KOPPERS Architectural and Construction Materials
preface
This manual contains recom mended roofing specifications and procedures which are based on the many years of Koppers experience and accepted good roofing practice.
They are intended to provide the architect, engineer, general contractor and roofer with the proper informa tion to plan and construct the best roofing systems with the most time-
proven materials available today. The availability of a Koppers surety
bond and guarantee for roofing and flashing constructed according to the information contained in this man ual under Koppers bond and guaran tee procedure, which customarily includes inspection by Koppers dur ing application, and the publishing of these specifications and informa tion shall not be construed as creat ing any warranty, expressed or im plied, with regard to any roofing or flashing for which a bond has not
been issued. This roofing manual supersedes all
previous roofing manuals and litera ture published by Koppers.
The specifications and details con tained in this manual have been deter mined to cover the proper procedures for long lasting roofing systems for most areas of our country. In certain locations, minor variations in details and specifications may be appropri ate due to unusual local conditions, such as wind, temperature, humidity, etc. To assure the best application of the proper specifications and de tails for your area, we recommend consulting our roof structure system specialist . . . your local Koppers
sales representative.
INDEX
1. Old Style Pitch Roofing Material and System Discussion
2. Koppers System Roof Material and System Discussion '
3. General Requirements and Special Conditions
3.1 Built-up Roofing
3.2 Insulation
3.3 Other Requirements
4. Koppers Old Style Pitch Roof Specifications
deck construction
no. of pliaa
4.1 Wood Plank/Plywood
5 4
4.2 Poured Portland Cement Concrete
4.3 Precast Structural Concrete Sections
4.4 Gypsum (Poured and Plank) and Lightweight Insulating Concrete
4.5 Metal Decks (insulated)
4.5 Water Cooled Roofs and Water Retaining Roofs
4.7 Wood Fiber
4 3
4 3
5 4
4 3
4 3
-4 3
5. Koppers System Roof Specifications
deck construction
5.1 Wood Plank/Plywood 5.2 Structural Concrete 5.3 Metal Deck
2 2 2
KSR Reference Data
8. Flashing Specifications
7. Flashing Details
8. Guaranteed and Bonded Roofing Programs
8.1 Koppers Guaranteed Roofing (KSR only) .
8.2 Koppers Bonded Roofing
.
basic spec. no. 1 2 5 7 10 11
12 13
17 18 23 24 27 28
30 31 32
PAGE
3 4 5-9 5 8 8 10-16
10 11 12
13
14 15' 16 17-19
18 19 20-21 22-25 28-27 26 27
2 r
NOTE For re-roofing, steep and smooth surfaces, and decks or Insulations not covered in these specifications, consult your nearest Koppers Sales Office.
10ld Style Pitch Roofing
Coal Tar Roofing Pitch
r-\
Tar is a very familiar word, how* usefulness and value:
ever it has different meanings for
PITCHES--of various consisten
different people. To many it is any
cies such as roofing material,
black liquid adhesive or plastic sub*
waterproofing products, protec
stance; however, it is much more
tive coatings for metals, mason
than this. It is a hydrocarbon, mean
ry, etc.
ing it Is composed primarily of car
CREOSOTE--for wood-preserving.
bon and hydrogen and is therefore
CHEMICAL OILS--for use in the
an organic compound.
manufacture of drugs, dyes,
Tar is obtained from the "destruc*--
paints, varnishes, cosmetics,
tive distillation" of coal, primarily
plastics, synthetic rubber, etc.
bituminous coal. This means whan
Coal tar is indeed a vital and valu
coal is heated to very high tempera able product that produces materials
tures without contact with air (thus for many industries in our world of
not allowing the combustion of coal today.
and its derivatives) the coal mole
In the ever-growing construction
cules in effect are "cracked" into industry a very valuable tar derivative
little molecules (gas), medium mole is Coal-Tar Roofing Pitch. Its value is
cules (tar) and coke. We see, there found in the fact that it has superb
fore, that the more proper term is water and corrosive resistance quali
Coal Tar.
ties as well as being an excellent
Coal tar, through further distillation adhesive especially applicable in
processes, is refined and separated adhering the tarred roofing felts to
into products of great commercial gether in built-up-roofing. These
KOPPERS 7.1/Ko Architectural and Construction Matsnals
qualities are'due to the unique prop erty that was endowed to it by na ture. Without going into a highly technical chemical analysis it can be most simply stated that Coal Tar Roofing Pitch is a balanced organic compound. The atoms in Roofing Pitch-Carbon (C) and hydrogen (H) --have a very strong molecular at traction or bond one to another and hence attacking atoms of oxygen (O) cannot attach themselves to the hy drogen atoms of Roofing Pitch and form a water molecule (H.O) that will be absorbed into the pitch.
Coal Tar Roofing Pitch is therefore inherently resistant to molecular penetration by water. Coal Tar Roof ing Pitch is nature's own balanced answer to waterproofing (roofs and elsewhere), adhesive bonding, and chemical resistance, especially to waterborne chemicals.
Coal Tar Pitch Built-up Roofing
Koppers coal tar pitch built-up roofing systems consist of layers of Koppers Old Style Pitch and Koppers approved tarred felt, surfaced with a heavy top pouring of Koppers Old Style Pitch into which is embedded an aggregate.
Koppers coal tar pitch built-uproofing systems are used whenever a roof is exposed to water and/or cor rosion and on all level or low sloped roofs where long, maintenance-free service is required. Particularly rec ommended for:
All 'dead' level roofs All water cooled roofs Low sloped roofs with retarded drainage Low sloped roofs with occasional water ponding (Note: coal tar pitch roofs are especially suitable to withstand the water attack around drainage areas on roofs that are pitched to the drains.)
All buildings with level or low sloped roofs that are built for long service life Coal tar pitch built-up roofing pro vides one of the most durable roofing membranes known. The advantages are found in the inherent superior characteristics of coal tar pitch for this purpose. This is the time-proven roofing system for level and low sloped roofs. Coal tar pitch has a natural resis tance tc water, air and water vapor penetration. A tight molecular struc ture enables coal tar pitch to perma nently withstand water penetration and resist oxidation of the roof sur face. Koppers water-cooled roof spe cifications take advantage of the unique water-resistant characteristics of coal tar pitch to give you long term roofing performance. Another unique feature of coal tar roofing is its self-healing ability. Aliigatorfng and hairline cracks common
.Koppers Old Style Pitch
Koppers Old Style coal tar roofing pitch is carefully manufactured to standards which have been regularly improved over many years. Koppers Old Style Pitch is manufactured to exceed the minimum requirements of the following specifications:
Federal Specification RP381 Type I ASTM D-450 Type A Underwriters' Laboratories, Inc.
Koppers No. 15 Tarred Felt
Koppers approved tarred felt is manufactured to meet the following specifications:
Federal Specification HH-R-595 Type I Class I ASTM 0-227 Underwriters' Laboratories, Inc. Koppers No. 15 Tarred Felt nor mally contains 432 square feet, cov ering 4 squares per roll.
to most materials, eventually cause damage to the roofing membrane. Coal tar pitch has a property known as "cold-flow" which automatically corrects these conditions before seri
ous damage takes place. This "coldflow" feature heals small mechanical fractures at normal temperatures.
Time and statistics have proven that coal tar roofing pitch when ap plied in accordance with the specifi cations in this manual results in the highest acceptable quality level of any built-up roofing system. Coal tar pitch is a nature-formed polynuclear large molecule compound. Coal tar roofing pitch is selectively manufac tured fraction which satisfies the basic requirements for long-term roofing service on level and low-
sloped roofs. When you specify Koppers Coal
Tar Roofing Systems, you are assur ing your building owner-client of long-term roofing performance.
_____________ IMPORTANT
Roofing System Guarantee
Keooers Ccmoan/ ~ar*:2:;~res jo -o*ng -laterals r zees -:r r*ic: :? not engineer -7 -1? `c-?***? r.s.'?`"*s
ziuoeo nereatte' .v*-" .ve Or..eve 'esu.t r
satisfactory nstaiatcrs re" z'zce' / ao*
ones '.V? ~-z*e no t
es -'`"a:'
soever as :o 'nater.a:s ct
nor oertormance c '~-e s,s:er.s
ze-
scroec ft'**-
Sz^c s -rz'.ec
the excress t/afar* es zn o^r ~s:t are on /
those soecrica-y enumerate? ireren *o
agent, sa esna'1 'iC'ese-tst e mzr s'"-
otoyee s em-zcne'ec -0 charge a ter c'
amewz this :rcrs>on -ness -/ s zzne n
wnt:ng 0y a j**iy aj'.nzr.zez cr*;cer 2: e'*'*
ofoyee n **$ zoroorate ^caacuarters
ort>ce. Rittssvo* s
3
2 Koppers System Roof
Xoppers System Roofs
Koppers System Roots (KSR) sre multiple component systems tor se lected structures designed tor board type insulation. These systems are normally for buildings with an interior temperature ranging from 60F. to 8SF. and a normal relative humidity below 40 (RH) or ventilated space where a vapor barrier is not required. The systems are designed to provide an ideal interface between compo* nents to permit ease ot application and the best conditions for long serv ice life with ready low cost mainte nance features. The systems are kept competitive through the use of the ideal component conditions which permit the use of products from the most advanced Bitumen, Felt, and Insulation Technology which are more expensive to manufacture. The sys tems consist of Koppers Bitumen, Koppers Felt and Koppers Glass Fi ber/Roof Base Insulation, with Kop pers Insulation Base Tape.
Xoppers Bitumen
In developing Koppers Bitumen, Koppers has analyzed, during the years 1955 through 1969, Coal Tar Pitch Roofs ranging in age from 30 through 43 years and still in good condition. Analysis of the Roofing Pitch from these buildings showed Pitch of excellent retained service life and a material chemically un changed over the years. Only one change in the original material was noted even in the most severe con ditions. As the foremost Coal Tar Refiner, Koppers has adjusted the process used to produce Coal Tar Roofing Pitch to produce a material which minimizes this change. The resultant material is Koppers Bitumen.
Like Koppers Coal Tar Roofing Pitch, its value is found in Its superb water and corrosion resistance as well as being an excellent adhesive. This is especially applicable in adher ing the Bitumen saturated roofing felts together in built-up roofing. These qualities are due to the unique property that was endowed to it by nature. It can be most simply stated that Koppers Bitumen is a balanced organic compound. The atoms in Koppers Bitumen-carbon (C) and hydrogen (H) have a very strong molecular attraction or bond one to another and hence attacking atoms of oxygen (O) cannot attach them selves to the hydrogen atoms of Koppers Bitumen and form a water molecule (H.O) that will be absorbed into the Bitumen.
4
Koppers Bitumen is therefore in herently resistant to molecular pens* tration by water. Koppers Bitumen is improved by modem manufactur ing processes to obtain the best of nature's own balanced answer to roofing, adhesive bonding, and chem ical resistance, especially to water borne chemicals.
Koppers KSR Felts
Koppers KSR Felts are selected to give the greatest strength to thick ness ratio available from organic felted membranes. They are heavier and stronger than conventional roof ing felts, yet are easy to apply. When applied in an Insulation/Roofing sys tem, two plies develop a roofing skin with Koppers Bitumen which is an advance in roofing concepts.
Koppers KSR Felt normally con tains 328 square feet, covering 3 squares per roil.
Kcppers Glass Fiber insuiation/Roof Base
Koppers Glass Fiber Insulation/ Roof Base is formed of Glass Fiber Roof Insulation with a k value of .25 with a top surfacing of a selected bitumen reinforced with a controlled pattern, continuous filament type, glass fiber. When installed, a glass fiber tape of the same type is placed in a full mopping and surface coated with Steep Asphalt at a rate of ap proximately 25 lbs. per square.
This roof base (top surface of in sulation) when combined with the joint taped system, as described above, provides a monolithic seal which can be maintained water tight during construction periods. It is not subject to organic fiber moisture type of swelling (blisters). This seal is 2 to 15 times thicker than the conven tional vapor barriers normally placed beneath the insulation. It becomes an integral part of the finished roof thus providing additional strength and durabiliy to the performance of the Koppers System Roof. The vapor seal is partially produced under fac tory control and is less susceptible to construction variables than con ventional underside seals. Construc tion damage and later mechanical damage do not have the same devas tating effect on the vapor seal. The base is much less susceptible to moisture being trapped during con struction.
Koooers Systems in Roofing
Koppers System Roof consists of Koppers Glass Fiber/Roof Base In sulation which is developed into a
monolithic substrate by the installa tion of a special reinforcing glass
fiber tape embedded in and coated with steep asphalt at all insulation joints. To this strengthening surface, two layers of Koppers Felt are in stalled in Koppers Bitumen. The final waterproofing phase is the applica tion of aggregate in a heavy top pour ing of Koppers Bitumen. Koppers System Roofs are designed for build ings with a roof slope of 0"-Vfc" per foot Special construction variations are available for roofs of Vi"-i" per foot slope where the superior water
and chemical resistance of Koppers Bitumen is a requirement.
Koppers Bitumen is a self-healing material and thus is highly beneficial to successful roofing. There are cer tain characteristics common to many roofing materials that can cause damage to the roofing membrane: ailigatoring; hairline cracks: move ment of the building structure, during and after construction due to build ing settlement as well as temperature and moisture variations. This selfhealing or "coid-flow" property of Koppers Bitumen heals these me chanical fractures at normal tempera tures before serious damage takes place.
Forces are developed in all struc tures due to temperature, moisture, and time (aging) changes. Because these forces are very large in rela tion to the possible strength devel oped in a roofing membrane; and because severe long-time weather exposure changes all materials, at tempts to build roofs with strength comparable to structural forces, or long term elasticity have been rarely successful. KSR is based on superior resistance to water and weather; the
"cold flow" feature, and the ability to achieve and retain (even develop through "cold flow") adhesion to substrate, membrane, flashing at tachments and aggregate for a long service life.
