Document rB7JNyk25nvXBex805Qr8dMG
DEFENDANT'S EXHIBIT^
SD000005A664
DSW 577127
WATER PCB-SD0000051665
Aroclor Expansion Krummrich and Anniston Plants
Design Manual Index
1-00
DESIGN BASIS
1.1 Project Objectives
1.2 The Process
1.21) 1.22)
11.23) 1.24) 1.25) 1.26)
Process Description Raw Material Specification
Products and By-Products Packing Waste Streams Toxicity and Safety
1.3 The Facilities
1.31) Facilities 1.32) Design Capacity
11.4 Service Requirement s (1.4331) FUlteilxitiibeislity of Operation I1..3442) FSuetruvriceesExpansion (1.3453) PehryssoicnanlelAppearance I.36) Raw Material and Product Storage and 1.5 Costs Shipment Requirements
(1.51) (1.52)
(1.53)
Capital Cost Estimate
Manufacturing Cost Estimate Scope of Work
1.6 Plans and Schedules
1.7 Amendment s
Appendix Five Year Production Forecast
- -1 -
DSW 577128
WATER PCB-SD0000051666
Design Manual Index
2-00 MANUFACTURING PROCESS
2.1 Synopsis of Process
2.2
Flow Sheet
2.3 Process in Detail
2.4 Comments on Process
2.5 Process Data
(2.51) (2.52)
(2.53) (2.54) (2.55)
(2.56)
Corrosion Data Specification Sheets for Raw Materials,
Intermediates and Finished Goods
Physical Constant Data Sheets Material Balance Atmospheric and Stream Discharge and Waste Disposal Information Safety and Toxicity Data
3-00 GENERAL PROJECT INFORMATION
3.1 Job Organizationand^rocedure
3.2 Plot Plan
. ..
3.3 Piping and Instrumentation Diagram
3.4 Utilities
3.5 Contracting Plan
4-00 DESIGN DATA
4.01 Equipment
(4.01-10) Equipment List (4.01-20) Performance Data and Specifications
4.02 Instruments
(4.02-10) Instrument List
- (4.02-2-0) Instrument Function Outlines (4.02-30) Instrument Specifications
4.03 Setting and Testing Equipment
4.04 Setting and Testing Instruments
4.05 4.06
Piling Excavation
DSW 577129
o WATER PCB-SD0000051667
Design Manual Index
4.07 Foundation
(4.07-10) (4.07-20) (4.07-30)
(4.07-40)
Site Data Basis of Foundation Design Basic Design Specifications Special Requirements
4.08 Supports, Platforms and Structures
(4.08-10) (4.08-20)
(4.08-30^ (4.08-40)
Basic Design Specifications Design Load Referencesto Typical Details and Standards Special Requirements
4.09 Building Items
(4.09-10) (4.09-20)
(4.09-30)
Building Data Sheets Building Sketches
References to Typical Details and Standards
4.10 Sprinklers and Fire Protection
4.10-10) Design Specifications and Requirements 4.10-20) References to Typical Details and Standards
4.11 Piping
(4.11-10) Design Specifications and Requirements (4.11-20) Pipeline Schedule
4.12 Ductwork
4.13 Electrical
(4.13-10) (4.13-20) (4.13-30)
Electrical Classification Design Specifications Motor List
4.14 Site Acquisition and Preparation-
4.15 Sewers and Drains - Underground Mains
(4.13-10) (4.15-20)
"
List of Underground Piping Requirements Sketches Showing Connections to Battery Limit s
4.17 4.18
Yards and Roads Railroads
-3-
DSW 577130
WATER PCB-SD0000051668
Design Manual Index
9-00
4.19 InsulatIon
(4.19-10) List of Insulation Requirements (4.19-20) Design Specifications
4.20 Painting
(4.20-10) List of Painting Requirements (4.20-20) Design Specifications
OPERATING INFORMATION
-4 -
DSW 577131
WATER PCB-SD0000051669
Section No. 1-00
E. A. No. 761.10-4-433 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 1 of 12 Revised July 9, 1965
1-00 General Design Basis
The conception of this project stems from:
1) Forecasted sales of aroclors in excess of our present capacity.
