnel: Ishmeal Ransaw and Andrew Nelson (J. L. Brown) Problem*. Evaluate the removal of Aroclor from the Anniston Plant effluent . by carbon adsorption Justification: Pollution Abatement Summory: In a 107 day pilot run, approximately 287,000 liters of waste water from the Aroclor sump were treated by passing through a series of four (4) packed-bed adsorbers (each adsorber was a five (5) inch diameter tube packed to a bed depth of 5.5 ft. with Pittsburgh's carbon type Fi1trasorb 300). Test-runs were made at 2 gpm/ft.2, 4 gpm/ft.2 and 6 gpm/ft.2 flows. During the first 20 days?of this study there were periodic indications of breakthroughs . This problem disappeared after backwashing was initiated on a periodic basis regardless of the pressure drop across the columns; The fo11owing conclusions may be drawn from this study: 1. The Aroclor level of waste water containing average concen t trations of 4,795 ppb1 of Aroclor 1221, 1,525 ppb of Aroclor ' 1242 and 95 ppb of Aroclor 1254 can be reduced to <10 ppb total Aroclor upon passing through the first carbon bed. at a 6 gpm/ft.2 flow with an expected carbon loading capacity of 25% (based on the first column). . 2. Backwashing frequency will have to be based on a factor ot.her than pressure drop alone. This factor is necessary to pre vent the mi grati on of small Arocl or.-con tai n i ng parti cl es 1 ppb = parts per billion 2 Breakthrough indicated by effluent concentrations >10 ppb AAroncrllnorr. ' * Appendix sections not i n^Jju do d . 0007142 WATER PCB-00055482 A roc 1 or Pollution Study research and Development Report Summary: (cont'd.) 2. through the carbon bed. The backwash water contains an unacceptable Aroclor concen tration; hence wi 11 have to be . treated before disposal. 3. Based on an experimentally determined 25% loading capacity and 6 gpm/ft.2' flow, the capi tal cost for treating a 200 gpm and 600 gpm is $25,000 +_ 30% and $45,000 + 30%, respectively. This cost does not include pumps, engineering or other indirects. The total cost becomes $99,000 +_ 30% for 200 gpm flow and $129,000 +_ 30% for 600 gpm wi th the inclusion .of a carbon reactivation system. Recommendations: It is recommended that Aroclor be removed from waste streams that contain 60 mg/1 or less solids and Aroclor concentrations not exceeding 10,000 ppb by adsorption in a fixed-carbon bed. Future: A study is presently in progress to evaluate tbe remove! of Aroclor by adsorption on a less expensive adsorbent and then removing the adsorbent by flocculation. . Ishmeal Ransaw PR&D Chemist /dp WATER PCB-00055483 At odor Pollution Study Research and Development Report Page 2 ' BACKGROUND: Anniston PRSD Report No. 1 (Job #446-514, 1/15/71) describes a filtration process in which Aroclor is removed from the waste stream by both fi1tra- tion of neutralization pit solids and by adsorption of any residual Aroclor on the fi1tration media (carbon). .In this study, influent con centrations (100-8,000 ppb)- were consistently reduced to <10 ppb upon passing through a four (4)'inch diameter column (packed to a bed depth of 5.5 inches with granular carbon) at flows up to 350 cc/min. The presence of 200-1 ,000 ppm of inert solid particles (size 1.5-250^) set a. maximum limit on the pressure and flow at which the unit could be operated. 11 was concluded .from this study that: . ' 1. An evaluation should be conducted for removing Aroclor in a pilot adsorption unit, and that ' 2. Such a study should not be conducted on the plant stream with- = out some provision for removing solids. . At that point, it was determined that a solution to the PCB removalproblem could be best reached by separating the study into two'phases - solids removal and Aroclor removal. Conventional solutions existed for the solids removal problem so efforts were directed toward the Aroclor removal phase. The Aroclor sump .provided the best test conditions for this study as the effluent here contains Aroclor concentrations similar to.the total pi ant effluent, but with less solids. The objective of thi s s tudy is to def i ne the op.ti mum flow rate and loading capacity for a packed-bed adsorption system for treating the Aroclor waste water. . The results of this studyare reported herein. EXPERIMENTAL: ' 1. Flow Piagram ' ' ,. Arocl cr r-.jnn 5 f*tT rr LLJLatM a Ln k tua 0007144 WATER PCB-00055484 'Aroclor Pollution Study Research arid Development Report Page 3 EXPERIMENTAL: (cont'd.) . 