-..TRAINING MANUAL WASTE AND MATERIALS OPERATOR
DEPARTMENTS 8jl and '827 REVISED NOVEMBER 1, 1971
by A. L. Rasmussen Copy
t
PCB-ARCH-EXT0372521
WASTE AND MATERIALS OPERATOR
TRAINING MANUAL
INDEX
.
Job Description
A. Duties
B. Responsibilities
Phase I - Waste Incinerator Operations
,1. Summary of Process - Waste Incinerator
II. Safety
A. Emergency Procedures
B. General
C. Design
D. Location of Gaiety Equipment
E. Inspection
F. Personnel Protective Equipment
III. Housekeeping
IV. f Normal Operations
1. Unloading Facilities
\
.
.
2. Sump Systems
3. Montar Collection System
4. Aroclor Storage Facilities
5. Waste Feed System
6. Incinerator-Scrubber System
7. Incinerator System Water Supply
8. Auxiliary Fuel Supplies
9. Atomizing Steam
10. Other Required Utilities
11. Condensate Collection. 12. Purge A.ir System
, Page 1 2*. 1
2 3 3 4 4 5 6 8 9 11 11 12 13 13 14 14 15 16 16 17 ^ 17
PCB-ARCH-EXT0372522
INDEX
.
V.
Pre-Startup Checkout
VI.
Normal Startup
1. Instructions and Sequence
2. Hot Startup AfterTemporary Shutdown
3. Check List for Incinerator Startup
VII. Shutdown Procedures
A. For Extended Downtime
B. For Short Term Downtime
C. Temporary (Hot) ShutdownProcedure
D. Emergency Shutdown Procedure
.
\
E. Check List for Normal Shutdown
VIII. Material Handling
A. Drums
B. Trailers
C. Tank Cars
IX. 'Equipment List
X.
Flow Sheet
XI.
Control Panel Diagram
XII. Key Variables
XIII. Interlocks and Alarms
XIV. Timers
XV.
Variable Listing
XVI. Utility Locations
XVII. Trouble Shooting
A. Flame Failure
B. Lighting Problems .
C. Power Failure
Page 19
21
2^
2^
31
31
33
34
35
'
,
36
38
38
39
40
42
43
44
48
60
64
65 66 66 67 68
PCB-ARCH-EXT0372523
INDEX XVII. D. City Water Failure
E. Well Water Failure F. Instrument Air Failure XVIII. A. Log Sheet B. Night Sheet
Phase II - Bulk Distribution
I.
Summary of Operations
Phenol Unloading and Loading
II.
Safety
A. Materials Handling
B. Safety Equipment
C. Requirements on use of Safety Equipment
D. Emergency Assembly Area
III. Housekeeping Responsibilities
IV.
Details of Operation
A. Unloading Phenol Tank Cars
' B. Tank Car Loading
C. Tank Truck Loading
D. Waste Phenol Handling
(
.
.
.
E. Inhibited (Color Stabilized) Phenol
V.
Sampling and Specifications
VI.
Equipment List
VII. Tank Calibrations
Page 70 71 72 73 74
75 75 75 75 76 77 77 78 .79 79 82 83 85 86 87 88 89
PCB-ARCH-EXT0372524
Page 1
JOB DESCRIPTION
Waste and Materials Operator
A. Duties
. Operation of waste incinerator equipment, including oxidizer scrubbing systems, sumps, and all related equipment.
Loading and unloading tank trucks, dumping drums, and un . loading tank cars of waste material for incineration.
Operation of unloading, loading and storage tank equipment
involved in in-plant bulk material storage in Distribution
Department equipment. This includes auxiliary equipment,
.. such as air compressors,, steam regulators, fork lift, and
other equipment incidental to loading, unloading, or
storage of these materials.
-
,
B. Responsibilities
1. Maintain maximum on-stream operation of the incinerator.
2. Maintain accurate legible records of operations.
3. Flammability testing of waste materials.
4. Take samples for laboratory analysis.
5. Keep precise unloading and loading records.
,
6. Inspect all cars and tank trucks before unloading
or loading. Report all defects to supervision
before handling.
7. Keep analytical data records.
8. Perform duties in a safe manner and use proper
safety equipment.
9. Report to and work under the direction of a
.
Distribution Foreman.
,
10. Maintain.housekeeping in the area at acceptable levels.
PCB-ARCH-EXT0372525
Page 2
I. SUMMARY OF PROCESS - WASTE INCINERATOR
Waste liquids containing polychlorinated biphenyls are decomposed by heat in the incinerator into the following combustion products:
HC1, Cl2, C02, H20, particulate matter (when burning Montar residue containing lime.)
Approximately 0.001 lb./hour of undestroyed PCBs are expected through the incinerator at the design PCB feed rate of 1-250 lb./hour. This will go to the sewer in the scrubber effluent stream.. This stream will be an HC1 solution of less than 2$ strength.
The hot combustion products leaving the incinerator are cooled' from incinerator temperatures (2800F. maximum) to approximately 210F. by water sprays in the contactor tube before discharging into the quench pot. Somewhat less than 50$ of the HC1 is also removed here. Leaving the quench pot, the cooled gases pass through a high energy venturi section where approximately 98$ of the particulate matter is removed by a pumped stream of HC1 solution from the quench pot and packed scrubber sumps. Additional HC1 is also removed in the venturi.
The gases then enter the bottom of a packed scrubber (polypropylene packing) where the remaining HC1 is
scrubbed out with well water. Scrubber efficiency is
calculated to be approximately 99.^$*-.
On leaving the packed section the gases pass through a
. monel",demister pad and into the atmosphere.
i/tl
"e-
Design specifications for the contents of this stream at
design waste feed rate are:
HC1
Cl2 Particulates Nitrogen Oxides
5 lb./hour maximum
<50 ppm
<0.05 grains/SCF 20 micron size
<200 ppm
*
PCB-ARCH-EXT0372526
Page 3
SAFETY
.
.
'
.
A. EMERGENCY PROCEDURES
1. In case of a fire, go to the telephone, and. dial Station 2000 and report a fire at the incinerator. Zone 3-4.
2. In case of an emergency and you need immediate help in the department, dial Station 2015 on the telephone; give the guard your name, department number and as much detail as possible concerning the emergency. The guard will then summon aid through the pagemaster system and help will come directly to the department.
3.
. .
4.
In case you need emergency aid for yourself or others at the dispensary, then dial Station 400 and report the name of person, the department number and location of injured person to whoever answers.
Emergency Plan
.
The assembly points for all plant personnel in case of a plant emergency are:
PRIMARY:
MAIN PARKING LOT
SECONDARY: WEST GATE
'
Department Shutdown
.
-
.
Shutdown will take place in either of two ways.
First, persons will shut down their departments and evacuate if instructed to do so by the night superintendent, or by anyone else in charge of
directing emergency activities.
Second, shut down and evacuation will'take place if the emergency whistle is sounded. This whistle is five short blasts repeated five times. The emergency whistle will be sounded only if an entire plant shutdown is desired.
The emergency plan has. been revised so that it
can be,implemented by the plant fire zones.
This is so since our experience here at the
plant and other large plants indicates that an
emergency is likely to be confined to a particular
zone of the plant..
.
PCB-ARCH-EXT0372527
Page 4
SAFETY (contd.)
.
A. EMERGENCY PROCEDURES (contd.)
The Incineration area fire call is 3-4 (3 long blasts followed by 4 short blasts of the fire whistle).
B. GENERAL
.
,
Most of the wastes contain primarily Aroclor
(chlorinated biphenyl material). However, other
unknown chemicals may be present, -and so additional
precautions must be taken.
,
Contact with the skin should be avoided. In case of spills on the body, wash the affected areas with soap and water.
Inhalation of fumes and vapors should be avoided. If it is necessary to work in areas where fumes are concentrated, a gas mask suitable for organic vapors should be worn.
Aroclors have very low vapor pressures and do not constitute a fire or explosion hazard and are not considered flammable. However, some material will
be contaminated with flammable solvents.
C. DESIGN
The following safety factors were incorporated into
the incinerator design:
1. The shelter at the drum dumping sump
has open wall areas to disperse any flames quickly.
2. The immediate dumping area has a
Class 1, Group D, Division 1 electrical
classification.
.
.
.
3. The storage tanks are blanked with nitrogen.
Storage tank filling lines are provided with dip pipes to prevent static charges.
A .weak seam on the north end of the oxidizer has
been incorporated to provide explosion relief for
a major explosion.
.
FIA type safety-approved combustion safeguards and process interlocks have been incorporated.
PCB-ARCH-EXT0372528
Page 5
II. SAFETY (contd.)
C. DESIGN (contd.)
.
Main back-up city water cooling systems are on .
separate power feeders. In addition, a tie-in
has been provided to the WGK plant firewater
'
system if a plant-wide power failure shuts down
the city water pumps.:
.
D. LOCATION OF SAFETY EQUIPMENT
1. Safety Showers and Eye Baths
.
.
a. Ground level west of the drum melter.
b. Ground level, east of the air combustion blower (150)
2. First Aid Boxes
.
a. In safety_shelter, ground floor, south side of office.
3 Gas Masks
/
a. In safety shelter, ground floor, south side of.office.
b. On catwalk above storage tanks.
4. Fire Extinguishers
a. In safety shelter, ground floor, south side of office. - CO2 and dry chemical .
b.- First floor platform on handrail, south side of incinerator.- dry chemical
c. Motor control center. - CO2
d. Ground floor at scrubber column. . This
is 150# dry chemical extinguisher on a
two-wheeled cart.
.
e. Column next to stairway leading to the storage tanks 116, 117 and 118. - dry chemical
-5- Emergency Clothing
a. Ground floor in safety shelter, south side,
of offide.
PCB-ARCH-EXT0372529
Page 6
SAFETY ( contd.)
.
E. INSPECTIONS
1. Inspection of safety equipment is the operator's responsibility. Report any malfunctions.
2. Equipment inspection forms will be provided to be filled out daily.
PCB-ARCH-EXT0372530
SAFETY EQUIPMENT CHECK LIST
Page 7 Date
Before checking safety showers please notify Int. PNA Operator
at Station 544. Also notify him when you have completed test
of all safety showers.
.
SAFETY SHOWERS
.1. West of drum heater
2 East of Control Panel
34..
Phenol truck loading dock North Phenol heating and
Aroclor unloading dock
.5 South Phenol unloading dock
First aid boxes Phenol area
(face shield and alcohol)
234r>...
Inside drumming Bldg. W. Door Truck loading dock North unloading dock South unloading dock
SHELTER EAST OF OFFICE
.1.
2
.3 .4
Gas Mask (l) Fire extinguisher (2)
Clothing Box (2) First Aid Box
STORAGE TANK WALKWAY
1. Gas Mask
INCINERATOR WALKWAY
1. Fire Extinguisher
Check and Sign Each Shift
Days
Middles
Lates
'
PCB-ARCH-EXT0372531
Page.8
SAFETY (contd.)
F. PERSONNEL PROTECTIVE EQUIPMENT
.
1. Lockers in the department will be assigned to
each operator to keep equipment and tools .
necessary for operations.
.
2. Wearing of the following safety equipment is ' required:
a. Safety glasses when in the operating area.
b. Goggle-face shield unit when sampling or
.
, ,
dumping drums and changing guns at the
incinerator.
.
c. Safety shoes, rubber or leather.
d. Rubber gloves when sampling or dumping drums.
3. Wearing of the following safety equipment is strongly recommended:
a. Hard hat
. .
.
b. Plastic apron when dumping drums,.
4. Although this is not a toxic clothing department, protective clothing is issued and should be worn any time in the plant.
5- Asbestos gloves or.heavy leather gloves will be
available for work around the incinerator (removing
waste gun, etc.)
.
PCB-ARCH-EXT0372532
Page 9
III. HOUSEKEEPING
'
The importance of a good, clean department cannot be overstressed. A clean department is both a safer and a more enjoyable place to work.
However, since the incinerator will be handling PCB,
good housekeeping is doubly important. All possible
,
precautions must be taken to prevent escape of PCBs
to the environment. Design has provided:
1. Curbed and sumped incinerator area.
2. Settling and separating basins.
3. Multiple scrubbing of incinerator combustion
gases.
.
A man walking through a spill could track enough PCB outside the curb to exceed the allowable department daily loss.
Supervision will make every reasonable effort to aid housekeeping. However, success or failure rests with each individual operator.
Housekeeping Assignments
A. All Shifts
1. Wash up all spills immediately.
.
.
.2. Coil up hoses and hang on racks when not in use.
3. Keep gauges, instrument panel, and rotometers clean for operations.
4. Special clean-up assignments as directed by
.
supervision.
.
B. Day Shift
Pick up trash around storage tanks 116, 117* and 118, tank truck unloading area and fuel oil storage area.
PCB-ARCH-EXT0372533
Page 10
III. HOUSEKEEPING (contd.)
.
.
C. Middle Shift
Pick up trash around and on all levels of the incinerator, the quench pot and settling basin area.
D. Late Shift
Pick up trash around office, scrubber column, and drum storage and handling areas.
PCB-ARCH-EXT0372534
Page 11
NORMAL, OPERATIONS
.
1. 'Unloading Facilities
'
a. Tank Car
Returned tank cars will be unloaded at the north
existing phenol unloading spot on-Track No. 7 at the
southwest corner of the building BB-T. An unloading
pump (Item 110) has been provided, and an Unloading
.
arm for top unloading of the cars. The material is
pumped from the car to one of the three 20,000 gallon
storage tanks (items.116, 117* and 118) through a
common 3" transfer line which also serves the
. unloading dock sump pump (item 125) ^ the Aroclor
sump pump (item 121) and the drum unloading sump
pump (Item 119). Care should be exercised when pumping
to see that all valves from these other sources are
closed.
b. Tank Truck
Return tank trucks of waste liquids will be unloaded in the area just west of the storage tanks. The truck will be backed into position from the road south of the incinerator area. A flexible hose will connect . the bottom trailer outlet to unloading pump, (item 111) which will pump the contents into one of the three storage tanks.
, c. Drums
Most of the returned material will be in 55 gallon drums.
These will be stored in a designated area for unloading.
They will be sampled for solvent content and viscosity
and then .picked up one at a time by fork lift with
attachment (item -134) and deposited on the south end of
the drum conveyor (item 107). The conveyor consists of
a south section for receiving cold drums (three-maximum).
The center section is a live steam drum heater (capacity
3 drums) and the north section is a storage section for '
hot" drums. The drum heater section is an insulated
chamber using live steam for heating. It has vertical
sliding counter-weighted doors. Each conveyor section
.
has a stop with a foot-operated escapement which allows
separation of the end drum so the drum crane (Item 128)
can be attached.
.
The drum crane is a hand-operated hydraulic crane with
an adjustable boom length and a lifter-dumper attachment.
PCB-ARCH-EXT0372535
Page 12
NORMAL OPERATIONS (contd.) 1. Unloading Facilities (contd.)
c. Drums (contd.)
The crane boom is swung over the drum on the conveyor
.
and the lifter-dumper clamped around it. The drum is
then raised several inches to clear the conveyor and
then the boom is swung manually to a position north
of the drum unloading sump. The wheel-operated dumper *
is then used to tilt the drum to discharge into the
sump.