2) The desirability of up to 30$ more capacity than indicated in sales forecasts.
3) Anticipated need for facilities for higher chlorinated aroclors than now produced.
4) The desire to upgrade existing operations so that production can be expanded without additional labor.
5) The need for more HC1 recovery capacity at Anniston to match higher aroclor production.
Evaluation studies by engineering nave indicated the desirability of expanding capacity at both Krummrich and Anniston. Evaluation grade estimates by Engineering for the Anniston.aroclor phase of the expansion, together with rough estimates based on TSD work at both plants, were used to scope out the desired project with the Product Director, the Director of Engineering and the Technical Production Manager. The estimated cost is $750,000; this amount is the limit which will be committed rather than a specific esti mate based on a well defined scope. In effect, the scope will be defined so as not to exceed this amount.
The original design basis nas been upgraded to include a second
appropriation of $350,000 (Project 1772A) and a third appropriation
of $214,000 (Project 1931).
*
1.1 Project Objectives
a) To increase our total aroclor capacity to 80-90 M Ibs./yr.
b) To Install a separate solid aroclor unit at Anniston de signed to minimize present operating difficulties and to
- increase capacity to approximately 10 M Ibs./yr.
c) To increase liquid aroclor capacity at both WGK and Anniston by modifications to the existing chlorinators.
d) To increase muriatic acid capacity at Anniston to match the new chlorlnator capacity.
e) Accomplish the above, if possible, without increasing
operating labor.
DSW577132
WATER1pCB-Sd6000051670
Section No. 1-00
E.A. No. 761.10-4-488 Date: March 20, 1964 By : R. S. Yates Approved by: RPS
Page 2 of 12 Revised: July 9, 1965
1.2 The Process
1.21
Aroclors are the reaction products formed by the chlorination of biphenyl or terphenyls in the presence of iron and iron chloride catalysts,
Biphenyl or terphenyl is chlorinated to a specified specific gravity or "hold point" which is a measure of chlorine content. The off gas hydrogen chloride is piped to recovery systems.
The crude aroclors are air blown to remove residual hydrogen chloride, then transferred to stills or tanks. The material is distilled under vacuum, serni-continuously, or batohvise, in a direct takeover still with an external gas fired heater.
The distillate from the liquid aroclor distillation is agitated with dry attapulgus earth, filtered and stored for shipment. Distillate from the solid aroclor distillation is drummed, flaked or ground and packaged for shipment. Distillation resi dues are generally discarded as waste or sold as Montars,
Process documents to be used for detailed design:
''Standard Operating Instructions", July 1964 - J, W. Molloy.
"Process Description for the Manufacture cf Aroclor in Dept, 24&" December 'll, 1952 ~ E, E, Martin
"W, G, Krummrich Operating Instructions - Dept, 246" September 7, 1961 - E. 2, Martin
"Standard Manufacturing Process for Aroclor Anniston" October 22, 1957 - M. J. Williams & R, L, Hedworth
"Dept. 27 - Operating Instructions1' February 20, 1961
"Standard Manufacturing Process for Muriatic Acid" October 22, 1957 - M. J, Williams & R,, L. Hedworth
"Final Report on the Continuous Chlorination cf Bipheny June 4, 1957 - R. A. Simone
"Tentative Process for Continuous Chlorination of Biphenyl" % Marcn 25, 1956 - R. A. Simone
"Final Report on tne Continuous Chlorination cf Aroclors - Plant Demonstration" May 7> 195*2 * H, L, Merten
DSW 577133
WATER_PCB-SD0000051671
Section No. 1-00 E. A. No. 761.10-4-488 Date: March 20, 1964 By: R.. S. Yates Approved by: RPS Page 3 of 12 Revised: July 9, 1965
"Process for the Production of Arociors, Pyranois, Etc. at the Anniston and Krummrlch Plants'* April, 1955 - E. Mather
1.22 Raw Materials Specifications
Supply
Chlorine is in sufficient supply at the Krummrieh Plant. At
the Anniston Plant, it is supplied from outside sources when
shortages develop.
