LLARD A. SELLE, Tnc.
Telfphone 333-1438 213 N. Poplar St. L PASO, TEXAS 79901 July 26,1967
nSAP'JG
box. Ill*
El Paso, Texas
entlm^r:
iu... 1* to aavi.e you tbat our ourrant 00c tract with litxttoi workers Local 71, A1 bu-ruerquo, 1*ev Vexloo will be terminated effective July , '9->7 Altuou^ft w* anticipate no war* etop" '*U[et fo feel ve u;*oulu notify you re^ardlnf tbe possibility of a labor cliayute,
tt tte /-resent ties, we are nefwtiatine mitfa Local * 76, and
we are bodeful tnat a new oontract will be eined br July 31,
196?.
are toic^ all tnat i possible to avole a labor dia-
oute*, However, should this situation develop*, we will certainly
appreciate jour cooperation*
Youre very truly,
ILlAl.D A. .TOLLK, rw. , n
J.K. loses
JI/*P
EDp r> r 1 ij
ri t b L 1 ?
U - t ' ! Y;
HER 0000029
ii
July lkt 1967
Willard A Salle Company, Inc. 215 N. Poplar Street El Paso, Texas 79901
Attention:_ Mr. Bob Crockett
Geotlemen:
1 am enclosing herewith a copy of our contract with you covering insulating air pipes and burner manifold on gas fired preheaters at our reverberatory furnace.
This contract has been approved and signed by cur New York Purchasing Department and is for your file.
Yburs very truly
JWE:nsg end.
J. V. English Plant Engineer
HER 0000030
Reviled 3/63 TO?
APPROVED BY
Page 1 Of 7
Construction er Repairt Contract Form PO-19 Under 1100,000.00
ORDER NO., EPS/
Operating RETURN TO PURCHASING DEPARTMENT
CONTRACT FOR pufslftklil I Installing IuiIiUm
(Insert aaae of job)
AMERICAN SMELTING AND REFINING COMPANY'S 1 Pete
II N. Tnu
at______________________ THIS AGREEMENT, made the
(Iaaert town aad state)
tft day of.
.Plant
by and between Millayd
IttCt whose address is
US Nortfc Pepler Stmt, B1 Fuo, Tuu 71901
.(hereinafter called the
"Contractor") and AMERICAN SMELTING AND REFINING COMPANY, a corporation of the
State of New Jersey, whose address is 120 Broadway, New Yorkk 5, N.Y. and
P, 0* lex S1U 81 Fast, Texas 7S9S9
(Iaaert address of pleat or uoit)
.(hereinafter called the
"Owner").
WITNESSETH:
The Contractor and Owner agree as follows:
Article 1. Scope of the work
The Contractor shall furnish all shop drawings, field engineering, labor,
tools, equipment, transportation, materials and other facilities, except such items as are hereinafter listed as being furnished or furnished and installed by
IftSttlAtlM
the Owner, for
81 Vast
_____________________________ (hereinafter called the "work")
(Insert neat of job)
81 Vest, Tests
at theplant of the Owner at_______ ________ ________________
.(Insert toon A state)
in accordance with the drawings and specifications listed below, all of which are incorporated herein by reference and made a part hereof:
As per t VlilsvA A*
April tl, 1997,
m* Jem it, 1947, catering insnlatlan tf Air Vrmsstar
pipits 4 terser eseifelA*
HER 0000031
Page 2 of 7
Article 2. Time of Completion
Mbttt July is, mr
The work shall be commenced
shall be substantially completejritMa W Uy%
,and
Article 3. Payment (to be deleted if progress payments are to be made)
The Owner shall pay the Contractor for the performance of this Contract,
ftli thtmiil lfhl fciift4y4 Hvntjf tlx
the sum of.;__________________________________________________________
dollar^
lawful money of the United States of America within M
.days after satisfactory completion of the work and sub
mission by the Contractor of evidence (including, if requested, complete releases of all liens arising out of or in connection with the work by all persons, firms or corporations on whose behalf such liens could be or were filed) satisfactory to the Owner that all charges for labor and material incorporated in the work and all other indebtedness connected with the work for which liens could be filed have been paid and that the work is free of all liens and encumbrances.
