Document r6QbgzYYpRJy5eJJNqvp3Jr1v
Mr. R. W. Van Battura
February 23, 1981
Wayne
Bureau of the Census -- MQ-C1
B. G. Witherspoon
Charlotte
280
SURVEY OF PLAHT CAPACITY, FOURTH QUARTER 1980
Attached is subject request
the Chicago Plant.
BGW/me
B. G. Witherspoon
&JT-
Location-
Date January 30, 1981
FTom:
R. W; Van Battunr
Location Wayne
Subject: SURVEY OF FLANT CAPACITY, FOURTH QUARTER 1980
Reference: Bureau of the Census * Form MQ-Cl
Please have the enclosed subject report Form MQ-C1 completed and returned to the under signed on or before February 25, 1981.
R. W. Van Battum
B/WII-9 Attachment
N11892.01
CYWX 24-0005969
MQ-C1-F1 (1980) (1-5-81)
UNITED STATES DEPARTMENT OF COMMERCE
Bureau of the Census
:
'
Washington, D.C. 20233
'
NOTICE
Additional instructions for Completing Form MQ-C1, Survey of Plant Capacity
Please read the following instructions before completing Form MQ-C1. These additional
instructions are intended to clarify questions frequently raised and to assist us in under
standing your report.
*
.
1. Data reported in item 1 (Actual, Preferred, and Practical Levels of Operations for Fourth Quarter) normally should be consistent with the operating rates reported in item 2. Please explain in the Remarks section any significant differences between the implicit operating rates in item 1 (i.e., the ratio of the "actual" to the "preferred" and "practical" columns) and the operating rates reported in item 2. Review particularly the measure corresponding to the box reported in item 3 (if you mark boxes 2013 through 2017).
2. While it is our intention to request only data which are readily available, we recognize that some of the information requested may be difficult to report due to circumstances beyond your control. In such cases, please provide your best estimates. Several of the data items (production workers and worker hours) are the same as reported on the Annual Survey of Manufactures (Form MA-100), and should be consistent with that report.
3. In reporting item 1, it is usually best to complete column c (preferred level <?f opera tions) before completing column d (practical capacity). Implicit in the idea of a preferred level of operations is the theory that there is a level of operations at which profits are maximized. This is a level where marginal revenue equals marginal costs. The preferred level (column c) should not exceed practical capacity (column d).
4. If your plant has departments or assembly lines which operate an unequal number of shifts (item 1, line 1), report the maximum number of shifts operated. Do not attempt to calculate an average number of shifts based on hours worked or some other factor. Do not consider overtime hours as fractional shifts. Also, for "hours per day in operation" (item 1, line 3), report the total elapsed time the plant is open and operating, not the number of person hours worked.
N(1892.02
CYffI 24-0005970
MQ-C1-L1 (1980) (12-2-80)
%
/V /
UNETED STATES DEPARTMENT OF COMMERCE Bureau of the Census Washington, D.C, 20233
OFFICE OF THE DIRECTOR
JANUARY 19, 1981
FROM THE ACTING DIRECTOR BUREAU OF THE CENSUS
Enclosed are your report forms and file copies for reporting in the "Survey of Plant Capacity" (MQ-C1) for the fourth quarter of 1980. The questionnaire is unchanged from the 1979 form. Estimates of capacity utilization are used by the Federal Reserve Board, the Council of Economic Advisers, the Treasury Depart ment, and other agencies responsible for developing monetary and fiscal policy. Private firms also use the data to analyze industry trends, investigate market potential, and predict capital flows.
We recognize that not all firms maintain records of capacity utilization, as such, and that capacity may change with the product mix, the time in operation for the plant, the equipment in place, or for various other reasons. Therefore, some degree of estimation may be required to complete the form. Please read the instructions carefully before completing the report. Use the "Remarks" section to explain any unique conditions that may have entered into your estimates.
The sample of respondents for this survey has been selected as a subsample of the annual survey of manufactures (form MA-100). You are requested to complete the capacity questionnaire only for those establishments for which you received forms, even though you may file forms MA-100 for additional establishments.
Response to this inquiry is required by law (title 13, United States Code, sections 131, 182, 224, and 225). By section 9 of the same law, your report to the Census Bureau is confidential. It may be seen only by sworn Census employees and used only for statistical purposes. The law also provides that copies retained in your files are immune from legal process.
Your cooperation in completing this form within 30 days will help to make possible the timely release of
the Survey results. If you have any questions, or if additional time is required to complete the report,
please contact the Special Projects Branch of our Industry Division at (301) 763-5915 for assistance.
Requests for additional forms may be made by calling (812) 288--3331.
.
Sincerely,
9$.
DANIEL B. LEVINE Enclosures
N11892.03
CYWI 24-0005971
Pile?