Applicability is one of the most important characteristics of any con struction material. KSR can be readi ly installed on any building; of the type and design for which it is suited; with existing skills and with the level of competence of contemporary field labor. Further, Koppers System Roofs
can be installed in the expected weather conditions to be encountered in most constructions. With the ex ception of heavy precipitation or un cleanable frozen surfaces they most nearly approach the principle of "allweather" construction.
a GCMrqii
REQUIREMENTS AND SPECIAL CONDITIONS
ROOF STRUCTURE
SYSTEM
In any building tha performance of tha Built-up-Roofing will ba affected to soma dagraa by all of tha parts of tha Roof Structure Systam as wall as tha instda and outsids atmospharic anvlronmant Each componant should ba invsstigatad for its compatibility with aaeh of tha oth ers. Tha Roof Structure Systam may In clude any or all of tha following:
Outside Air Conditions Roofing Systam Peripheral Details (Flashings) Insulation (If present) Vapor Barrier (if present) Structural Deck including sub purlins
(supports) Structural Framing Air Space (If present) Ceiling (if present) Interior Air Conditions
You wil And Information, In this man ual, pertaining to materials and applica tion methods other than for built-up-rootlog. They are offered to assist the designer in establishing their normal po sition in tha Roof Structure Systam. They should not ba construed as part of the built-up-roofing system, as endorsement nor as part of tha designated spactltcationa other than to establish a suitable f~ roofing base in the roof structure system.
The proper design, spactfleatfon and positioning of the various components of the Roof Structure Systam lo the rooponsi biiity of the building owner or Mo de signer. Any tubeequenf failures, due to either the instaflstlon or lack of Install#-
DOV) Will nO* N KOppOT VHponHMRjr
3.1 BUILT-UP ROOFING
3.1.1 Decks
Tha deck is tha base over which tha built-up roofing, or Insulation and builtup roofing is applied. Where tha 'term deck is used in this,manual without ref erence to insulation, it shall dasignata tha surface over which roofing is to ba ap plied. In tha case of KSR the deck will ba tha structural base over which the systam is applied. All decks shall ba clean, smooth, dry, rigid and free of de bris. Any deck defect shall ba corrected before application of roofing. All decks shall ba installed in accordance with tha deck manufacturer's specifications and shall ba in compliance with Koppers Gen eral Requirements.
In approving any deck as satisfactory to receive a Koppers roof, only tha deck surface is accepted. It Is tha responsi bility of the building designer and the deck manufacturer to provide for expan sion and contraction in a manner that will provide a stable base for tha roofing; for support of maximum anticipated loads: secure attachments vertically and later ally. and the selection of the deck matenal and construction details including
their ability to contain bitumens. Koppers will not assume responsibility for deck de fects. the affect of deck defects on Kopaers roofs, or bitumen seepage.
The placing of conduits, bolt heads,
ate- above tha roof deck and below the roofing membrane is not recommended.
All projections or openings in tha deck should bo completed prior to tha appli cation of tha roofing.
Optimum adhesion to tha deck is nec essary for good roof performance. Where Koppers Old Style Pitch. Koppar Bitumen or steep asphalt Is used for adhesion, quastionablo docks may ba tasted for dryness and adhesion by pouring one pint of tha bitumen, heated to application temperature, over a representative area or areas of tha deck. The deck la not sat isfactory if tha bitumen foams or bubbles, or upon cooling to ambient temperature may ba stripped clean of the deck.
3.1.2 Conditions of Surface to Receive Reefing
All surfaces must ba dry. reasonably smooth, claan, rigid and free from debris, loose materials, projections and holts which might causa rupture of tha mem brane.
Metal Decka: Decks of this type must also bo free from loose rust and oily sub stances. Oeflectlon should not exceed L/240.
Poured Portland Cement Concrete, Pre cast Structural Concrete Section, Poured Gypsum, Lightweight Insulating Concrete: Decks of thaas types with in clines of one-half (Vi) inch per foot or more shall permit nailing, or treated nail ing strips must ba sat in the deck and installed prior to roofing. Where insula tion Is specified, nailing strips may ba secured to tha deck surface and shall ba level with the suriaca of the insulation. These strips should be spaced not more than three (3) fast apart and placed up and down and not across the slope of tha roof. Roof deck shall be properly graded to outlets.
Precast Decks: (concrete, gypaum. wood fiber) Decks of thesa types, whether grouted or not, shall be caulked with Koppers Flashing Cement which shall be applied so that the top surface is level and smooth. Felt stripping four (4) to six (6) inches wide sat In a troweling of the cement is recommended to assist in lev eling uneven joints and bridge the joint openings thus providing a better surface for the roofing materials.
Wood Ptank/Ptywood: Wood shall be well seasoned, dry and preferably treat ed. End joints shall have adequate bear ing. Loose or void knot holes, large cracks, etc., shall be covered with sheet metal.
Lumber shall be a minimum of 1' nom inal thicknesa.
Plywood shall be a minimum of VS' thickness.
KOPPERS 71/ko Architectural and Construction Materials
3.1.3 Llcntweight insulating Decks
Lightweight Insulating decks include lightweight aggregate concrete (20 to 40 lbs. per cu. ft. oven dry density): foamed concrete, gypsum and thermosetting as phaltic decks. Except for Dycon Con crete a low water content, closed cell ag gregate insulating concrete, all other lightweight insulating deck systems must be capable of venting excess water vapor to the underside. Koppers will not accept these lightweight insulating decks to be pieced over vapor barriers, poured con crete substrates, unvanted metals, on any type of base which will not permit these materials to vent from the underside. It is necessary to prevent a water vapor pressure build-up under the built-up-roof. Occasional, or spot vents through the roofing as the only venting method are not satisfactory substitutes for underside or continuous vented systems.
In addition, lightweight insulating decks shall have sufficient cohesive strength to provide firm attachment of the roofing to the deck end framing to prevent wind up lift damage or blow-offs. Nailabla decks must be capable of developing at the very minimum, a 40 pound nail pull-out or withdrawal strength. If the materials do not achieve this valua. additional fastenera will be required over and above those quantities described in the ensuing speci fication (standard is approximately 100 fasteners per square) to achieve our mini mum attachment standard of 30 lb. per square foot. Koppers will not be responsi ble for failure of tha insulating deck to remain Integral or for disbonding of the roofing from the surface of the deck.
Provisions should be made wherever possible to provide additional venting such as notched wood perimeter nailers, etc., in conjunction with the venting from the underside of the deck. If board type Insulation is to be applied over a light weight Insulating deck, provisions must be made between the fill and the board Insulation to prevent fill moisture from af fecting the insulation and roofing.
3.1.4 Roof Slopes
Koppers recommends that Old Stylo Pitch roofing specification not bo used on roof slopes in excass of one (1) inch per foot For Koppers System Roofs, the maxi mum slope shall bo one-half ('A) inch per foot. On slopes for Old Stylo Pitch roofs ont-half (V4) inch or more all felts shall be backnailed. However Koppers does permit slopes up to two (2) inches par foot at flashings that Incorporate tapered cants and for short run crickets or saddles for drainage provided there is adequate back nailing and thase crickets or saddles do not cover more than 15% of the roof area.
5
3.1.5 Underwriters' Laboratories
Underwriters' Laboratories, Inc. Build* ing Materials Directory, Guide No. (360 018) TFJK--Built-up Roof Covering Mate* rials, has listed Koppers Coal Tar Pitch and tarred felts for use In construction of Classes A and B built-up-roof coverings.
Koppers System Roof (KSR) Is also Hated as a complete system under Class A designation.This includes Koppers Bitu men. KSR insulation and KSR felts.
Additional References: Roof Deck Constructions are listed un der U.L Guide No. (360 RO) TGKX. Roof Deck Construction Materials, such as vapor barriers, insulations and adhe sives are listed under U.L Guide No. (360 R 13). TGYV.
3.1.6 Application of Roofing
All roofing is to be built-up in place with alternate moppings of bitumen and layers of felt over the proper substrate and preliminary work as described or specified in this book under the several sub-heads for various types of deck con struction and slope. Application is to be made by experienced workmen In the manner described. The finshed roof is to consist of the number of plies of felt and moppings of bitumen plus top pouring as specified herein. Applicable portions of Koppers precautions for "Food Establish ments" apply.
3.1.7 Application of Bitumen
Recommended Weights per 100 eg. ft (for estimating purposes only)
Old Style Pitch Koppers Bitumen
(KSR) Steep Asphalt
Average Interply 25 lbs.
25 lbs-. 23 lbs.
Top Costing 75 lbs.
75 lbs. 60 lbs.
Average interply weights are based on long years of experience In good roofing practice, and take into account a reason able variation in distribution as well as a vanation in the amount absorbed In dif ferent substrates, and the type of specifi cation. Moppings of bitumen between felts shall be continuous. Felt shall not touch felt. The top pouring is most important and must be thorough; and must be uni formly covered with specification aggre gate embedded in the bitumen while hot.
When solid mopping is not part of the specification and is substituted by strip & spot moppings (sprinkle mopping may be substituted for spot mopping) for in stallation of vapor barriers, insulation and/or the first ply of the built up roof ing, the quantity of bitumen required shall be not less than 10 lbs.* per 100 square feet. Strip mopping shall be on 8" centers unless otherwise specified and in one di rection.
Recommended Temperature UmKadom:
Old Style Pitch Koppers Bitumen (KSR)
Steep Asphalt
(max.) (min.) (recom.) 400 300 375 400 300 375 475 350 425
Because Koppers Bitumen (KSR) diechargee an extremely small volume of fumes which are only slightly visible at application temperatures, it is necessary to use an accurate thermometer so that the correct temperature will be known.
If heat is desired during a holding peri od at the jobsite while material is not be ing drawn off and replenished as under normal usage, kettle temperature should be reduced and not permitted to excsed 350*F for Old Style Pitch and Koppers Bitumen or *25*F for steep asphalt The kettle should be full. These temperatures are applicable to job conditions and do not apply to holding or storage in kettles In excess of 4 hours. If bituman is not to be used for periods over 4 hours kettle should be shut off.
Prolonged storage in small containers, such as roofing kettles, at temperatures exceeding those detailed above may re sult in changes in softening point, ductil ity. and other characteristics which can adversely affect the performance and life of the bitumen.
Old Style Pitch & Koppers Bitumen may be contained in 1000 gallon or greater capacity heated and automatically con trolled closed vessel tankers at 375*F for periods, not exceeding 96 hours.
3.1.8 Application of Felt
Plies of felt must be laid shingle fash ion, not only because this method pro duces a stronger membrane, but because It also makes It possible to construct a roof of any desired number of plies in a single progressive operation. Where a water flow direction exists, felts should be applied so that tho direction of flow is not against the laps. Broom or press all plies of felt into the hot bitumen and lay without wrinkles, buckles or kinks, so that the finished roof Is free of pockets or blisters. Each felt ply shall be completely covered with a uniform mopping of bitu men.
The number of plies are controlled by varying the widths of the edge laps. Threeply roofing, for example, is achieved by lapping each ply approximately two thirds over the preceding ply; for applies, a lap of approximately three fourths the width is required. Koppers' felts are marked ai the factory with lap lines for this purpose. Except as specifically provided for in Kop
pers specifications, application of felts in a method where two plies are laid over two Mas, three plies over one ply, or any comuljailon. other than all plies in shingle fashion, will not be permitted at anytime.
Whan beginning a membrane roofing installation, appropriate width starting strips of fait shall be used at the starting point to achieve the specification ply build-up at that point so that successive piles laid shingle fashion will produce the ply requirements. Overlap ends of all con necting plies of felt (end laps) not less than 10 Inches. End stripping or taping of these laps is not permitted.
It is advisable on applications of felts on slopes from Vi inch to 1 Inch per foot, felts be run with the slope, up and over the ridge of the roof (parallel to the slope line) and each sheet back or blind nailed along the end lap closest to the deck at the high point end of each roll.
Koppers recommends that all felts be backnailed when the slope of the deck is one-half (Vi) inch per foot or more.
3.1.9 Application of Koppers Glass
Fiber Insulation/Roof Base (KSR)
Koppers Glass Fiber Insulation/Roof Base sheets shell be stored with the black side up. For storage the sides of the sheets shall be kept free from exposure to driving rain and snow to prevent excessive moisture pick-up. Sheets shall be stored on platforms above puddles, snow. etc. As used in the Koppers KSR systems the protection required from moisture expo sure is not as great as conventional systems.
It is necessary that the edges or perim eters be unsealed for venting the insula tion chamber. Ventilated underdeck air spaces are recommended where ceilings are used. It should be noted that the use of ceilings which are insulated will nor mally require the use of thicker Kop pers Glass Fiber- Insulation/Roof Base to increase the insulating value and com pensate for the lower underside deck temperatures resulting from the Insulat ing value of the ceiling.
Roofing equipment should be rubber (elastomer) tired, free from sharp edges or projections and loaded in a manner to prevent puncture or rupture of the roofing system components applied. Protection, cleaning and repair provisions (such as plywood work and storage areas), must be provided to prevent damage from other trades. Broken or damaged Koppers Glass Fiber Insulation/Roof Base can only be used when the undamaged portion is cut out for application areas where fill-in pieces are required. The. end and side joints may be laid in continuous straight lines.
Whan more than one layer of Koppers Glass Fiber Insulation/Roof Base is used. joints in each layer shall not coincide.