flw+iiiM' in
i#ipp!Wis|si> pi.iiiiiBiH)U!aiiM'iue tu ul muirt 11
TheOmwmnemrm+snma,milmmpmamy mtmiemmt(mCmomnmtrmacmtmomr +fmomrmmtnme**mpmemrfomrmmmamnmcmemomfmmthrnimsm contract,
foiUtiWS: ^ mmmmmmm mm m mm mmmmm mmmmmmm m ill mmmmmmmmm mm mm mm mmmmm
On or about theday of each calendar month, commencing
19____ , the Owner shall pay the Contractor
per cent
. %) based on the contract prices, of the
labor ana materials incorporated in the work ana of materials suitably stored at the site thereof up to the end of^M,nfay*andas
pletion of the entire work, a sum sufficient to increase the total payments to
mWMm* wuwUma^dm^mmmmmmt
be filed have been paid and that the work is free of all liens and encumbrances.
HER 0000032
Article 4. Payments Withheld
Page 3 of ?
The.Owner may withhold all cr part of any payment to the extent neces sary to protect the Owner from less or damage on account of (a) damaged or de fective work not remedied, (b) claims filed or reasonable evidence indicating probable filing of claims by other parties against the Contractor or the Owner (c) failure of the Contractor to make payments properly to Subcontractors or for material or labor, (d) a reasonable doubt that this contract can be com pleted for the balance then unpaid, or (e) damage to the Owner's property or the work of another contractor. Article 5. Liens
If any lien remain unsatisfied after payment of the full contract price has been made, the Contractor shall refund to the Owner all moneys that tile latter may be compelled to pay in discharging such lien, including all costs and a reasonable attorney's fee. The Contractor shall, at any time requested by the Owner,, deliver a bond satisfactory to the Owner indemnifying i^ against any lien and expenses occasioned thereby.
Article 6. Title to the Work
Title to all work completed1 or in the course of construction shall be in the Owner; and title to all machinery, equipment and materials to be in corporated in the work shall be in the Owner as soon as they are delivered on the site of the job.
Article 7. Inspection and Repair
The Contractor shall provide safe and proper facilities at all times for the inspection of the work by the Owner, and shall as soon as practicable after written notice from the Owner, at the Contractor's expense, replace and repair any materials or portions of the work which the Owner shall deem defec tive and make good all work damaged or destroyed thereby, whether or not there shall be a dispute with respect to any of the foregoing. Any such dispute shall be settled by arbitration.
Article S. Protection by Contractor
The Contractor at all times shall maintain adequate protection of the work from damage and shall protect the Owner's property and all persons thereon from injury, damage or loss by reason of any act or omission of the Contractor or any Subcontractor. The Contractor shall be responsible, and reimburse the Owner, for any loss or expense to the Owner arising from damage to the work or other property of the Owner caused by the wrongful act or neglect of the Con tractor, any Subcontractor or the employees of the Contractor or any Subcon tractor. Where such damage includes damage to the work it shall be repaired at the expense of the Contractor.
The Contractor shall use its best judgement and skill in dealing with labor matters, and take all reasonable .steps to avoid labor dispute. In the event of any strike or threat of strike, slowdowns, featherbedding, or other like practices, the Contractor shall apprise the Owner of all relevent facts and implications of the particular labor problem involved, and shall consult in good faith with the Owner in an endeavor to reach a mutually satisfactory solu tion to such labor problem and, so far as reasonably possible, to protect the Owner against delays affecting the work or damage or losses to its other oper ations.
HER 0000033
Article 9. Contractor's Liability Insurance
Page 4 of 7
The Contractor shall maintain such insurance as will indemnify it against claims under workmen's compensation acts and against any other claims for damages for personal injury, including death, which may arise from opera tions under this contract, whether such operations be by the Contractor or any Subcontractor or anyone directly or indirectly employed by either of them.
Prior to commencement of this work the Contractor shall file with the Owner completed certificates of insurance in form of "Insurance Certificate" attached and shall provide insurance coverage in amounts not less then those stated therein.
