Document rBzp00zJYzqa9ZMDeY0JVVxXq

MINUTES of the government technical l research committee meeting NATIONAL INSULATION MANUFACTURERS ASSOCIATION Washington, O. C. July 14, 1965 The meeting was called to order at 9:30 A. M with the following in attendance: L. H. Mills T. Ratkins F. J. Powell N. L, Eure J. S. King V/. F. Goddard J. W. Ford N. W. Lemley R. E. Foote R. Seith A, L. Munkres L. Irwin J. Volpe F, A. Covan R. E. Lyons R. D. Baker A. E. Kincaid T. C. Campbell S. K. Heard R, Austin W. Gubar J. Hankammer P. L. Loese K. M. Ritchie C E. Ernst B. Tower V. L. Miller W. p. Sinclair R. E. Harmon J. M. Barnhart GSA - Public Building Service CSA - Oublic Building Service National Bureau of Standards Federal Housing Administration Veterans Administration Veterans Administration U. C, Coast Guard U. S. Coast Guard Maritime Administration Bureau of Ships Bureau of Ships Bureau of Yards fc Docks Bureau of Yards b Docks Building Research Advisory Board General Services Administration Pope, Evans b Robbins Owens~Corning-Fiberglas Corp. Owens-Corning Fiberglas Corp. Owens~Coraing Fiberglas Corp. Gustin-Bacon Mfg. Company Gustin-Bacon Mfg, Company Gustin-Bacon Mfg. Company Eagle-Picher Company Baldwin-Eh ret-Hill, Inc. Johns-Manville Sales Corp. Johns-Manville Sales Corp. Pittsburgh Corning Corp. Pittsburgh Corning Corp. Pittsburgh Plate Glass Company NIMA MEETING ARRANGEMENTS The subject of separate meetings for the land group and the marine group was discussed, ft was agreed that separate meetings for the group would be arranged in the future. 2 IDENTIFICATION OF COAST GUARD APPROVED INSULATION MATERIALS The Coast Guard, ae per their attached letter, requested comments relative to identifying approved materials. ft was reported that the manufactures believed that marking a cartons would be sufficient. NIMA will discuss this subject further at their next T fc R Committee Meeting, BUREAU OF YARDS h DOC ICS SPECIFICATION The latest issue of this specification was discussed in detail. Inasmuch as time is of importance, it was decided that individual comments should be made prior to August 1, 1965, direct to: Pope, Evans Si Robbins 515 Wythe Street Alexandria, Va. Attn: R. D. Baker ft was suggested that NIMA establish standard design conditions and thick* nesses for low temperature pipe insulation. Mr. Barnhart reported that the T Si R Committee was working on this subject. ft was also suggested that NIMA establish criteria for sound absorption qualities of duct liners. FEDERAL SPECIFICATIONS HH-I-558 and HH-I-559 NIMA reiterated its stand against the promulgation of these specifications in their present form. ft was the consensus of those present that the specifications were not usable in their present form and would not be used by the various govern ment agencies. NIMA will request a meeting with GSA to discuss this subject further. GSA SPECIFICATION - AIR CONDITIONING GUIDE 301-B ft was reported that the specification had been revised deleting reference to NFPA Standard 90A. 3 FIBER DIAMETER IN MILITARY SPECIFICATIONS It waa reported that at present there are 11 specifications referencing fiber diameter as a criteria. NIMA is requested to furnish answers to the following: 1. Is fiber diameter a necessary criteria in specifications. Z. If soy what are the ranges of fiber diameter to be used in the specifications. 3. How should fiber diameter be measured. (Microscopic or Air Flow Method) OTHER BUSINESS (a) ft was reported that the program of specification upgrading now assigned to Mare Island, Calif., is to be brought back to the Naval Boiler and Turbine Lab in Philadelphia! Pa. (b) ft was reported that Federal Cpecification HH-I-521 contains reference only to mineral fiber blanket and batt insulation. Blowing wool is contained in new Federal Specification HH-I-1030. ADJOURNMENT There being no further business, the meeting was adjourned. Respectfully submitted J. M. Barnhart