Document rB7vLxG3LEXrX2qnyJ97YawRa

PLANTWIDE SAMPLING 1. A. North Area (Mike Foresman) Two permanent samplers at 5-E and 24" line to 5-K. Grab samples'of 18" line to 5-K. . c ' I ' . Analyses run on 3 and 4 day composite sample from each sampler per week. If "odd ball" results from any composite sample then each day's sample will be analyzed to identify day(s) of discrepancy. . * Will obtain 2 weeks of above results for record and interpretation. . On 7/8 a 24-hour composite sample will be obtained from the 2 samplers and analyzed for Hg. B. Monsanto Co. Plant discharges to Area 5 Village Sewer. (Moore, Munoz) Sample point locations: .' (1) W side of Dept. 254 (Bldg. CS) running to 5-0. (2) Lab line running into the 24" line to (3) Box 5-C for Dept. 214. - Sampler (1) presently in place. Samplers (2)- and (3) to be installed 7/7. Data will .be obtained as in 1-A above on a 3-4 day composite basis for the next two (2) weeks for record and interpretation. 2. Inventory to be made of all samplers (Munoz) as to A.) Location; B.) Use; and C.) Temporary or permanent installation. * . 3. Special sampling for FWQA (Munoz, Horner, Moore). Sampled 6/28, 29 & 30. - Started 7/5 and planned thru 7/7; then again 7/12, 7/13 and 7/14. DSW 296177 STLCOPCB4066121 PLANTWIDE SAMPLING Page 2. WGK 7/8/71 4. Area 1 - primarily AC1 - to be discussed with E. Billen.(Moore) - 5. rArea 2 - Define flows and content for each connection ' into 24W and 30W sewers. Confirm or obtain flows and : content where questionable and/or non-existent. . (Moore, Munoz, Buckley) - .i '* , 2-K sample point will be utilized as representing 24" line discharge into 2-E. A V-notch weir in 2-K can ' be used to obtain flow. (Muiioz) ' 6. Area 3 - Sample point locations established at: . . A. 3-E (24E), installed,'presently run for Hg & C-1 B. 3-1, installed, presently run for Hg & Cl C. 3-M to be installed 7/7, for Hg. These will quarter Area 3; samples will be as follows for Hg. (Munoz) *. . 3-E 24 hr. comp. 7/5, 6 & 7; 7/12, 13 & 14 for FWQA. A 4-day composite on 7/8, 9, 10 & 11. n 3-1 24 hr. comp. 7/5 -- etc. as for 3-E. 3-M beginning 7/7 24 hr. comp, and then same schedule as above. . Analyses of above results will dictate future sampling. (Moore, Munoz, Buckley). '` Plow test to be made to establish flow rates in this area. (Munoz) . 7. Area 4 - Flow tests run by Li Cl dilution method (24 x:l hr) on 7/1 and i. Results soon. (Munoz) . Must define flows and Hg balances, if possible, for this area. (Moore) - ^967?8 STLCOPCB4066122 PLANTWIDE SAMPLING Tage 3. WGK 7/8/71 8. Analyses Result Discrepancies Will attempt to resolve why there are differences ``in results obtained from supposedly the "same sample material". (Moore, Horner) gm 7/8/71 DSW 296179 STLCOPCB4066123