2. Equi pr.en t Description a. ' Piping -- All piping was done with 1/2 inch PVC tubing and connectors. . . b. Columns -- Columns (numbered 1, 2, 3 and 4 .in diagram) were all identically constructed of clear, heavy duty plastic. Columns measured 6 ft. X 5 in. I.D. Each was equipped with a 5 in. by 1/2 in. reducing flange at the top and bottom. The bottom flange had two separate outlets; one for sampling and one for transfer to the next column. Each column was packed to bed depth of 5.5 ft. (20 pounds) with Pittsburgh carbon (Fi1trasorb 300). c. Feed Pump -- A Jabsco Model P6I16 self-priming pump equipped : with a viton head and impeller. . 3. --G--ene- ral --Procedure Effluent from the Aroclor sump was pumped downflow through the series of packed carbon beds at an initial flow of 2 gpm/ft. (1,000 cc/min.). The columns were not backwashed during the initial phase of testing because it was not warranted by the pressure drop across the columns. Upon observing periodic breakthroughs, however, it was determined that ba-ckwashing could alleviate or eliminate this problem by exposing new carbon surface and preventing channeling. This problem disappeared after backwashing was done periodica' y for" the remainder of the test period-regardless of pressure drop. Flow was increased first to 4 gpm/ft. (2,000 cc/min.) and then to 6 gpm/ft.. (3,000 cc/min.) when there was no. indication of a break through of Aroclor. Results are tabulated in Appendix A. Design and cost estimates based on the experimental results are reported in Appendix B. 4. Sampling .' A 24 hour composite sample (300 ml.) was taken by catching a 100 ml. sample every eight (8) hours at points A, B, -C, D and E. Point A is ^ r t li g influent to Column 1. Points B, C, D and E are respectively the effluents from Columns 1, 2, 3 and 4. Considerable care had to be taken to avoid contamination -since the quantity of contaminants was so small. Care was especially taken to prevent the sample from coming into contact with the plastic bottle caps which are .known to adsorb Aroclor. ' 5. Pjro^ssure Drop The unit was never operated at a pressure greater than' 10 psig on the h e ad column. A pressure drop of 10 psi was used as a signal to backwash however, this was not the only signal used for this purpose WATER PCB-00055485 Aroclor Pollution Study Research and Do vel op risen t. Report Page 4 EXPERIMENTAL: (cont'd.) 6. Ana1ytical Analysis ' The Aroclor was extracted from the aqueous sample into a hexane solvent. Once extracted, the hexane solution was then dried and - analyzed on a EC/GC. - The concentration of Aroclors 1221, 1242 and 1254 was determined by comparing the main peak height of the unknown with tiie height of the same peak in the chromatographs of known Aroclor solutions of pure 1221 , 1242 and 1254. Not a 11 samples were analyzed. Generally, composites caught every other day were analyzed unless some other factor necessitated running samples in between the said period. Samples not analyzed were stored for future . reference. The analytical results are tabulated in Appendix A. 7. Backwashing Frequency and Rate * Each column was generally backwashed every 48 hours except during the first 20 days of operation. This operation was carried out by puniping upf 1 ow through each column at an approximate 6 gprn/ft. flow. This was enough flow to easily expand the`compacted carbon beds by 10%. However, this was not always enough flow to expend the carbon bed in the first column. The difficulty experienced in expanding the first column *was caused by the agglomeration of Arocloi Biphenyl, foreign solids and carbon granules at the top of the col u rr, n Most of the backwashing time was spent trying to break up this apparent solid mass. The backwash water from the first adsorber was saturated with unadsorbed Aroclor and other organics. The condition of the backwash water indicates that Aroclor is being removed by filtration and adsorption. Backwash water will have to be properly disposed of due to its Aroclor content. DISCUSSION: 1. Test Results The results of the 107 day pilot run with respect to'the removal of 'Aroclor is tabulated in Appendix A. These results represent the analysis of 52 sets of samples taken during the. test period. Since t.he analysis 11 mp required to complete an analysis is quite lengthy, only the samples considered necessary to define the problem solutio: were analyzed. With the exception of the brief period in October, . results show that the Aroclor 'was reduced to <10 pnb in the first column. For this reason all calculations are based on the results of the first column. , 2. Process^ Pa ramei e r s a. Influent 'Water Quality -- During the test period approximately 287,000 liters of water was treated with average Aroclor gl^, f;,n,i .. Vs . ootmu WATER PCB"06055486 Aroclor Pollution Study Research and Development Report Page 5 DISCUSSION: (cont'd.) 2. Process Parameters (cont'd.) * a. concentrations of 4,795 ppb of Aroclor 1221, 1,525 ppb of Aroclor 1242 and 95 ppb of Aroclor 1254. Aroclor concentrations' fluctuated