..
Biphenyl is in sufficient supply for both plants.
Santowax "R" is in sufficient supply for the solid aroclor production requirement.
Quality
Quality of biphenyl and Santowax WR" is satisfactory. However, the quality of the chlorine is quite variable at both plants. Sulfuric acid carryover in the Krummrieh system has resulted in low quality arociors being produced. Variable air to chlorine ratios will result m chlorine, biphenyl and/or aroclor carryover into the muriatic acid off gas system.
1.23 Products and By-Products
Minor changes to the present ehlorinatcr tank design for solids
chlorinations may result in some product differences as measured
by isomer ratio of components. Research agrees with this approach
however, and the changes envisioned should not affect the finished
product specifications for these arociors.
.
1.24 Packaging
No changes are contemplated in the existing packaging methods in use at this time. A separate project will be submitted to cover material handling and warehousing.
1.25 Waste Streams
No additions to the waste streams are contemplated.
DSW 577134
WATER PCB-SD0000051672
Section No.' 1-00 E. A. No. 76l.10-4-488 Date : March 20, 1964 By: R. S,, Yate Approved by 3 RPS Page 4 of 12
Revised July 9, 19^5
1.26 Toxicity and Safety
Fire Hazard
Biphenyl has a flash point of 255c? CO ana terphenyis a : point of 3^0F. to 910F. 0C. The arcciors do net neve an, flash points and are considered non-flammable,
Toxicity - Chlorine
Chlorine is an extremely toxic gas. The allowable concert::.:::;; for an eight hour day is reported to be from 0.33 to 1- car: .* y ' million. An exposure of 1000 ppm is rapidly ratal . 1" ^ - T detectable by odor at a concentration of 3.3 ppm and : 3 : ::. 1. throat irritation.
Toxicity - Biphenyl
Large concentrations of biphenyl vapors cause intoxlcs ti on.. Respiratory equipment should be worn when working in cent,a-: with its vapors.
Toxicity - Aroclors
Aroclors can give rise to dermatitis wnen contacted with n.skin. Inhalation of vapors is u sally f ol I owed by sytrer, poisoning. Proper protective clotning Should be worn v;ner :;anu_i:n,
aroclors. Respiratory equipment should be used when van::: is anticipated.
1.3 The Facilities
1.31 The following facilities will be added to the arocicr denar:ne-n at Anniston:
One 2400 gallon chlorination tank and accessory equipment y :r used for solids cnlorinations.
One 2300 gallon still pot, external neater, vapor concerts ex, receiver and ejector system for solids distillations.
One 2000 gallon Monel tank to debot-tlenecK the existing distillation system.
'
Ife External coolers on the existing chiorir-ators.
DSW 577135
WATER_PCB-SD0000051673
Section No. 1-00 E. A. No. 761.10-4-433 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 5 of 12 Revised July 9, 1965
A chlorine feed control system for each chiorinator.
A therminol heater to provide a heating medium for jacketed process and transfer lines at the solid still and chiorinator.
A new control room at the second or operating level containing instruments for both stills and chlorinators.
Installation of three heavy duty pumps on the chlorinators.
Minor relocations and alterations to equipment in the chlorination area.
New biphenyl feed pump for the continuous chlorinators, and a new transfer pump for the crude material from the continuous chlorinators.
A new tar withdrawal system for the four still units.
A new supervisor's office.
Demisters (Brink type) on all of the chiorinator units with one heat exchanger on the solid system and one on the liquid system to remove any entrainment from the gas stream.