Article 10. Indemnity by Contractor
The Contractor shall save harmless and indemnify the Owner from and against any expense, loss or damage on account of any claim, demand or suit made by any person whomsoever, including any employee of the Owner, which is in any way caused by or connected with, or grows out of the execution and per formance of this contract by the Contractor or any Subcontractor; provided, however, that the Contractor shall not be required to indemnify the Owner against any loss caused solely by the negligence of willful fault of the Owner or its employees. The Contractor accepts all risk of injury or damage and all responsibility for any claims for damages whatsoever resulting from the use, misuse, or failure of any hoist, rigging, blocking, scaffolding, or other like or unlike equipment used by the Contractor or any Subcontractor, even though such equipment be furnished or loaned to the Contractor or any such Subcon tractor by the Owner, and shall indemnify the Owner against all such claims.
Article 11. Owner's Responsibility for Certain Casualties
The Owner shall be responsible for all damage to the work, and to material, temporary structures, and equipment (excluding construction equipment not owned by the Owner) at the site of the job, which is caused by fire, wind storm, smoke, hail, aircraft, explosion, vehicles, riot or civil commotion.
Article 12. Compliance with Laws and Ordinances
The Contractor shall give all notices and comply with all laws, ordinances, rules, and regulations, bearing on the conduct of the work as drawn and specified. If the Contractor performs any work contrary to any such law, ordinance, rule or regulation, he shall bear all costs arising therefrom.
If for any reason the Contractor's or any Subcontractor's employees or agents acquire a status imposing liability on the Owner for employer's con tributions or taxes under the Federal Insurance Contributions Act, the Federal Unemployment Tax Act, any State Unemployment Tax Act, or any other Act, the Contractor shall be exclusively liable for, and shall indemnify the Owner against, the same and agrees to comply with all such laws and regulations so as'to relieve the Owner from any and all liability therefor and from the re sponsibility of making reports or keeping records with respect thereto.
Article 13. Patents
The Contractor shall indemnify and save harmless the Owner against and from any and all claims, losses, costs, damages, expenses, actions or other proceedings, growing out of or resulting from infringement of any patent by the Contractor or any Subcontractor in the performance of this contract, except that this provision shall not apply to patented articles or processes specified in drawine or snecificat ions furnishprt hv t.hp Dwrer
HER 0000034
Article 14. Changes in the Work
Page 5 of 7
The Owner, without invalidating this contract, may at any time order extra work or make changes by altering, adding to or deducting from the work.
Such order may be made the Owner on its own behalf or at the request of the Con tractor, upon discovery by the Contractor of any discrepancy between the plans and the physical conditions encountered. If such extra work or changes involve a change in cost, the contract price shall be increased or decreased by the fair value thereof. The Owner will itemize the changes to be made and upon receipt of written notice of same, the Contractor will submit promptly to the Owner, in triplicate, an itemized statement of his calculations of the adjustment in the contract price resulting from the changes or extra work. This must be done be fore work on the change is begun unless the Owner gives written order to proceed immediately. No work or change shall be made, except by written order of the Owner and no claim for an addition to the contract price shall be valid unless the additional work was so ordered. Any dispute under this Article shall be subject to arbitration.
Article 15. Owner's Right to Terminate Contract
If the Contractor should be adjudged a bankrupt, or make an assignment for the benefit of creditors, or if a receiver of the Contractor's property should be appointed or if the Contractor files a petition or if a trustee of the Contractor's property should be appointed under the reorganization or readjust ment provisions of the Bankruptcy Act, or if the Contractor at any time should refuse or neglect to supply enough properly skilled workmen or proper materials, or if he should fail to make prompt payments to Subcontractors or for material or labor, or disregard laws, ordinances or the instructions of the Owner, or otherwise be guilty of a substantial violation of any provision of the contract which he shall have failed to correct promptly after service of written notice thereof by the Owner, then the Owner may, without prejudice to any other right or remedy, terminate the employment of the Contractor for the Contractor's de fault and take possession of the premises and of all materials, tools and ap pliances thereon and finish the work by whatever method the Owner may deem ex pedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the con tract price shall exceed all the general damages of the Owner caused by the Con tractor's default, including the expense of finishing the work and compensation to the Owner for the Owner's managerial and administrative service, such excess shall be paid to the Contractor. If such damages shall exceed such unpaid bal ance, the Contractor shall pay the difference to the Owner. In the event the Contractor and the Owner are unable to agree upon the amount to be paid or re imbursed the dispute shall be settled by arbitration.
