Document rB544JMVQ4908mkLk7qzZew9v

PROGRESS REPORT TECHNICAL SERVICES DEPT. -- B. 0, KWIMHICH PLANT W.O. XRUMMRICM PLANT EG.L. Bratsch B gJD.W. Jackson . BD.J. O'Toole O O 3. W. Corlew B 0 R. McCutchan ` B *0 W. C Engman B B Ca F. Buckley <a *E) ' B B TO RECEIVE OfTAIL SECTION b B < 'B 1B B 1B B 0 I job no. (report no. { 93-370*^119____| 3 idate I 12/ 4 / 70 GENERAL OFFICE OTHERS M. P. Lux Anniston D D. Danna (4) B J.C. Landwehr * D.B. Hosmer/ F.J. Holzapfel Nitro W.R. Kellogg DR.E. Howard S. 2nd St. 'jxjj, R,, Savage UP.O. DeGarmo Bw, Papageorge *]T.M. Patrick B O J.F. Quinn B * R.L. Wiese . TiTLfi AROCLOR POLLUTION - AIR POLLUTION REDUCTION PROGRAM pkreonneli W6 A Krull (W. C. Engman) problem! Determine levels and define problem areas. SUMMARY As part of the overal PCB pollution control, a study was initiated to measure the Aroclor air pollution levels and develop a program for reduction. A tentative goal of two pounds/day was set at this time. The present level as measured and/or calculated from the manufacturing department Is about 5=7 pounds/day. Most of this is due to the sparging of Aroclor blends with nitrogen in the mix tanks. To reduce the losses to 2 pounds/day or less the following should be done. 1. Blanket the mix tanks instead of sparging with nitrogen. EDC 3/1/70. .2 Route the relief lines on the batch chlorinators to the concrete pad. EDC k/l/JO. /br Technical Services Dept, DSW 258029 COMPANY CONFIDENTIAL INFORMATION This daemon! is tbs property of Monsanto Cospsqr sad tbs recipient is rsspoasftls for its sstsksspiac sad disposition. It eoatsias confiden tial information of Monsanto Company which Must not bo rsproduood, rereeled to unsntborlssd persons or ssat outside tbs company without Ppt authorisation. Either retsla la secure Also or destroy. STLCOPCB4061741 91370:4119(5) 2 December 4, 1970 BACKGROUND As part of the overall PCB pollution control, a program was initiated to define and reduce the level of Aroclor air pollution from-the W. G. Krummrich Plant. This progress report describes the results of this program relative to the Aroclor Production Department. PROBLEM AREAS A survey of the department and consequent sampling and calculations defined these problem areas. Sources 1. Mix tanks (while sparging with nitrogen) Measured Loss #/Day Not sampled but visible loss exists, Calculated Loss #/Day " 5*70 2. Tanks and loading areas (assuming 55 M #/yr production) 0.70 0.10 3. Scrubber stack O.OCl 0.04 4. Fume removal stack 0.05 0.01 5. Vacuum jets Not sampled. None ob served and condenser should remove most of Aroclor. No calculations. 6. Therminol Furnace Not sampled. No visible fumes or odors. No calculations. Estimated Totals - About 7.0 #/day. The relief lines on four batch chlorinators relieve into the air creating a potential loss. REDUCTION PROGRAM To reduce the loss to two pounds per day, a blanketing system should be applied to the" mix tanks. The rupture discs on the batch chlorinators should be routed to the concrete pad to eliminate a possible large loss. /br W. *A. Krull Technical Services Dept. DSW 258030 STLCOPCB4061742