from no detectable.amount (NDA) to 90,000 ppb with certain com- ' ponents without arty apparen t effect on the effluent water quality. b. Loading Capacity -- Based on the averaqe influent concentrations and volume treated, a minimum of four (4) pounds of Aroclor was removed by 20 pounds of carbon. This represents a 25* loading factor based on Aroclor alone. This does not take into corisidera- . tion the removal of other organics in the stream, such as Biphenyl. This loading factor could be higher at complete exhaustion since a considerable quantity of Aroclor is actually fiItered out. : c. Flow Rate -- The operation of the pilot junit over the flow profi1c, 2, 4 and 6 gpm/ft. , seems to have little if any effect on the -product water quality. A 6 gpm/ft. flow was essentially aTl that could be realized in this unit. This flow does not necessarily represent the optimum flow. This variable probably should be evaluated further where the equipment permits. ACKNOWLEDGEMENT * I wish to thank Mr. Don Turner, Analytical Lab Technician, who conducted all the Aroclor analyses for this study. Further, I wish to extend gratitude to all the personnel of the analytical lab who helped to monitor pilot operati on during o f,f - s h i f t. /dp Att. Ishmeal Ransaw WATER PCB-00055487 -C(~< Aroclor 5432, Aroclor 5442, Aroclor 5460, Arobrom 5465, and Hc-xabroinobiphenyl (E. S.' Tucker) Development work on the analytical methods for monitoring these materials continues. Sampling of these units will be started as soon as the analytical methods have been demonstrated. The Aroclor 5460 SCASunit is showing possible toxic effects from the test compound as witnessed by a decreasing sludge volume and an observable decrease in LAS degradation. Feeding of this unit has been stopped to determine if it will recover. ' . A review of the progress to date toward developing biodegradation testing methods was held 5/11/71. ` Polychlorinated Terphenvls (PCTs) ,(e. S. Tucker) Attempts to measure PCTs by EC/GC have not been successful. The 300C upper temperature limit of the EC detector did not allow the column temperature to be held high enough to completely elute the PCTs. Fractions of each of the materials were eluted but the relative re sponses indicated that only small percentages of the higher boiling materials were eluted. This approach has been dropped and an attempt will be made to monitor total organic halogen microcoulome'trically. Aroclor Removal from Waste Water by Adsorption-Flocculation (I. Ransaw - Anniston) With the exception of the last two test runs, results.show that eff1uent with an average 61 ppb Aroclor was produced from influent water with average Aroclor level of 288 ppb by varying the cl ay concentration and flow. The resul t of tests carried out a t cl ay concentrat ions of 240 and 480 ppb Arocl or and a 2.5 gpm flow show effluent qua 1ity less than 50 ppb. (See Tables I and II.) However, there .is still considerable fluctua tion in the Aroclor level of the effluent. There is reason to believe that some residual Aroc1 or is being carried out on the solids in the overflow since essential ly the same ef.f 1 uen t quality is realized regardless of test conditions. This possibility is being checked out. At clay concentrations of 480 ppm, the economics of .using bentonite clay as an adsorbent becomes ques tionable. Therefore, in an effort to. realize the desired eff 1 uent quality (20 ppm sol ids and 10 ppb Aroclor) with' a, clarification type process, . powdered carbon will be evaluated. Cheaper sources of cl ay are also being evaluated. The extent of these efforts are reported in the work plan issued 5/11/71. .- WATER PCB-00055488 TABLE I v AROCLOR REMOVAL BY ADSORPTION-FLOCCULATION Test Conditions: *' * ' . Flow to clarifier - 2.5 gpm . . Clay concentration in feed - 240 ppm Polymer concentration in feed - 1' .5 ppm . Volume Avg. Inf1uent Concentration Avg. Effluent Concentration Through put (Gal.) SS* 1221 1242 1254 1260 SS* 1221 ' 1242 1254 1260 3,600 . 42 75 . i7 ...5 -- 7,200 490 590 ` ' 64 15 10,800 37 -- " -- ` T 46 3 -7 -- o CO 11,000 33 23 . . .8 NDA -- -- *SS -- Suspended solids concentration in ppm's & t F.h 1nraPi V(-P l.; 5R t ; c <8 uS kL: lit 000714y WATER PCB-00055489 . $ ' TABLE II AROCLOR REMOVAL FROM WASTE WATER ' r_'_ BY. ADSORPTIO--:;-CLARI FI CATION Test Conditions: Flow to clarifier - 2.5 gpm Clay cone, in feed - 480 ppm . Polymer cone, in feed - V.5 ppm ' Vol time Through put (Gal .) 2,250 5.850 9.450 13,050 16,650 . 20,250 Avg. Inf1uen t Cone. 1221 1242 1254 1260 180 68 = - -- 470 63 = - -- 163 114 -- -- ' 960 760 94 60 68 11 Avq. Eff1uent Cone. 1221 *24 57 0 43 1242 1254 nda' . 3 -'i .5 -- 1260 --- 57 4 26 NDA - - -- 14 1 0007150 WATER PCB-00055490