'
A pump (Item l6o) and flexible line has been provided for pumping drums out into the sump.
2. Sump Systems a. Incinerator Area Sump
,
.
The entire incinerator area, including the truck
unloading and drum unloading areas is curbed and
drains to a sump at the west side of the area. A
sump pump (item 120) actuated by level switch LS-120-1
pumps Aroclor spills and/or water to the 10,000 gallon
settling basin (item 124) at the west side of the old .
' phenol pressure evaporation area.
,
b. Settling Basin.
.
The Aroclor settles by gravity and the water flows off the top to the sewer, under a weir to prevent discharge of any floating material' contaminated with Aroclor. When the Aroclor layer on the .bottom reaches a pre determined level (approximately 3 ft.), as measured by level .indicator LI-121-1, the water layer is pumped to the sewer manually using Water Sump Pump (item 122).
Steam is then introduced to the sump heating coil to raise the Aroclor layer to a pumpable temperature. The hot Aroclor is then pumped manually to one of the three storage tanks using the common line described under Tank . Car Unloading Facilities. Be sure all valves are properly positioned to pump to the storage tank.
PCB-ARCH-EXT0372536
Page 15
NORMAL OPERATIONS (contd.)
2. Sump Systems (contd.)
..
c. Unloading Dock Sump
The.unloading dock sump pump (item 125) is located in an existing sump at the phenol unloading docks between tracks No. 7 and 7D. This sump collects any . spills associated with tank car unloading or unloading pump or piping leakage. The pump is piped to both the * common transfer line to the storage tanks or to a phenol waste tank, since phenol is also unloaded in this area. Operation of this pump is manual and will be used to pump Aroclor only in the event of a spill or leak in the unloading.area.
d. Drum Dumping Sump
The. drum dumping sump receives the returned Waste . Liquid Aroclors which may contain contaminants such as mineral oil, solvents, etc. As these drums are dumped into the sump, pump (item 119) actuated by level switch LS-119-lj pumps the waste liquids into one of the storage tanks.
3. Montar Collection System
.
.
Still residue, called "MONTAR" is collected in Department 246
.
and transported to the incinerator area by tank truck. The
procedure is as follows:
The truck is filled with approximately 2000 gallons of
waste liquid Aroclor from one of the storage tanks in the
incinerator area, using tank truck unloading pump (item 111).
The trailer is then transported to Dept. 246 and loaded in a
designated area north of the still. The hot "Montar" at .
approximately 200C. is pimped from the still into the trailer,
mixing with the Aroclor. When all the Montar has been
collected, the trailer is transported back to the incinerator
area and unloaded into storage, again using the tank truck
unloading pump (item 111).
.
The trailer should be moved to the incinerator area, and unloaded as quickly as possible to prevent the lime solids from settling out.
4. Aroclor Storage Facilities
'
Aroclor materials to be incinerated will be stored in three 20,000 gallon tanks. Items. 116, 117, and 118. The north
tank. Item 118, will be used for Montar. Each tank is provided with a heating coil to keep the contents pumpable (maximum 100C). The steam to the coils is- manually controlled.
PCB-ARCH-EXT0372537
Page 14
NORMAL OPERATIONS (contd.)
'
4. Aroclor Storage Facilities (contd.)
Local temperature indicators TI-116-1, TI-117-1; and TI-118-1 have been provided. Each tank is also provided with an agitator to provide a homogeneous mixture and to keep solids suspended. Each tank is also provided with a local level indicator (LI-116-2, LI-117-2, and LI-118-2).
Since the returned waste liquid Aroclors may contain other materials some of which will be flammable solvents, a nitrogen blanket has been provided for the storage tanks. Conservation vents (XE-116-3; XE-117-3 and XE-llo-3) will . relieve at 6 oz./in2 positive pressure or 1 oz/in^ negative
pressure. Bottled nitrogen is provided by portable trailers which feed a regulator station at the.south side of the area.
Piping has been provided to allow transferring the contents of any storage tank to any other storage tank. The storage tanks are tied together by 3" overflow lines at the tops.
A valve has been provided on a spare nozzle on the top of each tank so tank level can be checked by tape and plumb-bob.
5. Waste Feed System
.
Waste liquids are fed to the incinerator by a MOYNO positive displacement pump (item 104). Normal pump discharge pressure at full, feed rate (1250 lbs./hour) will be approximately 70-80 psig. Item 1-104 can pump from either the middle (item 117) or the north (item 118) storage tank. The pumping rate is governed by. a variable speed drive. Maximum rate is' approximately 4 GPM. The feed rate to the incinerator is regulated by controlling the pressure at the waste gun, normally 55-65 psig. A pressure controller (PC 104-7) at the incinerator opens or closes a control valve (PCV-1C4-7) in the return line to the storage tanks. A three-way valve ` (PCV 104-4) is set to return the excess waste to the selected feed tank (117 or 118). A back pressure control valve (PSV-104-1) set at 80 psig relieves excessive pressure/ volume back to either storage tank. A DP cell flow indicator, FI-104-5, has been provided to measure the feed rate to the incinerator. 100$ corresponds to an approximate 5 GPM feed
rate.
6. Incinerator-Scrubber System
The incinerator system consists of the combustion air blower
(item 150), quench column (item 151); incinerator (item 102),
quench pot (item 152), venturi scrubber (item 153); venturi
circulating pump (item 106), packed scrubber column (item 154)
and mist eliminator (item 155)-
PCB-ARCH-EXT0372538
Page 15
'J
NORMAL OPERATIONS (contd.) 6. Incinerator-Scrubber System (contd.)
The incinerator Is a refractory lined furnace where the
1
destruction of the waste liquids take place, resulting in
various gaseous products (HC1, dp, CO2., H20) . Also, when
burning material containing Montar, some particulate matter
results.
.
The waste liquid Aroclors require supporting fuel to maintain
combustion at the proper temperatures. This is provided by
interruptable natural gas normally, with a back-up fuel oil
system.
. -
.
The hot gases and particulates leaving the incinerator pass through the Hastelloy "C" quench column into the polyester lined quench pot where they are cooled and some HC1 removed by two sets of water sprays. A water level is maintained in the quench pot and the gases impinge on the surface, and the loose brick lining on the walls. Liquid level Is maintained in the quench pot by control valve LCV-81. HC1 solution from the quench pot flows to, the sewer. The scrubber circulating pump pulls solution from the packed scrubber and feeds the Hastelloy "C" venturi scrubber where most of the particulate matter and some additional HC1 gas are removed. The gases then pass vertically up through the polyester lined packed scrubber, where the balance of the HC1 is removed, through apgK>rl|,,demister pad and to the atmosphere. Well water flows dowrf the packed scrubber countercurrent to the gas. The HC1 solution from the scrubber sump (120 GPM) flows to the sewer through a loop which maintains a level in the sump. The loop has a siphon break. The manual by-pass valve is partially opened to control the scrubber sump level.
7. Incinerator System Water Supply
.
The primary water supply for the contactor tube sprays and the packed scrubber is well water. A booster pump (item 112)' supplies the required pressure (120 psig). In addition, city water- from the break tank (item 126) is pumped(by Items 127 ,c
or 132l) to a weir at the top of the contactor tube (25-35 GPMj .which cools the tube walls. In addition, this city water
supply is also an emergency backup for the well water to the contactor tube. If well water pressure falls below a preset point, the incinerator furnace is shut down and additional city water flows to the contactor tube weir to protect the polyester lining in the quench and scrubber systems.
PCB-ARCH-EXT0372539
Page 16
NORMAL OPERATIONS (contd.)
7. Incinerator System Water Supply (contd.)
As an additional protection, a failure of city water
automatically brings in fire water from the plant loop
system. This is the ultimate protection to cover such
things as plant power failure. The tie-in is under
ground just south of the oxidizer.
.
Well water is also supplied to ..twcr quench nozzles in the . incinerator. These are used to control burner outlet temperatures when burning Montar. An 80 psig steam supply, reduced to ^C^psig by PRV-102-4 is connected to the for use . 5T cooring the nozzles. Normally, -the quench guns will be removed and purge air will provide cooling.
8. Auxiliary Fuel Supplies
Natural gas is supplied from an existing 8" header above
the storage tank walkways- It is reduced from a header
pressure of approximately 50 psig to approximately 35' psig
by pressure reducing valve PRV-102-3. It is fed to the
incinerator through a FIA approved series of safety shut
off and double block and bleed valving. Natural gas also
feeds the pilot flame. The pilot gas supply will be non-
interruptable. This arrangement of valves and special
hardware is located at ground level below the east side of
the incinerator. Gas flow is controlled by temperature
controller TRC-15 to maintain the desired incinerator
temperature. At high waste firing rates it is necessary
to manually close the gas firing valve to achieve the
desired pressure at the main gas burner.
Back-up fuel oil, for use when natural gas is interrupted, is contained in storage tank (item 114) located northeast of the incinerator area, just north of the Interim PNA department. Pumps (items 115 of 123) deliver fuel oil. to the incinerator, again through PIA approved arrangement of . safety valves and other hardware. Fuel oil flow is also controlled by temperature controller TRC-15-
9. Atomizing Steam
125 psig steam is available to the waste fuel burner and
the fuel oil burner for use as a fuel atomizer. Normally
an atomizing pressure of 70-85 psig is maintained through
the guns.
V
.
PCB-ARCH-EXT0372540
Page 17
NORMAL OPERATIONS (contd.)
.
10. Other Required Utilities
Instrument air is supplied from an existing header located on the pipe bridge from Santosite.
Plant air is supplied from an existing header located on
the pipe bridge from Interim PNA.
.
Steam for pipeline tracing is from the existing 80 psig header. Tie-in point is on the pipe bridge running across the north end of the incinerator area.
Primary electric power feeder is from Substation No. 13 with an automatic switchover to Substation No. 4 in the event of a No. 13 failure. EMERGENCY POWER FEEDS THE CITY WATER PUMPS AND THE LIGHTING AND INSTRUMENT TRANSFORMER ONLY.
11. Condensate Collection
All steam condensate discharges to a header which runs to tank (item 133)^ located on the east side of the control building at ground level.
Liquid condensate is discharged to the sewer. Flashed steam exits to the atmosphere through a Swartwout exhaust head.
12. Purge Air. System
,
Plant air has been provided to the following with separate
shut-off valves on each feed:
-
a. Incinerator Sight Ports (On east side and north end of
oxidizer).- Purge air should flow continuous whenever incinerator is in operation. (Valve ---1/2 open)
b. Incinerator Quench Nozzles (On either side at south end of oxidizer) - Purge air should be turned on when changing nozzles in a hot oxidizer. (Full open)
c. Flame Scanner Assembly (On west side of Burner Plenum) Purge air should flow continuously whenever oxidizer is in operation. (l/2 open)
d. Waste Liquid Burner - Purge air should be turned on when replacing gun in hot oxidizer. (Pull open)
e. Fuel Oil Burner - Purge air should be turned on when replacing gun in hot oxidizer. (Full open)
PCB-ARCH-EXT0372541
Page 18
NORMAL OPERATIONS (contd.) 12. Purge Air System (contd.)
;
-
f. Thermocouple for TRC (in north end of the oxidizer) Purge air should be turned on only when removing or installing the thermocouple in a hot oxidizer. '
. g. The Rayotube requires continuous, cooling. This, how ever uses instrument air, and city water cooling.
h. Pilot Assembly - Purge air should flow continuously while the incinerator is operating (valve l/2 open).
PCB-ARCH-EXT0372542
Page 19
Pre-Startup Checkout
The following pre-startup items should be checked before proceeding with initiating the startup procedure: '
1. . Well water and city water pumps are operable, - well
water pump suction valve is open and the valve
between the city H2O break tank and the selected
.
city water pump (127 or 132) is open.
2. Electrical power is on to the control panel.
3- Instrument air is on and regulated at 20 psig.
4. Pilot gas manual valves are open, except last valve
at the burner.
.
5. Main gas manual valve at the burner is closed.
6. Open the main gas valve above 118 storage, open the inlet and outlet valves at the gas meter east of quench pot (152), close the by-pass valve around the gas meter.
7. Fuel oil manual valve at the burner is closed. Also atomizing steam manual valve at burner is closed. All other fuel oil and atomizing steam manual valves are open. , 'Fuel oil gun is removed.
8. Tf startup is to be on fuel oil, align fuel oil valves at storage tank and pumps for pumping to the oxidizer. Manual shut off valve at the burner should be closed.
9. Waste liquid manual valve at the burner is closed. Also, atomizing steam manual valve at burner is closed. Manual valves at the incinerator feed pump (104) suction and discharge should be open. Atomizing steam supply valving should be open. Waste oil gun is removed.
10. Manual reset safety valves, SV-65 on the main gas;SV-67 on the fuel oil are closed.
11. Fuel gas and atomizing steam supplies are available
at the required pressures:
"
Fuel gas - 35 psig
'
Atomizing steam - 100 psig (minimum)
PCB-ARCH-EXT0372543
Page 20
Pre-Startup Checkout (contd.)
12. ' Set incinerator feed pump speed for desired waste, feed rate (1250 lb./hr. Design, 400 lb./hr. minimum).
13. Shutdown pressure, flow and temperature switches are set
at the following values:
.
(TRC-15) Oxidizer Hi Temp.
2950F. on Hi Ray
Oxidizer Low Temp. - l600F. on Lo Ray
(TS-4 & TS-5) Quench Pot Hi Temp. - 225F.
(PSL-7) Low Fuel Gas Pressure
- 7 psig
(PSH-6) Hi Fuel Gas Pressure
- 50 psig
(PS-8) Low Fuel Oil Pressure
- 70 psig
(PSL-9) Low Atomizing Steam pressure - 90 psig
(FS-10) Low Combustion Air Flow
2.5 In H2O
(PS-38) Low Well Water Pressure to 4D
Contactor Tube
. - 0O psig
(FS-37) Low Recycle Flow to Venturi
8 GPM
(FS-127-2) Low City Water Flow to - 12$
Contactor Wier
(PAL-104-6) Lo Waste Flow - 2.5 psig
.
PCB-ARCH-EXT0372544
Page 21
VI. Normal Startup
^
.
A. Well Water to Scrubber
'
.
1. Open inlet and outlet valves to either upper or
lower well water strainer (use only one strainer
on stream at a time).
'
.
'
'
'
2. Open outlet valve to the flow indicator (FI 88)
to the packed scrubber column (154), be sure the
by-pass valve at flow indicator is closed.
3. Open pump discharge valve and start well water booster pump (112).
4. Slowly open and adjust inlet valve to flow indicator (FI-88) to set flow at 70 gpm.
5* With by-pass valve open in scrubber column over
flow line, check for discharge flow.
.
.
6. Close by-pass valve to establish level in scrubber
column. Check for proper overflow.
B. Control Panel Power
1. Turn on master power switch on the control panel
to activate the system. The RED "Low Oil Pressure"
light, the RED "Flame Failure" Light, the WHITE
"Power On" Light, and the RED "Quench Pot Low
. Water Level" lights will be lit. The remote
flame failure alarm and panel alarm horn will be
.
energized.
,
2. Depress "Alarm Silence" button to cut off alarm.
C. Well Water to Quench Column
'
1. Open valves to lower 5 spray nozzles at quench column (151).
la. Close valves to top 5 sprays.
