OPERATING MANUAL
OLD UNIT PVC REACTORS
ABERDEEN, MISSISSIPPI
I. INTRODUCTION
Page No.
A. Operator Responsibilities ------------------------------------------------------------B. Process Information----------------------------------------- --------------------------------
*
3
1. Evacuation 2. Charge 3. Initiator 4. Polymerization 5. Recovery and Steam Stripping 6. Dumping
II. GENERAL PROCESS DESCRIPTION
A. Evacuation -----------------------
B. Charge -----------------------------------------
1. Precharge Preparations 2. Reactor Charge
C. Polymerization -------------------------
D. Recovery and Steam Stripping
1. Recovery 2. Steam Stripping 3. Hydroquinone Injection 4. Recovery of Blowdown Tank
E. Reactor Dump and Rinse ------------
F. Chem Wash
G. Water Swirl
H. Batch Water Stripping System --
17
III. OPERATING PROCEDURES A. Reactor Evacuation B. Reactor Precharge
22 VAB.0001146540
Mm
mmmm
r-r^ vtt
WUPMH III" ..............................
1-2
TABLE OF CONTENTS (CONT.)
III. OPERATING PROCEDURES (CONT.)
C. Reactor Charge ---------------------------------------------------------------------
D. Polymerization ---------------------------------------------------------------------
E. Recovery and Steam Stripping-------------------------------------------
F. Reactor Dump and Rinse -----------------------------------------------------
G. Chem Wash and Rinse -----------------------------------------------------------
H. Full and Partial Swirl -----------------------------------------------------
1. Full Swirl 2. Partial Swirl
I. Colloid Solution Make-Up--------------------------------------------------
J. Hydroquinone Solution Make-Up ----------------------------------------
K. Used Chem Wash Solution Disposal---------------------------------
L. Initiator Handling and Storage --------------------------------------
1. Safety Precautions in Handling Initiator 2. Physical Characterics 3. Initiator Storage Freezers 4. Design and Operational Functions 5. Daily Operational Checks 6. Emergency Procedure for Initiator Freezer 7. Circle Chart Responsibility and Change Schedule
M. Reactor Pressure Check -----------------------------------------------------
N. Reactor Cleaning and Entry ----------------------------------------------
1. Reactor Manhead Opening Procedures 2. Reactor Cleaning and Entry
O. Filters-------------------------------------------------------------------------------------
1. Dura-Sekl Oil Filters 2. Reactor Gearbox Oil Recirculation Filters 3. Charge Water Filters 4. Seal Water Filters 5. Vinyl Chloride Charge Filters 6. Recovered VCM Filters
P. Housekeeping---------------------------------------------------------------------------
Page No. 24 28 36 44 46 50
51 55 57 58
67 68
1 m H wmmmmm
Vi p
H -F-- 'll lIllplH^l
VAB.0001146541
TABLE OF CONTENTS (CONT.)
IV. BATCH WATER STRIPPING SYSTEM OPERATIONS MANUAL
V. INCINERATOR
VI. APPENDIX A. Equipment List B. Instrument List C. P & I Diagram
1-2
A
VAB.0001146542
Operating Manual Old Unit PVC Reactors
1-2
I. INTRODUCTION (CONTINUED)
B. Process Information
Several types of resins are produced. Resin type is determined by
a set of physical properties such as particle size and viscosity.
Each type of resin produced requires that a certain set of operating
conditions be closely followed so that the desired resin properties
are obtained. Minor changes in formulas or operating conditions
can cause major differences in the physical properties of the
resin. Some factors in determining resin properties are reaction
temperature, which helps determine viscosity, colloid, which
influences particle size, and the amount of recovered VCM charged,
which also effects particle size, amount of short-stop which effects
stability and amount of calcium stearate which effects drying and
customer processing.
:
*
* *
The phases of reactor operation and a brief description of each follows:
1. Evacuation
This step removes all air possible by steam ejectors. Too
much air left in a reactor will alter particle size. Evacuation
should require about five minutes,
2. Charge
Water, Colloid and VCM are charged to the reactor simultaneously
through a timed sequence system. The temperature of the reactor
contents at the end of charging is determined by the charge
water temperature. The reactor will be below run temperature
at the end of the charge and jacket steam will be used to raise
....................11
I '"imiiiisu in.......mu- --"HI
m im n*
VAB.0001146543
1-2
Operating Manual Old Unit PVC Reactors Page 4
*
I. INTRODUCTION (Cont.)
B. Process Information (Cont.)
2. Charge (Cont.)
the temperature to the desired level. Charge should take about
nine minutes for D-300, D-400, D-500, and D-600. D-700 will
require about fifteen minutes.