A muriatic acid plant which will include a new absorber and tails tower, carbon towers for continuous processing of muriatic acid solution, relocation of the existing filter and Installation of four 18,600 gallon storage tanks for acid.
A vent system for tank truck and tank car loading to remove muriatic acid fumes during loading.
A new motor control center and power transformer and conversion of all existing power circuits from 220 volts to 440 volts.
The following facilities will be added to the aroclor department at Krummrlcn:
External coolers on 4 of the existing chlorinators (#5 already has one).
New circulating pumps on 4 of the 5 chlorinators (#5 already has been modified) .
DSW 577136
WATER PCB-SD0000051674
Section No. 1-00
E. A. No. 761.10-4-488 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 6 of 12 Revised July 9, 1965
A chlorine feed control system for each chlorinator.
A gravity indication on one chlorinator system to permit moni toring the course and end point of the reaction without manual sampling.
.32 Design Capacity
Operating Stream Time
Operating stream time is 7900 hours per year. This assumes 3 shifts per day 7 days per week operation with 10$ downtime for necessary repairs.
Rated Annual Capacity
Rated annual capacity will be:
At Anniston On liquid arodors On solids aroclors On muriatic acid
48.6 M Its./yr. 10.0 M lbs./yr. 32.8 M lbs./yr.
At Prummrich On liquid aroclors
28.6 M lbs./yr.
Total Aroclors 87.2 M lbs./yr.
Present capacity of the two plants, based on cost standard rates and on the production shown in the sales forecast is:
At Anniston On liquids & solids
27-6 M lbs./yr.
At Krummrich On liquids
20.4 M lbs./yr.
Total
48.0 M lbs./yr.
Design Capacity
At Anniston
On liquid aroclor products other than Aroclor 1242
On Aroclor 1242 thru the continuous unit
On solid aroclors thru the new chlorinator
On muriatic acid (as 100$ gas)
DSW 577137
3160 lbs./hr. 2980 lbs./hr. 1266 lbs./hr. 4120 lbs./hr.
WATER PCB-SD0000051675
Section No. 1-00 E. A. No. 761.10-4-438 Date : March 20, 1964 By: R. S. Yates Approved by: RPS Page 7 of 12 Revised July 9, 1965
At Krummrlch On liquid products
3620 lbs./hr.
Design capacities of the various aroclors are as follows:
At Anniston
Chlorination-Liquid Aroclors
Batch
Continuous
Chlorinator Size Chlorlnator Loading Number of Chiorinators Cycle Productlvlty/hr. of aroclor
940 gals. 53$ _
Pour (4) Variable 750 lbs.
940 gals.
51$ Pour (4) Continuous 2980 lbs.
Distillation-Liquid Aroclors
Type of operation Number of stills Size of still pots Productivity per still per hour
No. 1 No. 2
No. 3
Semi-continuous Three (3) 1285 gallons
1550 lbs. 2300 lbs. 2300 lbs.
Chlorination-Solid Aroclors
Type of operation Chlorinator size Number of chlorinators Cycle Productivity per hour of aroclor
Batch
2400 gallons One (1) Variable 1430 lbs.
Distillation-Solid Aroclors
Type of operation Number of stills Size of still pot Productivity per hour
Batch One (1) 2500 gallons 1266 lbs.
DSW 577138
WATER PCB-SD0000051676
Section No. 1-00 E. A. No. 761.10-4-408 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 8 of 12 Revised July 9, 1965
At Krummrich
Chlorination - Liquid Aroclors
Type of operation Chlcrinator Size Chlorinator Loading Number of Chlorinators Cycle
Distillation - Liquid Aroclor-s
Type of operation Number of stills Size of still pots
No. 1 No. 2 Productivity/hr. of Aroclor
Batch 1090 gallons o0% Five (5) Variable
Semi-continuous Two (2)
1280 gallons 2500 gallons 3620 lbs.
Flexibility of Operation
Cnlorination
Addition of external air cooling to the chlorinators will allow the chlorinators to operate at increased capacity. We expect, from this change a capacity increase of 40$ at Krummrich and 25$ at Anniston.
