Document rBpnY8j2r27Ex6nXYz4eve6Or
00
'jtxQL-
Washington, D C. 20004 202-737-6330
Organization Resources Counselors, Inc
May 26, 1987
Memorandu
To: ORC Asbestos Task Force
From:
Rebecca L Daiss
Subject: ORC Asbestos Data Collection Project . V\i u.'
\
Attached for your review is: 1) the filial draft of the->ORC Asbestos Sampling Data Sheet for Small Jobs;--^2) the instructions for com pleting the sampling sheet; 3) the introduction to and rationale for the ORC Asbestos Data Collection Project; and 4) the requirements for participation in the Asbestos Data Collection Project.
We would appreciate receiving your comments on the attached material before June 23 as we want to begin collecting data by July 1 from those companies who have already made the commitment to take part in the survey. We will send the same package, revised according the comments we receive, to the ORC Occupational Safety and Health Group at that time in an effort to broaden participation in the survey.
The Asbestos Removal (large job) Sampling Data Sheet and accompanying documentation is being revised and will be sent out for your review and comment upon completion.
BD/3
Collection Project
ASBESTOS SAMPLING DATA SHEET
1. SHEET NUMBER
.2 TASK (REMOVAL OF ACM IS NOT
d. ACM LOCATION (CHECK ALL THAT APPLY) (Telecom/Utility Specific)
PRIMARCYUiGi OuAL)^oA , , _ U7M- C,^i_\_ uofd
0 Above hung ceiling
a. TASK DESCRIPTION (CHECK ONE PER SAMPLING
A
^
O Beams/columns O Crawl space
ACTIVITY)
0 Tunnel
O Manhole
O Open ceiling tiles O Remove cable cover
0 Cable vaults O Piping
O Cable maintenance
O Other
0 Splicing cable
0 Pulling cable
e. LOCATION OF JOB
0 Task clean-up
WITH RESPECT TO ACM
0 Equipment installation
(Telecom/Utility Specific)
0 Equipment removal
0 Brake work
0 Adjacent to
0 Clutch work
O On
0 Gasket work
0 Through
0 Boiler maintenance
O Other
0 Pipe maintenance
0 Valve maintenance 0 Other equipment
f. DISTANCE TO ACM (Telecom/Utilty Specific)
maintenance
0 Shipwork
0 < 1 ft.
0 Other
0 1-3 ft.
0 3-5 ft.
b. ACM ACTIVITY RESULTING FROM
0 5-10 ft.
TASK (non-telecom/utility)
O 10-20 ft
(CHECK ALL THAT APPLY)
0 >20 ft.
0 Wetting 0 Removal
3 TYPE OF ASBESTOS (INDICATE % IF KNOWN)
0 Bagging 0 Transporting 0 Drilling/cutting/grinding O Incidental disturbing 0 Other
0 % amosite 0 % chrysotile 0 % crocidolite 0 Unknown
0 None
4 ACM CONDITION
c ACM FORM (CHECK ALL THAT APPLY)
0 Loose/friable 0 Hardened/non-friable
0 Sprayed on insulation 0 Troweled on insulation 0 Equipment insulation 0 Boiler insulation 0 Pipe insulation (g.t.
diameter)
0 Encapsulated
>5 ESTIMATED AMOUNT OF ACM REMOVED
______ square feet cubic feet
o Pipe insulation (l.t.
______ linear feet
0 Pipe fittings
unknown
0 Transite Pipe
none
0 Floor tiles
0 Ceiling tiles
ACM DISTURBED
0 Transite Board
0 Roofing
0 Asbestos cement 0 ACM fabricated items 0 Other
0 Yes 0 No
t4,ilction Project
7. OTHER FIBROUS MATERIALS PRESENT
0 Yes
O No
O Unknown -
.8 PHYSICAL CONDITIONS
a. 0 0
b. 0 0
Indoor Outdoor
Elevated Ground level
c. Temp . of Equipment (if applicable)
0 approximately 0 above ambient 0 below ambient
d. Air Temperature
0 > 32 F 0 < 32 F
e. Kind speed
(if applicable) 0 moh
9. STRUCTURE: OWNERSHIP
0 Company Owned 0 Leased 0 Customer Premise
20, STRUCTURE (CHECK ONE)
a. Type of Building
0 School 0 Hospital 0 Office O Telecom Central
Office, 0 Warehouse O Factory 0 Garage 0 Residential
b. Structure if other than building (specify, ex. tower, boiler etc.)