Article 16. Correction of Work after Payment
Neither payment nor any provision in this contract shall relieve the .Contractor of responsibility for faulty materials or workmanship and the Con tractor shall remedy any defects due thereto and pay for any damage to other work resulting therefrom which shall appear within one year from the date of completion of the Contractor's work hereunder. The Owner shall give notice of observed defects with reasonable promptness. Any dispute under this Article
shall be subject to arbitration.
HER 0000035
Page 6 of 7
Article 17. Arbitration
All disputes which are herein stated to be subject to arbitration shall be submitted to and determined by arbitration. Except as and to the extent otherwise provided by the controlling state law, no party may have recourse to legal proceedings (other than to enforce this arbitration Article) unless and until an arbitration award has been made. There shall be one arbitrator who shall be chosen by the American Arbitration Association, whose arbitration rules shall be followed.
Article 18. Subcontracts
The Contractor will not employ any Subcontractor without the prior written approval of the Owner and the Contractor shall require each Subcontractor to execute a contract in writing containing provisions similiar to all provisions of this contract which are in any way applicable to such Subcontractor and which will obligate such Subcontractor to comply with and perform all such provisions herein. Nothing herein shall create a contractual relationship between any Sub contractor and the Owner.
Article 19. Assignment
The Contractor shall not assign nor subcontract this contract in whole or in part, nor shall the Contractor assign any moneys due or to become due Contractor hereunder without the prior written consent of the Owner.
Article 20. Coordination of Work
The Contractor shall conduct the work hereunder so as to cause a minimum of interference with the Owner's operation. Where interference with the Owner's operations become absolutely necessary, permission shall be requested by the Contractor not less than seventy-two (72) hours in advance.
Article 21. Undertakings by the Owner
The Owner agrees to obtain and pay for any permits, licenses and ease
ments required for permanent structures or changes, and, to the extent practic
able without interference with operations, to furnish the Contractor, free of
charge, for its use during construction, electricity, water, steam and compress
ed air required for construction purposes, at the voltage and pressure currently
available at Owner's said plant, to a point adjacent to or within
feet of
the site, but the Contractor will be required to make the necessary connections,
provide approved shut-off and safety devices and furnish and install all tempo
rary lines required to bring them to the point of use.
Article 22. Applicable Law
This contract shall be construed and enforced in accordance with the laws of the state where the work hereunder is to be performed.
Article 23. Entirety Clause
This contract constitutes the entire agreement between the parties, and except as may be specifically set forth herein no changes can be made herein except by an agreement in writing duly executed by the parties or their duly authorized agents.
Article 24. Additional Provisions
HER 0000036
Page 7 of 7 IN WITNESS WHEREOF, the parties have executed this contract the day and year first above written.
itllUrd A, S1U late Contractor
AMERICAN SMELTING AND REFINING COMPANY
HER 0000037
AMERICAN SMELTING AND REFINING CuMPANY
FORM # INSURANCE* t R.Tis.4 11/56
INSURANCE-CERTIFICATE
AMERICAN SMELTING AND REFINING COMPANY REQUIREMENTS FOR CONTRACTORS AND SUBCONTRACTORS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE OESCRIBEO BELOW HAVE BEEN ISSUEO TO______
WILLARD A. STCT.T.TC. IMG,
THESE POLICIES ARE NOW IN FORCE. COVERING WORK BY THE ASSURED FOR AMERICAN SMELTING ANO REFINING
COMPANY ON CONTRACT _______________________________
AT __________
EL PASO SMKT.TTMff WRITS, KT. PlSf^ totac
IF THESE POLICIES ARE CANCELLED OR CHANGED IN ANY WAY THAT WILL AFFECT THIS CERTIFICATE. TEN DAYS*
PRIOR WRITTEN NOTICE WILL BE GIVEN BY THIS COMPANY TO AMERICAN SMELTING AND REFINING COMPANY.
SAMUEL METZGER. JR.. 120 BROADWAY. NEW YORK. N.Y.