2. Open outlet valve and close by-pass valve at flow indicator (FI-87) to quench column (151)
3. Open inlet valve gradually and set flow at 30 gpm with
80-100 psig.
'
PCB-ARCH-EXT0372545
Page 22
`&
VI. Normal Startup (.contd.)
C. Well Water to Quench Column (contd.)
.
.
4. Low pressure by-pass valve on quench pot over
flow should be open.
D. City Water to Weir
.
1. City water break tank (126) is full (low level
alarm is out). .
,
2. Automatic fill system (LCV 126-2) is operating.
3. Open valve from flow indicator (FI 127-8) located west of combustion air blower motor., (150) and close by-pass.
.
4. Open discharge valves above selected pump (127
or 132) and start, pump. Water is then circulating
back to the break tank.
-
5. Slowly open valve to flow indicator (FI 127-8'). This will establish approximately 20-30 gpm*of, city water to weir ring on the quench columnar (151) ^25-40$ on gauge)
E. Combustion Air-
1. Open blower damper ^'1/3 open. .
1
.
'
'
.
2. Start -combustion air blower.
3. Close low pressure by-pass valve on quench pot over
flow, when water level rises sufficiently.to- begin
flowing out.
.
'
.
.
4. Run the blower under these conditions for a minimum
.
. of one hour.
F. Venturi Circulating System .
1. Open the inlet valves to the scrubber circulating pump (106) and the block valves at the .bottoms of
. the quench pot (152) and packed scrubber column (154).
2. Open the discharge valves on the circulating pump
discharge1.
.
"
3. Start circulating pump (106).
PCB-ARCH-EXT0372546
Page 23
Normal Startup (contd.)
F. Venturi Circulating System (contd.)
4. Throttle the regulating valve below the mag flow meter (FT 102-2) to set the desired recirculating rate to the Venturi (50 gpm at 55 psig pressure).
5. Recheck well water flows to quench column and
scrubber column.
6. Check quench pot level control. (LC 92). LCV 8l . should be controlling-, High and low quench pot level alarms should be out. No water should be draining from low pressure by-pass.
G. Purge'
1. Establish purge air to all nozzles protruding
into the incinerator (102),
qpe*'
r
*
2. Depress RED reset button on the "High Quench Pot Temperature" switch.
3. Turn the TRC switch on the control panel to "ON", push RED button on TRC until position meter reads 0%.
4. Thermal couple should be in place. Position the
TC-Loray-Hiray switch to T.C.
.
5. Depress "Purge Start" button, lighting the BLUE "Purging Light" and energizing the Purge Timer (3 minutes). After timing out, the AMBER "Purge .Complete" light and WHITE "Relay Hot" lights come on and the BLUE light goes out. Power is now available to the burner system.
6. Allow a minimum of 10 seconds for the "Flame Scanner" ' to. warm up, then Open the Manual Pilot Gas Valve at the Burner. (South end of incinerator.)
H. Firing on Natural Gas
.
.
.
. 1. Turn gas combination oil selector switch to GAS.
Be sure' manual valve on the Main Gas Line is closed
. at the burner.
2. Depress the "Ignition" pushbutton and hold in until pilot is lit.
PCB-ARCH-EXT0372547
Page 24
Firing on Natural Gas (contd.)
3. If the pilot flame is established within 20 seconds,
the GREEN "Pilot Proved" light is lit and the RED
"Flame Failure" light goes out. Release the "Ignition"
button 1-2 seconds after the GREEN light comes on. If
depressed more than 20 seconds, the purge cycle will
have to be repeated.
.
*
4. When the Flame Scanner picks up the pilot flame .the GREEN "Gas Burner Ready" light comes on.
5. Allow the temperature to line-out while firing pilot only.
6. Manually latch OPEN the first Main Gas Manual Reset
Valve SV-65.
.
.
`
7. Gradually open the manual gas firing valve until main burner ignition. JMonitor flame from sight ports. Allow burner to stabilize and note light off temperature. Hold light Off temp, as low as possible maintaining a stable flame. This will require 5-10 psig gas pressure. Increase oxidizer temp, following the refractory cure
. sequence by opening the manual firing valve until the valve is full open.
.
t-
8'. The automatic gas valve has a minimum stop which allows
10-12# gas pressure at the burner with the manual firing
valve full open.
.
9. With the TRC output gauge zero'd,place the set point slightly below the operating temp.
10. Open solenoid valve SV-60. SV-60 will manually latch open 180 seconds after the manual reset solenoid is opened.
11. Switch the TRC to. "Automatic". This puts the system
in a high fire condition.
12. When the quench pot temperature has increased to 170F.
^\o>a\'{ open the upper spray ring (5 valves) in the quench column.
^ Cv&iAl
h
Us
1</J
6
}
13.. During warm up it will be necessary to open the fan
damper to maintain the 25$ excess air content to the
burner. (4$ Og on the analyzer or Fyrite).
PCB-ARCH-EXT0372548
Page 25
Firing
Incinerator Heatup Procedure
TIME-HOURS
'
OXIDIZER TEMPERATURE (Maximums).,
0-1
Raise to 500F.
1 -4
Hold at 500F.
4-5
Raise to 600F.
5 - 6
Raise to 800F.
6- 7
Raise to 1000F.
7-8
Raise to 1200F.
8-9
Raise to l400F;
'
9 - 10 Switch to Lo Ray Raise to l600F.
10 - ll
Raise to l800F.
11 - 12 Switch to Hi Ray Raise to 2000F.
12 - 13
Raise to 2200F.
13 - 14
Raise to 2400F.
14 - 15
Raise to 2600F.
A slower heat-up is desirable to prolong incinerator
brick life.
,,
HOT STARTUP AFTER TEMPORARY SHUTDOWN '
Over a period of 30 minutes, gradually increase the temperature to 1000F. Hold this temperature for one hour.- Gradually increase to 1200F. over a one hour- . period. Gradually increase to l400F. over a one hour period. Gradually, increase to l600F. over a one hour period. Switch to Lo Ray. Gradually increase to 2000F. over a one hour period. Switch to Rayotube before proceeding. Gradually increase to 2200F. over a one hour period. Gradually increase 2400F. over a one hour period. Gradually increase to 2600F. over a one hour period.
Notes
'
.
a. For operating temperatures up.to and including l600F. the temperature sensor is thermocouple (Item 18).'For " operating temperatures above l600F. up to and.including 2700F. the sensor is the Leeds and Northrup Rayotube-1.
b. There is a 3-position selector switch on the control panel marked TC- LO RAY HI RAY. This switch should be set on TC when operating up to l600F., LO RAY from l600F. to 2000F. and HI RAY from 2000F. to 2800F.
c. A Honeywell system is provided with a flame scanner
operating on the pilot flame. Loss of pilot flame
.
shuts down all fuel to the incinerator.
PCB-ARCH-EXT0372549
Page 26
Waste Peed
'
.
1. Select storage (117 or 118) to be Incinerated. Open proper outlet valve. Position 3-way valve (w/air 117
or w/o air 118).
2. The incinerator must be at least l600F. before wastes
can be fed (on LO RAY scale).
.
3. ` Wastes containing Montar are to be burned at 1900-2000F. Other wastes are to be burned at 2000-2700F.
4. Insert waste gun,
5. Be sure the manual valve on the waste feed line at the furnace is closed. Then open the manual atomizing steam valve at the burner. Pressure on the gage should be 60-70 psig.
6. Depress the "waste- start", pushbutton on the panel. This opens flow control valve FCV-80 in the waste line and makes waste liquid available at the manual valve.
7. Start waste pump. (104)
8. Increase air damper setting to give 8-12$ 02.
9* Lower TRC set point below operating temperature
(gas valve goes to minimum stop).
.
10. Set PC-104-3 setpoint to minimum.
.
11. Slowly open the manual valve admitting waste to the burner.
12. Trim up waste and steam flow to desired rate over 1/2 hr.
period. Holding steam pressure to a minimum of 15# over
the waste feed pressure.
13. AS more waste is brought on the main gas pressure must, be reduced to maintain 4-6$ O2
PCB-ARCH-EXT0372550
Page 27
Normal Startup (contd.)
K.
<
Switch from Natural Gas to Fuel Oil
*
-
*
"
.......... " ....................... ........... ............
' -------------------------------
. .
1. Stop waste flow to burner by depressing WASTE STOP button.
.
2. Insert fuel oil gun.
3. Open the manual valve at the burner admitting atomizing
steam. Set pressure at 60-70 psig.
#
4. Be sure fuel oil pump is running and valving is set to deliver fuel- oil to the burner. The manual valve at the burner
. should be "closed". Must have steam to PSL-9 also.
5. Turn GAS-OIL-COMBINATION selector switch to COMBINATION
.
position. Amber"Fuel Oil Ready" light will come on..
6. Lower TRC 15 set point to close the gas control valve (FCV 79) to minimum stop.
7. Manually latch OPEN.the Manual Reset Fuel Oil Valve (SV-67) and slowly open the manual fuel oil' valve at the burner to give 45-55 oil pressure at gun.
8. Both gas and oil are now being- fed to the incinerator at
the minimum stop rates,
.
'
9.. Turn 3-WAY selector switch to "OIL". Natural gas flow will shut off. The oxidizer is now operating on OIL only. - /
10. Slowly operate manual oil firing valve fully. This
activates the low-fire timer. ,
*
)
.
-
.
11. After the timer times out SV-6l may be latched open.
12. Return the system to automatic control.
13.' Reset TRC to desired temperature.
14. Re-establish waste- flow by depressing the WASTE START
button and starting pump. (104) Use procedure similar
,
to gas firing.
15.. Close manual valve in natural gas line at the burner.
PCB-ARCH-EXT0372551
Page 28
NORMAL OPERATIONS . ( contd..) L. Switch from Fuel Oil to Natural Gas
1. Stop Waste flow to burner by depressing WASTE STOP button.
2. Turn GAS-OIL-COMBINATION selector switch to the COMBINATION
position.
'
Check that the manual main gas valve at the burner is closed.
3. Lower TRC 15 set point to minimum stop on the oil control
valve. (FCV 78)
.
4. Manually latch OPEN the main gas Manual Reset Valve SV-65.
Also slowly open the manual valve in the main gas line at
the burner.
.
5. Both gas and oil are being fed to the incinerator.
6. Turn 3-WAY selector switch to GAS. The fuel oil will shut off. The oxidi-zer is now operating on GAS ONLY.
7- Return unit to automatic control.
_ 8. Reset TRC to desired temperature.
9. Close manual fuel oil valve at the burner.
10. Close manual atomizing steam valve at the burner.
11. Steam and remove fuel oil gun.
12. Shut off fuel oil pump.
13. Restart waste feed to incinerator.
PCB-ARCH-EXT0372552
CHECK LIST FOR INCINERATOR STARTUP
DATE:
;
t
.
. Page 29
.
Step
. .
.
.
1. Pre-startup
:
. A. Utilities Available
.
l) Electrical power
.
2) Steam
;
x
'
3) Well Water
4) City Water '
5) Instrument Air
6) Plant Air
7) Natural Gas
B. Manual Valves at Incinerator
Closed
1) Pilot Gas
.
2) Main Gas
3) Waste Peed
4) Atomizing Steam
` 5) Fuel Oil .
6) Quench Water
. '
C. . Power to Control'Panel
D. Well Water Systems
1) Align Valves
.
.
2) Start Pump
3) Set Flows
E. Venturi Circulating System
'
'
l) Align Valves
. .
.
2) Start Pump
...
... 3) Set Flow
4) Check levels.
.
Time
OPERATOR
.
. .
. .'
'
.
,
.
'
.
________ _ _ . .
________ ". _________ __________
___________
; .
PCB-ARCH-EXT0372553
Step
. -
,
P. City V/ater System
. l) Align Valves
. 2) Start Pump
3) Set Plows
6. Combustion Air
1) Set Butterfly
'
2) Start Blower
'
H. Temperature Controller
1) TRC On
2) Thermocouple
_ 3) Selector Switch
4) Control Valve Closed
I. Purge
,
J. Pilot
,
1) Manual Valves Open
.
2) Ignition
3) Pilot Proved
K. Fire Main Fu.el
1) Open Manual Valves
.
2) Reset Solenoids
.
3) Raise temperature slowly
B. Fire Waste
1) Align Valves
2) V/aste Start
.
3) Start Pump
. ..
Time
Page 30 Operator
'
_
. _
________
_________
'
. "
_j____
_______ _
' '
_________ _____________
___ ;_____ _____ ___
.
-
/
'_________ _____________
_
PCB-ARCH-EXT0372554
Page 31
VII. SHUTDOWN PROCEDURES A. For Extended Downtime
A normal shutdown will be one which is unforeseen due to lack of waste material for incineration, mechanical turn arounds, pre-scheduled mechanical work or any situation which will allow time for a safe and orderly shutdown of all equipment. It is important that outlined procedures be followed to assure operator safety and to minimize the risk of damage to operating equipment.
1. Shut off flow of waste liquid to the incinerator (Item 102) by depressing "WASTE STOP" push button on the control panel. This will close the flow control valve (FCV-80) in the waste feed line just to the south of the control panel.
2. Reduce air by closing damper to -""-'1/2 open.
3. Close manual waste shut off valve at south end of incinerator (item 102).
4. The (Moyno) waste feed pump (item 104) located at
ground level between storage tanks #116 and #117
will stop automatically when the flow control
valve (FCV-80) closes.
.
5. Open crossover steam to the waste gun to steam out trapped waste to avoid charring and'gun plugging.
6. Stop atomizing steam flow to the incinerator by manually closing the valve located on the incinerator platform. .
7. Pull the waste gun.
8. Decrease incinerator temperature gradually to 1000F. This is done by periodically lowering the temperature
recorder controller set point (TRC-15)* Do not exceed 200/hr. rate of reduction. The TRC is located in the control.panel.
9. Once minimum stop is reached on the control valve, the manual gas firing valve must be partially closed to reduce gas pressure ( *--- l#/hr.)
10. When the incinerator temperature (TRC-15) reaches 2000F. set the selector switch to Loray.
11. When the incinerator reaches l600F., set the selector
switch to TC.
.
PCB-ARCH-EXT0372555
Page 32
VII. SHUTDOWN PROCEDURES (continued)
A. For Extended Downtime ('continued) '
12. When incinerator temperature has been reduced to 1000F. hold for at least sixty (60) minutes. Monitor periodically to see if temperature is remaining constant.
13. Close the main gas or fuel oil manual shut off
.
valve at the incinerator. These are located at south
end of incinerator on-second level platform.
14. If burning fuel oil at the time of shutdown, close the manual atomizing steam valve at the incinerator after temperature has been reduced to 1000F. and held.for sixty (60) minutes. Use cross over steam to blow gun.
.15-
If burning fuel oil shut down the fuel oil pump (Item 115 the south pump or Item123 the north pump). These pumps have manual on/off switches which are adjacent to the pump. The pumps are located west of fuel oil storage tank (Item 114) next to Area 9 shop.
16. Continue to burn pilot until temp, levels off.
.17. Close the manual pilot gas valve at the south end of the incinerator, when pilot is cut off.
N'
18. Turn off top five sprays to quench column when
temp. <(500F.