2
11 CONTROL METHODS (CHECK ALL THAT APPLY)
O Enclosure (without negative pressure)
0 Enclosure (with negative pressure)
O Power tool witR^exfcaust ventilation
0 Local exhaust ventilation with fiber capture
O Wetting agent 0 Glove bag 0 Hepa vac O Wet wipe 0 Alternate route y
(telecom/utility) O Removal of entire structure 0 Mini Enclosure 0 Other 0 None
12. SAMPLING/ANALYTICAL METHOD
O Appendix A OSHA Standard 0 Appendix A OSHA Standard;
(37 mm cassette) O Confirmatory Analysis
(by SEM, TEM, XRD, PLM)
0 Other _______________
13. SAMPLING COMPLETED BY
0 In-house 0 Contractors
14. REMARKS
VUA A ew WiWi* f *
*
SHEET NUMBER
B. AIR SAMPLING DATA
1. Cassette #:
__
(One worker only)
(One task only)
AidjuwcltjuJ wJjo
3
JcAi&to 7V
Qa
Q/f^L Qi^-c tdcL, Wet n&jtju
h f^fes&o ef
oJud^-
A-lej
2. Date of Sample:
/______ L_____ __ (month) (day) (year)
3. Sample duration: (minutes)
4. Fiber Concentration: (f/cc)
5. Fiber Count:(f/100 fields) (if available)
Qk&J Oirj /9p^'0
Wlt ^02r^i_
6. Actual TWA Exposure:
.
7. 8 hour TWA Exposure^
ll,\vo _
xlAo 'ma^nru^T Jf< 'TFa-Giy.mj'&JACM C?OAV.,0
.8 Pump flow rate: (ltr/min) Pre-sample,
u r^x, ca. , is Post-sample
Date Checked: _________ // (month) (day) (day)
9. Pump Serial Number
10. Date of Sample:
// (month) (day) (year)
11. Worker ID (if applicable):
12. Upset conditions ___ Yes ___ No Comments (spills, unplanned events, etc.)
JL Cco Q
Signature/title of person filling out form
Print name in full: Company name (print) City_____________________
State
Phone No.
ORC Asbestos Data Collsetion Project
INSTRUCTIONS FOR FILLING OUT ASBESTOS SAMPLING DATA SHEET FOR SMALL JOBS
1. Sheet Number
The sheet number will be preassigned.
2. Task
The Asbestos Sampling Data Sheet is to be completed only for jobs in which removal of asbestos containing material (ACM) is not the primary goal.
a. Task Description
What is the nature of the actual work being performed? Check the one entry which best describes the task.
b. ACM Activity Resulting from Task (non-telecom/utility)
What was done in regard to actually working with or handling the acm:
c. ACM Form
What is the form of the ACM encountered on the task? Check all that apply.
Questions 2(d). 2(e) and 2(f) are to be completed only by tele communications and utility industry employees.
c. ACM Location
Where is the specific location of the ACM encountered on the task? Check all that apply.
d. Location of Job with Respect to ACM
Where, in relation to the ACM, is the task being performed?
e. Distance to ACM
What is the distance between the site of the task and the ACM.
3. Type of Asbestos (Indicate % if known)
What type of asbestos is present - amosite, crocidolite, chrysotile, unknown? Check all that apply and, if possible, indicate the percentage of amosite, crocidolite, and/or chrysotile present in the ACM.
Collection Project
2-
4. ACM Condition
Is the material being removed loose, crumbly, - does it flake off, when worked with* is it hard to the touch* or has it been encapsulated with another material? Check the appropriate box.
5. Amount of Asbestos Removed During Sample
How much asbestos was removed if any? Estimate in lengths of pipe removed, square feet of boiler insulation, or tiles etc. Fill in the appropriate amount.
6. ACM Disturbed?
Was the ACM disturbed during the task. Check the appropriate box
7. Other Fibrous Materials Present
Are fibrous materials other than asbestos present? Check the appropriate box.