KIND OF INSURANCE
NUMBER
DESCRIPTION OF POLICY
EXPIRES
LIMITS OF LIABILITY
REOUIRED MINI MUM
CONTRACTOR'S PUBLIC LIABILITY (COMPREHENSIVE INCLUDING CONTRACTUAL)*
BODILY.INJURY
ICC 50017
1-1-68
PROPERTY.DAMAGE
ICC 50017 1-1-68
CONTRACTOR'S PROTECTIVE LIABILITY
EACH PERSON $ 250,000 EACH ACCIDENT $ 500,000
EACH ACCIDENT $ 200,000
$100,000 $300,000
$ 25.000
BODILY.INJURY
PROPERTY.DAMAGE
COMPREHENSIVE
AUTOMOB 1LE BOOILY.INJURY
PROPERTY.DAMAGE
LCC 50017 1-1-68 LCC 50017 1-1-68
EACH PERSON $ 250,000 EACH accident $ 500,000
EACH ACCIDENT $ 200,000
OTC 1131 OTC 1131
1-1-68 1-1-68
EACH PERSON >250,000 EACH ACCIDENT $500,000
EACH ACCIDENT $ 100,000
$100,000 $300,000 $ 25.000
$100,000 $300,000 , $ 25.000
WORKMEN'S COMPENSATION AND
TPJ1107
1-1-68
COMPLY WITH
applicable
STATE LAW
EMPLOYER'S LIABILITY
TPJ 1107 1-1-68
EACH ACCIDENT $500,000
$ 25.000
pate
E1 Paso
C ity
UNITED STATES FIDELITT AND GUARANTI CO.
June 26, 1967AND FIDELITT & GUARANTI INS. UNDERWRITERS. INC.
Saunders & BY<Zl7*-
Texas
state
AUTHORIZED REPRESENTATIVE
The Contractor shall aavt haraleae aa4 iadeanify tit Ontr froa and against aay expense, loss or daaage oa accoaat of any claia, daaaad or saifi aado by aay porsoa vkoatotvtr, including aay eaployee of tha Owner, which ia ia any way caaaod by or eoaaactad with, or grows oat of tho osoeatioa aad performance of this contract by the Contractor or any Subcontractor; pro vided, however, that tho Contractor shall not bo required to iadoMify tho Owner against aay loss caaaod solely by negli gence or willful fault of the Owner or its employees. The Contractor accepts all risk of iajary or daaage and all respon sibility for any claias for daaagos whatsoever resulting froa the use! nisuae, or failure of any hoist, rigging, blocking, scaffolding, or other like or unlike eneipaeat ased by the Contractor or any Subcontractor, even though such eouipaeat be
HER 0000038
VuLLARD A. SELLE, .Ac.
TuxraoNi 333-1438 * 213 N. Popia* St. EL PASO, TEXAS 79901 April 21, 1967
American Smelting & Refining Co P. 0. Box 1111 El Paso, Texas
Attn: Mr* Bill Naysmith
Gentlemen:
Re: "Thermo" Hot Blast Heaters and Connecting Hot Air Piping i
We are pleased to quote the total sum of $6,243*00 to furnish and apply insulation in connection with the above referenced project* Our quotation .is based on a complete insulation job for the areas shown on your Drawing Number D-6489 and Drawing Number -12470* We will furnish all materials, labor, tools, scaffolding, etc* necessary for a complete job as outlined below in our proposal*
We propose to insulate the various areas as follows:
1* The air manifold of both Hot Blast Heaters from the baffle to the cupola air outlet and the transition from the cupola air outlet to the 30&" I*D* pipe shall be insulated with Owens Coming Piberglas Corporation*s Kaylo Block Insulation, 4" thick* The insulation shall
be applied is two 2* layers- and shall be wired oh using lugs that are 3 --welded on* The blocks shall be plastered with insulating cement and
then covered with poultry netting. A weatherproof mastic shall be applied over all insulated surfaces*
2* The transitions from the existing 50" I*D* Burner Manifold to the new 30&" 1*D. piping shall be insulated as outlined in 1* above*
3* The new 30fc" I*D* Hot Air Piping shall be insulated with OwensCorning Fiberglas Corporation*a Metal Mesh Blankets, 4" thick, with poultry netting on both sides* The blankets shall be wired and/or banded in place* Straight runs of insulated pipe shall be weather
proofed witiL.galvanlsed metal jacketing secured with bands* Elbows and bends shall be plastered with insulating cement, covered with poultry netting, and weatherproofed with mastic* No expansion joints or butterfly valves are to be covered*
We exclude the furnishing or welding of necessary lugs*
t
Applicable state taxes are included in our quotation*
Thank you for allowing us to quote on this project* We hope we may be able
to serve you*
L
lb !<-*
Respectfully submitted. WILLARD A. SELLE. INC
BC:R
IS*/!*
ob Crockett
HER 0000039
WILLARD A. SELLE, Inc
Tiuphoni 333-1438 213 N. Portae St. el paso; Texas 79901
Jane 19, 1967
American Smelting & Refining Co, P. 0. Box 1111 XI Paso, Texas
Attn: Hr, Bill NaajKth
flentlcoen:
Re: Reverb Blower Reader
Ve are pleased to quote the total sum of $633*00 to furnish and apply insulation in connection with the abase referenced project. Our quotation is based en a ccnplete insulation Job for the areas shown, on jour Drawing Huaber E1C702, We will furnish all naterials, labor, tools, scaffolding, etc,, necessary for a conplete Job as outlined below in our proposal.