6
*'">
The prim* recommended adhesive for installing Koppers Glass Fibsr Insulation/ Roof Bass is Koppers Stasp Asphalt Whan adhesives othar than this ara deslred thay shall comply with Koppers min* imum Attachmant raquiramants (Section
3.3.4, page 10). These adhesives shall be applied in accordance with the Specifiers and/or adhesive manufacturers' require* mants to achieve proper attachment. How ever the adhesive must produce a contact point on a minimum of 12" centers with a minimum diameter of one (1) Inch contact between the deck and the insulation. For best results the adhesive should be at least Vi" deep at the contact points.
3.1.10 Application of the Koppers
insulation Base Tape (KSR)
Koppers Insulation Base Tape shall be applied over all of the top joints of the Koppers Glass Fiber Insulation/Roof Base sheets including those at cants, flashings, fascia gravel stops, etc. Where two layers are used, the middle layer must not be stripped at the joints. When applying the Koppers Insulation Base Tape, the Koppers Steep Asphalt used to embed the tape shall be uniformly spread at the pre scribed application rate and extend at least 1' on each side of the tape. The tape must be pulled flat to avoid buckles, fishmouths. etc., and thoroughly embedded
in the adhesive and surface coated at a rate of 25 lbs. per square. The tape shall be centered on the joint and laid flat without attempt to maintain an exact cen terline by causing fishmouths, buckles, etc. If the tape runs off from the centerline of the joint more than two inches, cut the tape, make an end lap and start a naw run. End laps shall be a minimum of 2". Where adhesion voids in the taping appli cation appear at the time of application or as water leaks before the final roofing is applied a top glazing with Koppers Steep Asphalt will be a satisfactory means of repair.
Where the Koppers Glass Fiber Insula tion substrate is a monolithic poured re inforced Portland Cement Concrete, Kop pers Bitumen may be substituted for Kop pers Steep Asphalt
3.1.11 Application of Old Style Pitch
or Koppers Bitumen and Aggregate
Surface
The final application of this Koppers
Specification Roofing la a triple weight application of Old Style Pitch or Koppers Bitumen, 75 lbs./sq,, into which is dis tributed an aggregate of slag or gravel. This aggregate acts as an armor coat against mechanical forces, such as hail, and to deflect the intense radiation of the sun.
The application of the Old Style Pitch or Koppers Bitumen and aggregate must be dona at the time the felts are applied: except in periods of hot. dry weather when the top surfacing may be delayed over night.
When the specifier desires glaze coat-'
Ing and/or all work to be completed the same working day, he shall be responsible to so state this requirement in his specifi cations.
The aggregate surfacing must be ap plied into the top pouring while hot so that a uniform layer will be embedded and adhered. The completed Roof Assem bly will have a uniform aggregate sur face. Depending on deg weights in eertain parts el the caantry, 400- fee. of stag per square may be remitred. Occasionshy
on well applied roofs, small black globes known as "raspberries" or "blackberries" will form in the roof surface. These are not detrimental to the root.
3.1.12 The Aggregate
The aggregate to be used ahoul&jpeat ASTM Specification 0180344. ThiSttic
requirements for this aggregate are as follows:
1
1
Sieve Mae 14"
W" H" No. 4
No. 8 Oust max., percent Moisture, max., %
crushed stone and gravel
crushed roofing slag Unit weight (loose), min. lb. per eu. ft
Pereeet' 100
90-100 m 4*70 ' 0-15
0-5 0.5
0.5 5.0
60
ASTM 01863-64 covers other proper ties. such as hardness and includes prop er methods for sampling. If any doubt exists, the aggregate supplier should furnish a certified analysis' and a certifica tion that the product is produced to con form to ASTM D1863-64.
3.1.13 Cold Weather Application
When roofing is applied at temperatures below 45* F. special precautions must be taken to Insure the satisfactory perform ance of the finished roof. Before applying roofing, the effects of moisture, that is all ice, snow, surface water, etc., must be removed from the deck. Any moisture present at the time the roofing is applied which is not burned off by the heat of the bitumen may result In poor adhesion of the materials and voids in the application.
Hot applied bitumens tend to congeal rapidly in cold weather, even when the deck is dry, so extra care must be taken to sat insulation or roofing in as quickly as possible.
Oo not heat bitumens above the maxi mum temperature limit listed above to compensate for rapid chilling.- Insulated containers, along with carefully timed material handling methods, must be em ployed. Whether hand mopping or me chanical distribution equipment is used, lapsed time before contact of felts or ag gregate witn hot bitumen must be kept to a minimum. In the case of hand mopping, mop no farther than 5 feet In front of fait roll and immediately roll in. Felts should be broomed or pressed in immediately.
KOPPERS 7.1/ Ko Architectural and Construction Materials
3.1.14 Temporary Roofing
Old Style Pitch Specifications
Temporary roofing applied for various reasons shall not be considered a part of the permanent built-up roofing. Consult your Koppers representative for recom mended specifications over vanous type decks for temporary roof construction.
3.1.15 Temporary Roofing KSR Specifications
Where it is necessary to cover a build ing so that the interior is closed In or protected for construction work, the Kop pers Glass Fiber Insulation Roof Base stripped with Koppers Insulation Base Tape may be used for this purpose pro viding the following steps or precautions are taken:
1. Upon completion of the Installation of the Koppers Fiber Glass Insulation/ Roof Base and Koppers Insulation Base Tape, the Insulation Base Tape shall be covered by a mopping of 25 lbs. per 100 sq. ft. of Koppers adhesive which shall extend at least 2" on each side of the In sulation Base Tape.
2. The temporary roof surface shall be covered with plywood in work areas of other trades and shall be kept clean and free from construction debris.
3. Any accidental damage (leaks) shall be repaired Immediately.
4. Any leaks which develop due to in advertent application discrepancies shall be repaired upon detection. Please note, that occasional discrepancies of this type may be expected as the roof assembly is only partially completed.
Items 2 and 3 are the responsibility of the General Contractor and repairs shall be charged to the contracting party re sponsible for the damage. Minor repairs shall be made using Koppers Heavy Outy Glass Mesh or GLASFAS* installed in Koppers Steep Asphalt and coated with Koppers Steep Asphalt at a rate of 25 lbs. per square. Where Koppers Glass Fiber Insulation/Roof Base is severely dam aged. they shall be removed and replaced.
Oo not use the Temporary Roof Pro cedure for periods exceeding (3) three months. Some water penetration can be expected and valuable interior finish work or interior installations should not be com pleted during this period of time.
Before proceeding with'the installation of the Koppers felts, the base which has been used as a temporary roof must be thoroughly cleaned and allowed to dry.
When temporary roofing is used, all openings and ends of insulation applica tion shall be sealed to eliminate ingress of water into building. At parapet walls, install cant in Koppers Steep Asphalt and cover with Koppers insulation Base Tape, carrying tape onto wall and insulation sur face. Coat surface with Koppers Steep Asphalt
Mote: This system cannot be employed when a vapor barrier is required.
7
3.1.16 -Coppers Steep Roofs
For detailed specifications regarding steep, smooth surfaced asdeetos roots, consult your local Koppers representative or contact Koppers Co. in Pittsburgh.
3^ INSULATION
3-2-1 Board Type Insulations (Old Style Pitch Systems)
These insulations come In varying thicknesses and sizes. The provisions or manner of attachment which follows in the various specifications are suggestions only. Should the manner of attachment as suggested, conflict with that specified by the individual insulation manufacture, the insulation manufacturers specifications shall be followed, and in addition, shall be in compliance with Koppers General Requirements.
The roofing insulation must be kept dry at all times. It must be of a type aproved by Koppers for use with a Koppers built-up roof. It should only be applied over a deck complying with all of the General Requirements. Work must be scheduled to prevent damage from other trades and equipment. Roofing equipment must be of a type which will not damage the insulation used. Broken or damaged Insulation sheets can only be used when the undamaged portion is cut out for ap plication areas where fill-in pieces are re quired.
If the deck slope Is one-half (Vk) inch per foot or more the Insulation must be able to retain nails, or wood nailers must be installed perpendicular to the slope at each course of- insulation. Provision for wood nailers in this fashion will provide both a surface for anchoring of roofing felts wnich shall be laid perpendicular to the wood nailers as well as an insulation stop. Spacing of nailers must be such that the insulation fits snugly with the nailers but must not be foree fitted.
No more insulation shall be laid at any one time than can be protected by pitch and felt in case of sudden wealther chang es. Edges of insulation shall be brought closely together and shall not be forced into place. Where Insulation joina vertical surfaces the insulation shall be cut in a neat manner allowing at leaat one-half (Vi) Inch clearance.
When more than one (1) layer of insula tion is used, joints in each layer shall not coincide. All layers shall be parallel to preceding layers.
3.2A Vapor Barrier
Vapor barriers are normally used 'where the heat flow direction and/or humidity within the building, during any climate or oc-. eupaney cycle, might cause the dew point or condensation to occur under the buftt-
up roofing within the insulation chamber. It is Important that the vapor barrier, when installed, provide a continuous seal, including ventilators, skylights, peripheral walls, and other terminations from the source of the water vapor. Ventilation provisions of the insulation chamber, when a vapor barrier is used, are dic tated by the heat flow cycle and clima tology of the building. Generally a build ing with a preponderant heat flow-up cycle should have an insulation chamber venti lated to the exterior. A building with a preponderant heat flow down cycle in a humid area, should not be ventilated to the exterior if the dew point can be reached above the deck and in the insula tion chamber.
Alternate vapor barrier systems to those described on the specification pages are as follows and offered for assistance and reference:
a. Vinyl Type Fire resistant adhesive and vinyl-type
vapor barrier as listed by and applied as specified by Underwriters' Laboratories, Inc., and Factory Mutual may be used. Adequate adhesion of the vapor barrier to the deck and adhesion of the Insula tion to the vapor barrier for securing the entire system against wind uplift and movement, must be attained. (See Section
3.3.4.Attachments page 9)
Note: When installing insulation over vinyl-type vapor barrier apply approved adhesive over the approved vapor barrier in ribbons at the rate specified by U.L. and F.M.
b. Kraft Type Fire retardant kraft lamination type va
por barriers, applied with Steep Asphalt as listed by and applied as specified by Factory Mutual may be used. Adequate adhesion of vapor barrier to the deck and adhesion of insulation to the vapor bar rier for securing the entire system against wind uplift and movement, must be at tained. (See Section 3.3.4 Attachments page 9)
Note: This system is rated for insurance
purposes by Factory Mutual only.
Care must be exercised so that the va por barrier is not ruptured during installa tion. This is particularly true in areas over the flutes of the steel deck.
3.2.3 Water Stops (Temporary Protection)
Water stops consisting of two (2) plies of tarred felt and moppings of Old Style Pitch for flat roofs or asphalt felt and asphalt for steep roofs extending onto the deck at laaat six (6) inches and four (4) inches on top of the Insulation, shall be -applied at the end of each day's work over exposed edges of insulation.
Water stops shall be continuous and tight.
In the KSR system, the Koppers Glass Fiber Insulation/Roof Base may be sealed off with a ply of Insulation Base Tape set in Koppers Steep Asphalt along the edge and covered with Koppers Steep Asphalt.
These temporary protective measures must be removed cleanly when work is re sumed to prevent blocking moisture vapor movement to vented edge details.
3A4 Cut-offs (Permanent Installation)
Venting of roof insulation at walls, curbs, eaves, etc., is recommended for ail but a few special roof structures. There fore. cut-offs should not be installed at edges of insulation adjoining these areas for venting purposes.
Cut-offs may be installed, however, pro vided they are constructed to run in one direction continuously to vented edges and provided no section of the roofing Is isolated or blocked from venting.
3.3 OTHER REQUIREMENTS
3.3.1 Materials Protection
Roll roofing materials and insulation should be stored indoors if possible, oth erwise it shall be protected by raised plat forms and covered with suitable weather proof protective coverings such as tar paulins, plastic sheeting, etc.
3.3.2 Wood Nailing Strips
All non-nallable decks require wood nailing strips at eavea, edges, walls, roof openings, etc. for proper securing of metal flanges. Nailers must be securely and firmly attached to the deck or through to its supporting members. Nailers shall extend not less than 1" beyond the apron or flange.
Roofing felts for all decks having a slope of one-half (Vk) inch per foot or mom must be back nailed and therefore non-nailable decks must be furnished with treated wood nailing strips. Wood nailers, installed on or In non-nailable decks for slopes one-half (Vk) Inch per foot or more or when insulation is re quired of a non-nailable type, shall be run in the direction perpendicular to the direction In which the felts are to be laid.
Nailers should be treated to preserve their condition and hence their nail retantive power for the expected life of the roofing. Creosote or oil bom preservatives may affect the roofing they contact and should not be used. Nailers should be pressure treated with a water bom pre servative such as Woiman salts or with penta applied in a liquified petroleum gas carrier auch as the Cellon Process.
8
KOPPERS 7.1/Ko Architectural and Construction Materials
m Cold Storage & Freezer 3uildings
Koppers will not bond its roofing ovar tbasa structures if insulation, or Insulation and vapor barrier is installed over the deck: and unless there is an adequately ventilated air space between the deck and insulated refrigerated area.
For procedures on nan-bonded roofing applications, consult your local Koppars representative or Koppers Co. in Pitts burgh.
3,3.4 Attachment
Maximum adhesion or secure attach ment of all components in the roofing as sembly is necessary to satisfactory long term performance of the roofing mem brane. For proper adhesion of ail roof components. Koppers suggests that the adhesive and fasteners, in the quantities specified by the manufacturer, be capable of passing a minimum uplift resistance of 30 pounds per square foot (psf). This up lift resistance translates into adequate lateral attachment of the built-up-roofing system.
When Building Code requirements dic tate a higher uplift resistance than our minimum requirement additional fasten ers or adhesive will be required over and above the quantities described in the en suing specifications.
Solid mopping has been found to pro vide an uplift resistance in excess of 120 pef.
Strip mopping, as suggested in the spe cifications in this manual, has been found to provide an uplift resistance in excess of 60 psf.
