'SHERWIN ASBESTOS AIR SAMPLES 'yfXiLLDxr^1 DATE: TO: FROM: RE: October 1, 1998 Homer Cole Richard (Rick) HScks^ PLAINTIFF'S EXHIBIT Asbestos Ambient Air Samples Collected at Sherwin Plant - August 1998. During the month of August there were Thirty-five (35) asbestos area samples collected at the Sherwin Plant. The samples were collected and analyzed utilizing the NIOSH 7400 Analytical Method. One Hundred percent (100%) of the samples were < 50% of the Reynolds Occupational Exposure Limits (OEL) of 0.1 f7cc. Ninety-one percent (91%) of the samples analyzed were below the detection limits ofthe NIOSH 7400 Analytical Method. Sample ID # 11998 was rejected due to overload ofdebris. The following information pertains to Non-fiiable Asbestos Containing Material removed in the 35 Building, Middle Section of the HVAC Duct The data was collected on August 29* and 30* 1998: Samples 12000, 12001, 12002 and 12003 were sent to an independent lab and a TEM analysts was used to read these samples. Sample ID # 11988 and 11989 indicate higher fiber counts than the others taken in the same abatement area. These samples were not read using a TEM Do to the high number offibers in the #2 Boiler Burner area Sample ID # 11874 was sent to an independent lab and was read using a TEM. See the attached table for a summary ofthe information. Ifyou have any question regarding this data please contact me at (512) 777-2574. RMC080014010020746 > rVaei* s a. s CM CM < 2> jo5* s3 2s | o 3. CM > 3 X er ore 12 2. res . B So* re* s res* re B O > ?* i > 5. 3 OO 00 00 00 OO OO OO OO OO OO Sample ID Sample (RMC Number) Date 00 1 11755 I V0O0 1 11768 I NO OO ( 11769 1 11776 f t 1777 8/5/98 8/5/98 918!I | 8/11/98 111817 1 11841 8/17/98 I 11842 8/17/98 I 11849 8/17/98 OO O 1 11857 I 11858 | 11874 111883 1 11897 11898 1 11903 8/18/98 I 8/19/98 I 8/19/98 5 VO v00O '00S 00 oo V0O0 oo VooO Location/Area Start Time Area I Field Caustic Transfer Pump Piping Facility 30,2-3 Heater Piping Facility 30,2-3 Heater Piping 1Facility 30,2-3 Heater Piping Facility 30,2-3 Heater Piping Facility 110, t il Boiler Wind Box Facility 110. t il Boiler Wind Box -ti3 Rod M ill Oil Steam Lines -til Rod M ill Oil Steam Lines Fac. 110,92 Boiler SteamMotor Valve Station Piping Fac. 110,92 Boiler SteamMotor Valve Station Piping Fac. 110,92 Boiler SteamMotor Valve Station Piping | Fac. 110,92 Boiler Steam Motor Valve Station Piping { t il Boiler Burner 1 #3 Digester, 3-5 Heater | #2 Boiler Windbox I t il Boiler Windbox 1 Fac. 110, #2 Boiler Wind Box 0845 0825 0827 1000 1003 1049 1050 1130 0746 0749 0658 0700 1430 0925 1630 1630 0652 FrmAnim 10/97 03 3 3 SCn3P 83 *3< "5L sf 3 8 . 1 fcs> 0011 oeii 10 > Stop Time Concentration (f/cc) AAA o o *o AAAA AAAAAAAAAA OOOoooOOOOOO 1433 1500 1457 1430 1430 1430 1430 1600 1600 1430 1430 1100 1600 1240 1930 1930 1530 * 1 RMC080014010020747 FrmAnim 10/97 r > o 00 NO 00 h 8 8 % NNOO 00 s rw <o 5 s> RMC080014010020748