Document rB7vLxG3LEXrX2qnyJ97YawRa
PLANTWIDE SAMPLING
1. A. North Area (Mike Foresman)
Two permanent samplers at 5-E and 24" line to
5-K. Grab samples'of 18" line to 5-K.
.
c '
I
'
. Analyses run on 3 and 4 day composite sample
from each sampler per week. If "odd ball"
results from any composite sample then each
day's sample will be analyzed to identify
day(s) of discrepancy.
.
*
Will obtain 2 weeks of above results for record
and interpretation.
.
On 7/8 a 24-hour composite sample will be obtained from the 2 samplers and analyzed for Hg.
B. Monsanto Co. Plant discharges to Area 5 Village Sewer. (Moore, Munoz)
Sample point locations:
.'
(1) W side of Dept. 254 (Bldg. CS) running to 5-0.
(2) Lab line running into the 24" line to
(3) Box 5-C for Dept. 214.
-
Sampler (1) presently in place.
Samplers (2)- and (3) to be installed 7/7.
Data will .be obtained as in 1-A above on a 3-4 day composite basis for the next two (2) weeks for record and interpretation.
2. Inventory to be made of all samplers (Munoz) as to
A.) Location; B.) Use; and C.) Temporary or permanent
installation.
*
.
3. Special sampling for FWQA (Munoz, Horner, Moore).
Sampled 6/28, 29 & 30.
-
Started 7/5 and planned thru 7/7; then again 7/12,
7/13 and 7/14.
DSW 296177
STLCOPCB4066121
PLANTWIDE SAMPLING
Page 2. WGK 7/8/71
4. Area 1 - primarily AC1 - to be discussed with E. Billen.(Moore)
-
5. rArea 2 - Define flows and content for each connection
' into 24W and 30W sewers. Confirm or obtain flows and
: content where questionable and/or non-existent.
. (Moore, Munoz, Buckley)
-
.i
'*
, 2-K sample point will be utilized as representing 24"
line discharge into 2-E. A V-notch weir in 2-K can
' be used to obtain flow. (Muiioz)
'
6. Area 3 - Sample point locations established at:
.
. A. 3-E (24E), installed,'presently run for Hg & C-1
B. 3-1, installed, presently run for Hg & Cl
C. 3-M to be installed 7/7, for Hg.
These will quarter Area 3; samples will be as follows for
Hg. (Munoz)
*.
. 3-E 24 hr. comp. 7/5, 6 & 7; 7/12, 13 & 14 for FWQA. A 4-day composite on 7/8, 9, 10 & 11.
n 3-1 24 hr. comp. 7/5 -- etc. as for 3-E.
3-M beginning 7/7 24 hr. comp, and then same
schedule as above.
.
Analyses of above results will dictate future sampling. (Moore, Munoz, Buckley).
'`
Plow test to be made to establish flow rates in this
area. (Munoz)
.
7. Area 4 - Flow tests run by Li Cl dilution method (24 x:l hr) on 7/1 and i. Results soon. (Munoz)
. Must define flows and Hg balances, if possible, for this area. (Moore) -
^967?8
STLCOPCB4066122
PLANTWIDE SAMPLING
Tage 3. WGK 7/8/71
8. Analyses Result Discrepancies
Will attempt to resolve why there are differences ``in results obtained from supposedly the "same sample material". (Moore, Horner)
gm 7/8/71
DSW 296179
STLCOPCB4066123