When nails or fasteners are used, they must be nailed through flat tin disks or have sufficiently large heads to prevent fracture or puncture through the roofing felts.
The following are the names of some manufacturers who provide nail and/or fastening devices for use with built-up roofing:
E/S Products. Ine.. New Rochelle, New York
Simplex Nail & Manufacturing Corp., Americus. Ga.
Independent Nail Corp., Bridgewater, Mass.
Wheeling Steel Corp.. Wheeling, W. Va. E. G. Building Fastener Corp., New
York. N. Y.
Koppers wM not be responsible for any damage caused by or the result of unsadefectory attachment
For further information contact your lo cal Koppora representative.
33 4 Base Sheet Alternate
Koppers Asphalt Coated Base Sheet (ASTM D-2626) may be substituted for the first ply (plies) of the Old Style Pitch Sys tem roofing specification. It is not per mitted with the Koppers System Roof specifications.
When substituted for the first ply in a solid mop application specification it shall be embedded in a solid mopping of Kop pers Steep Asphalt followed by thorough brooming to eliminate air pockets, wrin kles. fish mouths, buckles, etc. The re maining two (2) or three (3) plies shall be solid mopping with Old Style Pitch in ac cordance with the specification.
When substituted in a nailing applica tion specification it shall be used in lieu of the two nailed No. 15 tarred felts. When rosin sized or sheathing paper is a part of the original specification it shall remain and be applied beneath the Base Sheet. Edge laps shall be four (4) inches and end laps shall be six (6) inches. The nailing pattern for the Base sheet shall be on nine (9) inch centers two (2) inches from the edge lap and down the center of each sheet on nine (9) inch cen ters. (Note: This is approximately 100 nails.)
When specifying the Base Sheet alter nate use the designation bs at a sub script to the specification number. For example when substituting base sheet in a roofing specification ovar Metal Deckdesignate as 17 wibs.
3,3,3 Expansion Joints (Building)
Since all matenafs expand and contract due to temperature and/or moisture, the use, location, and design of building ex pansion jointa, especially the roof struc ture system, should be taken Into con sideration at the time of original building design.
Although provisions for adequate ex pansion joints are the responsibility of the building designer, Koppers offers the fol lowing recommendations for the protec tion of the roofing system against splits
caused by expansion and contraction of the building. Building expansion joints should be installed:
1. On large roof areas at least 200 feet in each direction.
2. At all places where the structural supports and roof assembly change direction.
3. Where type of adjoining deck mate rials change.
Where control, expansion, or contrac tion joints are provided in structural steel, deck material, or deck system, provisions must be for continuation through the builtup-roofing system. Koppers realizes that in a climate controlled building there may be little or no expansion AFTER the build ing is in use. however, building expansion joints are still recommended based upon the following points:
1. During construction the building will not be under a steady state temper ature/humidity condition so that thermal and moisture movement can be sufficient to fracture the roofing.
2. If no building expansion joint is pro vided, the owner must keep the building at the steady state temper ature and humidity condition at all times aa holiday shut-downs can fracture the roofing, due to the movement of system resulting from temperature/humidity variation.
3. If the occupancy is fairly large, the sudden entrance on a rainy day of many rain-soaked employees may cause moisture movement in the roof structure system which can fracture the roofing.
3,3,7 Notice:
This roofing specification manual con tains the latest and best available informa tion aa derived from Koppers long experi ence In tie roofing industry. The design criteria and details contained herein have been consisted and are offered as a guide for consideration to aaalat the architect, owner and roofer In an attempt to provide the best roof possible for long, troublefree service. Responsibility, however, tor design of any roofing system, remains with the architect or engineer and build ing owner. The contents of this manual are subject to change at the discretion of Koppers Company as future developments and experience are achieved.
9
deck construction:
4.1 Wood Plank/ Plywood
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
For recommendation* on wood end wood treatment, contact: Koooer* Company Inc.. Forest Products Division. Lumder Sales Dept.. 750 Koppers Bldg.. PittsOurgN. Pa. 15219
Spec. No. 1--5 ply Spec. No. 2--4 ply
Spec. No. 1 wl--4 ply Spec. No. 2 wl--3 ply board type insulation
Spec. No. 1 wiv--4 ply Spec. No. 2 wiv--3 ply board type insulation and vapor barrier
Treated wood should b uMd whr a vapor barrier is required, see Sec. 3.2.2. Page 8.
Hot Cold Tar Pitch should never ba applied di rectly to a wood deck. Sandwiched between the heat from above and the heat from below, such material finds its way through the boards into the building. Good practice demand* the cushioning and blotting affect ot a layer of
sheatmng paper followed by layers of dry felt. Stuplap and square edge boards snould
be avoided where possible. If (he underside df the root deck is exposed to sir pressure created from open doors or windoors. tongueand-grooved lumbar snould ba used.
PROCEDURE
Select clauses as required. Optionat clauses in italic.
Zzz, color oenotes bum-uo roofing szaz `'carzn
Condition ot Surface to Receive Roofing
See Section 3.1.2. Page 5. >
Material Quantity Requirement*
See Section 3.1.7, Page 6.
Preparation Below Insulation
1. The wood roof deck shall be cov ered with one (1) layer of approved roein sized sheathing paper wetgnmg approxi mately five (5) pounds per one hundred (100) square feet. The sheathing paper shall be lapped two (2) inches and se cured to the deck by occasional nailing.
2. Two full thicknesses of Tarred Felt shall be laid over the entire surface, lap ping each sheet nineteen (19) inches over the preceding sheet and nailing the sheets In place.
Application of Vapor Barrier Below Insulation
Note: When vapor barrier is required, use these procedures in addition to Prep, aration Below Insulation noted above.
Lay over the entire surface two (2) full thicknesses of Koppers Approved Tarred Pelt, lapping eacn sheet nineteen (19) in ches over the preceding sneet--mopping with Old Style Pitch the full nineteen (19)
inches so that in no place shall felt touch felt.
For other types of vapor barriers see Section 3.2.2. Page 8.
Application of Insulation
1. Mop the entire surface with a uni form coating of Old Style Pitch into which, while hot. firmly embed the insulation. When roofs have an incline of from two (2) inches to six (6) inches per foot use Steep Roofing Asphalt.
For application of roofing materials over insuia'.icn follow AoDlication of Roof ing Materials procedure in Section 4.2. Page ' i
Application of Rooting Materials Directly on Wood
1st. Lay one oiy of rosm sized or otner aoprcved sneatnmg paper weighing not ess trar ive 5 ids per 100 square `eet lapping eacr. sheet t.vo 21 .ncnes ana nail sufficiently to ncla m place.
2nd. Spec. No. 1 Spec. No. 2
Insta!' two '2) plies of tarrea felts over entire surface laoced nineteen 191 inches. Nail on eight ana one-haif i8':i -nch cen:ers one -nph `rom eage iao .Note. TNs s aporoxim ate>y `00 n.viS per 100 sa `t `.an snanis are to ce of `eouired 'eng:- :zr maximum .v-no-fling cc.ver
co- Ease Sreet j'temate see Section 3.3.5 =ace9.
3rd. Spec. No. 1
Apply mree 131 dies of Koppers Aporo'/ea Tarrea Fen lapping. ones ;wentylour ana :wo-tniras 1242i .ncnes. Where slope d oecu s one-nztt -C" per `oof ot more, nail each sheet ot ten six 6i inches Irom me oacK edge ot `wenry-tour r24i men centers All laps snail oe moopea mth pncn the lull 'wenty-io.- and "wctnirds (24*a) inches, so mat m no place snail lelt touch ten.
3rd. Spec. No. 2
Apply two (2) phes ot Koppers Ap proved Tarred Felt, lapping phes nineteen 119) inches. Where slope ot deck is onehall t'z) inch per toot or more, nail each sneet s.x 16* inches from me Pack edge on twenty-lour i24, inch centers. At; aos snail be mopped with pitch me lull nine teen (ISi ncnes so mat m no dace s-aii lelt touch lelt.
4th. Pour over the entire surface of the roofing membrane a uniform coating of Old Style Pitch into which, while hot embed not less than four hundred 14001 pounds of gravel or three hunoreo (300) pounds of siag for eacn one hundred (100) square feet.
General Requirements on pages 5 through 9 and Detailed Specifications on pages 20 through 25 ar* a part of this specification and must ba adhered to where applicable.
10
r
drivel or Sl Embeddee m Pouring of Coal Tar Pitch Altamata Layara of Coal Tar Pitch and Tarrad Pan Mooping of Coal Tar Pitch
Insulation Embedded In Coal Tar Pitch Two Layara of Coal Tar Pitch and Tarrad Falta
KOPPERS 7.1/Ko Architectural and Construction Materials
deck construction:
4.2 Peured Portland Cement Concrete
SLOPE See Section 3.1.4. pg. 5 SURFACE a Aggregate
Spec. No. S--4 ply Spec. No. 7--3 ply
Spoe. No. 5 wi--4 ply Spec. No. 7 wi--3 ply board type insulation
Spac. No. 5 wiv--4 ply Spac. No. 7 wiv--3 ply board typa insulation and vapor barriar
Detail of Specification No. S wtv
Pourad conersta dackt sometimas esuaa trouble because the built-up rooting >s laid before the dock is thoroughly dry--suen as might happen when the general contractor is anxious to gat the building under cover and
so urges the roofing contractor to begin work shortly after the deck has been poured. When
this happens the result >s a blistered and buckled membrane' or, just as serious, insu
lation curls end mikes an unsatisfactory job. The roofing contractor, backed by the archi tect. should insist on a thoroughly dry deck before beginning work. He should also see to it that the deck is free of loose sand, frozen scale and other foreign matter. Protections
should be removed, low points hlted with cement grout or other suitaeie matenal. and
all cracks oomtsd up.
PROCEDURE
Select clauses as required. Optional clauses in italic. Copy m color oenqtes Ouut-up rooting specification
Condition of Surface to Receive Roofing See Section 3.1.2, Page 5.
Material Quantity Requirements See Section 3.1.7. Page 8.
Application of Vapor Barriar Below Insulation
1. Apply a uniform coating of Old Style Pitch to the deck.
2. Lay over the entire surface two (2) full thicknesses of Koppers Approved Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheetmopping with Old Style Pitch the full nineteen (19) Inches so that .in no place shall felt touch felt.
3. Extend all plies of felt up vertical surfaces and cut off at height of insula tion.
For other types Of vapor barriers see
Section 3.2.2. Page 8.
Application of Insulation
Apply a uniform coating of Old Style Pitch over the entire surface into which, while hot. emped the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with Old Style Pitch into which, while hot. embed the second layer of insulation.
Application of Roofing Materials
1st. '<'00 deck o' "'Su.avc- --as 30p icao e cc--c e:eiy .vith Clc S:> e 3 "
2nd. Spec. No. S
Aco yr o/er fhe
s-**2c?
;
?1 *t?"a? * --
3OP`0'5 C -?S
Moo souaiv
s?zm
27': --p- no Mir. Co S'y e 0,tcn sc vaf
n rc c-sze s-av `el: touc.- `a *
2nd. Spec. No. 7
-cc.v
me enure Su^'cca '--ee '7/
s ies cl * coca's fiepro/eo Zi"ec se !
lOP'rg plies u.e-ty.tour and vp-'t'iras
Zi11 rp-es Moo sc.'d.'v Per*eer eac24-j rc- so mm Os S.'v.e 3 :c.i sc :.ia! --pc ?pe s-s `e : -p-p-. 'a r
casa sr-eet a-te-cate see Secron 3.3 5 =?. =
Vi'he'e sicoe o` Sect is cra--a'<
nr- per *3Ct 3" --e'e a-c ceck ce'~>
'a -c *= acre cac< cr ucce- ecce
eac* s-ee- cr '.ertv-'c-.' 2-
car
ters W-e'e cec< coes nc: ce'~ -a
rai'ing at' os are 'scc'ea a-o eac- s-ae:
rauea a c-c cac< c' -coer ecce a; scac-
-gs :o assu's ceret'atien c -a e-s.
3rd. =cjr o-.er --a eryro s^-ace --e
*cc'*c -e--c-a-e a -m'c-- ccs- ~g c`
2z S', e 3 -c" "'3 M-.P-
e -o'
emcee .-c- ess far fo,-' -.-cec -3C
co'.'cs o` crave1 zr m-ee -u-c-ec 200'
oou-Cs of sac 'cr eac- c-e -.-c-ee
(10C) sQuare 'eet
General Requirements on pages 5 through 9 and Detailed Specification* on pages 20 through 25 are a part ot this specification and mutt be adhered to where applicable.
ii
deck construction:
4.3 Precast Structural Concrete Sections
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
Spec. No. 10--4 ply Spec. No. 11--3 ply
Spec. No. 10 wl--4 ply Spec. No. 11 wi--3 ply board type insulation
Spec. No. 10 wlv--4 ply Spec. No. 11 wiv--3 ply board type insulation and vapor barrier
Qrt**f or Slie Embedded In Pouring of Coil Tir Wien
Altemtte Liysn of Coil Tir Pitch ind Time Pott
Mapping of Coil Tir Pltcn Insuinion Embedded in Coll Tir Plten Two tiyifl at Coil Tir Plten and Time Felti
Detail of Specification No. 11
Pinning Cement or Pinning Cement nd V Stnooma See Section 3.1.2 Ptge S
PROCEDURE
Select clauses as required. Optional clauses in italic.
Zoov co or oenores built-up roofing scecihcat.or>
Condition of Surface k>-Receive-Roofing
See Section 3.1.2. Page 5.
Material Quantity Requirements
See Section 3.1.7. Page S.
Application of Vapor Barrier Below In* sulation
1. On precast concrete slab or tile deck, strip mop with Old Style Pitch up to four (4) inches from the edge of each joint. Not less than 30% of the surface must be mopped, at a min. rate of 10 lbs. per 100 square feet.