3. Initiator
The initiator is manually loaded into the initiator injection pot
and charged into the reactor after reactor charge is complete.
4. Polymerization
This is the time from the initiator addition until most of the VCM
has been converted to resin. The reaction generates heat continu
ously as liquid VCM becomes PVC resin. Heat that is generated is
removed by cooling water on the reactor jacket and condenser.
Reaction times varies, but generally requires five to six hours for
D-300, D-400, D-500, and D-600. D-700 will require 4 1/2 to 5 hours.
5. Recovery and Steam Stripping
Recovery and steam stripping removes most of the un-reacted VCM
from the eractor via a compressor-vacuum pump system. Steam is added
to the bottom of the reactor and rises through the PVC and water
slurry to help remove unreacted VCM. Recovery and steam stripping
takes about 60 minutes for D-300, D-400, D-500, and D-600 and 90
minutes for D-700.
6. Dumping
The PVC resin, after reaction is complete, is in a slurry form. The
slurry is dumped to a strainer and dump tank and is pumped to blend
tanks in the Dryer Room for drying. Dump requires about 25 minutes
for D-300, D-400, D-500, and D-600 and 35 minutes for D-700. VAB.0001146544
1-2
Operating Manual Old Unit PVC Reactors Page 5 n. GENERAL PROCESS DESCRIPTION
A. Evacuation Before charging, the inerts present in the polymerization reactor are removed by evacuation. The interlock selector switch is placed on "evacuation'1 position. *The main condenser valve is opened; the reactor evacuation valve is opened, and the evacuation header valve and the steam supply valves to the ejector system to be used are opened. The emergency cooling water supply valve to the reactor is then opened. When the reactor breaches 28.5 inches of mercury vacuum, as indicated by the pressure indicator in the control room and at the reactor, evacuation is complete. This portion of the cycle requires about 10 minutes.
B. Charge 1. Precharge Preparations After evacuation, the reactor is ready to be charged. In pre paration for charge, adequate quantities of VCM, hot water, col loid solution, and initiator are made ready for the charge sequence. Prior to charge, fresh VCM is transferred from the VCM storage sphere to the fresh VCM storage tank. This transfer of VCM begins automatically when the VCM liquid level falls below a certain level. When the high liquid level is regained, the transfer process shuts down automatically. Two 150 gpm VCM transfer pumps are used to transfer the VCM from the VCM storage sphere.
VAB.0001146545
4 1-2
Operating Manual Old Unit PVC Reactors Page 6
ii. GENERAL PROCESS DESCRIPTION (Continued)
1. Precharge Preparation (Cont.)
Process water is automatically supplied to the hot water tank when
the water level drops below a certain point. The water is filtered
by the process water filter, and is heated in the hot water pre
heater, enroute to the hot water tank. The colloid solution, pre
viously made up, is pumped from the make-up tank to the charge tank
before every charge. When the make-up tank becomes empty, a new
batch of colloid will be made up. After a new batch is made, a sam
ple is taken to the laboratory for analysis. The colloid percent-
total solids must be 1.40-1.60, The colloid is then pumped from the
make
Immediately
actor is to be charged, the initiator injection system is made ready
for the charge in the following manner. First the initiator injec
tion pot at the reactor to be charged is drained to the sewer. One
gallon of water is manually added as indicated by the local flow
manually
The
pressure service water to at least 180 psig. The initiator injec
tion system is now ready for the reactor when the charge is com
plete. Caution: The initiator should never be left in the charge
pot if the charge is aborted. It is to be dumped to the sewer and
the pot flushed with water.2
A
2. After evacuation is completed, the interlock selector switch is moved to the "charge" position. If the following precharge cona tions are met, the charge sequence is ready to begin:
VAB.0001146546
Operating Manual
Old Unit FVC Reactors Page 7
II. GENERAL PROCESS DESCRIPTION (Cont.)
B. Charge (Cont.)
2. Reactor Charge (Cont.)
b. There is sufficient pressure in the initiator injection
pot and in the high pressure service water header.
c. The charge meters are reset to the charge quantities.
Steam is usually applied to the reaetor jacket at the start of
charge by manually opening the steam valve from the Control Room.
