Document rBRakLy1m3BrgwYnBooG3D9Ja

CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas fi Laboratory Department Summary fe - July, 1973 - RGB 63-73 - Distribution: Messrs J. H. Frick A. S. Baker W. C. Beyer T. N. Dowdy H. A. Ducote S. W. Fretwell E. J. Heinz L. D, Hinson J. M. Hodges M. A. John C. C. Johnson B. C. Kerr M. Lantau G. C. Lease C. W. Lee W. W. Massey J. T. McMahon W. O. Me Reynolds R. G. Pongetti R. H. Prinz W. L. Sharp P. A. Turek R. H. Wile C. H. Wilke r K. A. Wolf F. T. Talbert J. W. Corley J, M. Ramey T. D. Hunt W. H. Tuke F. B. McAndrews Dr. F. Zitomer W. E. Heinz W. J. Hunphrey W. T. McNair Dr. D. R. Napier W. E. Taylor Dr. E. N. Wheeler Central Files Bay City Clear Lake NYCS Newark. Terminal Pampa Summit Summit CCCTC CCCTC CCCTC CCCTC CCCTC CCCTC CCCTC 002606 CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas To: Mr. L. L. Schweers From: R. G. Brandt RGB 63-73 August 10, 1973 Laboratory Department Summary - July, 1973 - Status of Laboratory Department projects active during July are described below. Current priorities and department statistics.are attached. MO Support - Becker, Harris, Branecky Bank efficiency data obtained in MO I (7-25-73) showed all four banks of new catalyst at the 79-85% level. The low efficiency coupled with high reactor outlet temperatures indicate iron contamination catalyst beds. The unit was shut down July 30. On July 13, 1973, MO II lost cooling water to the absorber and went down. The unit was restarted in four hours, however, reactor efficiency analyses indicated a decrease from 89. 5% to 88.8% and unit efficiency of 86.8%. Work is in pro-: gress to increase reactor velocity to improve efficiency. All the old catalyst has been changed in MO IV and iron levels in the process stream are being evaluated to determine what effect methanol feed purification and the York 326 demister pad have had on the system. Samples of Engelhard Silver catalyst were evaluated in an effort to locate an acceptable alternate vendor. Engelhard catalyst was found to be an acceptable substitute for currently used Anaconda catalyst. These studies further indicate that overall MO efficiencies can be increased 1-1.5% by selecting catalyst having somewhat finer particle size. A plant trial was recommended using Engelhard 20 x 30 mesh silver catalyst. If plant data confirm Lab findings, Anaconda should also be approached on the possibility of supplying 20 x 30 mesh catalyst. Formed Quality - Harris Analyses of butyl and methyl Formcel shipments by CCCTC show organic chloride in the 3-20 ppm range. Analyses of methanol, butanol, and formaldehyde feeds 002607 To: Mr. L. L. Schweers -2- August 10, 1973 were 1 ppm or less chloride. Work is continuing to either locate the source of the chlorides or identify analytical problems. Formalin Tank Car Liner Evaluation - Harris Thirty-day evaluation data is complete. All liner test strips (Plasite 3066, Talicor 40, Heresite 40, Lithcote 19) show no signs of deterioration and formalin quality compared to the control sample is good. A report will be issued when the 60-day evaluation data is complete (Sept 4, 1973). PE Debottlenecking - Castoro Analytical support is continuing for the" Tech grade EVOP run. Mole ratios (FoH/AcH) and FoH concentration are being varied in an effort to increase through put without altering product quality or unit efficiency. Air Emission - Jackson Analytical method development for MD I vapors in air is complete. Air sampling is in progress and values are being compared with unit analyses obtained using the MSA procedure. A report-will be is-s-ued. Pampa Crude Ethyl Acetate - Kerr A 5-gal sample of crude ethyl acetate (ethanol-acetic equilibrium mixture) was received from Pampa and evaluated. Lab studies show that this mixture can be used to produce product meeting Celanese sales specs, but is not expected to pass the sensitive methyl compounds test required by some pharmaceutical accounts. It will be necessary to purge a light-ends stream for later rerun to prevent build-up of methyl acetate in recycle. Re-processing of the purge stream is expected to minimize efficiency loss (<1^) TMP Quality - Jackson Marketing reports indicate that we have been unable to export TMP to a Japanese customer due to quality. The customer claims that our TMP makes TMP adipate esters with high color. This claim is being evaluated using both Celanese and Japanese adipic acid and Celanese and Japanese TMP. Paraform Quality - Prinz, Lease Paraform polymerization studies are complete. A report will be issued. 002608 Xo: Mr. L. L. Schweers -3- August 10, 1973 Waste Treatment Studies - Me Reynolds Anaerobic studies are continuing using a feed mixture of polyol, paraform, and Celcon sumps (COD = 15,000 - 80,000). These studies are being expanded to define the effect of residence time on both packed and back-mixed anaerobic di gestion vessels. EJH/bb Attachments: 2 R. G. Brandt I 002609 August 10, 1973 CURRENT PROJECT PRIORITIES Priority Waste Treatment Paraform Debottlenecking and Quality Pampa Crude Ethyl Acetate Propanol Support Pentaerythritol Debottlenecking and Efficiency TMP Debottlenecking Celcon Support MO Optimization New Silver Catalyst Supplier MS Steam Savings Formalin Tank Car Liner Study Formcel Quality Air Emissions 1 1 1 2 1 2 1 1 1 2 1 1 1 Chemist Me Reynolds Lease, Prinz Kerr Kerr, Branecky Castoro Castoro Gary Harris, Branecky Harris, Branecky Harris Harris Harris Jackson 002610 STATISTICS August 10, 1973 Chemical Section Samples Instrument Section Samples Celcon Section Samples Total 5,401 2,415 3,011 10,827 YTD 33,439 15,053 13,663 62,155 Prev. YTD 34,859 16,374 12,809 64,042 Sample Shipping - Domestic - Export - Celcon - Othe r Total 203 1, 187 4 35 3 83 38 207 248 1, 512 1, 142 52 73 93 1,360 Technicians Overtime - Hours Chemical Instrument Celcon Special Problems Total 11 4 130 16 ' T6l 415 77 1,047 58 1,597 470 350 253 189 1,262 Shipments (No. of orders) Delayed Shipments Quality Waivers Customer Complaints Customer Complaints Accepted 703 0 0 2* 1 5,255. 11 0 8 5 5, 126 22 13 12 11 n-Butyl Acetate to the Newark Terminal - High water (0.26 wt. %) on arrival, our retain (0. 06 wt. %). Complaint accepted - Carrier's responsibility. Molten TMP trailer to Wyandotte Chemical Co. r One compartment rejected on low freeze point (54.0C). Freeze point checked on returned material (58.0C) and unloaded into spec, inventory. 002611