External air cooling eliminates the need for water cooling to jackets and coils and will result in less operating downtime and lower maintenance costs.
Distillation
A commercially designed heater of correct design should result in some fuel savings and some maintenance savings. A unit of tnis type will be installed on the new solids still at Anniston and will provide comparative data for replacement heaters for the future,
A separate Tnerminol heater to provide hot Tnerminol for line heating at the new solids still at Anniston will result in greater throughput due to decreased blockages from frozen lines. Arcelor 1268 has a hold point of 150 to 170C and the other solid aroclors have high viscosities at relatively high temperatures.
DSW 577139
WATER PCB-SD0000051677
Section No. 1-00 E. A. No. 761.10-4-488 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 9 of 12 Revised July 9, 1965
Installation of a new 2000 gallon receiver for Still No. 3 in place of the existing 1000 gallon receiver will result in a 4-1/2 hr. blend and filtering cycle instead of the existing 9 hr. cycle.
Time cycle for the new solid distillation will be:
Charge Heat Up Distill Empty Xtra
x .0 hr. 2.0 hrs. 10.2 hrs. 2.0 hrs. 1.3 hrs.
Total
17.0 hrs.
1.34 Future Expansion
If the large chlorinator proves feasible, the present batch type chlorinators can be replaced with a saving in space and attendant production increase.
Additional still capacity can be added at Anniston in the existing Bldg. 27 by replacing existing systems with larger units. Additional still capacity at Krummrich may have to go on a new structure north of the existing control room and office.
1.35 Physical Appearance
At Anniston
Consolidation of chlorination and distillation controls in a new control room will allow us to dismantle the existing con trol rooms. The west section of Bldg. 27 will be dismantled to provide space for the new solids still.
Existing No. 2 Blowing Tank in the chlorinator area will be dismantled. The Mitor Control Center will be installed in a new structure immediately under the control room.
At Krummrich
No extensive changes are contemplated except those changes which will be a part of the debottlenecking work.
DSW 577140
WATER PCB-SD0000051678
Section No. 1-00 E. A. No. 761.10-4-438 Date: March.20, 1964 By: R. S. Yates Approved by: RPS Page 10 of 12 Revised July 9, 1965
1.36 Raw Material and Product Storage and Shipping Requirements
No additional storage tanks are provided for in this project. Storage capacity at the completion of this project and TSD projects underway is listed below:
Intermediate Storage
Anniston
Krummrich
Blowing Tanks
1 - 750 gal. (cont.) 2 - 2,200 gal. 4 - 2,500 gal.
Still Feed Tanks
1 -10, 000 gal. 1 -12,000 gal.
None
Still Receivers
2 - 1,000 gal. 2 - 2,000 gal.
2 - 1,000 gal.
Blend Tanks
)
Filter Receivers )
Flaker Hold Tank )
6 - 2,000 gal.
4 - 2,000 gal.
000 0
Finished Storage
gal.
116, 000 gal.
1 .4 Service Requirements
1.41 Utilities
Utilities are now available in both plant areas. The use of highly efficient still heaters should partly offset any additional gas consumption required for Increased production.
The use of external air cooled heat exchangers will actually decrease the amount of cooling water now required.
Electric power consumption will increase, and a new power transformer will be installed to satisfy the new loading.
1.42 Services
At Anniston
A new supervisor's office will be added. No other additions to service facilities are planned at this time.
DSW 577141
WATER PCB-SD0000051679
Section No. 1-00 E. A. No. 761.10-4-483 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 11 of 12 Revised July 9, 1965
At Krummrich
No additions are planned at this time.
1.43 Personnel
At Anniston For Entire Dept. For Chlorlnators
One chief operator
One head operator. One operator who assists the head operator and operates the muriatic system.
For Stills and Filter For Flaker
One operator.
One operator utilized on an overtime basis.