This aids in heating the reaction mass to the desired temperature
during and immediately following charge. The automatic charge
sequence begins with the hot water charge. The hot water is
pumped from the hot water tank, to the reactor by the hot water
charge pump. After a predetermined quantity of hot water has been
charged, the colloid charge pumps and the second hot water charge
pump start. The next step in the charge sequence begins with the
fresh and recovered VCM charges. The fresh VCM is pumped to the
reactor from the fresh VCM storage tank, by one of the two VCM
charge pumps. The recovered VCM is pumped from one of two
reeoverd VCM storage tans by the recovered VCM charge pump into
the suction of the VCM: charge pump. The reeoverd VCM is filtered in
the recovered VCM filter and the total VCM charge is filtered enroute
to the reactor by the VCM charge filter.
Shortly after the beginning of the VCM charge, one of the hot water,
charge pumps shuts down until the VCM charge is completed and then
restarts. This insures that there will be an adequate amount
of water charge remaining to flush out the charge line except on D--700
where the VC line is separate. Both hot water charge pumps continue
to run until charge is completed.
VAB.0001146547
Operating Manual Old Unit PVC Reactors
1-2 A
H. GENERAL PROCESS DESCRIPTION (CONTINUED) B. Charge (Continued) *When the VCM, water and colloid charge is complete, the initiator is charged by opening the initiator charge valve from the reactor
*!
by "A" operator. Loading the initiator and preparation of the
* n
initiator charge pot was discussed in the precharge preparation section. C. Polymerization
After charge is completed, the reactor interlock selector switch is placed in the "polymerization" position, and the reactor temperature controller is placed on automatic. When the reaction mass reaches the desired temperature the steam is turned off. The reaction mass temperature is automatically controlled by varying the amount of cooling water that is passed through the top-mounted knockback condenser and the reactor jacket.
The reaction mass is continually mixed and kept in suspension by the bottom-mounted single speed agitator. The agitator mechanical seals are lubricated and cooled by seal oil from a seal oil pressure unit.
During polymerization, mechanical seal purge water is injected into and
mechanical seal. The cleaning nozzle and agitator mechanical seals clean. The purge water flow for each service is indicated with a rotameter and
anually adjusted.
..........- . --ij
Pfhuaqn
Mni
VAB.0001146548
Operating Manual Old Unit PVC Reactors
Page 9
1-2
II. GENERAL PROCESS DESCRIPTION (Cont.)
C. Polymerization (Cont.)
The inerts present in the reactor during polymerization accumulate
in the reactor condenser head space. These inerts are vented
to the recovery system to prevent inert blanketing.
When the desired degree of polymerization is reached and the reactor pressure has dropped to the desired pressure, the reaction is stopped by manually adding a mixture of AMS and Naugard (the short stop solution) to the reactor. High pressure service water is used to pressure the short stop solution from the initiator injection charge pot into the reactor through the same piping as the initiator charge. The charge pot is then blocked in and refilled with the short stop solution which will be used at the middle of steam stripping. An emergency AMS kill pot, located at grade, is provided to pressure AMS into the reactor to kill the reaction in the event of a power failure or upon loss of agitation. The AMS will be injected into the reactor through nozzles in the reactor head, using push buttons on the control panel or by manually operated valves in the field. The pots for D-300, D-400, D-500 and D-600 will contain 15 - 20 gallons of AMS. The pot for D-700 will contain 40 gallons of AMS. The material will be pressuirzed into the reactors using nitrogen, supplied by a nitrogen bottle located beside the pot.
A
VAB.0001146549
Operating Manual Old Unit PVC Reactors Page 10
1-2
n. GENERAL PROCESS DESCRIPTION (Cont.) C. Polymerization (Cont.) A nitric oxide (NO) short stop addition system is provided to inject NO into the reactors in the event of power failure, major VCM releases, fires, or other emergencies. The system is activated locally. NO is supplied from emergency NO short stop bottles and is injected into the reactor through the same piping as the agitator mechanical seal purge water.
A
D. Recovery and Steam Stripping 1. Recovery When the reaction is completed, the interlock selector switch is moved to the "recovery and steam stripping" position. The following sequence then occurs. The recovery compressor seal water systems, the water recirculation systems for the recovery knockout drums and two of the three recovery compressors are manually started from the board. Cooling water to the recovered VCM condenser and the water recirculation cooler starts automatically with the compressors, and the hydroquinone injection system starts with the compressor seal water systems.
wmmm
lb*.b
k-
VAB.0001146550
1-2 A
Operating Manual Old Unit PVC Reactors Page 11 II. GENERAL PROCESS DESCRIPTION (Cont.)