We propose to r--owe the existing insulation. The Header will then be re-insulated with Oesns-Cornlng FibergLas Corporation's Metal Mesh Blanketa, 4" thick, with poultry netting on both sides. The blankets shall be plastered with insulating ceaent. All plastered surfaces and the stiffners en the Header shall be covered with poultry netting and weatherproofed with nastie.
Applicable state taxes are included in our quotation.
We appreciate the opportunity to quote on this project, and hope we nay be of service.
Respectfully submitted,
WILLARD A, SSLLB, INC,
BClR
Bob Crockett
*
.
HER 0000040
July 111, 1967
>% (f>
Southwestern Transfer Company 1730 Bassett Avenue El Paso. Texas 799W
Attention: Mr. W. Clay Wake
Gentlemen:
I aa enclosing a copy of our contract vith your company covering the erection at structural steel far a silica handling system and setting two air preheaters.
This contract has been approved and signed by our Rev Tour Purchasing Department and is for your file.
Tours very truly.
JVE:nsg end.
J. V. English Plant Engineer
HER 0000041
m
ASARC0 PO 1 - RSVIICO IVM
PLANT JOO NO*
% PURCHASE ORDER
PAM
4 D*T," 7/11/67
AMERICAN SMELTING AND REFINING COMPANY
on ocr no. uummy 67- 1 3 4 3
runwwsiMQ ytPANimm
ftIQUIMTtON MO*
120 BROADWAY, NEW YORK. N.Y. 10005
EP-31
A OP
-1
^
To: Willard A. Selle, Inc.
(Original not to be mailed out for record purposes only)
PINAL DMTINATION'RLCASC NOT I COMMA*
El Paso, Texas
DATS HBQUIMKD AT OBATtNATIONS
as arranged
IMIPPING INTERVAL PPOMIUD
POINT OP SHIPMENT
F.O.B. POINT
PCLLSA WILL HIP
as arranged
TBRMa
Net 30 days
QUANTITY UNIT
coN>iaN*{|M?-iILi.KA MIL'IMW W' "
'
American ISmelting & Refining Company El Paso, {Tqxas
NCR ATTACHED MIWIN* INSTRUCTION* *
V
ITCM NO.
UNIT mu
This Purchas ment entered of 215 North 79901 work Mani
ishnfed to record Agreelilhacd A. Selle, Inc.
it, El Paso, Texas covering insulation
<ater Piping and Burner
?6,876.00 lot
received
jut ^
EL PASO SMELTING WORKS
IMPORTANT TUm erdtrU Mt klmjimg .
mmU.m tkm ftm.kmJ
_________________of nutr ami mwri promptly to ywchattr.
FOR PURCHASING DEPARTMENT USE ONLY
TV0_$6f 876.00 URGERCC 6Q1
_PC. 206
DISTRIBUTION:
f--V
'igmd ky aa
mgmt
HER 0000042
ASARCO PO 1 - R8VISID M/t PLANT JOB NO*
APPROPRIATION NO*
%. PURCHASE ORDER
OATCl
RAOK
7/11/67
XX or
AMERICAN SMELTING AND REFINING COMPANY
______67 - 1 3 4 4- 1
PUfTCMAOINB DEPARTMENT
120 BROADWAY, NEW YORK. N.Y, 10009
RKOUIMTION NO. p_^2
* *
Southwestern Transfer Co., Inc. (Original not to be mailed out for record purposes only)
DATE RKOUIREO AT OESTIMATION) SHIPPINO INTaCsAVaALrrPaPOnMgISeCOd
rOlNT OP SHIPMENT
P.O.O* POINT
SKLkCM Wiki. SHIP SSPONBI as arranged
TtMM
TJtaf 30 Hays
.INAL OKTINATION
El Paso, Texas
c8oV5U2i^5nUimtrurc lit flUXlMI. TO
" ..... . 1
American SpA1ting & Refining Company
El Paso, liexas
nsiirun sii i asWcn attached shipping instnuctions -
QUANTITY UNIT
IT*M unit mci
ns
NO.