Drumming and Biphenyl Flaking
Two laborers who drum aroclors, bag flaked material, flake and bag biphenyl and clean cars.
At Krummrich
For Chlorlnators Stills, Blending and Filtering
One chiorinator-still operator. One operator who charges the chlorlnators, earth treats the distilled product and filters and makes the Pyranol Blends
Drumming
No change in labor requirements, either additions or deletions, are contemplated by this project.
1.5 Costs
1.51 Capital Cost Estimate
An equipment list, instrument list, process piping diagram, definitive scope and preliminary layouts were used in estab lishing the cost estimate for the aroclor additions at the Krummrich and Anniston Plants.
DSW 577142
WATER PCB-SD0000051680
Section No. 1-00 E. A. No. 761.10-4-488 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 12 of 12 Revised July 9, 1965
1.52 Manufacturing Cost Estimate Manufacturing cost estimates were made by scaling up both the Krummrich and Anniston aroclor plant variable costs from the standards of January 1, 1964 and leaving the cost of labor unchanged. Repair costs and depreciation were scaled upward based on the new capital that is being added to the two plants. The cost estimate as submitted is based on Production Dept, estimates.
1.53 Scope of Work Scope of work for the aroclor and muriatic acid plants is based on definitive definition of the additions proposed at Anniston and Krummrich.
1.6 Plans and Schedules Engineering design is complete. The Krummrich phase of the work will be carried out first, followed by the Anniston phases. Target dates are: June 15, 1964 complete design package for Krummrich Plant. July 1, 1964 start construction at Krummrich Plant. September 1, 1964 complete construction at Krummrich Plant start construction at Anniston Plant. May 15, 1965 complete construction of aroclor facilities at Anniston Plant. July 15, 1965 complete construction of muriatic acid facilities at Anniston Plant. Oct. 1, 1965 complete construction of miscellaneous additions.
DSW 577143
WATER PCB-SD0000051681
Section No. 3-00 Job No. 761.10-4*488 Date: April 10, 1964 By: R. S. Yates Approved by: R.P.S.
Page 1 of 4
3-10 Job Organization and Procedure
3-11 Responsibilities
The Organic Engineering Department, through the Project Manager, will be responsible for cost estimating, design, procurement, construction, cost accounting, cost control, construction checkout, and engineering participation in st art -up.
AC1 matters of policy, changes in scope of work and scheduling will clear through the Project Manager. Portions of the engineering will be delegated as indi cated in the following sections but the Project Manager retains primary responsibility.
Project Section
.
The Project Section will be responsible for the detailed design on the project and will be responsible for handl ing the following items in accordance with the indicated engineering proeesures.
Design Manual - 0E-105
Project Files - 0E-109
Detailed design work for expansion of Arcelor Facilities will be accomplished by Organic Engineering personnel.
The project will be divided into three major areas. Expansion of Aroclor facilities at Anniston, Expansion of Aroclor facilities at Krummrich, Expansion of Muriatic Acid facilities at Anniston. Assignments are as follows:
R. S. Yates
- Project Engineer - Coordination of pro ject and liaison with the plant and with Research; preparation and issue of scope of work, schedules and logs, and design information (Design Manual).
Note:
On the Krummrich plant expansion, W. B. Johnson of WGK-PTS will assist Engineering in the defin ition and design phases.
H. D. Gabelman -
Mechanical Engineer - specification and
procurement of equipment, materials and supplies; piping layout and details, de sign of structural steel, foundations and buildings.
DSW 577144
WATER PCB-SD0000051682
Section No. 3-00 Job No. 761.10-4-488 Date: April 10, 1964 By: R. S. Yates Approved by: R.P.S. Page 2 of 4
D. W. Richmond R. N. Harris -
Design, specification and procurement of control systems; preparation and issue of IFO's and field checkout of installations.
Services Section
Drawings and models for the project -will be prepared under the direction of the Chief Draftsman. A Drawing Log will be maintained in accordance with Procedure 0E-112.