19. Cut back on combustion air flow to incinerator by throttling butterfly valve. Maintain minimum combustion air flow. Variables such as outside temperature will be a factor in the cooling rate of the incinerator.
20. The combustion air blower will always be left on
until the incinerator temperature drops to 300F.
When 300F. has been reached shut down blower by
depressing blower "OFF" button.-
.
21. Open the low pressure by-pass valve at the quench
pot if level permits.
.
22. Close the manual gas valves at the meter and south
of the control panel.
-
PCB-ARCH-EXT0372556
Page 33
VII. SHUTDOWN PROCEDURES (continued) A. For Extended Downtime (continued)
23. With incinerator temperature 150F. or lower, stop
the well water pump. Close manual valves at pump, to scrubber column, and to quench column.
2.4. After fire water timer has timed out, stop city water
.
to weir. Close manual valves at pump and to weir.
25. Stop circulating pump (106) and close valves to ' Venturi.
26. Drain quench pot and scrubber to sewer.
.
27. Close manual valves at quench pot and scrubber column.
28. Turn "Master Power Switch" on panel tq OFF.
29. In winter drain water in all trapped piping legs.
Also close city water to break tank (126) and
drain.
B. For Short Term Downtime
.
This procedure will be followed for shutdowns of several days or less. It is assumed mechanical work or other short term outages will allow the resumption of operations without going through extended shut down procedures. It is important that these procedures be followed to assure operator safety and to minimize the risk of damage to operating equipment.
1. Shut off flow of waste liquid (Aroclor) to the oxidizer (incinerator Item 102) by depressing "Waste Stop" push button on the control panel. This closes the flow control valve (FCV-80) in the waste feed line just to the south of the control panel.
2. Close manual waste shut off valve at incinerator
(item 102). This is at south end of incinerator
on second level platform just above the floor
*
plate.
.
PCB-ARCH-EXT0372557
Page 34
VII..SHUTDOWN PROCEDURES (continued)
,B. For Short Term Downtime (continued)
3. The (Moyno) waste feed pump (item 104) located at ground level between storage tanks #116 and #117 will stop automatically when the flow control valve (FCV-80) closes. ..
4. Blow waste gun and pull. '
5. Decrease incinerator temperature gradually to l600F. The same procedures should be followed as for an extended shut down.
6. If shutdown is expected to last less than twenty-four
(24) hours allow the unit to operate at 2000F. This
.
will require less heat up time when operations resume.
7. If shutdown is expected to last over twenty-four hours and/or up to 7 days* reduce the incinerator temperature to l600F. and al-low the unit to continue operating.
8. Supervision will direct further shutdown.procedures..
C. Temporary Hot Shutdown Procedure
1. This thermal oxidizer system has been equipped with a corrosion liner of polyester material. This liner
, may be damaged if extreme care is not taken during temporary shutdown periods.
2. Shut off all waste flow and purge out and pull the
waste guns.
.
3. Reduce oxidizer temperature to the lowest point time
will allow.
.
.
4. Increase weir water flow to maximum.
.
5. Shut off fuel to the main burner and pilot.
6. Close damper to l/3 open on the blower.
7. Close off the upper 5 quench spray block valves.
8. Shut off blower and close blower damper.
This type of shutdown is intended to be used when short term repairs or adjustments are to be made.
When the down time is to exceed one hour a normal shutdown should be used.
PCB-ARCH-EXT0372558
Page 35
VII. SHUTDOWN PROCEDURES (continued)
D. Emergency Shutdown Procedure
This procedure is used to shut down and render the unit
safe in any emergency situation, where personal injury
is threatened. Emergency conditions may be such things
.
as a minor explosion. This shut down should not be used
unless absolutely necessary.
1. Cut electrical power to the unit by turning off the
"Master Power Switch" on the control panel which is
located under the incinerator (item 120) at ground
level.
.
2. By turning the "Master Power Switch" to the off position there will be a loss of power on all controls and they will go to a fail safe condition. The following will then occur:
a. Main Gas - Closes and vents
b. Fuel oil - If in use will close
c. Pilot gas - Closes and vents
.
d. Waste liquid (Aroclor) - Closes, and pump stops -
e. Combustion air blower - Stops
f. City water to weir continues
.
,
g. Well water to quench column and scrubber column
continue. Damage to the incinerator brick will
..
occur unless the top 5 sprays are closed..
.
h. Circulating water to Venturi continues,
i. Fire water to weir starts
\
3. If prevented from reaching the control panel, the same emergency shut down results may be obtained by throwing the main control panel disconnect at the
. motor control center which is located on the second level above the control room.
4. If time and conditions permit (l) close the 5 quench column sprays, (2) close damper, and (3) close the
. manual valves on natural gas or fuel oil lines. Also close the manual valve in the waste liquid (Aroclor) line.
a
(
........... .................................... .............................. PCB-ARCH-EXT0372559
VII, (Cont'd) CHECK LIST FOR NORMAL SHUTDOWN
Step
.
Time
A. Stop Waste
_____________
1) "Waste Stop" Button
.
2) Pump Stops
3) Close Valves
4) Blow Gun
5) Remove Gun
B. Gradually Lower Incinerator
,
Temperature
_____________ ...... ...............
1) 200F,/Hr. Rate of Decrease
2) Selector Switch
3) Thermocouple
.
C. Main Fuel
_____________
1) Gas or Oil
2) Hold at 1000F.
3) Close manual valves
D. Combustion Air
____________
1)> Adjust Butterfly 2) Stop at 200F.
3) Open By-Pass
E. Well Water
_____________
1) Stop pump at 150F.
2) Close Valves
F. Circulation Pump
_____________
1) Stop Pump
2) Drain Equipment
3) Close Valves > . ' .
.
Page 36
Operator __________
__________ ' '
________ __
__________
__________ __________
PCB-ARCH-EXT0372560
VII. (Cont'd)
CHECK LIST FOR NORMAL SHUTDOWN (continued)
Step
Time
Page 37 Operator
G. City Water
1) Timer
2) Stop Pump
3) Close Valves
H. Cut Control Panel Power
_____________ _________________ .
p
PCB-ARCH-EXT0372561
Page 38
VIII. MATERIALS HANDLING
A. Instruction for Material in Drums and Disposing of
Empty Drums
.
.
.
Aroclor in drums will be delivered by the Warehouse Department to Dept. 831 via Stradolift. All full drums will be handled by fork lift or drum hoist, to be dumped or pumped into the drum unloading sump. Careful handling of material is very necessary to minimize any spills. The following instructions will be followed:
1. All drums delivered to area must be gas tested . before unloading from pallet.
2. Any drum that is more than 0.1 on the gas tester is considered a flammable drum. Each flammable drum is to be dumped with at least six (6) drums that are not flammable.
'
3. A live steam drum heater is provided for any drum that will not pour freely. This is determined by sticking each drum with a rod that is provided. Do not heat any flammable drum.
4. Position drums on conveyor, using drum snatcher,
that fits over the forks of the lift truck.
.
5* After conveyor is full, dump each drum one at a .
time using drum hoist.
6. A pump (l60) is provided at the drum unloading sump to permit pumping of drums containing lighter materials.
7. The valves should be lined up to the selected tank and the sump pump (119) switched to automatic.
8. Replace all bungs in drums. '
9. Empty drums will be stacked neatly in area designated
.
by supervision. Remove drums by placing on pallet
moving four (4) at a time.
.
PCB-ARCH-EXT0372562
Page 39
VIII* MATERIALS HANDLING B. Loading and Unloading of Trailer
Some waste material will be received in tank trailer. In addition it will be necessary to load some tank trucks for picking up montars at Department 246.
Loading
These instructions begin after tank trailer has been spotted in department,
1. Attach ground cable to trailer.
2. Have driver cut motor on trucks set brakes and chock wheels. If trailer is dropped, place stand under front end of trailer.
3. Attached flexible hose from loading dock to quick coupling that is provided on top of trailer.
4. Measure tank and align all valves in line for pumping waste Aroclor to tank truck.
5- Start pump (ill).
6. Pump approximately 2000 gallons of waste material
from desired storage tank to's,trailer.
.
7. Stop pump, close all valves in line. Allow flexible hose to drain (5) five minutes to trailer. Secure hose.
8. Remove grounding cable. If tractor is attached to
trailer remove chocks. Notify driver that trailer is ready for delivery.
Unloading
The following instruction begins when after a truck has been spotted for unloading.
1. Attached ground cable.
.
2. Have driver shut off motor, apply brakes, and set cocks.
PCB-ARCH-EXT0372563
Page 40
VIII.
MATERIALS HANDLING (continued)
.
B. Loading and Unloading of Trailer (contd.) Unloading (continued)
3. Connect hose from unloading pump to bottom of trailer.
4. Align valves in line for unloading of trailer to
. .
storage tank #118.
5- Be sure trailer is vented by opening fume nozzle on top of truck.
6. Start pump (ill) and begin unloading.
7. When truck is empty, pressure will decrease on pump- as indicated on pressure gauge (PI-lll-l).
8. Stop pump and measure tank.
9. Close all valves--in line.
10. Secure truck and trailer, notify driver that empty truck is ready to be removed.
C. Instructions for Unloading of Tank Cars
. Some waste material will be received in tank cars. These cars will be spotted on Track 7 at Phenol unloading dock for unloading. Precautions must be taken to avoid any spills. If spills occur, there is a trench sewer and sump equipped with pump for pumping waste material to storage tank. To assure:a safe operation, the following instructions are to be followed:
1. Hang blue track fiag on semaphore.
2. Hook up ground connections and place wheel chocks . in place.
3. Open dome vent. Remove dome cover.
4. Connect flexi hose to standpipe.
* 5** Gas test car.
6. Open hand valve at suction side of pump
7. Close drain in bottom of line at pump.
'
8. Be sure line from sump is locked out.
PCB-ARCH-EXT0372564
Page 4l
VIII. MATERIALS HANDLING (continued)
.
C. Instructions for Unloading of Tank Cars (contd.)
9. Open valves in discharge line to desired storage
tank. Check to be sure all other valves are
. closed.
.
10. ,Measure storage tank to be sure enough room is available to hold car.
11. Hold switch in "ON" position until enough line pressure will let pump run until low pressure again shuts down pump.
-
12. Disconnect car., close valves, secure track and
measure storage tank.
PCB-ARCH-EXT0372565
c Vi
V
-Sf
<
PCB-ARCH-EXT0372567
(7) : <|) ' (?) <S>
(gU ' .....
0,.
m
Page 44
11
-
Cs) (fe'i
\\ /
0
V-^-V-
V28>
--VZi-Jzc~'.J.\l
"1. Quench pot high temperature indicator
2. Venturi circulating liquor flow indicator
3. Combustion air pressure gauge 4. Temperature recorder controller
5. Temperature recorder controller s off/on switch
6. v Thermo-couple-Lo Ray-High Ray selector switch
7. Master power off/on switch. 8. White light indicating power on 9. Blue push button to start purge 10. Blue light indicates purging 11. Amber light indicates
purge complete. 12. White light indicating relay
hot 13. Selector switch for gas-
Combination-Oil 14. Green light indicates gas
burner ready. 15. Amber light fuel oil ready 16. Black push button for ignition 17. Green light indicates pilot
proved.
18. Red light indicates flame
failure 19. Red push button to stop waste 20. Green push button to start
waste 21. Red light indicates quench pot
low leve1 22. Red light indicates quench pot
high level 23. Red light indicates low oil
pressure 24. Orange push button to silence
alarm 25. Green push button to start
blower 26. Red push button to stop blower 27. Red light indicates city water
break tank low level 28. Hi-Low Combustion air flow
switch 29. Red light indicates city water
low flow 30. Timer for purge 31. Timer for ignition 32. Timer for low fire time delay 33. Timer for fire water time delay
PCB-ARCH-EXT0372568
Page 45
ALARM PANEL
FLAME FAILURE
- '
LOW COMBUSTION AIR
QUENCH POT
HI/LOW
!
LEVEL
LOW WASTE FLOW
CITY WATER BREAK TANK LOW LEVEL
ALA RM TEST AND SILENCE PUSH BUTTON
AROCLOR SUMP HIGH
LEVEL
CITY WATER LOW FLOW
LOW
VENTURI
. FLOW
1
GAS PRESSURE SHUTDOWN
OIL/AIR SHUTDOWN
LOW QUENCH COLUMN WATER
HIGH TEMP. SHUTDOWN
PCB-ARCH-EXT0372569
Page 46
''rocess Area Variable Or Description of Paraneter As It
r Step
Parameter Affects Safety, Quality, Yield
Rate Or Other
L.Water flow rate (FI 127-8) to weir.
Indicates city water flow rate to quench column weir.
Range For Best Frequency
Known Process
nitc
Performance
35 * 5%
Hourly by operator.
?.Water flow Indicates well water flow rate to 85 rate (FI 8?) quench column sprays.
to quench
column.
Hourly by operator
3.Water flow Indicates well water flow rate to rate* (FI 88) scrubber column distribution to scrubber header.
70 + 10 gpm
Hourly by operator.
^.Liquor flow Indicates circulating liquor flow 55
rate
rate to venturi scrubber
(FI 106-2)
to venturi
Hourly by operator.
5.Pressure
Indicates pressure of the quench
(PI 82) in pot.
quench pot
80 + 5 in H20 Hourly by operator.
3. Temperature Indicates temperature of the (TISh) in quench pot. quench pot
205 + 5F
Hourly by operator.
7.Level
Indicates liquid level in quench
(lc 92)
pot.
of quench p 3t
(9^2 PSIcf!>
Hourly by operator
3. Pressure (PI 56) of combustion air1
Indicates discharge pressure from combustion air blower.
30 * 5 in H2O
Hourly by operator.
?.Tempe rature Indicates temperature of the gases 2000j25F w/
(TRC 15) of in the discharge end of the
Montar6;w/
the incin- incinerator.
Aroclor6
e rator.
(2200-2600)
Hourly by operator
Measurement of Variable
?requency - Method
Accuracy
Continuous Magnetic +1% rotameter
A-
Continuous Annoured + 1.2 gpm rotameter
Continuous Armoured rotameter
1.5 gp
Continuous Magnetic + .8 gpm flowmeter
Interaction With Other Variables
How Control Variables
F S 2
3 power
4
5
Opens
Adjust manual valve.
F 38 1 2
3 4
Adjust manual valve. .
Adjust manual valve.
Comments Needed for cooling Hast.C quench column; 1'% = -75 gpm
Needed to quench the hot gases and protect the polyester lining.
Jeeded as final scrubber to remove UC1.
F feed.
Adjust manual valve.
Needed to scrub particulate matter.
Continuous Pressure
1 in H2O
l
gauge
c
t
s
Adjust air-fuel rates to incin erator.
Continuous Iron
^5F 4
< :onstantan
thermocoup! .e
l
]
power
f
1.Control incin erator temp.
2.Manual adjust water flows
High temp, can dama* the polyester lining.
Continu ous
Liquid level displacer
+ 1 PSIG
J t .Low level alarm
Automatic control loop to LCV 81
1.Highrexcessive back pressure;effect on quench potj
Continuous Magnehelic pressure gauge
* 1.5 in HgO
Continuous <1600F PlatinumRhodium thermo couple
+8F
]I.FSl 10 cuts
Adjust manual
incinerator power butterfly valve
Orsat analysiis to get 25^ excess air at
maximum firing rate;
of incinerator
equivalent of 4% O2
pressure
.CS 18-76^-uts power tcf/incin-
Adjust setpoint on High temp, or sudden TRC 15;modulates changes can damage
erator b
the auxiliary fuel the refractory.