D. Recovery and Steam Stripping (Cont.) The vapor from the reactor flows through a pressure control valve to two resin knockout drums in series which remove carryover resin. The pressure control valve prevents excessive carryover of resin from the
h
reactor by limiting the pressure to the recovery system to about 35 psig. Each of the knockout drums have an internal water spray system and a recirculation pump. Both knockout drums have an on-off level control system which, on high liquid level, diverts the discharge of the water recirculation pumps to the blowdown tank. A water recirculation cooler, (the function of which is explained in the steam stripping portion of the recovery system process description), is provided and can be used in the water recirculation loop of either scrubbing stage.
The VCM vapors from the knockout drums are compressed by the recovery compressors.
The recovery compressors are constant volume liquid ring compressors with a water seal. The discharge streams from the compressors flow to two parallel seal water recirculation systems which operate as fol lows. Seal water is separated from the VCM vapors in the seal water separators, filtered by the seal water filters, cooled by the seal water coolers, and pumped back to the compressors by the seal water pumps. The flow of seal water to each compressor is controlled at 50 gpm. The seal water temperature is controlled just above the VCM conden sation temperature (95-105F). Automatic draining of the seal water
VAB.0001146551
1-2 A
Operating Manual Old Unit PVC Reactors Page 12
II. GENERAL PROCESS DESCRIPTION (Cont.)
D. Recovery and Steam Stripping (Cont.)
1. Recovery (Cont.)
separators to the water stripper is provided to maintain the
correct water level.
The VCM vapors from the seal water system are condensed in two
recovered VCM condensers. The condensed VCM is collected in
the recovered VCM collect tank which is on automatic on-off level
control. VCM is transferred to the recovered VCM storage tanks
by the recovered VCM transfer pump when there is high liquid level
in the VCM collect tank. Inerts are bled from the collect tank to
the incinerator.
When the reactor pressure drops to
psig, the two recovery
vacuum pumps automatically start. The VCM flow from the recovery
knockout drums and the seal water flow are both diverted to the
vacuum pumps which discharge into the suction of the compressors.
2. Steam Stripping
In order to reduce residual VCM in the slurry, the slurry in the
reactor is heated and stripped with steam. At the start of a
normal recovery, steam addition to the reactor is manually started
from the control room and the slurry mass is heated. When the temper
ature of the reactor has risen to the desired temperature, the steam
stripping operation is completed.
As recovery proceeds, less and less VCM is recovered from the reactor.
To supply sufficient VCM vapor to the recovery vacuum pumps and com
pressors, a VCM backpressure system is used. This is done to prevent
VAB.0001146552
1-2
A
Operating Manual Old Unit PVC Reactors Page 13 II. GENERAL PROCESS DESCRIPTION (Cont.)
D. Recovery and Steam Stripping (Cont.) 2. Steam Stripping (Cont.) cavitation and overheating of the vacuum pumps and compressors. Before entering the recovery knockout drums, the steam and VCM from the reactor are combined with a bleed stream of VCM from the recovered VCM storage tanks. The amount of VCM bled into the recovery system is adjusted by the backpressure control valve such that a set supply pressure to the vacuum pumps is maintained.
The majority of the steam is condensed in the first knockout drum described in the normal recovery process description. The first stage of the scrubbing system consists of a recovery knockout drum with an internal water spray system, a water recirculation pump and the water recirculation cooler. The water cooler reduces the water temperature sufficiently to allow the internal spray system in the knockout drum to cool the VCM and condense much of the steam in the vapor stream. After leaving the first stage of the water scrubbing system, the VCM vapor flows to the second stage of the scrubbing system and then to i the rest of the recovery system in the same manner as during normal recovery. 3. Hydroquinone Injection The VCM removed from the reactor during recovery still contains a small amount of initiator. As a result, the VCM will continue to polymerize, resulting in plugged lines, charge lines, and recovered VCM storage tanks. Polyermization is significantly reduced by
Wmnnppw
VAB.0001146553
Operating Manual Old Unit PVC Reactors Page 14
1-2
A
II. GENERAL PROCESS DESCRIPTION (CONTINUED)
T
D. Recovery and Steam Stripping (Continued)
3. Hydroquinone Injection (Continued)
the addition of an inhibitor such as hydroquinone to the VCM
stream as it is being recovered. -
A 4,6 percent solution of hydroquinone in water is prepared in the hydroquinone storage tank.