This Purchase
merit entered
Co., Inc. of
Texas
o
Handl^is^Sys tem a:
and A
refer
to record Agreestem Transfer Avenue, El Paso, tion of Silica ing Two Air Preheaters accordance with drawings
$17,978.00 lot
RECEIVED
JUL 7 7 tSfi?
HL PASO SMELTING WORKS
IMPORTANT
A
toTUa ordaria so* tUtoi am pmehmaar nltu lit aUmckad mekaamUdgataat aard iaaigmtdkrm aatkoriaad mama*
of aaUar gad ratamad promptly pmekmaar.
/
FOR PURCHASING DEPARTMENT USE ONLY
TV0$17,978.00 URGER cc 601 _PC. 206 DISTRIBUTION:
l-Tlant
HER 0000043
1ABDICATING
ENGINEERING
P. O. BOX IN*
CO..
UfC.
fea
YORK, PENNSYLVANIA 17405W
PACKING SLIP
wem york
74<M7
SOLD
T 'AMERICAN SMELTING k REFINING CO*
PURCHASING DEPT. 120 BROADWAY L NEW YORK, N.Y.
"1 PSHIP TO
AMERICAN SMELTING k REFINING CC EL PASO, TEXAS
JL
10/5/66
1439
OWN 1. A
'!
itcm
NO.
*1
1439
QUANTITY REQUIRED GHIPPKD
TOUR ORSRR
DATS SMIPPO
RtlPNS VIA
66-1766-3
rf/HOt tfvTo*.
MlPPIttR NO*
RPRCIAL NARRINOO
i43-1
PART NUMBER
_____ SnuTbl__ hlEPirr/l
DESCRIPTION
f.AB.
YORK, P
K
1 23
28 BNS-1
1/2 X 1-1/2 CAPSCREWS (COM3. TO C.A.D.)
2 28
*u7. 22 4 r*/. riCv
28 BNS-P 22 BNS-6 22 BNS-7
1/2 HEX NUTS (COMB. TO C.A.D.) 1/2 X 1-1/2 CAPSCREVS (C.A.D. TO BLOWER) 1/2 HEX NUTS (C.A.D. TO BLOWER)
5 84
84 BNS-22 5/8 X 2 CAPSCREWS (CASING TO H.G.P. )
6 84
84 BNS-23 5/8 HEX NUTS (CASING TO H.G.P.)
7 56
56 BUS-41 1/2 HEX NUTS (COMBUSTOR TO H.G.P,)
8 169
9 44
169 BNS-51 1/2 V.EDGE WASHERS (H.E.K. TO T.S.) 44 BNS-52 1/2 X 1-1/2 CAPSCRFWS (H.E.lff. TO H.Z.M.)
10 44
44 BNS-53 1/2 H^T NUTS (E.E.M. TO E.E.M.)
11 169
169 BNS-56 1/2 X 1-3/4 CAPSCREWS (E.E.1C. TO T.S.)
12 169
169 BNS-57 1/2 HEX NUTS (H.E.Mi TO T.S.)
13 12 14 12
12 ED-5 1/2 HEX JAM NUTS
12 ED-7 1/2 X 8-1/3 STUDS
j
15 2
2 ED-8 EXPLOSION DOOR GASKET 1/4" THE.
16 24* 24 ED-10 1/2 FLAT WASHERS
V
17 24 18 12
24 ED-11 1/2 HEX NUTS 12 ED-12 SPRINGS
/ ^
19 1
20 1 PI l
1 G-l 1/16THK. ASBESTOS (COMBUSTOR TO H.G.P.)
1 G-2 1/8 THE. WIRE INSERTED ASB. (CASING TO H.G.P.)
1 *n 1 mrrrr a
t
"** 1
HER 0000044