1
rates
waste liquid feed
>1600F Rayotube
_^8F
PCB-ARCH-EXT0372570
'
XII. KEY VARIABLES
** * .
'
VARIABLE LISTING
CITY WATER
Page 48
Item
Name
Function
PSL 126-1 PA 126-1
Pressure switch/alarm on air to city water make-up LCV.
Sounds alarm on low city water level in break tank (126); and lights red |. light on control panel (CP) and alarm in control room (CR).
LE-126-2 LC-126-2 LCV-126-2
Level control loop on ~ Measures level of water in break
city water break
tank' (126) ; adds city water as
tank.
needed; valve is ATC.
PI 127-1
Pressure indicator on city water pumps discharge.
Measures pump condition and pressure available to weir (also emergency water).
SV 127-5
Solenoid valve in city water recirculation to break tank.
FSl 127-2 ^ Flow switch/alarm on_.
FA 127-2
city water to weir.
Closes on low city water flow (FS 127-2).
....Lqw flow: 1) opens fire water solenoid (SV 127-7); 2) sounds alarm, lights red low flow city water and alarm in CR; 3) cuts power to flame safeguard system, 4) cuts power to air blower.
FI 127-8*
Rotameter in city water line to quench column.
Measures city water flow to quench column weir,
FO A22-4
city ^ ' Restricts normal city water flow
""water to weir.
quehdfi'"ddllton weir.
SV 64
Solenoid valve in emergency city water to weir.
Opens on low well water flow (FSr 38) to quench column; also on 1) high incinerator temperature (TS 18-76H) or, 2) high quench pot temperature (TS 4fi or TS 5H).
PRV-127-9
Pressure regulator on city water to weir.
Reduces city water pressure from pumps to prevent back-up into fire water system.
WELL WATER
PI 112-1
Pressure indicator on . discharge of well water booster pump. .
Measures pump condition; with PI 112rmeasures pressure drop across strainers
Denotes key variable.
................
.....................................
.
PCB-ARCH-EXT0372572
XII. KEY VARIABLES (Cont'd)
FIRE WATER
Item
Name -
* SV 127-6 'Solenoid valve in back up fire water line.
/
* SV 127-7 -'Solenoid valve in back up fire water line.
Page
Function Opens on proof of pilot (BE 2); loss of pilot actuates timer to close; FLP. Opens on low city water flow (FSl 127-2); FO.
CIRCULATING SYSTEM
PI 85
~v
Pressure indicator on circulating liquor to venturi scrubber.
FI 106-2***Flow indicator in cir culating liquor to venturi scrubber.
FSl 37 J Flow switch in circu lating liquid to venturi scrubber.
Measurement of pump performance; measures pressure of circulating liquid to venturi scrubber.
Measures flow of circulating liquid to venturi scrubber.
Low flow:,l) closes waste valve (FCV 80); 2) stops Moyno pump (104); and 3) activates alarm panel in CR.
QUENCH POT
PI 82
Pressure indicator in
. vapor space of quench
pot.
J TISh 4* Iroh-constantan thermo'
S'
couple/switch in vapor
space of quench pot.
TSH 5 >/ Chrome1-alumel thermo couple/switch in vapor
, space of quench pot.
LC 92*
Level controller for quench pot liquid level.
Measures pressure in quench pot; indirect measurement of pressure drop across venturi and scrubbing column.
High temperature: 1) cuts power to flame safeguard system, 2) opens emergency city water solenoid (SV 64), and activates alarm panel in CR.
Same as above.
High level opens LCV 81; low level closes LCV 81; air signal directly indicates quench pot level.
*Key Variable.
**When open, a fire alarm (3-4) is automatically turned into the powerhouse.
PCB-ARCH-EXT0372574
XII. KEY VARIABLES (Cont'd)
Page
61
NATURAL GAS
Item
Name
FQ 102-1 Accounting meter for natural gas usage.
PRV 102-3 Pressure reducing valve for natural gas to the incinerator.
PSL 7 J Pressure switch on the
'
natural gas to the
incinerator
FCV 79
Flow control valve in natural gas to main . burner.
SV 60
Manual reset solenoid valve in air to FCV 79 (natural gas control valve).
SV 66 <J Solenoid valve in
natural gas to main burner.
SV\62 J
Solenoid valve in vent of natural gas between block valves to main burner.
SV 65 PSH 6
^ Manual reset solenoid valve in natural gas to main burner.
J Pressure switch in
natural gas to main burner.
PI 51
Pressure indicator on natural gas to main burner,
PRV 83
Pressure reducing valve in natural gas to pilot.
Function
Measures natural gas usage for optimization and accounting.
Steps down the natural gas header pressure to the required pressure (35 PSIG) for feeding the incinerator
Low pressure (on either oil or gas) cuts power to flame safeguard system and activates alarm panel in CR.
Modulated by incinerator temperature controller (TRC-15); low temp, opens; high temp, close; ATO valve; valve equipped with minimum stop positioner
1) On flame failure vents air to
-
FCV 79 (valve closes);
2) prevents firing main gas until
timer times out following proof of
pilot and opening SV 65.
Closes on flame failure; first valve of double block and bleed; cannot open until proof of pilot.
Opens to vent natural gas on flame failure; cannot close.until proof of pilot.
Closes on flame failure; second of DB&B; must be manually reset follow1 ing proof of pilot when on gas.
High pressure cuts power to flame safeguard system when on gas, and activates alarm panel in CR.
Measures pressure of natural gas available to main burner; may indicate gas rate.
Steps down natural gas pressure to /~10 PSIG for pilot gas.
PCB-ARCH-EXT0372576
XII. KEY VARIABLES (Cont'd)
NATURAL GAS (Cont'd)
Item
Name
PI 54
Pressure indicator on
t. ^
natural gas to pilot. '
SV 57-1 J Solenoid valve in
natural gas to pilot.
SV 58 l/ Solenoid valve in vent of natural gas between
SV 57-2 ^ Solenoid valve in . natural gas to pilot.
PI 102-5 Pressure indicator in natural gas at meter.
PI 102-6 Pressure indicator in natural gas.
Page
53
Function
Measures natural gas pressure avail able to pilot. Closes on flame failure; first valve of double block and bleed; opened during ignition. Opens to vent natural gas on flame failure; closed during ignition. Closes on flame failure; second of DB&B; opened during ignition. Measures pressure of gas passing through meter. Measures pressure of gas .downstream of PRV 102-3.
FUEL OIL*
L1 114-1 Level indicator on fuel oil storage.
PI^115-1 Pressure indicator on
discharge of fuel oil
pumps.
PCV 123-2/pressure control valve
on discharge of fuel . oil pumps.
PSL 8 / Pressure switch in fuel
' oil line to incinerator.
FCV 78 Flow control valve in fuel oil to inciner ator.
Measures level of #2 fuel oil in storage.
Measures pump condition and operation
of PCV 123-2.
.
.
Relieves excess pressure/volume from discharge of fuel oil pumps to storage.
When.burning oil low pressure cuts power to flame safeguard system and activates alarm panel in CR.
Modulated by incinerator temperature
controller (TRC-15); 1) temp, below
set .point - valve opens; .2) temp,
above set point - valve closes;
ATO valve.
.
PCB-ARCH-EXT0372577
XII. KEY VARIABLES (Cont'd)
FUEL OIL (Cont1 d)
Item
Name
SV 61
Manual reset solenoid valve in air to FCV 78 (fuel oil control valve).
SV 67 ^ Manual reset solenoid
valve in fuel oil to incinerator.
PI 52
Pressure indicator on fuel oil to incin erator,
LSO 68
Limit switch on manual fuel oil firing valve.
PRV 78-1 Low limit regulator in air signal to FCV 78 ---
Page -50"
{jtr*
'
Function
1) On flame failure vents air to FCV 78 (valve closes); 2) prevents firing oil until timer times out following proof of pilot# opening SV 67 and LSO 68.
Closes on flame failure; must be manually opened after proof of pilot when on oil.
Measures pressure of fuel oil avail able to incinerator nozzle.
When valve is fully opened, low fire
timer is activated.
,
\
Maintains a set minimum air pressure
to FCV 78 so valve is always
partially open.
INCINERATOR
BE 1
Flame safeguard system.
(See attachment).
BA^
Alarm for flame safeguard. Activation of flame safeguard sounds
alarm, lights red f.lame failure at
control panel, and activates alarm
panel in CR.
BE 2 J Purple peeper on pilot gas flame.
Ultraviolet scanner monitors the pilot gas flame; failure of the flame cuts power to the flame safeguard system.
PI 56*
Pressure indicator on air blower discharge.
FSl .10 y Flow switch in com
"
bustion air to incin
erator.
"
Indirect measure of incinerator pressure; indirect measure of air flow; measures pressure of air delivered to incinerator.
Actually measures vacuum at blower suction; lov? combustion air flov; cuts power to flame safeguard system and activates alarm panel in CR.
*Key variable.
PCB-ARCH-EXT0372578
.
'
XII, KEY VARIABLES (Cont'd)
Page '53P
$4 ' UJ
INCINERATOR (Cont'd)
BE 1 - Flame Safeguard System - Function
Flame safeguard system will activate (cut power) on:
1* High fuel gas pressure (PS 6H) (while on gas)
2. Low fuel gas pressure 0$ 7L>.
3. Low combustion air flow (FS 10^) .
4. Low fuel oil pressure (PS8L) (while on oil).
5. Low fuel oil atomizing steam pressure (FS9-2L) (while on oil).
6. Low city water flow (FS 127-2^),
7. Low well water pressure (PS 38l).
8. High incinerator temperature (TS 18-76H).
9. High quench pot temperature (TIS 4H or TS 5H).
10. Flame failure (BE 2).
Flame safeguard system activation wills
1. Stop pilot gas (SV 57-1, SV ^8, SV 57-2).
2. Stop main gas (SV 66, SV 62, SV 65, SV 60).
.
3. Stop fuel oil (SV 67, SV 61).
s.
4. Start timer (20 CRT) to close fire water solenoid (SV 127-6).
5. Stop waste liquid (SV 59, 104).
6. Start alarm (BA)*
7. Stop quench gun water (SV 63).
8. Activate alarm panel in CR.
PCB-ARCH-EXT0372579
XIIV KEY VARIABLES (Cont'd)
INCINERATOR (Cont'd)
Item
Name
-
PRV 102-4
Pressure reducing valve in cooling steam to incinerator quench guns.
J TS^ 18
Platinum-Rhodium
"
thermocouple in incin
erator.
TS*? 76 ' Rayotube (temperature
L
sensor) in the incin
erator.
TRC 15*
Recorder-controller for temperature of the incinerator.
Page 52
Function
Steps down 80 PSIG steam header pressure to 20 PSIG needed for cooling quench guns while running water through guns.
Measures temperatures inside the incinerator up to 1600F; high temperature cuts power to flame safe guard system and activates alarm panel in CR; low temperature cuts waste liquid feed (stops 104 pump and vents SV 59).
Measures temperatures inside the
incinerator above 1600F; low range
1600-2000OF; high range >2000F# high
temperature cuts power to flame
'
safeguard and activates control panel
in CR; low temperature cuts v/aste
liquid feed (stops 104 pump and vents
SV 59).
'
Continuously records the temperature of the incinerator; modulates the auxiliary fuel control valves (FCV 78 or FCV 79) to maintain the temperature at the set point.
WASTE LIQUID FEED -
PRV
j Pressure control valve
104-1 ^ on feed pump discharge.
PI 104-2 Pressure indicator feed pump discharge.
PC 104-3 Pressure controller for waste feed.
FCV 104-4 3-way valve in relief line back to 118-117 storage tanks.
FI 104-5 DP cell in v/aste feed line.
Relieves excess volume/pressure from Moyno feed pump back to storage tanks 117 or 118.
Measures pump condition/action of PRV 104-1.
Senses pressure of v/aste at gun and controls action of PCV 104-7.
Used to return the excess Waste from Moyno pump back to storage W/A to 117; WO/A* to 118.
Indicates v/aste feed flow to the incinerator.
*Key Variable.
PCB-ARCH-EXT0372580
XII. KEY VARIABLES (Cont'd)
'
WASTE LIQUID FEED (Cont'd)
Page 53.
f^7
Item
FAl 104-6
PCV 104-7
Name
Low flow alarm for waste feed.
Control valve in return line to storage tanks.
FCV 80
Flow control valve in waste liquid feed to incinerator.
102
Air-line lubricate for
FCV 80.
SV 59 j Solenoid valve in air supply to FCV 80.
PI 53-3* Pressure indicator on waste liquid feed to incinerator.
Function
Activates alarm panel in CR when the FI 104-5 signal is low.
Used to set feed pressure PI 53-3 to incinerator by restricting waste flow back to storage tanks. ATC valve
On-off valve to stop flow of waste liquid to incinerator on flame failure or low atomizing steam pressure (PSL 9-1); ATO valve.
Lubricates FCV 80.
On flame failure or low atomizing steam pressure (FS^ 9-1) vents air to FCV 80 (valve closes).
Measures pressure of waste liquid available to burner; indirectly waste liquid rate.
SCRUBBER
, .
......
Stack Sample
1
Analyze for HCl, PCB and particulate in vapor to atmosphere.
Measures efficiency of scrubbing system.
Effluent Analyze for PCB and HCl
Sample
in stream to sewer.
Measures effectiveness of inciner ator; check on proper water flow rates efficiency.
LI-154-1 DP - bubber system on scrubber sump.
Indicates level of HCl solution in scrubber sump.
PI-154-2. Manometer below packing section of scrubber column.
Indicates pressure of column.
.
Measures pressure drop across column.
Indicates when plugging is occurring.
*Key Variable.
PCB-ARCH-EXT0372581
.
.
Page
XII. KEY VARIABLES (Cont'd)
WASTE STORAGE
Item
Name
Function
PRV 116-4
Pressure regulating valve for N2 pad system.
Steps N2 pressure down from header to several ounces for padding three storage tanks.
TI 101-1 Temperature indicator on Measures temperature of Aroclor in
residue trailer.
. Montar trailer.
PI 111-1 Pressure indicator on tank truck unloading pump discharge.
Measures pump condition.
TI-116-1 Temperature indicators on Measures temperature of Aroclor in TI-117--1 three storage tanks. TI-118-1
LI-116-2 Level indicator on LT-116-2 storage tank.
' Measures level of Aroclor in storage tank.
LI-117-2
n
LT-117-2
LI-118-2
n
LT-118-2
n
,,
'
' .( ...
.
XE-116-3 "^Conservation vent/flame XE-117-3 '"yarrestor for storage XE-118-3 "'tanks.
Maintains slight N2.pressure on storage tank; prevent flash back of flame from outside source.
PI 116-5
s
PI-99
Pressure indicator in N2 supply to storage.
Pressure indicator at nitrogen trailer.
Measures pressure of N2 pad system.
Indicates amount of N2 remaining in trailer.
SUMPS
, .
. .......................................................................
.