8. Physical Conditions
a. Location
Is the task being performed indoors or outdoors? Check the appropriate box.
b. Elevation
Is the task being performed at ground level or above ground level? Check the appropriate box.
c. Temperature of Equipment
If the task involves working on equipment that has ACM content, indicate the temperature of the equipment.
d. Air Temperature
Is the workplace temperature above or below freezing? Check the appropriate box.
9. Structure Ownership
Is the task being performed on a company owned premise, company leased premise, or customer owned premise? Check the appropriate box.
ORC Asbestos Data Collection Project
-3-
10. Structure
a. Type of Building
If in a building, in what type of building is the task being performed? Check the appropriate box.
b. Structure if Other than a Building If other than a building, identify the type of structure the task is being done in, or on (ex., tower, boiler, etc.)
11. Control Methods
What method(s) are being used to minimize the release or generation of airborne asbestos fibers? Check all that apply.
12. Sanpling/Ana3ytical Method
What method is being used to analyze samples for the presence of asbestos, and if that test indicates the presence of asbestos, what kind of confirmatory analysis is performed? Check the appropriate box or identify alternate method of analysis.
13. Sampling Completed By;
Was the sampling done by company employees, or an outside consultant/contractor? Check the appropriate box.
ORC Asbestos Data Collection Project
4-
Each Task is to be Monitored from Start to Pinish for the Purposes of this Survey
B. AIR SAMPLING DATA
1. Cassette #, One Worker Only, One Task Only
Each cassette should be given a distinct identification number. If more than one cassette is used per task, record a separate number for each in this space, record the data for the task, and indicate the reason for using more than one cassette in the comment section.
2. Date of Sample:
Enter month, day and year.
3. Sample Duration (Minutes)
Sampling should begin when the task is initiated and end when the task is completed. The sample duration should be identical to the duration of the task.
4. Fiber Concentration
The fiber concentration (fibers per cc) as determined from the laboratory analysis. Use "GT" and "LT" for "greater than" and "less than" (respectively). If the sample filter is overloaded, note GT before the result.
5. Fiber Count (f/100 fields)
Enter fibers/100 fields fiber count if this information is available or obtainable.
6. Actual TWA Exposure
What was the time weighted average exposure for the duration of the j ob.
7. 8 Hour Time Weighted Average Exposure
If more than one sample was taken on a person during a shift, a time weighted average should be calculated using the below formula:
C1T1 + C2T2 4____ CnTn T1 + T2 ...Tn
Cn = the fiber concentration for sample n Tn = the sample duration for sample n
uju. AS^etioi uiu
Collection Project
-5-
8. Pump Flow Rate: (Liters/Min)
The pump flowrate should be the averaged flowrate as determined by calibration with a primary standard such as a bubble tube. Enter the date the flow rate was checked.
9. Pump Serial Number:
Enter the pump serial number
10. Worker ID;
Enter the worker identification number, if any, used by your company.
11. Upset Conditions
Was there a greater than normal exposure to asbestos due to an unplanned event? Specify the event in the comments section. Mark the appropriate box.
DKM/20
INTRODUCTION TO THE
ORC ASBESTOS DATA COLLECTION PROJECT
GOALS
To build a data base on the levels of airborne asbestos fibers generated during the completion of a variety of routine jobs in the chemical, petrochemical, telecommunications and utility industries.
INTENDED USE
This data base is intended to allow the participating companies to meet the requirements of the Occupational Safety and Health Administration for "objective data". The source of the data will be kept confidential with only ORC retaining knowledge of it. ORC needs to be able to contact the submitting company should questions about the data arise.
METHODS
The intent is to monitor a variety of separate jobs, and to establish a TWA exposure for each job. This would be done in the chemical, petrochemical, telecommunications and utilities industries. For the purposes of this study we are less concerned with the overall exposure of the individual (8 hour TWA) than we are with the actual fiber concentrations generated by each specific task.
THE BENEFITS
If, as expected the data shows exposures to be consistently below the action level of 0.1 f/cc, this "objective data" should provide participants with a valid data base upon which to defend a decision not to perform "initial monitoring" each time a small asbestos removal job, or other small job involving asbestos, is started so long as standard techniques are used.
