Document rBxed6y25mDgn8N6R91j01yO0
AR226-2552
-^
Washington Works
EPA/COE Update Meeting July 18, 2002
Agenda
Background/Receat Project Activity - RCRA Program Status
- Multi-Media Consent Order Update
- GW Modeling Project
Review Preliminary GW Modeling Res RCRA Program Path Forward
- RFI Report/EPA Review
-El Status
Meeting Objectives
Provide brief overview of recent MMC
activity at Washington Works
Re-assess where we stand with regard t
EPA Region HI RCRA program, determ
next steps (i.e., RFI, EJ.s) Receive technical feedback from EPA/C
on the newly constructed Wash Works Flow Model
^K
Background/Recent Activi
RCRA Program Status
- EPA reviewing RFI report
- C-8 screening levels needed for completio
--- El evaluation also on hold pending C-8
screening levels
- Ongoing GW Modeling project will addre
EPA/COE 2001 comments on 1999/RFI version of GW Model
Background/Recent Activi
Multi-media Consent Order (WVDEP)
Required Elements:
- Toxicology/CAT: Develop RBC-Like
screening levels for dw, soil, and air
- GW/SW Investigation/GIST: Determme
in groundwater & surface water at/near sit - Cap/reduce emissions to air & sw
CAT Highlights
Toxicology team met May 5-7. Nation
recognized experts. Evaluated 20 years
tox data and TERA recommendations.
Final Results:
- Drinking Water: 150ug/L - Soil: 240 mg/kg (ingestion) - Air: Not final, range .1-6 ug/m3
GIST Highlights
Main Plant, Local, Dry Run, Letart Landfills. Have
completed:
-- 1-mile water use survey & sampling (all sites) - 2-mile near Main Plant/Local LF - Ohio River PWS sampling (10 miles up/50 miles
down)/l-4 events per location (15 sites) - Site monthly gw/sw sampling (4 consec. months) - Ohio River Sampling
- Reports (Historical, Monthly, Summary) - Site(s) Investigation, 26 weUs, ongoing
- GW Model, expanded domain, ongoing
ASH02-W7 EID7811S7
EID781157
MMCO-Emissions
Required: Cap air emissions at year 20
levels
Voluntary Efforts in Teflon:
- Teflon Wastewater/Oberim Filter (90%
Reduction)
- Air: New scrubbers installed in April, hop
achieve 85% reduction
MMCO-Groundwater
Modeling Project
Little Hocking WA 12/2001 results provided near -term d
Objective: Is groundwater transport of C-8 possible from
site to LHWA well field
GIST Oversight Use team of regulatory technical experts (I.e. USGS, WVB
EPA, COE) throughout process
Today^s Objective:
- Mid-term review of progress to-date, including model
conceptual model development, calibration runs, to ob early feedback and answer questions