LE 120-1 Level control floor drain Keeps pad sump pumped out; starts
sump*
and stops sump pump (120) on high
and low levels, respectively.
PI 120-2 Pressure indicator sump pump discharge.
Measures pump condition, '
PI 121-2 Pressure indicator Aroclor sump pump discharge.
Measure pump condition, .
PCB-ARCH-EXT0372582
XII, KEY VARIABLES (Cont'd)
SUMPS (Cont'd)
Item
Name
Function
Page 5^
J2?
LI-121-1 Interface indicator, LE-121-1 alarm, and interlock LAh-121-1 for basin Aroclor level.
LS** 121-1
Measures Aroclor level in settling basin'; sounds alarm, lights red high level Aroclor sump pn CP, and activates alarm panel in CR; no 121 pump on low,
TI-121-3 Temperature indicator on settling basin.
Measure temperature of Aroclor in basin.
PI-122-1 Pressure indicator basin water pump discharge.
Measures pump condition.
PSl-110-1 Pressure indicator switch PI-110-1 on car unloading pump
discharge.
Measure pumping action, shuts down pump when low discharge pressure.
LS^ 119-1 Level control/switch on LE 119-1 drum unloading sump.
Starts pump on high level; stops on low level.
PI 119-1 Pressure indicator
Measures pump condition.
drum sump pump discharge.
Settling Analyze for PCB in stream
Basin
to sewer,.
Effluent
Measure of effectiveness of settling basin.
Sewer
Analyze for PCB in sewer
Sample* stream.
Measurement of department effective ness in controlling PCB losses.
*Key Variable
PCB-ARCH-EXT0372583
Page 60
XIII. INTERLOCKS AND ALARMS
MOTOR INTERLOCKS
150 - Incinerator Air Blower
The following conditions must be satisfied before starting Item 150.
a. Well water pressure to quench column (PS-38)
b. City, water flow to weir (FS-127-2) .
c. Main power on at incinerator panel.
Loss of any of the above, will stop the blower.
104 - Incinerator Feed Pump
The following conditions must be satisfied before starting Item 104.
a. Incinerator temperature above 1600F (TS-15).
b. Atomizing steam to waste nozzle (PS-9),
c. Pilot flame proved.
. .
d. Waste valve (FCV-80) open. Depress "start waste" button
on control panel.
e. Circulating water flow to Venturi (FS-51) ,
Loss of any of the above will stop 104.
\
The following motors have no interlocks and are controlled by a local
start-stop pushbutton station.
106 - Packed column circulating pump.
111 - Tank truck unloading pump,
112 - Well water booster pump,
118 - Storage tank agitator.
116 - Storage tank
agitator.,
117 - Storage tank agitator.
PCB-ARCH-EXT0372584
XIII. (Cont'd) Motor Interlocks (Cont'd)
Page 6l
122 - Water sump pump.
127 and 132 - City water break tank pumps.
These pumps have timed seal-in relays to automatically
restart after short power outages (less than 3 seconds).
'
'
`' '
`
' l
`
To stop pumps, hold stop button in for at least 5 seconds.
110 - Tank car unloading pump.
To start, hold start button depressed until discharge pressure
closes PS-110-1. Pump will stop when discharge pressure
drops or when stop pushbutton is depressed.
119 - Drum unloading sump pump.
Pump has 3 position control station located at motor.
Position 1 - Manual - pump runs continuously.
Position 2 - Off - pump stops.
Position 3 - Auto - pump starts upon high level in sump
(LS-119-1 closes), pumping continues until low level is
N
reached (LS-119-1 opens) stopping pump.
120 - Incinerator floor drain.
Same operation as 1-119. Substitute LS-120-1 for LS-119-1.
121 - Aroclor sump pump.
To start, depress start pushbutton. Motor will seal-in if
sump is above low level (LS-121-1 closed), When sump reaches
low level, pump will stop (LS-121-1 opens). To operate
pump below low level, depress and hold start pushbutton.
16Q - Drum pump.
PCB-ARCH-EXT0372585
XIII. (Cont'd)
Page 62
Alarms
The following conditions will sound alarm on burner control panel.
a. Flame failure (Honeywell safeguard).
b. Low or high level quench pot. (PS-12 or PS-11).
c. Low waste flow. (FA^ 104-6).
,
d. Low level city water break tank. (PA-126-1) .
e. High Aroclor level Aroclor sump. (LS-121-1).
f. Low flow city water. (FS-127-2).
g. Low combustion air flow. (FS-10).
h. Lov; Venturi flow. (FS-37) .
i. Low or high gas pressure. (PS-7 or PS-6),
j. Low oil or air flow. (ES-8 or FS-10).
k. Low water flow to quench column. (FS-38 or FS-127-2).
l. High temperatures. (TS-4, TS-5 or TS 15-1).
.
.
>
PCB-ARCH-EXT0372586
Item Number
PS-6
PS-7
Name High Gas Pressure Low Gas Pressure
X
INTERLOCKS INCINERATOR
H H
H
Function
o
0
Complete shutdown. (when using gas only)
3rt
Complete shutdown.
a
PS-9-1 Low Fuel Oil Atom. Steam Pressure
Complete shutdown. (when using oil only)
PS-8
Low Fuel Oil Pressure
Complete shutdown. (when using oil only)
FS-10 F5-38
Low Combustion Air Flow
"Bes&wvC Low Water -E-low, to Sprays
Complete shutdown. Complete shutdown. Opens SV-64, stops blower -
FS-127-2 Low City Water Flow
Complete shutdown. Stops blower, starts fire water.
TS-15-1 High Incinerator Temperature
Complete shutdown. Opens SV-6 4
TS-4 & TS-5
High Quench Pot Temperature
Complete shutdown. Opens SV-64.
TS-15-2 Low Incinerator Temperature
Stop Waste Pump. Closes FCV-80.
PS-9-2 Low Waste Atom. Steam Pressure
Stops Waste Pump. Closes FCV-80.
BE-1
Flame Scanner
Complete shutdown.
LSO-65 Gas Valve
Start Low Fire.
LSO-67) Oil Valve
)
Start Low Fire.
LSO-68) Limit Switch )
Timer (oil)
T0 J
-
C>1 D
X01)
. '
.
mx--0I i
B) oq
(D
o\
VjJ
CO
N0O1
00
.
-vl
-
XIV. TIMERS
. '
. .
Page 64 .
A. 1TR - Purge Timer - Purpose is to "purge" (Blow all flammable
gases out of) the incinerator. Timer is activated by depressing
"Purge Start" button. Timer is set at 3 minutes. Completion of
timer will allow the pilot ignition step of start-up.
B. 3TR - Ignition Timer - Purpose is to prevent forming an explosive
mixture in the incinerator by flowing pilot gas Without igniting.
Timer is set at 20 seconds. Timer is activated as long as the
"Ignition" push button is depressed. Failure to establish "Pilot
Proved" within the allotted time or before releasing push button
will require repurging the incinerator.
C 2TR - Low Fire Timer - Purpose is to prevent shocking the incinerator
refractory with high heat input during start-up. Timer is set
at 180 seconds.
1) On Gas
Timer activated by manually resetting main gas solenoid (SV65).
Completion of timer allows manual resetting of solenoid
N
(SV60) in air to main gas control valve.
2) On Fuel Oil
Timer activated by manually resetting fuel oil solenoid
(SV67) and opening the fuel oil manual valve at the incinerator.
Completion of timer allows manual resetting of solenoid (SV61)
in air to fuel oil control valve.
D. 20TR - Fire Water Time Delay - Purpose is to provide fire water
backup supply to city water while incinerator is still hot during
shutdown. Timer is activated when pilot flame is lost. Timer
is set for 8 hours. Completion of the timer will shut the second
'
i
.
fire water solenoid (SV127-6).
PCB-ARCH-EXT0372588
Page 65
XVI. UTILITY LOCATIONS
.
A. City Water
Underground valve for department supply is located about 12 feet
north of packed column (154) discharge to sewer. Shut off above
ground in the storage room east of department office.
B. Well Water
Underground valve for department supply is located under the
'
,
truck ramp at the southeast of department. Shutoff above ground
is about 2 feet north of the quench pot (152).
C. Fire Water
Underground valve is located about 3 feet southwest of the southwest
column to the incinerator platform.
D. 200# Steam Supply
. Comes into the department on the north piping bridge to the east
side of the office building.
E. 80# Steam Supply
.
Comes into the department on the north piping bridge from Santosite
\
and continues in to Interim PNA.
F. Instrument Air
Comes into the department on the north piping bridge from Santosite
and continues on to Interim PNA.
G. Plant Air
-
Comes into the department on the east piping bridge from Interim PNA.
H. Natural Gas
'
Comes into the department on the east piping bridge from Interim PNA
and continues on to Santosite.
I. Fuel Oil Storage (114)
Tank is located north of Area 9 maintenance office.
PCB-ARCH-EXT0372589
Page 66
XVII.
TROUBLE SHOOTING
A. Flame Failure
.
In the event of a flame failure, the incinerator should auto
matically shutdown. The red "flame failure" light comes on,
the audio alarm sounds, and the alarm panel in the control room
is activated.
The following equipment will continue to operate:
1. City water pump (127 or 132)
2. Well water booster pump (112)
3. Venturi circulating pump (106)
4. Combustion air blower (150)
The objective during a flame failure is to reestablish fire to
the incinerator as rapidly,, as possible. This is to minimize
possible damage to -the refractory.
Determine the cause of the flame failure -
Cause
Check
Low combustion air flow
Blower running, PI 56, alarm panel
High Incinerator Temp.
TRC15, alarm panel
High Quench Pot Temp.
TIS4, alarm panel, TIS5
Low or high gas pressure
PS-7, alarm panel, PS-8
Low fuel oil pressure
Pump (115 or 123) running,
(on oil)
PI 115-1, alarm panel
Low atomizing steam
PI 53-2, alarm panel
pressure (on oil)
Low city water flow
FS-37, alarm panel, pump running
Low well water pressure
PS-38, alarm panel, pump running
PCB-ARCH-EXT0372590
XVII. TROUBLE SHOOTING (Cont'd)
Page 67
A. (Cont'd)
1. If blower down, immediately close valves to top 5 sprays
on quench column.
2. Reduce combustion air to 1/3 damper or about 35 inches H2O.
Higher air rate may snuff out the pilot,
3. Check to be sure Moyno feed pump is off and Robot waste
valve is closed.
4. Check panel for cause of failure and correct.
5. Start purge cycle.
6. Close manual gas valve, manual waste valve, trim back on
atomizing steam to waste gun and blow the waste gun with steam.
7. When purge is complete - light pilot.
8. When pilot is lit, trip maxim valve.
9. Open manual gas valve slowly (1# at a time) until ignition -
Stabilize the flame; then slowly open to full valve,
10. Adjust combustion air and check 02.
11. Contact department supervision.
...............
' 12. Return system to automatic.
13. Bring waste material on slowly when temperature is restored.
B. Lighting Problems
1. Failure of a pilot to ignite and burn steadily within the 20
second timed interval indicates a definite problem which must
be located and corrected before any attempt is made to relight
or otherwise proceed.
2. Visually observe the pilot through the Sight port during
the ignition period.
PCB-ARCH-EXT0372591
Page 68
XVII. TROUBLE SHOOTING (Cont'd)
B. (Cont'd)
3. If no sparks are seen at the ignition spark gap at pilot tip,
check for improper spark gap or shorting in the high tension
spark system. Simply rapping on the pilot assembly often is
enough.
4., If sparks can be seen, but pilot will not light, check for air
in gas supply line, insufficient gas pressure (10-15 psig'at
pilot), plugged pilot gas orifice, etc.
5. If pilot lights, but flame scanner does not activate the "Pilot
Proved" light, dirty purple peeper lens is the most probable cause
6. Verify purge air flow to the scanner*
7. Slight smugging,can often be overcome by simply turning up the
pilot gas to produce a larger flame body which the scanner can
"see" without difficulty.
8. If preceding step fails, CAREFULLY remove flame scanner and clean
lens with lens tissue.. When properly aligned, the pilot flame
s
body will completely cover the viewing area of the scanner tube.
9. If the flame cannot be seen, or is off center of the sight tube,
realign the pilot by carefully bending or shimming*
10. If alignment is correct but scanner does not activate "Pilot
Proved" light, check scanner by holding a match or other flame
(flashlight will not work) in front of scanner eye.
11. If scanner does not respond to flame, see enclosed Honeywell
trouble shooting guide.
C. Power Failure
1. Partial
Normally, power is supplied from substation #13. A failure
PCB-ARCH-EXT0372592
Page 69
XVIX. TROUBLE SHOOTING (Cont'd)
C. 1. (Cont'd)
will shut-down the entire incinerator area except:
an automatic switch changes power supply from #13 substation
to #4 substation for emergency power. This supplies the
lights, the instrument panel, and the city water pumps.
Try to reset the power to #13 substation by depressing reset
'
'
`
A
button in motor control center. If power is established to
#13 substation, the incinerator can be started again under
normal startup instructions. If power cannot be established
to #13 substation, call the night superintendent and the
electricians.
Cool the quench column with city water until the incinerator
can be restarted.
2. Total
During a total power failure (both substations) the following
will occur:
a) Fire alarm 3-4 comes in
b) Fire water starts into weir system at high rate.
c) All pumps and blower stop
d) Waste liquid valve closes
e) Pilot gas, closes and vents.
f) Main gas, closes and vents
g) Fuel Oil, closes
h) Quench pot level valve closes, so will overflow through
Venturi
XVII. TROUBLE SHOOTING (Cont'd)
Page 70
C. 2. (Cont'd)
i) Well water continues to flow at reduced rate
j) Automatic switch in motor control center will be energized
to secondary substation supply:
1) #13 substation is primary power
2) #4 substation is secondary power
k) Control panel and alarms are dead
_
'
Actions
*
1. Close top 5 well water sprays to quench column.
2. Notify the night superintendent when the system goes down.
3. Close the manual valves at the south end of the incinerator on
natural gas, pilot gas, fuel oil, waste, atomizing steam and
quench guns.
:
4. Prepare system for a resumption of operations.
.
5. Reset power to substation #13 when power available.
6. Start up.
7. If the system is down for one (1) hour or more, notify department
supervision,
D. City Water Failure
In the event city water fails, the following will occur:
1. Fire water comes in setting off alarm (3-4) for fire
department - 127-7 opens.
2. The alarm sounds and the red low flow city water light comes on.
3. Power to flame safeguard system cut.
.
4. Cuts power to air blower.
5. Recirculating solenoid valve (SV127-5) closes.
6. By-pass solenoid (SV64) opens.
PCB-ARCH-EXT0372594
Page 71
XVII. TROUBLE SHOOTING (Cont'd)
D. (Cont'd)
Check List
.
1. Close top 5 well water sprays to quench column.
2. Check item #126 (city water break tank) level.
3. Check items #127 or 132 (city water break tank pumps).
If stopped: a) Check- start and stop button? try to reset
b) Switch pumps
.
