THE ASSOCIATED ETHYL COMPANY LIMITED 20. BERKELEY SQUARE, LONDON, W. l
Note' to Mr. Muller
t - 5 10-00-03-00281
May 15th, 1957-
TEL Blending Plant
- - We have discussed Type of TEL Blending Plant with
Dr. Akatsuka of Tokyo Medical College who is a technical adviser
of Ethyl Corporation and Du Pont.
'
He wrote a letter to Ethyl and Du Pont stating that our TEL Blending Plant is designed not to wash TEL drums because only a few cc of TEL is remained in a drum according to the instruction by The Associated Ethyl Company.
He received a reply from Accounting Manager of Petroleum Division of Du Pont saying that they recommend to install gasoline wash line, if we stick to the weigh tank blending plant. Dr. Akatsuka expects the similar answer from Ethyl Corporation.
^ ! |
Since that is the case, we should like you to write a letter to B.P.M. and convince Du Pont that A E C 's device does not require drum washing.
j !
Since we are obliged to be supplied TEL by three suppliers, Ethyl Corporation, Du Pont and AEC, we will not be able to install a TEL Blending Plant which is objected by one of them.
- ' On the other hand, Dr. Akatsuka wanted to know how long the, ;
AEC's stand pipe device has been in practice and its practical
data. .
' 'r
In General,
" ' '
'
Dr. Akatsuka is not in favour of the weigh tank blending plant from
,the, following stand points
,,
-
We have no experience in that type of blending plant.
;
- W e have no practical data experienced in other refinery.
"`Therefore, we do not know the advantages of the pla n t .
' 3 . It may be dangerous to operate the plant by Japanese workers
in view of their educational background.
* f. Since Our Refinery is located close to sea, weigh tank scale is
;; apt to cause trouble.
5. We experience much earthquake.
r We hope that BPM will contact Ethyl Corporation and Du Pont
so as to obtain their approval about our way of blending plant as
soon as possible.
Mr., Goodcliff
K. Taraagawa
Chief Engineering, Section 1.