Purchasing will be handled as described in Procedure OE-119. Distribution of purchase orders is shown on the attached assignment and distribution chart.
Vendor's Data
Three copies of Vendor's drawings of fabricated equip ment, obtained by Purchasing, will go to the requisition ing engineer for approval. An approved print is returned to the vendor through Purchasing; one gees to Drafting for layout work; one to the project file.
Six copies of vendor's data (including certified drawings) obtained from Purchasing, go to the requisitioning engineer to be distributed as shown, on the attached dis tribution chart.
Upon completion cf the job, the field engineer will turn his vendor's data over to the area maintenance engineer; the chief draftsman will return his copies to the project engineer who will forward them to the plant spare parts engineer.
A Procurement Log and Procurement Status Report will be
published periodically in accordance with Procedure OE-111.
Construction Section
The Construction Section will be responsible for issuing capital estimates, project schedules, contracting plan, construction specifications, bid packages and contracts as required and at the request of the Project Manager.
DSW 577145
WATER PCB-SD0000051683
Section No. 3-00 Job No. 761.10-4-488 Date: April 10, 1964 By: R. S. Yates Approved by: R.P.S.
Page 3 of 4
The receiving address for all purchases will be:
At Krummrlch -
R. D. Casey Monsanto Company
Project No. 8849 East St. Louis (Monsanto) Illinois
At Anniston -
J. W. Colgan Monsanto Company
Project No. 1663 Anniston, Alabama
Field Construction Engineers will be assigned to this project as follows:
Anniston Facilities - J. W. Colgan
Krummrlch Facilities - R. D. Casey
They will be responsible for the work of the contractors and their compliance with plant rules. Contact between the contracting groups and the plant or the Engineering Department -will be through the respective Construction Engineer.
Project Control
F. W. Corich, Project Accountant, will maintain all necessary accounting records in accordance with the procedure for project cost control (OE-113).
Communieations
The Project Engineer will schedule regular project re
view meetings in order to review the schedule, define and take appropriate action on problems that may arise, and to keep everyone informed as to the progress of the job. He will publish minutes, and follow up on assign ments made.
Personnel assignments and distribution of manuals, draw ings, and other correspondence are Indicated in Appendix B.
DSW 577146
WATER PCB-SD0000051684
Section No. 3-00 Job No. 761,10-4-488 Date: April 10, 1964 By: R. S. Yates Approved by: R.P.S. Page 4 of 4
3-12 Items for Review and Approval
Research Review
The Research Department will review portions of the pro cess design work as indicated below. This review is to confirm adherence to the process and to indicate any conditions which may adversely affect yield and quality of finished goods or safety of the operation. Research will transmit their comments to the Project Engineer.
Items for Review
Design Basis Process Section (Section 2) of Design Manual Equipment Layout Model Process Piping Diagram
Research may forego the review of any item or may in dicate their desire to review other items by notifying the Project Engineer.
Plant Review
The Manufacturing Representative will arrange for the appropriate operating and maintenance personnel to re view portions of ~he design work as Indicated below. This review is from the standpoint- of operability, safety, maintenance consideration and conformance with standard plant practices. Comments will be sent to the Project Engineer.
Items for Review
Design Manual Equipment Layout Model Process Piping Diagram Project Schedule Construction Drawings
Items for Approval
Plot Plan Model and/or Equipment Layout Manufact Turing Cost Estimate
In order to prevent undue delay of the project, comments arising from review of any portion of the project work must be transmitted to the Project Engineer within five DSW57714 working days of receipt of material for review.