4. Explain alarm to fire department when they arrive in department
5. Check city water supply
6. Start-up incinerator when city water reestablished.
E. Well Water Failure
Well Water Users
1. Quench column sprays ~
2. Packed scrubber column
3. Incinerator quench guns
-
Loss of W/W will shut the operation down. The most critical of the
three users is the loss of flow to the quench column sprays. Low pressure to the quench column sprays ( 4o psig) will open
emergency city water solenoid (SV64), cut power to flame safeguard, and cut power to combustion air blower. Upon indication of no flow or low flow, check the following: 1. Close top 5 well water sprays to quench column. 2. Well water booster pump Item 113. Pressure indicator (PI 112-1)
will measure pump condition. Pump pressure diould be 125 psig. 3. Check strainers in well water line. There should be no more
than 25# drop between PI 112-1 and 112-2. 4. Check flow orifice for pluggage.
PCB-ARCH-EXT0372595
Page 72 XVII. TROUBLE SHOOTING (Cont'd) E. (Cont'd)
5. Check well water sprays for pluggage 6. Start-up incinerator when well water reestablished 7. Notify supervision if department will be down longer
than one (1) hour F. Instrument Air Failure
In any event that instrument air failure occurs, the following, list of valves will be affected. 1. LCV-126-2 - Level control valve on city water break tank
opens and tahk overflows. 2. FCV-80 - Flow control valve, waste liquid feed to incinerator
closes. Stops waste liquid feed to incinerator. Waste pump (104) stops. 3. LCV-81 - Level control valve in quench pot drain closes. Causes quench pot to overflow to pack column through Venturi. 4. FCV-79 - Flow control valve in natural gas to main burner closes. Minimum natural gas, to main burner.
1 5. FCV-78 - Flow control valve in fuel oil to incinerator closes.
Shuts off fuel oil to incinerator. The incinerator will continue to operate on pilot gas only. Action 1. Stop fuel oil pump if running. 2. Determine cause of failure, 3. Reestablish auxiliary and waste fuel flows when corrected.
PCB-ARCH-EXT0372596
8
!
|
9
.10
j
11
|
12
I!
/
' 1
!
2
i
: ?
___i
MIDDLE SHIFT
I
6
7-
8
9
>
10
11
LATE SHIFT
12
!
I
1
2
&
5 6 r-
--JDMMENTS:
j
v
.
--1
. .
' -J
Operator
i
WASTE STORAGE
Tk HE 111? Tl8~
jTemp Level
1 J..-
Gas Meter
Aroclor Sump
Level
lNa_Pess_u_rg-___
j
Operator
.
' ii
WASTE STORACrE
TK 1116 1117 ttb~
Temp i i
Level |
Gas Meter
Aroclor Sump
Level
T- N2 Pressure
11 1 ! i __ _ i1
J
j
r
. Operator
WASTE STOR/IGE rk 1116 1117' TlB" lemp i ^evelj | ias meter Aroclor Sump jevel ^2 Pressure
PCB-ARCH-EXT0372597
Days
NIGHT SHEET-DEPTS. 831 & 827 Date
Middles
Page 74 Dates
Operate Incinerator and Allied Equipment as follows:
Incinerator Temp. Between_P and F> Combustion Air,
Quench Pot Temp. Not to ExceedPressure (PI-82) ______
# and
Level (LC-81)
' ' City Water Flow to Wier % and the Pressure '(127-1)
at
,______ #. Well Water Pressure at (PI 112-2) _________ #, Flow to Column
(FI-87) > Pressure to Sprays (PI 53-4) #, Flow to Scrubber
(FI-88)
.
Venturi Flow (FI 106-2)
, Circ. Liquor (PI 85)
Pressure at Moyno Pump
#, Waste Feed (PI 53-3)
#>
nj-om. Steam at Waste Gun
#i Gas Pressure at Burner
#.
Maintain
to
% O2
Burn Waste From No.
Stg.
WASTE AROCLOR UNLOADING:
PHENOL:
SAFETY:
HOUSEKEEPING:
^NERAL COMMENTS:
If the unit is shut down for any reason take steps to bring it back on the line and notify the Night Supt. and Dept. Supervision.
PCB-ARCH-EXT0372598
PHASE II - BULK DISTRIBUTION
I. SUMMARY OP OPERATIONS
PHENOL UNLOADING AND LOADING
Cumene Phenol is received in 26,000 gal., tank cars from Chocolate Bayou. The tank cars are unloaded into two 20,000 gal. storage tanks, the Southwest and Southeast storage tanks. From these tanks phenol will be loaded into tank trucks, tank cars or pumped to the East or West storage tanks to hold for inventory or loading.
II. SAFETY
A. Materials Handling
1. Phenol is a corrosive liquid which crystallizes at
40.9C. If skin contact is made, severe burns will
result, the severity being in proportion to the
contact time. The nervous system is injured if
first aid treatment is not used immediately. Phenol
vapors .are toxic and should be avoicfecT"at all times.
Phenol is an extremely dangerous chemical and
\
should be treated as such at all times. Flush
contact areas with copious amounts of water and
apply alcohol. Do not apply alcohol to eyes.
a) Safe Handling Procedures
1) Keep pump packing glands tight and mechanical seals repaired at all times.
.
2) Wear protective equipment such as rubber
gloves, eye protection and other equip
ment as required by the specific job,
3) Stay out of areas contaminated by Phenol vapors.
'
4) Use extreme caution when sampling, pumping
or working with equipment where there is
even a remote possibility of skin contact.
2. Oxalic and citric acid .powder used as inhibitors (color stabilizers) for some Phenol customers
Page 76
PHASE II - BULK DISTRIBUTION (Cont'd)
II. A. 2. (Cont'd)
present no problem as far as skin contact is concerned. However, oxalic acid is a poison and should be treated as such.
B. Safety Equipment
1. Inspection of Safety Equipment
.
.
Inspection of safety equipment is one of joint responsibility -- the operator and the foreman. It is the operator's responsibility to check safety equipment and report any malfunction. The foreman is responsible for keeping equipment repaired arid ordering safety supplies and equipment.
2. Location of Safety Equipment
Safety Showers & Eye Baths
a) North tank car melt dock
b) Ground level center of unloading dock
c) South tank car unloading dock
d) Tank truck loading dock
e) Foot of stairs to office
.
f) 2nd level at office door
g) Outside east wall Bldg. BBT
h) West of "Lil Mo" on ground level
\
Safety Shower Alarms
Use of safety showers (a, b, c, d and h) sounds alarms in Dept. 251.
First Aid Cabinets
a) At S.E. and S.W. storage tank pumps
b) North tank car melt dock
c) Center tank car.dock
d) South tank car unloading dock
.
e) Truck loading dock
f) At east and west storage tank pumps
.
g) In safety station on outside east wall of Bldg. BBT
h) At "Lil Mo" pump
PCB-ARCH-EXT0372600
Page
PHASE II - BULK DISTRIBUTION (Cont'd)
II. B. 2. (Cont'd)
Telephone Extension
Inside southeast corner of Bldg. BBT at door.
Fire Extinguishers
a) Inside S.E. corner of Bldg, BBT - CO2 b) Inside S.E. corner of Bldg. BBT - 2-wheel cart,
dry powder
.
Fire Alarm Box is located on pipe bridge post outside
northeast'corner of Bldg. BBT. Dept. 827 is in
fire zone 3-4.
Gas Mask - All purpose. Located inside Bldg. BBT at 00t of stairs to office.
Emergency Clothes
' a) Inside southeast wall of Bldg. BBT.
b) Outside east wall of Bldg. BBT in safety station.
C. Requirements on Use of Safety Equipment
1. Safety glasses must be worn at all times while in
this area unless goggle-faceshield unit is required
s
for greater protection,
2. Safety goggle-faceshield unit must be worn when sampling or when doing other high hazard work. Rubber gloves are also required at such times. Aprons and face shields as needed.
`
3. Always use special safety equipment such as track
flags and tank car and tank truck grounding wires,
D. Emergency Assembly Area
The assembly points for all plant personnel in case of a
plant emergency are:
,
PRIMARY:
MAIN PARKING LOT
,
SECONDARY:
WEST GATE
'
PCB-ARCH-
Page 78
PHASE II - BULK DISTRIBUTION (Cont'd) II. D. (Cont'd)
Department Shutdown
.
Shutdown will take place in either of two ways. First,
persons will shut down their departments and evacuate
if instructed to do so by the night superintendent or
by anyone else in charge of directing emergency
activities.
.
Second, shutdown and evacuation will take place if the emergency whistle is sounded. This whistle is five short blasts repeated five times. The emergency whistle will be sounded only if an entire plant shutdown is desired.
The emergency plan has been revised so that it can be implemented by the plant fire zones. This is so since our experience here at., the plant and other large plants indicates that an emergency is likely to be confined to a particular zone of the plant.
The Phenol distribution area fire call is 3-4 (3 long blasts followed by 4 short blasts of the fire whistle).
III. HOUSEKEEPING RESPONSIBILITIES
A. The Distribution Operator is responsible for cleanup in
the Phenol handling area.'
.
B. At the end of each shift all hoses not being used are to be boiled up on hose racks where provided. All hoses should be blown clean with air after each use to prevent possible hazard to next user, freezing, or contamination of product.
C. Special cleanup instructions are given to the operator by the foreman so that a high level of housekeeping is maintained.
PCB-ARCH-EXT0372602
Page 79
PHASE IT - BULK DISTRIBUTION (Cont'd)
IV. DETAILS OF OPERATION
.
A Unloading Phenol Tank Cars
26,000 gal. tank cars of Cumene Phenol when received from Chocolate Bayou may be frozen and will require melting before transfer to storage can be made.
The Phenol tank car unloading pump located at ground level at the end of the south tank car dock, pumps Phenol to both the SE and the SW storage tanks.
The valves on the line from the unloading pump into the
southeast and southwest storage tanks are located at the
,
top of the tanks. Also, the tanks are connected by a
leveling line. If this line is frozen, it will be
necessary for the distribution operator to direct flow
as required, to prevent a spill, since a 26,000 gal.
tank car is larger than a single storage tank (each
storage tank holds 20,000 gallons),
26,000 gal. cars can be melted at'both south (unloading) docks and the north dock. The north dock can be used for loading tank cars.
1. To prepare for top unloading of tank car:
..
N
a) Put blue track flags on semaphore arms.
b) Attach ground wire to tank car. Step on running board to drain off static electricity.
c) Open dome cover to vent car. (You should vent car before steam coils are connected). Wear goggles and stand behind or to one side to avoid Phenol crystals blown by a sudden
. release of pressure from car.
d) If Phenol is solid, put steam on the standpipe jacket or use stainless steel hairpin coil to melt a hole to the coils before turning on steam to the coils. Be sure steam condensate from the standpipe or the hairpin coil doesn't drain or blow into the dome. Insert probe into tank car to activate automatic steam control valve and insure temperature doesn't exceed 60C. on the steam regulator gauge.
PCB-ARCH-EXT0372603
Page 8
PHASE II - BULK DISTRIBUTION (Cont'd)
,
IV. A. 1. (Cont'd)
e) Turn steam on both standpipe and coils. Use
low pressure steam (about 10 to 15 lbs.) f:or
the first hour or two to avoid high impact at
coil bends which can' cause coil rupture or
cracking of weld joints.
.
f) Increase steam pressure to coils to 60 to 80 lbs., (do not exceed- 100 lbs.) after first hour or two and heat car to 60C. (140F.)
g) Sample Phenol after it is all molten. Lower sample bottle slowly to bottom of car to get a repre sentative sample. (Sample bottle clamp rod, chain or sheath would be made of nickel, stainless steel, or wood).
h) Never heat Phenol above 60Ci
j i) If lab analysis is ok, connect Unloading line of
self priming pump to the car standpipe. Wearing
eye protection, remove probe, coil it and place
.
. on hanger on dock. Use extreme car in coiling
probe so as not to flip Phenol and that insulated
portion of probe doesn't touch steam lines. .
s
j) Make sure there is room in storage tanks to hold
contents of car.
k) Make sure steam is on the transfer line and SE and SW tanks leveling line tracers. Make sure losing hole lid is open and remains open during car unloading. Shut off all' steam to car.
l) Turn on unloading pump and check to see if level
4
is rising in both SE & SW storage tanks. (The
level may rise in only one storage if level line
is frozen).
m) When the tank car is empty, blow the unloading line free of Phenol with dry air.
n) Disconnect the steam hoses and blow out the steam coils with air. A good blow out is especially necessary in cold weather. Condensate left in coils may freeze and split them. Leave the caps off the coils.
PCB-ARCH-EXT0372604
Page 81
PHASE II - BULK DISTRIBUTION (Cont'd)
IV. A. 1. (Cont'd)
0) Disconnect ground cable, remove all steam hose
connection fittings and prepare cars for return
trip to Chocolate Bayou*
*
P) Remove blue track flags from semaphore arms.
q) If the tank car needs repair, notify supervision.
2. Summary of Top Unloading Procedure
a) Connect ground cable to tank car. Place blue track flags on semaphore arms.
b) Open dome to vent car. Leave dome open during entire unloading operation.
c) If phenol in car is solid, put steam on jacket of standpipe or use stainless steel hairpin coil to melt vent hold to coils. Insert temperature control probe.
d) Connect steam fittings to tank car heating coils.
.
(Steam traps are on steam supply and condensate
lines).
e) Turn on steam slowly to prevent damage to coils
n
(about 10 to 15 lbs. for the first hour or two).
f) After 1 to 2 hours, increase steam pressure to
a max^muin of' 100 lbs; 60 to 80 lb. steam is adequate.
g) Heat contents of car to,60C, on steam regulator gauge. Never heat over 60C,
h) Sample the phenol.
1) Remove the temperature control probe. Connect suction line of unloading pump to the standpipe in the car dome and start pump.
j) Blow unloading line free of Phenol.
k) Disconnect unloading line and blow out the steam coils with air. Leave caps off coils.
PCB-ARCH-EXT0372605
Page 8 2
PHASE II - BULK DISTRIBUTION (Cont'd)
,
IV. A. 2. (Cont'd)
l) Disconnect ground cable and raise ramp. Prepare car for return to supplier.
m) Remove blue flags from semaphores when car
is ready to be switched out.
.
.
B. Tank Car Loading
,
`
1. , Tank cars to be loaded with phenol will not be spotted at.the north dock (track 7-11 spot). To prepare for loading a car:
a) Put blue track flags on semaphore arms.
b) Lower ramp and extend it to the car. Make sure
'
ramp and sliding handrails are securely locked
m position.
.
.
c) Open dome of the car and inspect it to be sure that the car is clean and free of foreign odor.
d) If car has a heel less than 12" that is'crystallized and appears white in color, it is ok to load,
x .
e) If car is not clean enough, call supervision.
f) Large heels (12" or more) must be sampled and ok'd by the lab before loading.
g) A coil test sheet is required for each car prior
to loading. This is supplied by the Rip Track
and should be found in box on outside wall at
southwest overhead door of Bldg. BBT. Do not
.
load car unless coils have been tested. .
h) Place loading arm in the dome of car and secure by chain on arm. Pipe must be properly secured before starting to load.
i) Attach ground wire to car step or running board,
j). Be' sure seat valve is closed and that there is . a cock on the bottom outlet of car.
k) Start phenol to car,
l) Stop phenol transfer to car when there is about one foot of phenol in car.
PCB-ARCH-EXT0372606
Page 83
PHASE II - BULK DISTRIBUTION (Cont'd)
IV. B. 1. (Cont'd)
m) Slowly open the cock on the bottom outlet, (Take care ana wear protective equipment). Any phenol indicates that the seat valve is not closed.
n) If ok# close cock and continue to load..