GENERAL INSTRUCTIONS - Continued
Practice! Capacity - This Is the greatest level of output this plant can achieve within the frame* work of a realistic work pattern. In estimating practical capacity, please take Into account the following considerations:
4. Take Into account the additions) downtime for maintenance, repair, or cleanup which would be required as you move from current operations to full capacity,
1. Assume a'normal: product mix. If the plant Is subject to considerable short run variationin product ml* you may dssume that the current piajLte'rnofptodoctvon IS normal.
5. Assume availability of labor, materials, utilities, etc.: . sufficient toutilise the machinery and equipment that wav in place at the end of the; quarter. 1- '
_ ...... 2. In setting capacity In terms of the numberof
shifts and hours of plant operation assumean expansion of operations that nn be reasonably
attained in'your, industry and your! locality,
4. Do not consider overtime pay, added costs for matttials, or other costs to be r.online factor* In setting capacity,
.1
.
7, Although It may be possible to expand plant
3. Consider only the machinery and equipment In
output, by using productive facilities outside
place and i ready to operate.1 Oo hot consider
of die1 plant, such as by connecting out sub
facilities which have been IripperutlVe for a
assembly work, do not assume the use of such
len('petiocl of. time ahd, therefore, r^iuire. exten-
outside facilities: in mote than the proportion
live reconditioning before they; cert be
that, hies been i normal In your current level
i . made operajtiyie.of operations.
Item 1 - ACTUAL,PREFERRED, AND PRACTICAL LEVELS OF OPERATIONS FOR FOURTH QUARTER
; I960 {OCTOBER-DECEMBER) -- In; reporting shifts, days, and hours of operations you may use the most
typical .pattern during the period. Lines 1 through S * Please make every effort to report information requested
in column* (bJife),add (d);, ''
. ; ''
Line No.
Item la)
4th Quarter 1980 Preferred level oh operation* (bj (Il)
1 Shifts per day (Number)
2 Oays per week in operation (Number) 3 Hours per day in operation {Number)
^....
022
1
3 . 7.
34 4 4
Weeks in operation during 4 die 4th quarter {Number)
: 5 Number of produciion workers as of November 12
Total wDrk-lmurs worked during the quarter , 6 byiptoducnon workers (Thousands)
l 2--
IOSI *
S'
/>" /7
BS2
" />
: Hjfi n /f i.
7 Percent of overtime hours Included in line 6
n " ,s%
"
,, Value of production (51,000)
jcfft
if possible, please report [o' lines 9 ond 10 below.
Ose reasonobte estimates for (he i(emfS) most
suitable for yot/r establishments-
* 9 Quantity of production - Specify units
me srtt
tost
to Quantity of materials' consumed -- Specify units
V-
^ Item 2 - OPERATING RATES DURING THE FOURTH QUARTER 1980
Line No.
Z73-7
'""gSVb
\Ql 4%
17&
Percent
At what percentage of practical capacity did this 1 plant actually operate during the fourth quarter I9BC
4/ -
2 At, what percentage of practical capacity would you have preferred this plant to operate during the fourth quarter 1980)
9S
b Item 3 - METHOD USED TO DETERMINE OPERATING RATES - The purpose of (his inquiry is to learn how
operating rates are computed.
Mark (X) one *01 J j_ 1'Production wotker* *91* IJ Work hours *0t 'jVsHie of production 201 Quantity of production
*01* (__) Ou*M>ly of materiel* consumed 20 18 [_ ] SnDiecr..* ev*t,,HOn 20 t* | ] Other - Specify
fc Hem 4- REASONS FOR OPERATING AT LESS THAN 100G OF PRACTICAL CAPACITY AND LENGTH OF TIME REQUIRED TO REACH AND MAINTAIN PRACTICAL CAPACITY - If during the 4ih querfer I960 this establish, ment operated at Jess than 100*1 of your practical capacity, please complete items 4a, 4b, and 4c below.
fc8. Principal reason your operations fell short of practical capacity. Enter the number 1 through for each nppli'c'sble item to indicate the ranking of the reason in importance. Number only those reason* which penbift to your operations.
n-i__Inrulflclent o-derj
jot._____ Lick ofnil.lt or vi.optit*
jori
Inmiemiate tabor farce ttotal or
*eecl|le skill*}
56'S_____ Strike or other -e'k tieppae**. etc.
>0't-------_Lrk of luttlelenr uel or electric ener*r
9r_____ Other (fire. Monrf, etc.) - S/wrifr_______________
b. Length of time it would require to expand actual operations to practical capacity providing the sufficient demand !t>r the output --
Mark (X) one
9021 [_) 1 week o> less
jon [' ] 4-4 moxih*
9922^^7 --eek* to a month
02 f"J More then 6 month* -- Specify
S62{ j 3-1 month,
c. Length of time practical level of operation could be sustained for level specified in 3026 above)
*02* | ) tmpf*ecl lo expend lo
practical capacity -- Specify esttrmSed percent or practice! capee/ly Ifwr could bo reached within 6 months...........................
......................
, h/, nt.
--,,,v..
Item 5 -- Person to contact regarding this report
N11892.04
CYWI 24-0005972