WATER PCB-SD0000051685
Correspondence
C o n s tru e || D e s i g n M a n u a l | I P r o j e c t L o g 1 | P u r c h a s i n g |
ONISVHOUQd
0 p
NOIXOflHlSNOO
bO c S30IAH3S --4 cH N0IS3a *0N3 Ctf
U 4)
H0HV3S3H
Cu
KOixonaoHa
XX XX XX XX Kx xx
*X
X
.:
1
j
K
.. X
1[
K i X `:
;* I!
i i
XX
X
XX
XX '
XX
SJapJO PIT3 1 e^OBJ^uoo
uoTdonjaeuoo 4P
suot3B0TJI0Sds uoTcona^Euoo 3Ba B,JOpUSA
fiaojoAUi
B^aoday SuiATaoay
suapjo aBrqcuny
X
XX X
i I jX X
XX
xX
xS X
X
s x X^ x X XX
X X
c? X
X x!
1 OJ 1 .x\
1
X xI X
S3 X| j XI 1 1
X |xx
j xj
|
BSufMeua
3Joday sn3^3S 3BO0 3oafojj
Soq 2utmbjg
^jodaH sn^^s ^usuisjnooa^ Hoq cuatnaonoojy
` axnpauoy aoafouj
X
jX X
jX
!x i
S x
jX X
jX
lx ! 1 ! i
! x X
xx
X
*
S XX
x
X*
XX XX
x1 *i
x| x
l 1 1
1 1 1-
--------------- ------------ j-----------------------
j !1 !1
B^-ea uSps aa
j
uoT^Buiaojuj ^oafoa^ i^aauso
1 X1
uoTaoss B DOJ<J
* i
1
spBeg uSpsaa X X X |
XV
X
1 xxlx**x
i
|X
acaTduioo
|X x x
1
X-
1 xjxx
: jX |
i
___ J_____ Xx
1 _ 1 ._
1 1 X 1X 1 j x j x 1x x
j1
? i *!
._
a w: a as*
W
CU
<o^
Cu
< SJgR u 91
zw rI ' * U
W0 o
i-H1 w o
t<o z
cj
s|^2-
awooa:
Cu
3CC 0( ^I S *|
3^
pUo cu; O to
0) cG
tH. C<G Q
U0to) U0t7o
C3 c3
cc srt 5to:
5
2
9.
i-sI
$
* ' ^v)|
Mi
!
V-'
.<
k
.'O
o vN*
5$^
o,
VI H
&ssL
S4^
m4> 9X
,,> ?T
kMV
X
n
s^ ^Xtcdl ^co c^to4-)cwwuuoGtco<^Wua4Ct>>oDhoC
4oc1
ea
O H
<1)
><D Q
{cox:|,I-4Hoo->WtCo o-0* 4Co-> CoP
*3>
rf -U
O
CU
w 4J
<Oi)
^<C0
3RU
S3U*
-OOoJ Of^c, SOoH*<c0Hwc5
u
Cu
u<D
O
C o t,
to C
C 4) +
--I tc to
^LtJCC 45 c
C to 4J <G 4) <0 o W U to
<4OJrtWC
(CtfOl -C0c, <to XE05)
<u CO
to c
OC WC *Oh
45 oo
<n < (4 opoh (U D tOCi C *H
O <0 CU C <G
4-q5
oCO O
H U *-< O 4-> o O
p 3 OHpH^t, Q
o 4-5
on u 4J (Q
o U Id U to
< <DD PH tO-C4-4 D P U h E
OH 4O <--< Cro
> r-( 4-> <0
OU or-<
3 .C
UrtPOH
*Wj OC OC 4Q>, 40P)
4Q.J
oU
4U> w 33 Cu O
to
COOlOW
oo
-oCH (U
^> 4) | O ->r-l
> 4->
4-5 4(-C5
4OCtO-f3>l OOc0uQ7J
UacC:J
o
IK
-C
to 3C03jU;lE Sa:
^
< v s ~-
r^^* % <XSv I^ N 40<-Dh7 ri|C>"|1; >v
c(o3P0>
NfTXcx.o-f IO CO Q
WATER PCB-SD0000051686
ft* WATER PCB-SD0000051687
C onstrue- Correspondence
DSW 577149
WATER PCB-SD0000051688