2. Lay over the entire surface two (2) full thicknesses of Koppers Approved Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sneet-- mopping with Old Style Pitch the full nineteen (IS) inches so that in no place shall felt touch felt.
3. Extend all plies of felt up vertical surfaces and cut off at height of insula tion.
For other types of vapor barriers see Section 3.2.2. Page 8.
Application of Insulation:
Over Vapor Barrier. Apply a uniform coating of Old Style Pitch over the entire surface into which, while hot. embed the
Precast concrete structural sections demand the same recommendations as poured concrate decks, although the presence of mois ture. due to insufficient drying time, is not likely. If the contractor finds one or more slabs resting unevenly, with edges protecting above the surface, this should be corrected by resetting or leveling off. Low areas should
insulation. If there are two (2) layers of insulation (e.g. as required for pre stressed concrete sections) mop the en tire surface of the first layer with Old Style Pitch into which, while hot, embed the second layer of insulation.
Over Deck. On precast concrete slab or tile deck, strip mop with Old Style Pitch up to four (4) inches from the edge of each joint. Not less than 30% of the surface must be mopped, at a minimum of 10 lbs. per 100 square feet. While hot, embed the insulation. If there are two (2) layers of Insulation (e.g. as required for pre-stressed concrete sections) mop the entire surface of the first layer with Old Style Pitch Into which, while hot, embed the second layer of insulation.
For application of roofing materials over insulation follow Application of Roof ing Materials procedure in Section 4.2. Page 11.
Application of Roofing Materials
1st. Eacn slab snail be spot or strip mopped with Old Style Pitch, keeping pitch moppings back at least four (4i inches from a.i edges of eacn slab ioint. No' ess than 30o of the surface must be mopped. When applying over insula tion. mop insulation completely with Old Style Pitch.
2nd. Spec. No. 10
Apply over the entire surface four (4) plies of Koppers Approves Tarred Pelt.
not be filled with open-cell aggregate for it traps air and moisture, causing it to expand and crack whan covered and badly blistering a built-up roofing surface. All joints, grouted or not. should be caulked with trowel-grade asphaltic plastic cement. Slab sides and ends should be square, rest firmly and evenly on supporting members, and be installed to pre vent lateral and vertical movement.
lapping plies twenty-seven and one-hail !27Vt) inches. Mop solidly between each 27'2 inch fao with OId Style Pitch so mar in no place snail felt toucn felt.
2nd. Spec. No. 11
Apply over the enure surface three 3/ plies cf Koppers Approved Tarred -eir lapping ones twenty-tour and 'wo-U-irds I2a-3i -penes Moo sc-idiy between 'he 24V}-men lap with Old Style P'tch so that m no place snail te<t touch fe-r.
For base sheet alternate see Section 3.3.5. Page 9.
Where slooe of deck is one-ha'f ' 2 > inch per foot or more and deck oerm.ts nailing, nail aieng back or ubDer eege of each sheet on a maximum of twenty four (24) inch centers. Where dec* does not permit nailing, naning strips sna" oe installed and each sneet nailed a'o-g back or upper edge at spaemgs to assure oenetration of nailers.
3rd. Pour over the entire sur'ace o' tne roofing membrane a uniform coating of Old Styie Pitch into which, while "ct. embed not iess than four hundred '4C0' pounds of gravel or three hundred 3C01 pounds of slag for each one hundred (100) square feet.
Qsoars! Requtrsmenfr on page* 5 through and DotaHod Specifications on pages 20 through 25 an a part of this specification and must bo adharsd to whom appdcabfe.
12
Qrsvsl or Stas Embedded m Oourins of Coal Tar tttcti Attamara Larara ol Coal Tar Pitch and Tarrad Palt Mopping ol Coal Tar Pitch
Insulation Embedded In Cool Tar Pitch
KOPPERS 7.1/Ko Architectural and Construction Materials
deck construction:
4.4 Pcursd Gypsum
(Precast Gypsum)
Lightweight insulating Concrete
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
Spec. No. 12--5 ply Spec. No. 13--4 ply
Detail of Specification No. 12 wfv
The aarno rocommandatlona applying to pro* east concrete slabs apply to pracaat gypsutn slabs and gypsum matal bound planks. All unavan slabs should bs reset or leveled off so that the roof will bo laid on a flat and even surface, tree from projections and low areas. Because these slabs are precast, the possibility of a high moisture content being present is more remote than in the poured gypsum deck. Poured gypsum decks sometimes cause trou ble because me built-up roofing is laid before the deck is thoroughly dry--such as might happen when the general contractor is anx
ious to get the building under cover and so urges the roofing contractor to begin work shortly after the deck has been poured. When
this happens the result is a blistered and buckled membranes or, just as serious, in sulation curls and makes an unsatisfactory job. The roofing contractor, backed by the
architect, should insist on a thoroughly dry deck before beginning work. He should also see to it that the deck is free of loose sand, frozen scale and other foreign matter. Protec tions should be removed, low points filled with cement grout or other suitable material, and all cracks pointed up.
Select clauses . as required. Optional clauses in italic. Copy <n cc.'or denotes built-up roofing specification
Condition of Surface to Receive Reefing
See Section 3.1.2. Pago 5.
Material Quantity Requirements
See Section 3.1.7. Rags S.
Application of Membrane Below In sulation
1. Apply over entire surface one (1) ply of Koppara coatari baaa sheer, tapping each sheet four (4) inches over preceding sheet and nailing at lap no lass than nine (9) inches, and down canter of each sheet on nine (9) inch canters.
2. Extend plies up vertical surfaces and cut off at height of insulation.
For vapor provisions contact your local Koppers Representative.
Application of Insulation Over Membrane (or Deck)
Apply a uniform coating of Old Style Pitch over the entire surface into which, while hot. embed the insulation. If there are two (2) layers of insulation mop the entire surface of the first layer with Old Style Pitch into which, while hot, embed
the second layer of insulation. Per aco'ication of roofing -'-"s'-a.s
over msuiation `oiic.v Acp-caf'O" o` ~ee;;rg Materials procedure t" Sec: :" J 2 Page 11.
Application of Roofing Materials to Deck
1st. Install -wo i2i ones of sr'ea a-',
over entire surface lappeo nme'een :?<
inenes with aoproveo nans Nai. on e g"i
and cne-haif 3':i centers one
.ncr
from eage lao. >Note: This is approximate
ly 100 nails oer 100 sq. ft.).
_ Where ligowe^-h ,rstj a::"g ;c
oarnc: be -ai'ed. scoi.
Vs! o :
'el! with spot or st-'Oir.ccoirg- using
'ess man 13 lbs. oer sc^a-e of Pitch a-r
on not less than 3" centers.
Alternate: Applv over ent.re sur'ace one f'i oy cl Kcppe's coated Pate s-eet aocmg each sheet four ;a, mc-;s ;.-e* cecedmu sheet and rai'mg er less than nine t9l nches end or.*-"
te' of each s.reet on nine 2- -- centers.
2nd. Spec. No. 12
Acc.'v three 31 dies o' Keepers coproven Tarred ~e-t. 'aocmg pres :.ve--vtour and f.vo*thiros \2^1'z / inches, .'/here since of cec< 's """-'a/' i'^, -eo car 'oct or more. ~.ai eacn sheet n~ `e" t-r
Spec. No. 12 wl--4 ply Spec. No. 13 wi--3 ply board type insulation Spec. No. 12 wlv--4 ply Spec. No. 13 wiv--3 ply board type insulation and vapor barrier
See Page 5 for Lightweight Insulating Decks Section 3.1.3. Thermosetting Aephaltlc Concrete: Bate sheet must be used es first ply-- see Section 3.3.5, page 9. Use application procedures as described in Section 4.2, page 11.
-c-jare -aeGeneral Requirement! on pagee 5 through and Detailed Specifications on pages 20 through 25 are e part of this specification and must bo adhered to where applicable.
13
deck construction:
4.5 Metal Decks
(Insulation Required)
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
Spec. No. 17 wi--4 ply Spec. No. 18 wi--3 ply board type insulation
Qravel or Slag Embedded in louring of Coal Tar Pitch Mtartiata Layart or Coal Tar Pitch
and Tarred Fait
Mopolng of Coal Tar Pitch
Inaulttlon Adhered to Vaeor Samar
Vaoor Barrier Memorane Adhered to Deck
Spec. No. 17 wiv--4 ply Spec. No. 18 wiv--3 ply board type insulation and vapor barrier
See Page 5 for Lightweight Insulating Decks Section 3.1.3.
Detail of Specification No. 17 wiv
It la absolutely necessary to Install insulation on a metal deck before the built-up roofing Is applied.
A metal deck must be clean, smooth, and properly anchored to the steel purlins and all joints correctly lapped and fastened.
Type of metal deck, flute opening and vari ous other factors determine the type and
thickness of insulation required. Consult your Koppera reoreaentatlve for recommendations.
Metal roof decks shall be designed so that they will not have a deflection exceeding 1/240 of clear span under all types of loads (live & dead). Designer should taka into ac count roof traffic conditions including me chanical equipment used for roof application.
PROCEDURE
Select clauses as required. Optional clauses in italic. Sony n coior cenotes built-up rooting specification
Conation of Surface to Receive Roofing
See Section 3.1.2, Page 5.
Material Quantity Requirements See Section 3.1.7, Page 8.
Application of Vapor Barrier Below litsulation
A. Felt Type Coat the ribs of the matal deck with Steep Asphalt and then install two (2) full thicknesses of Koppers No. 15 Asphalt Felt, lapping each sheet nineteen (19) inches over the preceding sheet mopping with Steep Asphalt the full width of the nineteen (19) inch lap. Extend all felt up vertical surfaces and cutoff at height of Insulation.
For other types of vapor barriers see Section 3.2.2. Page 8.
Application of Insulation and Roofing Materials
1st a. Install insulation in steep asphalt applied to deck at rate of 12 to 15 Iba. per 100 sq. ft. and place insulation while
steep asphalt is still moltan to provide good adhesion. See Attachment Section 3.3.4, Page 9.
b. If slope of deck is one-half (Vi) inch per foot or more, insulation must be able to retain nails and. in addition to being set in steep asphalt, insulation must be fastened to the metal deck with ap proved meetallcai fasteners placed at all four (4) comers and the center of each sheet If two layers of Insulation are spe cified, top layer joints shall not coincide with joints of bottom layer. Fasteners shall bo driven after the top layer of insulation is installed.
c. If U.L. and F.M. requirements are a factor for insurance rating, insulation must be listed and approved in accordance with their current data.
2nd. Mop a uniform coating of Old Style Pitch over the insulation preceding the application of roofing membrane.
3rd. Spec. No. 17 wi
Apply over me entire surface, tour (4/ plies of Koppers Approved Tarred Fen. lapping plies twenty-seven and one-halt 127' z) inches.
Mop solidly between each 27vj inch lap with Old Style Pitch so that in no place shall felt touch ten.
3rd. Spec. No. 1# wi
Apply over the entire suriace. three (31 plies of Keepers Approved Ta"ed Felt, lapping phes twenty-four ana two-trirds C24&3) inches.
Mop solidly between each 242 j men lap with Old Style Pitch so that in no place shall ten touch felt.
If slope of roof is one-haif ;'i) inch per foci or more, each ply of felt snail be nailed along the back or upper edge on twenty-four (24) inch centers. If base sheet alternate is used, each cly of case sheet shall be nailed two f2> inches lrcm the back or upper edge on twerty-'cur (24) inch centers.
4th. Pour over the entire surface of the roofing membrane a uniform coating of Old Style Pitch into which, wmie hc: embed not less than four hundred '4001 pounds of gravel or three hundred (300) sounds of slag for each one nundred (100) sauare feet.
For base sheet alternate see .Section 3.3.5. Page 9.
Qeneral Requirements* on pages 5 through 9 and Detailed Specification* on pagoo 20 through 25 are a part of this specification and muat be adhered to where applicable.
14
KOPPERS 7.1, Ko Archrtecturaiand Construction Materials
deck construction: Poured Concrete a Poured Gypsum a Precast Concrete
4.6 Water Cooled Roofs Water Retaining Roofs
SLOPE See Section 3.1.4, pg. 5 SURFACE a Double Aggregate (with double pour)
Water Cooted Roof
Water is dstignsd to bo eontainod on ths root at all timoa at a eonttam lovol by moana of a drainage tyatam and a watar source. (Sot nota on cold waattiar conditions.) Watar Coolad Roofa alao include apray pond roofa whtro tna root la eonatantly aprayad with watar but not nacaaaarlly kept at a eonatant lovol. Watar Coolod Roota atiould Do apptlad ovor pourad eonerata, gypsum or pro-caat
eonerata dacka.
It ia mandatory mat tha watar cooling tya> tom ba cloaad down and tha root drainad
prior to cold waathar. Noithar rooting nor tha tructuro will withatand tha axpanaion cauaad by lea formation.
wtpr winning noon
Rrocaaa Watar. Watar from manufacturing procata, cooling tower*. ate., that ragularty dalivor watar acroaa tha roof for normal drainaga.
Resented Drainaga Ponding: Drama ara sized to dalivar a eontrollad amount of watar to tha storm syatam and thus ragularty nacasaitata haavy watar ponding.
Spec. No. 23--4 ply--on deck Spec. No. 24--3 ply--on deck
Spec. No. 23 wi--4 ply Spec. No. 24 wi--3 ply board type insulation
Spec. No. 23 wfv--4 ply Spec. No. 24 wiv--3 ply board type insulation and vapor barriar
NOTE: The base sheet alternate Section 3.3.5 shall not be used.
PROCEDURE
Select clauses as required. Optional clauses in italic. Cody m co/or denotes Duilt-up rooting specification
Condition ol Surface to Receive Roofing See Section 3.1.2. Page 5.