The hydroquinone solution is pumped by the hydroquinone injection pump into the suction of the recovery seal water pumps. The injection pump starts and stops automatically with the seal water pumps. The metering pump has a variable stroke which can be adjusted manually to maintain the preset hydroquinone injection rate.
1
4. Recovery of Water Stripper The water stripper is to collect the various steam and water streams containing VCM from the four-reactor module. The emission recovery system is used to recover VCM vapor. When the temperature of the tank rises to the desired temperature, re covery of the tank, is stopped.
E. Reactor Dump and Rinse After the reactor is recovered and steam stripped, the reactor interlock selector switch is moved to the "dump" position. The appropriate dump valves are opened from the control room and the VAB.0001146554
mm
. -i.
i -- h ....................................... i-H
w 11 it nM
1 1'
Operating Manual Old Unit PVC Reactors Page 15
1-2 A
II. GENERAL PROCESS DESCRIPTION (CONTINUED) E. Reactor Dump and Rinse (Continued) slurry flows by gravity to the dump system. The slurry passes through an enclosed vibrating slurry strainer where the PVC culls are collected until dump is completed. The slurry then flows to the slurry dump tank. The slurry transfer pumps transfer the slurry to the blend tanks. The dump tank level is automatically controlled. Near the end of dump, the reactor condenser is flushed with water by turning on the condenser rinse system from the board. Hot water is pumped from the hot water tank by the hot water charge pumps through the cleaning nozzle in the reactor condenser. The rinse water mixes with any remaining slurry and is pumped with the slurry to the blend tanks flushing out the slurry transfer lines. F. Chem Wash and Rinse If it has been determined that the reactor needs cleaning, the
t
reactor interlock selector switch is moved to the "clean and rinse" position after the dump and rinse is completed.
The chem wash solution is a caustic solution. The cleaning solution
pump pumps the solution at 500 GPM from the cleaning solution tank
through the cleaning solution heater to the reactor condenser spray
nozzle. Steam to cleaning solution heater is automatically adjusted to provide an exit solution temperature of 190tF. When the chem wash
solution tank is empty, recirculation is started with the chem wash
solution being pumped from the reactor and back to the reactor through
the reactor cleaning nozzle.
VAB.0001146555
hi
1-2 *
Operating Manual Old Unit PVC Reactors Page 16
H. GENERAL PROCESS DESCRIPTION (CONTINUED) P. Chem Wash and Rinse (Continued) When ing solution tank by the cleaning solution pump. The D--300, D-400, D-500, and D-600 requires ten minutes to fill the re actor through the condenser, five minutes to wash the reactor, and ten minutes to empty the reactor, for a total of twenty-five minutes. D-700 requires a total time of forty-one minutes -- twenty one minutes to wash through the condenser, ten minutes to wash the reactor, and ten minutes to empty the reactor.
After the chem wash is completed, the reactor is rinsed with hot water from the hot water tank. The hot water is pumped by the hot water charge pumps to the reactor. The water first enters through
t
the condenser cleaning nozzle and then the reactor cleaning nozzle. The chem wash and rinse system in manually controlled from the con trol room. The operator monitors the bullseye at the sewer drain to be sure the reactor is empty. When the reactor amps have dropped to the no load amps indicated on the ammeter, the lead operator opens the rinse valve for a short period of time. By observing the water flowing from the bullseye, he can determine that the reactor is empty.
G. Water Swirl
*
If the resin formula calls for a water swirl, the reactor interlock
selector switch is placed in the "swirl" position after the chem
VAB.0001146556
...............................
i irV -H'l i i^taiil
.. ......................... ......
1-2 A
Operating Manual Old Unit PVC Reactors Page 16a
wash rinse is completed. Cold or hot water enters the suction of the hot water charge pumps, and is pumped through the reactor charge line into the reactor. When the water charge reaches a preset amount, the water charge system is automatically shut down.
m mmmmmmmmmmmm
i\
mm m
VAB.0001146557
Operating Manual Old Unit PVC Reactors Page 17
1-2 A
II. GENERAL PROCESS DESCRIPTION (CONTINUED) G. Water Svirl (Continued) The reactor agitator is then used to swirl the water for approximately 25 minutes. The lead operator then drains the water to the sewer. This completes one reaction cycle; the reactor is now ready for evacuation. H. Water Collection System Various waste water streams from the process must be collected and treated before discharge to the plant sewer system. The batch water stripping system serves as a central collectior. point for all the contaminated streams, which include water drains from the V-ll receivers, water from the emission recovery system, water from the new module, and water from miscellaneous flushes and seal waters. A separate operating guide is included in Section IV of this manual
The various streams are routed to one of two parallel stripping tanks. Each new tank is used as both a storage tank and a stripper. While one tank serves as a collection vessel, the other one is being stripped, with steam. The water collected in each tank is stripped to 170F and recovered to a vacuum using the emission recovery system. Once the stripping operation is finished, the operator opens the outlet valve on the tank and drains the tank to the sewer. When the liquid level falls below 12% in the tank, the outlet valve is automatically closed, completing the cycle.