.
)
o) If there is any evidence of phenol at bottom outlet,
stop loading procedure (blov; line, etc.) and notify'
supervision.
p) Load car to amount requested by customer.
q) Blov; loading line with dry air. Do not use steam.
r) Sample car. Get 1-8 oz. for complete analysis.
s) Remove loading line and close dome.
t) Wash any phenol drip from car,
u) Remove ground wire.
v) Place seals on car openings of car's destination
.
is outside of plant.
w) Call Repair Track (Station 2042) to head car.
,
s
x) Raise ramps after car is headed.
< y) Pull track flags.
z) Inform supervision that you are loaded, headed, clear and ready for switch. Record in the loading log book the car number, lot number and amount of phenol loaded.
C Tank Truck Loading
1. Tank trucks are inspected essentially the same as tank cars. That is, it is ok to load if the tank truck is:
a) Clean and free of foreign odor.
b) Or, if the last load was phenol and it has a heel of 12" or less, that appears white in color.*
*
c) Large heels of phenol - 12" or more must be
sampled and ok'd by lab before loading. Check
-
with supervision.
PCB-ARCH-EXT0372607
Page 84
PHASE II - BULK DISTRIBUTION (Cont'd)
IV. G. 2. Tank trucks will be loaded from southeast and south west storage tanks by Monsanto truck drivers. Since only in specification phenol will be pumped to these tanks, sampling by truck drivers will not be needed.
3. The Distribution Operator will pump to or from any phenol storage as needed and take required samples.
4. Tank truck wheels must be blocked and the tractor, if under the trailer, must have the engine off and the brakes set. If trailer is dropped, place aluminum support under nose of trailer before loading.
5. Before removing loading lines from any type carrier, the line must be blown with dry air. Do not use steam, as this will contaminate phenol and lower the crystallizing point. Blow lines slowly to avoid splashing.phenol out of truck dome.
6. Try to keep rain, snow, sleet, steam condensate or dripping water out of both full and empty tank trucks.
7. Summary of tank truck loading procedure:
a) Spot tank truck at dock,
b) Turn off engine and set brakes.
c) Block tank truck wheels and place support under nose of trailer if unit is dropped for load.
d) Connect grounding wire. e) Open dome and inspect the tank truck.
f) Put loading line in dome and secure it. (Secured by sleeve on line).
g) Monsanto truck drivers line up valves for flow from SE and SW storage tanks to the tank truck to be loaded. Distribution Operator can load by storage tank outage from east and west storage tank or by trailer innage from the SE and SW storage tanks.
h) Check filling of tank truck and shut off transfer pump and block valves when tank truck is loaded.
PCB-ARCH-EXT0372608
Page 85
PHASE II - BULK DISTRIBUTION (Cont'd)
.
.
IV. C. 7. (Cont'd)
i) Blow line to the tank truck from air taps on loading storages. Introduce air slowly to avoid splashing phenol.
j) Return all valves to original open or closed positions.
k) Remove loading line from tank trucks.
l) . Take sample.
.
m) Close dome and wash any phenol from tank truck with hot water.
n) Disconnect ground wire and remove aluminum trailer support if trailer was dropped for loading.
( -
Note: Tank trucks (and cars) can be loaded from
the east and west storage tanks by .tank
.
outages, but when loading from the south
east and southwest storage tanks it will
be necessary to watch the tank truck and
go by tank truck innage.
. ^ s'
Tank trucks for Queeny and V7GK Departments 2 36, 248 and 254 will not be sampled. They will accept the analysis of the tank from which they will be loaded. All other tank trucks and cars will be sampled, and samples taken, to lab.
WGK Form 201 (Rev. 12-66) scale ticket is used for tank truck loads,
D. Waste Phenol Handling
1. . Drips, spills, rainwater and wash water collect in a sump wbich is located at the south tank car dock.
2. A high level electrode in the sump turns on the stamp
pump. This fraction water from sump is pumped to a
waste tank and hauled, to dump. If sump overflows
check power to pump or electrodes.
c
.
.
.
PCB-ARCH-EXT0372609
Page 86
PHASE II - BULK DISTRIBUTION (Cont'd)
.
IV. E. Inhibited (color stabilized) Phenol.
There are two color stabilizers for phenol:
1. Oxalic acid.
a) It is cheaper.
b) It is poisonous - not fit for food grade or pharmaceutical grade phenol.
c) To add oxalic to the phenol:
1. Fill tank car or truck 1/3 full.
.
2. Add amount of oxalic determined by supervision.
3. Finish filling the tank car or truck.
2. Citric Acid.
. a) It is expensive.
b) It is non-poisonous. It can be used for food gra;de or pharmaceutical grade phenol.
c) Fill tank, truck or tank car 1/4 to 1/2 full, then add a determined amount of citric into tank truck or car.
d) Finish filling tank truck or car.
Note: As a rule, oxalic inhibited phenol is never shipped by tank truck.
PCB-ARCH-EXT0372610
Page 87
PHASE II - BULK DISTRIBUTION (Cont'd)
V, SAMPLING AND SPECIFICATIONS
A Tank Car Unloading
1, Take 1 - 8 oz, sample of each car. Take them to the lab for complete analysis.
2. Call supervision if car is out of specs. Unload car if it is in specification material and you
r have room in storage tanks.
By Tank Car and Tank Truck Loading
1. Be sure storage from which phenol is being taken is in specificationmaterial,
2. Get 1 - 8 oz. sample from tank cars and 1 - 8 oz. from trucks for outside customers.
3. Tank trucks for Queeny and WGK Departments 236,
248 and 254-will not be sampled. They will accept
tank analyses.
.
4. Off color and low Xpt. phenol can be used by
Department 236.
PCB-ARCH-EXT0372611
Page 88
PHASE II - BULK DISTRIBUTION (Cont'd)
VI-. EQUIPMENT LIST
519 551 552 557 558 559 566 567 5571 574 575 580
- ,, ,..
PHENOL HANDLING EQUIPMENT
->
Sump Pump
Lav;rence 2 x 3 HBDH Type 9 316 SS
.
South end
In 3.0 Out 2.0 Motor Vertical 15 HP
unloading dock. 1200 RPM Frame 3240.
S.W. Phenol Storage Tank 21-3292
20,000 gal. Heresite lined steel tank.
Phenol Loading Durco 3X25110 Type 8 20 Alloy in 3.0
Pump .
Out 2.0 Motor Horizontal 10 HP 1800 RPM
Frame 256U.
5
,
.
i
E. Phenol
13'0" Dia. x 20'0" High Heresite Lined
j
Storage Tank
Steel Tank.
.
.
K
I-
W. Phenol
Same as Item 557.
f
Stg. Tk,
.
1l
S.E. Phenol
Same as Item 557.
Stg. Tk.
E. Phenol
Durco WHD2 Type 1 20 alloy In 2*0 Out 1.0
.
Pump (East Set) Motor Horizontal 5 HP 1800 RPM Frame 215
,
#,
W. Phenol
Same as Item 566.
Pump (East Set) Motor GE Horizontal 5 HP 1800 RPM Frame 215.
Phenol Transfer Durco WHD2 Type 1 20 Alloy In 2.0 Out 1.0
Pump
Motor United Horizontal 10 HP 1800 RPM
Frame 256U..
.
j
Air Compressor Motor Wagner Horizontal 3 HP 1800 RPM
'
(Ref.Room)
Frame 213 Joy Size (2) 3 1/2 x 3 Tank
Mounted Belt Drive.
Phenol Loading Durco A60 Type 1 20 Alloy In 3,0 Out 2.0
Pump
Motor Westinghouse Vertical 10 HP 1800 RPM
Frame 256U.
j'
Phenol Unload Durco
ing Pump
.
is
.
fL
;
` .
1
t
l
`
.
'
E
1r
1
.
.
# i
'
PCB-ARCH-EXT0372612
Page 89
PHASE II - BULK DISTRIBUTION (Cont'd)
VII. TANK CALIBRATIONS
EAST, WEST, SOUTHEAST AND SOUTHWEST PHENOL STORAGE TANKS
Diameter = 13'
Capacity per 1" on side sheet = 82,75 gallons
M
" 12" on side sheet = 993 gallons
Height =20'
.
INCHES GALLONS ' INCHES GALLONS INCHES GALLONS INCHES' GALLONS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 v 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
83 166 248 331 414 497 579 662 745 828 910 993 1076 1159 1241 1324 1407 1490 1572 1655 1738 1821 1903 19 86 2069 2152 2234
2317 2400 2483 2565 2648 2731
34
2814
35
2896
36
2979
37
3062
38
3145
39
3227
40
3310
41
3393
42
3476
43
3558
44
3641
45
3724
46
3807
47
3889
48
3972
49
4055
50
4138
51
4220
52
4303
53
4386
54
4469
55
4551
56
4634
57
4717
58
4800
59
4882
60
4965
61
5048
62
5131
63
5213
64
5296
65
5379
66
5462
67
5544
100
8275
6 8
5627
101
8358
69
5710
102
8441
70
5793
103
8523
71
5 875
104
8606
72
5958
105
8689
73
6041
106
8772
74
6124 , 107
8854
75
6206
10 8
8937
76
6289
109
9020
77
6372
110
910 3
78
6455
111
9185
79
6537
112
9268
80
6620
113
9351
81
6703
114
9434
82
6786
115
9516
83
6868
116
9599
84
6951
117
9682
85
7034
118
9765
86
7117
119
9847
87
7199
120
9930
88
7282
121
10013
89
7365
122
10096
90
7448
123
10178
91
7530
124
10261
92
7613
125
10344
9 3
7696
126
10427
94
7779
127
10509
95
7861
128
10592
96
7944
129
10675
97
8027
130
10758
98
8110
131
10840
99
8192
132
10923
PCB-ARCH-EXT0372613
PHASE II - BULK DISTRIBUTION (Cont'd) VII. TANK CALIBRATIONS (Cont'd)
Page 90
INCHES ' GALLONS ' ' INCHES' ' GALLONS ' ' INCHES
133
11006
166
134
11089
16 7
135
11171
16 8
136
11254
169
137
11337
170
138
11420
171
139
11502
172
140
11585
173
141
11668
174
142
11751
175
143
11833
176
144
11916
177
145
11999
178
146
120 82
179
147
12164
180
148
12247
181
149
12330
182
150
12413
183
151
12495
184
152
12578
185
. 153
12661
186
154
12744
187
155
12826
188
156
12909
189
. 157
12992
190
158
13075
191
159
13157
192
160
132 40
193
161
13323
19 4
162
13406
195
16 3
13488
196
16 4
13571
197
165
13654
19 8
13737 13819 13902 13985 14068 14150 14233 14316 14399 14481 14564 14647 14730 14812 14895 149 78 15061 15143 15226 15;309 15392 15474 15557 15640 15723 15805 15888 15971 16054 16136 16219 16302 16385
199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231
GALLONS
16467 16550 16633 16716 16798 16881 16964 17047 17129 17272 17295 17378 17460 17543 17626 17709 17791 17874 17957 18040 18122 18205 18288 18371 18453 18536 18619 18702 18784 18867 18950 19033 19115
INCHES GALLONS
2 32 '2 33 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264
1919 8 19281 19364 19446 19529 19612 19695 19777 19860 19943 20026 20108 20191 20274 20357 20439 20522 20605 20688 , 20770 20853 20936 21019 21101 21184 21267 21350 21432 21515 21598 21681 21763 21846
PCB-ARCH-EXT0372614
VII. TANK CALIBRATIONS (Cont'd)
EAST/ WEST, SOUTHEAST AND SOUTHWEST PHENOL STORAGE TANKS
715#/inch - 19,860 Gallons
INS. POUNDS INS.. POUNDS INS ., POUNDS INS . POUNDS
1 2 3 4 5 6 7 8 9 10 11 12 . 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 s 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
715 1430 2145 2860 3575 4290 5005 5720 64 35 7150 7865 8580 9295 10010 10725 11440 12155 12870 13585 14300 15015 15730 16445 17160 17 825 18540 19255 20020 20735 21450 22165 22880 23595 24310 25025 25740 26455 27170 27885 28600 29315 30030 30745 31460 32175 32890 33605 34320
49
35035
97 69355
50
35750
98 70070
51
36465
99 70785
52
37180 100 71500
53
37895 101 72215
54
38610 102 72930
55
39325 10 3 73645
56
40040 104 74360
57
40755 105 75075
58
415 70 106 75790
59
42284 , 10 7 76505
60
42900 10 8 77220
61
43615 109 77935
62
44330 110 78650
63
45045 111 79365
64
45760 112 80080
65
46475 113 80795
66
47190 114 81510
67
47905 115 82225
68
48620 116 82940
69
43995 117 83655
70
50050 118 84370
71
50765 119 85085
72
51480 120 85800
73
52195 121 86515
74
52910 122 87230
75
53625 12 3 87945
76
54340 124 88660
77
55055 125 89375
78
55770 126 90090
79
56485 127 90805
80
57200 12 8 91520
81
57915 129 92235
82
58630 130 92950
83
59345 131 93665
84
60060 132 9 4380
85
60775 133 95095
86
61490 134 95810
87
62205 135 96525
88
62920 136; 97240
89
63635 137 97955
90
64350 138 98670
91
65065 139 99385
92
65780 140 100100
93
66495 141 100815
94
67210 142 101530
95
67925 143 102245
96 . 68640 144 102960
145 103675 146 104390 147 105105 148 105820 149 106535 150 107250 151 107965 152 108680 153 109375 154 110110 155 110825 156 111540 157 112255 158 112970 159 113685 160 114400 161 115115 162 115830 163 116545 16 4 117260 165 117975 166 118690 16 7 119405 16 8 120120 169 120835 170 121550 171 122265 172 122980 173 123695 174 124410 175 125125 176 125840 177 126555 178 127270 179 127985 180 128700 181 129415 182 130130 183 130845 184 131560 185 132275 186 132990 187 133705 188 134420 189 135135 190 135850 191 136565 192 137280
Page 91
INS. POUNDS
193 194 195 196 19 7 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230
231 232 233 234 235 236 237 238 239 240
137995 138710 139425 140140 140855 141570 142285 143000 143715 144430 145145 145860 146575. 147290 148005 148720 149435 150150 150865 151580 152995 153010 153725 154440, 155155 155870
156585 157300 158015 158730 159445 160160 160875 161590 162305 163020 163735 164450 165165 165880 166595 167310 168025 16 8740 169455 170170 170885 171600
PCB-ARCH-EXT0372615
Storage Location East Stg. Tank West Stg. Tank S. E. Stg. Tank S. W. Stg. Tank Little Mo.
Number
....
,
'otc 3ounds n Tank Cars
DEPT. 827 PHENOL DISTRIBUTION CUMENE PHENOL INVENTORY DATA
"
,
Level In Inches
Page 9 2
. Date' # Stock
Total Stock in Storage
Correction Factor
Total Pounds
'
' |
in Stg. Tanks
TANK CARS AVAILABLE
Pounds
Total Pounds in Stg. Tanks
r
Total Pounds in Tank Cars__
GRAND TOTAL \
"
Foreman/Operator Sta. 412
- s'