Material Quantify Requtremente See Section 3.1.7, Pag* 8.
Application of Built-up Roofing
1st. Moo deck completely with Old Stye =>!lch
2nd. Spec. No. 23
Appiy over the entire surface four (4) ones of Koppers Approved Tarred Felt, tapping p'ies twenty-seven and one-halt 27'? i renes. .Vfoo solidly oetween each 27'2 ncp> :3P with Old Style Pitcn so that m no c:ace snail felt touch felt.
2nd. Spec. No. 24
Apply ever the entire surface three (3) p'ies of Koppers Approved Tarred Felt, lapping phes twenty-four and two-thirds (24m inches. Mop solidly between each I24111 inch tap with Old Style Pitch so that in no place shall felt touch telt.
All telt snail be turned up not less than our (4i inches at vertical surfaces.
3rd. 3our over the entire surface of the roofing membrane a uniform coating of Old Style Pitch into which, while hot. emoed not less than four nundred (400) pounds of gravel or tnree nundred (3001
pounas of slag for each one hundred (100) square feet.
If slope of root is one-half (''21 inch per foot or more, each ply of felt snail be nailed along tne back o- upper edge on twenty-four i24i iren centers.
4th. All loose gravel or slag shall be swept `rom surface and a second jmform pounng of aporoximately eignty-five :851 pounds of Old Style Pitch shall be applied over the gravel or slag, into which, wmle hot. snail be applied a second aver of tnree "undred (300) sounds of gravel or two hundred 1200) pounds of slag for eacn 100 sauare feet. The entire surface snail then be tnoroughiy broomed free from all loose gravel or slag. It is advis able to roil the fnisned surface with a light -oiler so that aggregate is tnoroughiy embedded.
Note:
a. At points whara water pressure from the spray may be excessive, the roof sur face should bo protected with treated board platforms or other suitable con struction to break the force of the watar. These platforms should be laid on top of tha roof surface and not fastened to tha deck.
b. Insulation under a Watar Cooled Roof should ba of a type which is rigid, dimensionally stable with high compres sive strength and of a sealed cellular structure such as Foamgias.S
c. At all points where roofing mem
brane meets a vertical surface the flash ing specifications used shall be as fol lows:
Water Coaled Roofs--Koppers Flashing Specification No. 110 only shall be used. See Pg. 21.
Water Retaining Roofs--Either Koppers Flashing Specifications No. 108 or No. 110 shall oe used. See pg. 21.
d. Insulation and vapor barrier, if used, shall be applied according to procedures found m basic specifications 5 & 7 (Pg. 11), 10 & 11 (Pg. 12), 12 & 13 (Pg. 13).
e. Specifications 23 and 24 may be applied over wood deck (Pg. 10) or metal decks (Pg. 14) only if used as Water Retaining Roofs. Insulation and vapor barrier, if used shall be applied according to procedures found with these specifi cations.
f. Roof Structure design live loads for specifications 23 and 24 shall be a mini mum of 50 psi and deflection shall not exceed 1/360 of the span, both in addition to the anticipated weight of the water. Insulation joints must be taped. Vapor barriers must be two ply. solid mopped. Use steep asphalt over metal decks. Wood musrbe treated to prevent warping (see Section 3.3.2 Page 8).
General ReqOiraments on pages 5 through t wid Detailed Specifications on pages 20 through 25 ara a part ol this specification and must be adhered to where applicable.
15
deck construction:
4.7 \/:cd riber
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
Spec. No. 27--4 ply Spec. No. 28--3 ply
Spec. No. 27 wi--4 ply Spec. No. 28 wi--3 ply board type insulation
Spec. No. 27 wiv--4 ply Spec. No. 28 wiv--3 ply board type insulation and vapor barrier
All decking must be Installed in strisApecordancs with the particular deck manufacturer's recommendations for Installation. Deck mate
rial must be protected during shipment, lob site storage and prior to moling application. No planks which have become structurally weakened due to moisture, fractures' or muti lated edges may be used. All Joints must be level and preferably grouted full and level with plank surfaces as recommended by the deck manufacturer. All planka must be well'
anchored to supporting "members to resist movement in a fashion recommended by the deck aejjpefactursr. Any planks which bow or deflect or do not seat securely must be re placed. Responsibility for the selection of a particular type of wood fiber deck. Its instal lation. provision for expansion and contrac tion Its suitability to iob requirements,- and ita ability" to support, anticipated loads 'in Ita environment rests .with the designer and deck
manufacturer.
Select clauses as required. Optional clauses in italic.
v. " zz o' :e-c is
re: '
r
:-jo root.ro
Condition ot Surface to Receive Roofing See Section 3.1.2. Page 5.
Material Quantity Requirements See Section 3.1.7, Page 6.
-Doncation cl Scoring '.laterals
si. := r . r
} ` ~ ; 2 2 `.`-2 Z -Sa -'<= = ; r-.'9r r'** '
=r- - z ~ :zz ~z C ~vqe Mi S'esc
- = - =r --r -as?
5^a:' ^c; tojc^
c---
cr r'=?ss
?- r-
" ':7? : " t ** -? ~Zl S'CcC
' cuck'ss
--s a~ acs
-j *rCb--f-r*j "f i;/wc:pa' Aoco
:-.zer S'zauc:s issr-z.ation c oes co' s~c.n js 3,--p.ex T,oe--onai-s.
r"?.n ~ ..Tf-L. '<
*.'
~.cziz:jze
m`zzccfs
s1
r? : z c>~-c 1 ` .**$ '** * "(,,''* v? *
' C'
3S r~CO---r>9''C"C
.*? S''JC,Zr3- //?'' 7 c zer '?C jZ** "5 sc
c ::>cn.
2nd. Spec. No. 27
Acoly m'ee 13, olies c! Kccoe'S Aporovea Tarraa Pen 'aooirg css iwentytour ana two-mircs 2-: . meres. Where siope ot deck is one-nan <': men per toot or more, nail seen sheet ot lett six iS. mcnes t'zm me fee* eege on twentyicw 2-' 'tc- certe-s -.7 .305 snail be .Topped .v:n ore- vs `ult wenty-'our ar.s i.vo-tiras ;Za:: ,-cres. so that in no dace sr.ai, tell touch ten.
2nd. Spec. No. 28
Apply :wo 12; p.'ss ot Keepers Ap-
c.'Crea Ta"eo ?e lapomg pi`ss nine-
tee" '? Tones. Where slope ot Peck is
c-e-natt
men per toot or more, nail
eecr sneer sir f rcr.es '.'om me back
eoge on 'wenty-tzur 13a, men centers.
a.1 20s s-atl ts '"oppeo ruth pitch the
~ rcteen -:g- nones so that in no
0 ace ;-= '?' roue- `eh.
3rd. -ou' z .er '"e =>l" -e
0* *re
".'.'"z -e--c-ar'e 3 or,--, oca:.''.: of
-> o .c~
... ",cr at-e "ot
"O' p:c - 1 -- 'C ",w''CrC -CO'
Z' *''*90
ZZZ;
y. 5=0 `or eaco o-e -j-d-eG
oare ^eet.
Insulation and Vapor Barrier
1. Insulation without vapor barrier. In stall insulation in Type III steep asphalt in conformance with 1st paragraph. Nail able insulation not exceeding one (1) Inch thick may be installed using TV. inch Simplex Tube-Lok nails at all four corners and at center of board. Installation of roofing over Insulation shall be as per specification outlined above with base sheet mopped solidly to the insulation in steep asphalt.
2. Insulation with vapor barrier. Install two (2) plies of No. 15 asphalt felt lapped nineteen (19) inches in Type III steep asphalt as per 1st paragraph of this spe cification. Both plies shall be mopped solidly so that in no piece shall felt touch felt. Install insulation in solid mopping of steep asphalt. Roofing over insulation is to be in accordance with the details of the specification above with base sheet mopped solidly to the insulation.
General Requirements on pages 5 through t and 0stalled Specifications on pages 20 through 25 ate a part of this specification and must be adhered to where applicable.
16
5 Xoppers Sys:s" Roc/
ONE SOURCE RESPONSIBILITY
With the new Koppors System Roof ail you need is the deck. Koppers pro vides everything else. The result is an efficient installation of a long-fasting roof. And with Koppers having sole responsibility for all materials, your headaches of the future are a thing of the past.
SYSTEM DESIGN A one-source system means that
the components were planned to work together. They are totally compatible. That's your assurance of a long-fast ing, trouble-free roof. And because all the components arrive together, you'll have no costly installation delays.
10 + 10 GUARANTEE Your Koppers System Roof is total
ly guaranteed for 10 years with an option for an additional 10 years when it is installed to our specifica tions. For further details of this un usual guarantee see "Guaranteed Roofing Program" on page 26.
DECK CONSTRUCTION:
Kopoer* GMl* fibr insuMnon/Roohnf Best Stnpor Soot Mopped n ftgooff* StMO Asenalt
KOOOtf mauMdOR IBM Tape EmOMded* and Coated^ Over w<h Koppers Steeo AfOha*
Two Alternate Layers at W*h xoooers Bitumen
Fr Mopped Sot*
Gravel Of Slec Cmsiosafl toPogrinf of Koppers BRumen
Kooeers GMes Fiber intuiotnn/ftootac Bee* Embedded -- n woocen Steep Asphalt
Koppers irwiatcn Beee Teoe Emoedded m and Coated Over wen Kpoors Steep Alpha*
Two Alternate Layers of KM Fed Mopped Solid Wnn Koppers Btfumen
KOPPERS 7.1 /Ko AicMectunland Construction Materials 4prUMEN
Koppers Bitumen has superb water and corrosion resistance, and acts as an excellent adhesive. The bitumen has a self-healing ability because of a property known as "cold-flow.'' This allows hairline cracks to heal automatically. Because Koppers bitu men contains tow volatile oils, the surface will not evaporate as fast as conventional roof surfaces.
TWO*SPARATE PUES OF FELT
Koppers felts are specially selected -to give the greatest strength-to-thickness- ratio available from organic felted membranes. They are heavier - and stronger then conventional roof ing felts, yetessy to apply.
GLASS FIBER INSULATION
Our Grass Fiber InauijfiK espe cially designed for the f^Rm roof, has two distinct advantages. (1) Be cause of its great weathering ability, you can close a structure fast and it will serve as a temporary roof, (2) It is not subject to the blistering that is so prevalent with other insulations. Also, once the insulation is seal stripped with our tape, it becomes an integral part of the roof.
TAPE Koppers Glass Fiber Tape is set in
bitumen at pre-roofed insulation joints. Seal stripping with glass fiber tape helps make insulation more stable.
Kooeen Glass fcber mAatntwRootin Baee Stnpor Soot Mepoed -n Koppers Steeo Asphalt
Keepers insuMtipn Base Taot Embedded m and Coated Over wah Kooeers Steeo Aspneit
Two Alternate Lavers ot kSR Fen Mopped Send
wen Kooeers Bdumen
Mooomfs of
*bod Wtt*er*)weoq
deck construction:
XSR-- Wood piank/piywood
Detail of specification No. 30
XSRRsinforcsd Concrete
Detail of specification No. 31
deck construction:
XSR-- Metal Deck
Detail of specification No. 32
17
KSR
deck construction:
5.1 SMC. No. 30--WOOD PLANK/ PLYWOOD
5.2 Spoc. No. 31--REINFORCED PORTLAND CEMENT CONCRETE (Monolithic or pro-cast)
5.3 Spec. No. 32--METAL DECK
SLOPE See Section 3.1.4, pg. 5 SURFACE Aggregate
PROCEDURE
Select clauses aa required. Optional clauses in italic.
Copy in color denotes KSR Specifications
Condition* ot Surface to Receive KSR Materials
Saa Saction 3.1.2, Pag* 5.
Matartal Quantity Requirements Saa Saction 3.1.7, Page 6.
Vapor Barrier Koppars Syatam Roofs (KSR) ara not
normally usad .whera vapor barrlars ara required. Whan vapor barnors ara raquirad contact your Koppars Salas Representstive for spacific requirements.
Application ol KSR Systam 1st. Application of Koppars Glass Fiber
Insulation/Roof Basa Reference: See Section 3.1.9. Page 6. a. (all applications)
\-,;c a un.form coating of hot Kopoers Steep Aspnait. install Koppers Glass Fiber insj'ation aoof Base immediately press ing firmly mto place. When more than one n- ayer of insulation is used, joints in each layer shall not coincide. Each suc cessive layer snail be embedded in a uniform coating of hot Koppers Steep Asphalt.
b. Spec. 30 When applying Koppara Steep Asphalt (and/or adhesive! keep material back from edges of wood plank and plywood to prevent asphalt or adhesive drippage.
b. Spec. 31 When monolithically placed Portland Cement Concrete is the structural base. Koppers Bitumen may be used as an alternate to Koppers Steep Asphalt, how ever keep back from edges of perimeter and opening a minimum ol four (4) inches.
b. Spec. 32 Tne insulation /oints parallel with the flutes of the metal deck shall be centered along the flat portion ot the deck to obtain solid adhesion. Refer to Chart 5.6. page 23 to determine the minimum insulation thickness to span the open flute of the metal deck.
2nd. Application of Koppars Insulation Basa Tap*
Reference: See Section 3 1.10. Page 7. Apply a solid strip of hot Koppers Steep Asphalt over the joints of the Glass Fiber Insulation/Roof Base at least one (1) inch wider than the Base Tape. Immediately embed the Base Tape in the hot Steep Asphalt. The Base Tape shall be pulled flat to avoid buckles, fishrribuths, etc. Use
at least two (2) inch end laps and cross over laps. Completely top coat all Base Tape with hot Steep Asphalt. When mono lithically placed Portland Cement Concrete is the structural base. Koppers Bitumen may be used as an alternate to Koppers Steep Asphalt. (For temporary roofing fol low procedures in Section 3.1.15. page 7.)
