Document rBvxe94O1vq9wDXoxLrrKvZev
w
Dele: January 24, 1986 To: R. J. McCloskey
Copy: . See Distribution From: Jim Fisher sublect: .EPA RULING ON ASBESTOS
Internal Correspondence
R. Burks M. Collins D. Fraser T. Kelly J. Latsko K. Patel R, Rauch
J. Smith R. Smith J. Spangler
R. Spratt J. Topola B. Turchek
E. Vogler
EPA is issuing a proposed rule today to elimiiiateV the of asbestos in all products. This proposal? wills, go
Alternative 1:
j- . *r-'S -i-> - , l;;-'J-r Eliminate the use of all abfcos'T/ikCtion products
years after promulgation^'dil thertxiifi
1. .!" \J
five
The same as Alternative l%^it affects friction products.,
.
Alternative 3; '
9**.. o `
ii- 'V
<4 <:>*.
^ ' Ci.'"'
-'
.
. Phase down.. th"^ use |pf ^asbestos friction products over a ten year jo^f'i-.od a[ftsr' promulgation of the rule.
We agr%<d/thisj:\i|ek to replace all NF-285 asbestos material
with 'N&r'4i0, .^no.h^asbestos material.
This will be the
standa.rd `cpefficient material for the VC, E, VE, DBA, and
cal.ij^er products. We are currently evaluating a standard
cpe&f icien^'non-asbestos woven material for the CS/CT
,,Vi. pjpducfeeii The CB/EB friction materials tested to date are
In coefficient at the higher surface speeds.- A
'V'refojrroplation of this material should be received early next
week "" to extend the operating speed range to match our
.-products. Nafco is confident their reformulation will
v>,.derform as expected. We will have preliminary evaluation of
/'Vlhe CS/CT material and the CB/EB material by mid-February.
If these results are favorable, CB/EB complete testing would
^ be done in March, and CS/CT in April.
fC"T> C30 ?>lH. 12.8J)
SCF-EC-3035
1
Page Two Staff January 24, 1986
NF-127 and NF-276 low coef^i^'^ntf'iinings for VC, caliper,
and centrifugal clutc^e^jO:the^J^iie high coefficient CT
material for Standun, f-tHe:^Abe;x<'438x23 standard coefficient
for centrifugal cl'ufccljes, \ji5je Abex 693-551 standard
coefficient for one.i.large sjjze E application, and the NF-^Sl
standard coeff ic&4bt> GB!l.application for Washex. . The
replacement for
and NF-276 may come as a result
of.Navy development'testing, which will leave mainly special
application matVFial^^hat need replacement.
If the next"fttfmth b'f'testing is successful, we can eliminate most of opr^asDestbs products this year.
Jinv^Fishdr,
FAW 24334