In the telecommunications industry this data base can help document the kinds of exposures that can be expected in routine telephone and cable installation jobs where it is known that asbestos is present. Protective measures appropriate to the known hazard can then be put in place to meet the requirements of the OSHA standard, and adequately protect workers.
In those industries where it is not always known whether or not asbestos is present, the monitoring of a large number of randomly selected, short duration, low exposure jobs across the country, should give a solid indication of the probability, on any particular like job, of encountering levels of asbestos at or above the 0.1 fibers per cubic centimeter of air, the action level in OSHA's asbestos standard.
Or^niAH ion K(*souf( Counselors Inc.
Pcnn^K.im.i *vcmn\ sn W.i'hin^lon. D C 3000-1
-2-
RIGH CREDIBILITY NECESSARY
The requirements that OSHA is establishing for the collection of this "historical objective data" are strict. Therefore, for the data base to be credible and thus usable, all data must be collected in strict accordance with the rules of the study.
If we accurately collect monitoring data relating to levels of airborne asbestos fibers generated during certain operations, it can be used with confidence to meet our obligations under the OSHA Asbestos Standards. If we do not make every effort to be as accurate as possible in this study, we will be wasting both our money and our time.
REQUIREMENTS OF THE' STUDY
The following are the general requirements that all participants in the study have been asked to meet in order to insure the smooth functioning and high quality of the study:
1. This study will require that participating companies monitor a significant number (to be determined internally) of their employees engaged in activities where they may potentially be exposed to airborne asbestos fibers.
2. Documentation information will be collected for each operation monitored, recorded on the ORC forms and send to ORC in a timely fashion.
3. The data base development, data entry, and analysis of results will be done by a contractor, selected by ORC and approved by the Task Force, at a price agreed upon by the Task Force.
5. The cost of the study will be divided equally among those participating in the study.
6. Each participating company will receive a block of numbers that are reserved for its use. These numbers will be used sequen tially to identify the sampling data sheets.
7. Each sheet will be the data for one person and one task performed.
8. For each job an actual TWA and 8 hour TWA will be calculated.
9. All participants will follow the relevant requirements of the OSHA Construction Asbestos Standard (1926) or the General Industry Asbestos Standard, 1910.1001.
OrU.ini/.Hinn Kcsumt's Counselors. Ini. 1331 PennMlvjm.i Avenue. \ AN VNjvhinpnn. n c :oooj
-3-
10. All participants agree that sampling data will be for those doing "hands-on" work, not supervisors or observers.
11. All participants agree that all analytical work done for the purposes of this study will be performed by laboratories certified under the existing Proficiency Analytical Testing (PAT), or the American Industrial Hygiene Association (AIHA) Asbestos Accreditation Program.
12. Where possible, the data collection forms should be filled out by industrial hygienists using their organizations monitoring data forms.
13. The sampling data forms will be signed by the person filling them out. The company name and address and a phone number for the person signing the sheet should be included. After data entry this information will be removed from sheets.
14. Where reasonable, a certain amount of third party, (contrac tor/consultant) monitoring should done as part of the study and identified as such on the data sheet.
15. Each participating company should submit once, a separate company cover sheet to OHC. This sheet will include overall information about the percent of the potentially exposed employee population that was monitored, the total number of employees monitored, and total number of employees in the corporation.
16. The company cover sheet should discuss how jobs enter the system, and how the particular job site and individual(s) who do. the work are chosen. This needs to be done to document the method used internally to obtain a representative selection of samples.
17. Detailed data from this study will be available only to those organizations that participated in the study.
18. Companies not having participated in the study initially, but wishing to have access to detailed data from the study after it is completed, must agree to do a certain minimum amount of sampling using the agreed upon task force protocol and data collection forms, the results to be entered into the data base.
19. Once the information on the sampling data sheets has been entered into the data base, a summary of the compiled data will be provided to participating companies. Participants will have access to the original data, except for company names, through ORC.
20. The final results of the study will be written up and, upon review and majority approval of the task force, they will be submitted for publication to the AIHA Journal.
Orunm/at ion Kfsourirs ("ounykxslix. 1331 PmnMkjn i.i Airnuo. \A\ V\jshingirm. DC. 20004
-4-
This data is to be collected with all participants using the same sampling and analytical techniques, and the data recorded on the same form. This information will form the data base of "objective data", documenting the levels of airborne asbestos fibers generated in a variety of jobs, across 4 large industrial classifications, and many individual corporations.