3rd. Application of KSR Fails Apply over the entire surface two (2)' plies of Koppers KSR Felts, in a continu ous and solid mopping of heated Koppers Bitumen, lapping plies nineteen (19) inches. Bitumen shall be applied so that in no place shall felt touch felt. Slopes in excess of one-half ivn inch per foot are not permitted. Base Sheet alternate is not permitted.
4th. Application of Koppers Bitumen and Aggregate Surfacing
Pour over the entire surface of the ap plied felts a uniform coating of heated Koppers Bitumen into which, while hot. embea not less than four hundred (400> pounds of gravel or three hundred (300) pounds of slag for each 100 sg. ft.
General Raquiramants on pagaa 5 through 9 and DataMad Specification* on pages 20 through 25 are a part of this specification and must b* adhered to where spplicaM*.
18
KSR Reference Data
HOPPERS 7.1/Ko Architecture ana Construction Materials
5.4 Calculated Heat Transfer Through Typical Roof Decks With Various Nominal Thicknesses Of Insulation
FUAT METAL DECK
No Insulation, UsOJO
METAL DECK* SUSPENDED
CEILING
POURED GYPSUM
DECK
LIGHT WEIGHT CONCRETE ! DECK
Bocsai i
CONCRETE OECK
2" SLAB and 1' FIBERGLAS
BOARD No Insulation,
U=0.1S
2 SLAB and WGYPSUM
BOARD No Insulation,
UxO.38
Jittaa' *_ r-..i._i_n__._. V|- COT**** *K|,
No Insulation, Us045
4" SLAB No Insulation,
U=0.70
WOOO OECK
r bos.
(Actual 'Hr") No Insulation,
UsO.48
r PLANK (Actual 144*) No Insulation,
Ux042
1
| %
pu
1 |s 8 11 i
f*
i* ia 1
Cl 2J
11 9
-
1 Cl Si
je 8
ii 9
! c*3ff
*
f
if
1 I
9
1 % u
1
ll if
I J
9t
. ll 1
if If
J1
if
ll
s M
it 91
m
i 1.
J
3 Is s
si
Jl S 9
'f
.05 2X.-2K
.06 .07
va-va
1X.-1X,
.OS
.09
1X.-1K 2X.
.10 .11
VA
IK
.12 .13 .14
VA
IK IX.
.IS
.16 .17
IK
IK IX.
.11 .19
IK IX,
.20 l
.21 'X.
.22 .23
K
.24 %
.25
.26 .27
K
'X.
.26
..23901 K
.31 X.
.35
va-vA
2.0 1K-1M 2K
1.4 IK
IX.
3 1 14 2K 1.0
IK IX. K 'X. 'X.
1 X, 2 04
l
i IK 0.651lI
i !:
> i;
:
1
k:
1.4 3 1.2 2K 1.0 2 0J r/a 045
11
K| 1
kI
1
11 i
1 1
i ,
IX.-1X. 2K IK IK IX. 'X, K
3 2K IK 1 K K
1.4 14 1.0 0.65
1K-2X. 1X.-IK 1K-1K 2K 2X, IK IX. IX. IX. IX.
'X.
K
'X.
K
'X.
K
X.
1.4 3 14
22 K
1.0 0.8
IK 0.55
1
K 1
K
IK-1K IK-1X. 2X, 2X IK IK IX. 1
'X. % X.
3 2'K 2 IK
1
K
K
1.4 14 1.0 04 0.65
2X.-2K 1K-1K 1X.-1X. 1XWX. 2X. 2X. IK IK IX. IK IX. IX. IK
l
'X.
K
'X.
K
'X. K X.
1.4 3 1.2 2K 1.0 2 0.80 IK 0.65
1 K K
2X.-2X. 1K-1K 1K-1X. 2X. 2K IIKK IX. IK IK 1IX.
'X.
K
'X.
K
'X. K
3 2K 2
IK
1
K
1.4 14 1.0
04 0.65
IK-1K 1X.-1X. 1X.-IX.
VA
IK IK IK IK IK I
K
'X.
K
K X.
1.4
3 2K
11.40
2 0.3
IK 0.65
I
K :
;
K.
.05 .05 .07 .08 .09 .10 .11 .12 .13 .14 .15 .16 .17 .18 .19 .20 .21 ..2232 .24 .25 .26 .27 .28 .29 .30 .31 .35
.40 *1
.40
i
TM "U" Mint ntuni tin Out Imnammad llmu|S on* aauar* Mot m on* Dour lor <acK o*tr*< Fahrennert dilftranc* in t*fflp*ritur* totwttn tut nr on *ach aid*. S* "Contraction Senator" tumimr into 1958. "Ttornul Proe*rtmof Walla and ooh." (Not*: Supeortmi St**l not ineludtd in pourM lyosum "U" valuta.)
5.5 THERMAL VALUES
CONDUCT. RESIST* KSR
EXP. URETHANE FIBER- FOAMQLAS
ANCE
ANCE IN8UL. PERLITE
BOARD BOARD
.10 12P .13 .15# .16 .19# .21 .24# .25 47 .29 .38# .48 .72
10.00 8.33 7.89 8.87 6.25 5.28 4.76 4.17 4.00 3.70 3.45 2.78 2.08 1.39
2-7/18* 2-1/18*
1%** 144* 1-9/18*
1-5/181-3/16* 1-1/18--
3* 244*
2K* 214*
r
144*
IK*
15/18--
449/16*
114* 1*
44*
1.4*
14*
1.0*
0.8* 0.85*
3* 2K* 2* IK*
r
144*
IK"
1* K*
# -- "C" valuat of Simpllflad Practics Rseommandatlon R257-55. * -- Standard Stock matsrials--othsrs madt-toordsr.
5.6 MINIMUM THICKNESS TO SPAN OPEN FLUTE METAL DECKS
Thickness
Max. Flute Span
Standard Roof Insulation
Va 44 44 15/16 1-1/18 1-5/16 1-7/16
44 1 144
244 244 314 4-'
Wide Flute Roof Insulation
44 IK 44 244
15/18 1-1/16 1-5/18
** 2v*Vt
Must hsvs s r minimum Hang* searing surtice datween
Hut**.
19
Xoppsrs hashing Specifications
1 General
i i
j Application Detail
Plashing* are the terminal closuras of a roofing system which perform a waterproofing, and in some systems, a decorative function. Flashings must be installed at all intersections formed by vertical surfaces. Their import* ance cannot be stressed too strongly. Water entering the roofing system through flashings can result in water vapor forces which will destroy the
effectiveness of the roofing. Koppers flashings are an integral
part of a Koppers roof. Designed for flexibility so that slight movements do not dislodge them and fastened securely to the wall, they give many
years of service. It is particularly important that the
top edge of the flashing be protected by counter flashing, which will insure a diversion of the water away from any opening which might develop be tween flashing and wail. In any case where the design or anchoring system of metal counter flashing is difficult, the top of the flashing system should be double stripped with Koppers Glasfab tr wide set in Koppers tar base cement for Specification 110 or Koppers flashing cement in Specifi
cation 108. Metal work is only useful for dec
orative, water shedding, or protec tion against mechanical damage, and is not a waterproofing part of the flashing system. Because of the high coefficient of expansion of sheet
metals and the large temperature changes experienced on a roof, sheet metai or exposed metal components must be isolated from the waterproof
ing components of the roofing and >
flashing system as efficiently as poa- J
sible to prevent the metal from split- j
ting the membrane.
I
Flashing should be installed as
roofing progresses to prevent water
damage to insulation or deck under
the roofing. If this is not possible 1
water cut-offs must be installed and
later removed when flashing is in- >
stalled. Metal counter flashing- or a
top seal of Glasfab and flashing ce- j
ment must be installed as flashing
progresses.
The basic Koppers flashings re
quire a metal cap flashing to be in
serted in the raggle immediately upon
completion of base flashing. The cap
flashing is to extend into the raggfe
not less than two (2) inches and is to
have not less than a four (4) inch
exposed apron extending down over
the base flashing. Completely fill rag
gle with Koppers flashing cement
NOTE: 1. If bonded flashing is required, it must be installed in conjunction with a Koppers bonded roof and can be bonded for standard periods up to but not greater than the period for which the roofing is bonded. To be bonded, flashings must be set at least 7Vi" above the roofing base. 2. Meta) Cap flashings are not bondable and are not included under any flashing bond. 3. Metai work of any description used as flashing or a parr of a flashing sys tem is not bondable and is not in cluded under any flashing bond.
Specification No. 108 Application Oetail
Specification No. 110 20
KOPPERS 7.1/Ko Aictvtactunland Construction MatcnaM
6.2 Specification No. 108 (reinforced asbestos)
Recommended where aunllght Is the prsdominant exposure. Should ba usad for all high flashing.
METAL CAP ASBESTOS BASE (1+1) COATED SURFACE
Application Extend plies of roofing felts and pitch or bitumen moppinga up ail walls, parapets and curbs for a distance of two (2) inches above cant strip.
A raggle not less than seven and one-half (7%) inches or more than twelve (12) inches above the roof deck is to be provided except where capped nailers are used.
Prime all masonry walls from top of roofing felts to raggle with Koppers Asphalt Primer. Allow to dry thoroughly.
In a uniform coating of Koppers Flashing Cement, install one (1) ply of Koppers No. IS Asphalt saturated asbestos felt extending from the rag gle to not less than four (4) inches
from the base of the cant onto the roof. On top of this apply a second uniform coat of Koppers Flashing Cement into which embed one (1) ply of Koppers reinforced asbestos base flashing (reinforced fabric side down). Nail with one and one-half (116) inch masonry roofing nails through flat tin discs along upper edge eight (8) inches o.c. maximum into mortar joints. For concrete construction, nail to treated wood nailing strips set in flush with the surface with appropri ate nail through flat tin discs.
End laps for the two (2) plies shall be not less than three (3) inches and staggered not less than twenty-four (24) inches. End laps of reinforced base shall be nailed vertically a mini mum of once into the wall at upper edge and once into the cant at a point not lower than the mid point of the cant
End taps of reinforced base after nailing shall be covered with a strip
of Koppers asbestos felt not less than four (4) inches wide set in a coating of Koppers Flashing Cement.
Coat entire surface of flashing with Koppers Flashing Cement or Koppers Chembond (including nail caps along top edge of flashing as well as top edges of felts to sesl at wail).
Interply and top coatings shall be troweled uniformly, full height and continuously approximately oneeighth (16) inch thick. Plies must be laid in smoothly with no pockets, wrinkles or buckles.
Install metal cap flashing.
NOTE: Hot applied steep asphalt may be used as an alternate to the two (2) interply trowelings of asphaltic plastic cement. One (1) ply of No. 15 asphalt felt may be used in lieu of the one ply underiayment sheet of No. 15 asphalt asbestos felt when re quired. All other requirements of this specification must be adhered to.
6.3 Specification No. 110 (forwatsreooladreofs)
Recommended for water and corrosive atmosphere exposure. Low capped and sealed Pashtngs.
METAL CAP COMPOSITION BASE (2 + 2) COATED SURFACE
Application
Cant strips shall be installed at the angle between the roof deck and the parapet wall or any other similar per pendicular surfaces.
Extend plies of roofing felts and pitch or bitumen moppings up all walls for a distance of two (2) inches above cant strip.
A raggle of not less than ten (10) inches above the roof deck is to be
provided for water cooled roofs and water retaining roofs.
Prime all masonry walls from top of roofing felts to raggle with Koppers Concrete Priming Oil (coal tar base). Allow to dry thoroughly.
Set two plies of Koppers Approved Tarred Felt in trowelings of Koppers tar base roof cement. Have plies ex tending from the bottom of the rag gle; the first extending out onto the deck not less than four inches from the bottom of the cant strip, and the second, one inch beyond the first Over this apply two layers of tar satu rated asbestos felt similarly imbedded in Koppers Tar Base Poof Cement each ply extending onto the deck one inch beyond the preceding ply.
Nail with one and one-half (116) inch barbed roofing nails through flat tin discs at upper edge approximate ly ten (10) inches o.c. (For brick or block construction, nail into vertical mortar joints. For concrete construc tion, nail to treated wood nailing strips set in flush with the surface.)
Felts are not to exceed ten feet three inches (10^') In length. Ends of connecting strips are to overlap three (3) inches and are to break at least twenty-four (24) inches with laps of underlying strip.
All plies of felt shall be firmly pressed into the trowelings of Kop pers Tar Base Roof Cement so that there will be no wrinkles in the fin
ished surface.
21
7. Flashing Details
! GENERAL INFORMATION
There are numerous flashing details that have been proven by experience over the years. There ' are normally a number of acceptable construction | details for accomplishing one purpose. The architect should select a detail that beat serves the purpose under the various and different condi tions concerned with the specific job at hand. In certain cases, slight modifications are necessary to adjust a proven detail to job conditions or one method may serve better than another.
The details shown in this manual are some sug gestions based on experience. Space limitations prohibit listing many others.
Design or selection is a responsibility of the architect
Koppers representatives are available to review flashing details to assist the architect in providing the best details for specific jobs.
7.1 Raised Edge Meta* Cap Set t* *oooer% casning earnest
Nanssoacedl from edge of metai $tno end
3 lojrtmroufftneopreneaineri
4* i 6`WoodCent
Memorane flashing Material eft Or* at vertical face and N*etf 6'OC at Bottom
KoopanlOtor *110Sosct
*000*r*R ohnf
7.4 Parapet/Precast or Poured Concrete
Not# Walt Shall oeF'toaree to Inmmate water eetret>t Through Concrete to UnOertiOe 5*
Roofing
7.5 Parapet/Metai Curtain Wail
Oacoracwa Watt Cap
2 Ptm ot MemOrr* Set m Roeoan flashing Cement Turn Ooiam om tat#
Trotted WoodNeuer
Fiimen Soaceo l from edge ot
MneeereorreSntr*iowaansohe3rs Aoert through__
7.2 Relief Joint
2 * of \iemoue a** >
*oooe< ( Cement
7un Qow* o*er Cage
>iej^.n(;N4iedlO OC
s *000 tener csiAeO to Bees
*000Cent4 *4
: 7.3 Equipment Support
1
2 Plies of Membr*n in
i*. scraw
I Plashing Cement Turned Down / *
; Over Edge \
^ Neoprene Pad
Flashing Specs. = 108 or =110
Sheet Metal
I JUUUUMAlHUUMlillll
Cant & >4"
* Treated Wood Hauers
22
7.5 Parapet/Wall Cap
Metal Counterftafhng <wh*n Reouweo) (ttena Oownwerd 4* Set m Plaining Cement
wetf Cat
2 P'*es of Memo* me xooce's r<asn<ne Ce<nrw rgmed Down o*r Edges ,-nt+t oo>*>o
Treated Wood Naner
^aiReauired
f Note vmen composition fiasnmg ooes not ettena T
-o to an cao or wan cao ooes not onmoe
1
water egress protect** a meta> coumen-asning j
must oe mstaneo according to orocedures ouns |
n faming i0oc>ta>ions
Mm **
^Cant
Koooart Rooting
m ^TO%
!
x"
HIM......... llfllMIMIW
\
Deck
N Treated *000 Naner CementitfOuS Wa*l
Flashing Details (continued)
7.7 Tapered Cant
KOPPERS 7.1/Ko Architectural andConstruction Materiel*
7.8 Tapered Cant
Fi*nt* mdtfl minimum
M*t*lGf*e* StOO" Seem Kooovn ^wil Cement
N*i**Mdl"ffljm*d*omm
itno ana 3~ prt m treated ooa
nanmf no. Two
of fatf Ffamarao
over flane* m Coat Tar P'ten.
Bituman orTar BaatCamam
TaoaradCam nctma 2r oar foot
.floofiti| Mamorana
IMlMilfJllil
Natwutfipn (Nom j
0*cr
mutation
TraatedWoodKaitar
F>an|Mdtn4
Nans soacac 1 from o of mtai iv>o*f'0 3 aoart mirtaiao wood na*nnf $tro ^ T-0 pi** Qf p<tt
over ftanct m Coai tar Pnen. 8<tumanor T#r Bata Camant
Taoarad Cant .Mai neuna 2 oar toot
R00tm| Mamoran*
rraatadivoodNanar
7.9 Hanging Gutter
Koooart Roofinf
Aopreortan N*i$ and Langw For Maximum Anenorafa
Metef Grave* Stoo With 4" flanje SadoedmKoooan
Fiashmi Cement
7.10 Vented Edge
B Grave* Stoo narted 1" from inner Mfeot flan* and3-OC.
flan* wdW 4* mtmmum
pNoeoen Poo***
Tap P* of Fett faatfwreo Over Fiance m Coat Tar Pten. Beuman or Tar Baee Camant
Taoared Cant Maumvm ncnne-2 * oar foot
7.11
Metai P*tcn Oam
fange
SFeta*snhmncooCpeemrsent
Vent Pipes, Stacks. Flagpoles, and Other Projections
*-- Lead Sleeve enm ftarft
2 felt Stnos Set m Pitch or Bitumen Over Lead Flange
7.12
Mow Band Ballad On Metal Pitch Oam
Flange Set >n Koooers Fiasnmg Cement
Fasten Flange to Deck
. ' i/-
| j * Fasten Flange to Dee*
i All vant pipes, stack*, flagpoles, or other projections penetratj ing the built-up roofing, whether indicated on drawings or not,
' must have a proper metal sleeve fleshing with flange, pen flashl ing with flange or other flanged flashing installed. ! Behind metal sleeve and beneath roofing membrane next to
deck install metal pitch dam as shown in detail. The sheet
metal flange must be cemented to the surface of the felt with a mopping of hot coal tar pitch or bitumen. Over flange apply, with
alternate moppings, two (2) reinforcing plies' of felt so that the first extends not lass than three (3) inches beyond the outer edge of the flange and the second not less than six (6) inches,
23
Flashing Details (continued)
7.13
Future Columns. Sign Supports and Angle Irons 7.14
\ Cam ' / \I TrMMdWoodNiMr
Surrounding Column
Stub Column Attacnad to Structural Framing
' At all locations whsra stub or futurs columns, sign supports and angia irons aro to psnotrata built-up roofing, Koppars recom-
i mands woodan curbed basa units with cant strips to be installed to accept standard built-up composition-flashing system. Where
i structural steel section extends beyond "stub" height, metal cap
flashings with tight fit to the structural section must be fabricated ;
and continuously welded to the projection to assure a watertight
metal cap.
I
For pitch pocket design consult your local Koppers sales
representative.
i
7.15 Curbed Expansion Joint
7.16 Roof Drain
Curb expansion joints are to be flashed In accordance with Koppers specifications for parapet walls and must provide nail ing to hold metal cap and flaahing membrane in place. Metal cap must be designed to expand so as not to disturb flashing.
It is the responsibility of the designer of the building to pro vide for adequate expansion joints.
For the protection of the roofing system against splits caused by expansion and contraction, Koppers recommends that an expansion joint be installed: (1) on large roof areas at least every 200 feet in each direction, (2) at all places where the structural
supports and roof assembly change direction, (3) where type of adjoining deck materials change.
Where control, expansion, or contraction joints are provided in structural steel, deck material, or deck system, provisions must be made for continuation through the roofing system, i See Section 3.3.6 (Expansion Joints) Page 9.
All roof drains shall be provided with metal roof drain flashing
flanges which extend at least 12" beyond drain opening and ,
shall be stripped with felt in accordance with drain detail. All .
drains should be provided with expansion joint sleeves.
!
The sheet metal flange furnished with the drain must be ce
mented to the surface of the felt with hot coal tar pitch or flash
ing cement Over the flange apply, with alternate moppings or,
troweling*, two (2) reinforcing plies of felt so that the first ex-1
tends not lees than three (3) inches beyond the outer edge of the
flange, and the second not less than six (6) Inches.
Roof drains must be of a type provided with a wide lead or
copper flange. Strainer construction should provide adjustment
for meeting variations in roof level or slope.
To obtain proper drainage, roof drains should be located at,
points of lowest expected deflection In roof deck.
i. 24
Flashing Details (continued)
7.17 Hoof Vent (Existing Building)
KOPPERS 7.1/Ko Architectural and Construction Materials
7.18 Reef Vent (New Building)
A Flashing Ctment Ovsr Fait Edges Secured toWood Nailar
3"-6"
5" Flanga Sat in FlashingCamant
Lag Bolt through Neoprene Waeher
Note: If eountartlashmg is not mtagrsl m vant flanga provide saparata matal countarflashmg undar flanga
Flanga Sat in Flashing Camant
i
i ii . ... .. . II
ILMoosflaMInusulslahtiaonii luTfreateaHd Wonorvdl NaaiiIlmars with V x W Continuous Vant Holas Approx. Z O.C.
Insulation
Trsatad wood Nailars with Vi* < `i* Continuous Vant Holas Approx. Z O.C.
Kappara does not recommend occasional or spot vents through ' the roof as the only venting method or a substitute for underside : or continuous vented systems. There may be certain Instances
where spot or mushroom type vents might be deemed advisable by the designer for a new building (eg. at expansion Joints for vent relief on long run underside continuous venting systems.
etc.) For new construction, wooden curbed base units with cant ,
strip to accept a standard built-up composition flashing system
is recommended. For existing construction where relief is re-
quired to vent the saturated insulation cavity, spot vents may be
used without wooden curbs.
.
7.19 Walkways (Treated Wood Walkway)
7.20 Traffic Pad
C**mCrrtvtt AfgrC*tt
Pfteh or Bitumen
7.21 P.cof Opening
Curbs extending a nominal 8 Inches to 12 Inches above roof surface shall be provided at all openings for skylights, ventilators, expansion joints, etc., to pro vide for installation of adequate base flashing.
Skylight
Condensate Gutter
Ventilator
Flashing Nailed 10" O.C.
Flashing Specs. #108 or #110 Koppers Roofing
Wood Cant 4" x 4" Treated Wood Nailers
25
8.1 Guaranteed Roofing Program (KSR only)
Guarantees for KSR Roofing and Flashing systems are available for the listed specifications in this manual. All materials must be constructed in accordance with Koppers specifica tions. using KSR materials and by a roofing contractor approved, in writ ing, by Koppers. Any deviations from specifications or requirements of Total Guarantee procedure must be approved by Koppers.
Koppers Total Guarantees are available for KSR System Roofs only and for a 10-year period. Guarantees cover only the materials supplied for the KSR system and their application where approved.
Additional Options Available To The Owner
1. Free Inspection. At any time dur ing the first nine (9) months of the final year in which this Guarantee is in effect, the Owner may request that Koppers Company, Inc. inspect the roof guaranteed herein free of charge and without any obligation in order to determine what repairs, if any, may be required to make the roof eligible for an additional ten (10) year Guarantee. Koppers Company, Inc. shall then perform, an inspection, make an inspection report and sub mit such report to the Owner. The inspection report shall advise the Owner of any maintenance repairs which may be necessary to qualify for renewal of this Guarantee for an additional ten (10) year period.
2. Renewal of Guarantee. Should the Owner elect to renew this Guar antee for an additional ten (10) year period, the Owner shall cause the repairs specified in the inspection report to be made at the Owner's sole expense by a roofing contractor approved by Koppers Company, Inc., and shall notify Koppers Company, Inc. in writing of his desire to renew the Guarantee no later than ninety (90) days after the expiration date of the above Guarantee. Upon payment by the Owner of a guarantee fee for such reinspection of 2/3 of Koppers Company, Inc. then standard guar antee fee, Koppers Company, Inc. shall reinspect the roof in order to determine whether the repairs spe cified in the inspection report have been satisfactorily completed.
If Koppers Company, Inc. then
finds the roof acceptable, this Guar antee will then be extended for an additional ten (10) year period from the above expiration date.
Koppers will Issue its KSR Total Guarantee for low sloped or fiat roof ing. KSR systems, to be guaranteed, must be constructed in conformance with Koppers specifications. Koppers Total Guarantees are not available for residential roofing. Koppers Total Guarantees are transferable upon timely written notification of change of property ownership.
Koppers Total Guarantee roofing
program provides for use of proven specifications, quality materials and that the roofing will be applied by a qualified, Koppers approved roofing contractor. It also provides a discus sion of specifications during the planning stage, consultation during
the construction, and assistance to the owner throughout the guarantee term aa may be necessary in relation to leaks, additional items to project through or be placed above the roof, or any matter related to the perform ance of the total system. It further provides for repairs of leaks to the roofing not occasioned by defects in the building, abuse or extreme weather conditions during the term of the guarantee. Koppers Total
Guarantees do not cover repair, in stallation or the replacement cost of decking materials, metal work or products In the roofing assemble furnished by others. Nor will Koppers assume any responsibility for any damage to the guaranteed roofing system caused by, or the result of, the use of these products, their in stallation or attachment KSR Total Guarantees are not effective in cases of vandalism or owner abuse.
Koppers Total Guarantees are available within the continental limits of the United States in all cases ex cept those areas where Koppers does not presently provide inspection service. Charges for KSR Total Guar antees are made up on a per square (100 sq. feet) basis of the roofing system. Guarantee charge payment is due at the time the guarantee is issued and no additional charge is necessary during the term of the guarantee.
Koppers reserves the right to can cel the guarantee if the roof is dam aged due to causes not covered by the guarantee if it is determined that its satisfactory performance for the remaining term of the guarantee is impaired. Cancellation due to dam age of this type does not provide for any refund of the original charges.
26
KOPPERS 7.1/Ko Architectural nd Contraction MeUntM
ooflng will bs applied by a qualiflad Copper* Approved Roofing Conrector. It also provides for discussion >f specifications during the planning itage, consultation during construeIon and assistance to the owner hroughout the bond term as may be leceasary In relation to leaks, addlional items to project through or be slaced above the roof or any matter 'elated to the performance of the ooflng. It further provides for repairs sf leaks to the roofing not occailoned by defects In the building, ibuse, or extreme weather conditions during the term of the bond up to the monetary limit specified in the bond. Flashing membranes may be included an request in riders to the bond.
Koppers bonds do not cover re pair, installation or replacement coats of decking materials, vapor barrier materials. Insulation products, metal work or products in the roofing as sembly furnished by others, nor will Koppers assume responsibility for any damage to the bonded roofing or flashing caused by or the result of the use of these products, their in stallation or attachment Bonds are not effective in cases of vandalism or owner abuse.
Koppers bonds are available within the continental limits of the United
States in all cases except those areas where Koppers does not presently provide inspection service.
Flashing endorsements when re quired for bonded roofing may be for terms up to but not exceeding the term for which the roofing is bonded.
Charges for roofing bonds are made on a per square (100 square feet) basis of the roofing membrane. If a flashing endorsement to the bond is required, the area of flashing is included for computing the total bond charge. Information on bond charge fees and minimum charges with re lation to monetary coverage limits and terms are available through Koppers Approved Roofing Contrac tors, Koppers District Offices and lo cal Koppers Roofing Representatives. Bond charge payment is due at the time the bond is issued and no addi tional charge is necessary during the term of the bond.
Koppers reserves the right to can cel a bond if the roof is damaged due to causes not covered by the bond if It is determined that its satisfactory performance for the remaining term of the bond Is impaired. Cancellation due to damage of this type does not provide for any refund of the original charge.
27