This monitoring data is to be collected with a high degree of accuracy, and thoroughly documented. It is intended that this study be highly credible and able to withstand close examination and criticism.
Many of the jobs that this project will examine are similar across a variety of industries. For instance, removing asbestos insulation from around a valve before working on it. This job, if done in accordance with accepted, good industrial hygiene and safety practices, will be performed similarly in the chemical, petrochemical, or utility industries. With similar jobs and procedures, one would expect that actual levels of airborne asbestos fibers generated would also be similar across different industries; the study may tell us if this assumption is correct.
Sampling Data Sheets
Two sets of sampling data sheets will be used; one intended for use in "small scale" work as defined by OSHA, and the other for primary removal, demolition and renovation.
Small scale work would include a variety of jobs in the chemical, petrochemical, telecommunications and utilities industries where the removal of asbestos was incidental to the accomplishment of the job. Large scale jobs would include those where asbestos is being removed from buildings, where asbestos containing pipe insulation is be removed and will be replaced with other insulation, and other operations where the removal of asbestos is the main purpose of the job.
Each set of sampling data sheets will have two pages of questions designed to collect background data, and one air sampling data sheet to record the actual monitoring data.
Ory.iniAilionKcsourcr'.Coijny.^xs.Inc
PmnMU.im.i Ammumv s v\ V\
. D ( 'OOPJ
B. AIR SAMPLING DATA
1. - Cassette # (One worker only) lone tod onayj
2. Sample duration: (minutes)
OXC Aabcstoa Oat* Collection Project
*
3. Fiber Concentration: (f/cc)
4. Duration of job: (total xnin. pump ran) (total individual sample durations from 4)
5. Actual TWA
6. 8 hour TWA:
7. PumD flow rate: (ltr/min) Pre-samde
Post-sample
8. Pump Calibration:
Pump Cereal Number
9. Date:
//
Month Day Year
10. Worker ID (if applicable):
11. Upset conditions
Yes ___ No
Comments (spills, unplanned events, etc.)
Signature/title of person filling out form
Print name in full:
Phone No.
Company name (print)_____________________________________________________
City State
ORC Aab*atoa Data Collaction Project
ASBESTOS REMOVAL SAMPLING DATA SHEET
- 1.
0 O 0 0 O O 0 0 0 O 0 0 0 0 O O O
2.
ACM FORM (CHECK ALL THAT APPLY)
Sprayed on insulation Equipment insulation Pipe insulation Boiler insulation Floor tiles Ceiling tiles Clutches Brakes Gaskets Pipe fittings Large diameter pipe > 12" Small diameter pipe Asbestos cement Roofing Transite Board Transite Pipe Other
AMOUNT OF ACM REMOVED
8. STRUCTURE OWNERSHIP
0 Company Owned 0 Leased
9. STRUCTURE (CHECK ONE)
0 School O Hospital 0 Office Building 0 Warehouse O Factory O Garage 0 Residential 0 Chemical Plant O Refinery
9. ACM LOCATION
O Inside O Outside
oooo
______ square ft. 0 None
10.
cubic ft.
0 Unknown
0
3. TYPE OF ASBESTOS
0
(INDICATE IF KNOWN)
11.
% amosite
% chrysotile
_____ % crocidolite
0
Unknown
0
O
4. OTHER FIBROUS MATERIALS
O
PRESENT
AIR TEMPERATURE
> 32 0 F < 32? F
SAMPLING/ANALYTICAL METHOD
NIOSH 7400 Appendix A OSHA Standard Other (specify) Confirmatory Analy sis (by SEM, TEM)
0 Yes
0 NO
12. SAMPLING COMPLETED BY
5. ACM CONDITION
0 Loose/friable 0 Hardened/non-friable 0 Encapsulated
0 In-house 0 Contractors
11. REMARKS
6. CONTROL METHODS (CHECK ALL THAT APPLY)
O Enclosure (without negative pressure)
0 Enclosure (with negative pressure)
0 Power tools with exhaust ventilation
0 Wetting agent
0 Glove bag 0 Hepa vac 0 Wet wipe 0 Alternate route 0 Ventilate
0 None