VAB.0001146558
Operating Manual Old Unit PVC Reactors Page 18
1-2
A
III. OPERATING PROCEDURES A. Reactor Evacuation Evacuation of the reactor is required prior to charging in order to remove as much of the air as possible. Air is introduced into the reactor during previous phases of the reactor batch cycle since dump, rinse, and chem wash require that the reactor be vented to the atmosphere. Air in the reactor during reaction causes poor temperature control during the polymerization and may alter the particle size of the resin.
Evacuation is accomplished using one of the two available twostage steam jet ejector systems. Evacuation is controlled by the lead operator from the board. The "A" operator must confirm that all process equipment is operating correctly during evacuation.
Procedure 1. If the reactor has been opened, follow procedure given in the
"Reactor Cleaning and Entry" section on how to close the reactor manhead. 2. The lead operator puts the interlock mode selector on "evacuation." 3. The lead operator checks to see that all valves are closed. A. The lead operator opens the condenser recovery valve and the evacuation reactor valve. Then the lead operator opens the steam supply valves and the evacuation valve to the steam ejector systems as follows:
VAB.0001146559
Operating Manual Old Unit PVC Reactors Page 19
1-2
A
III. OPERATING PROCEDURES (CONTINUED)
A. Reactor Evacuation (Continued)
a. For D-300, D-400, D-500 and D-600, the operator will open
-frftlves CV-151 arid CV-152. This starts the ejector system
located in the V-ll building.
b. For D-700 the operator will open valves CV-133 and CV-13L.
This starts the ejector system located on the D-700
reactor structure.
He then opens the emergency cooling water valve, which
supplies cooling water to the reactor condenser.
Note:
In the following steps, 5-10, the operators prepare the
f
initiator for charge while evacuation is in progress.
5. The "A" operator will go to the initiator freezer and bring
the specified amount of initiator to the initiator charge
pot. Extreme caution must be exercised by the "A" operator
to be sure that no VCM is allowed to get back into the initi
ator injection pot. When a small amount of VCM is mixed with
a large amount of initiator, an extremely fast reaction takes
place giving off heat and pressure. To guard against this
situation, the operator must know that he has an adequate
water supply and pressure. The reactor initiator injection
valve must never be opened unless the bomb is fully pressurized
with the inlet water valve open.
Note: The following precautions must be taken when handling
initiator.
VAB.0001146560
Operating Manual Old Unit PVC Reactors Page 20
III. OPERATING PROCEDURES (Cont.) A. Reactor Evacuation (Cont.) a. Plastic gloves must be worn while handling initiator. b. If any initiator is spilled on skin or clothing, immediately flush with water c. Should any initiator remain in the containers, return it to storage d. Take all empty containers to trash and split side of all containers. empty the caps seperately. f. Do not allow the initiator to stand in the bomb for more than 10 minutes. Drain it to the sewer, and flush with water 6. The "A" operator must check the initiator charge pot to be sure that it is empty. Close the drain valve. Open the initiator addition valve. 7. The "AM operator will now add the initiator to the injection pot and pressure the pot to 180 pounds.
.8 The lead operator will stop evacuation when a vacuum
Hg is attained. The reactor vacuum is double checked by the "A" operator on top of the reactor with a mercury manometer. The lead operator stops evacuation by closing the condenser recovery valve, evacuation header valve, and the steam supply valve to the ejector This will shut off the evacuation steam jets He then closes the emergency cooling water valves 9. Evacuation is now complete.
VAB.0001146561
Operating Manual Old Unit PVC Reactors Page 21
1-2
III. OPERATING PROCEDURES (Cont.) A. Reactor Precharge The reactor precharge procedure includes a series of precharge
r
checks and precautions that must be carried out by the lead and "A" operators. If the necessary precharge conditions are not met, the Modicon (a small computer which controls the automatic charge sequence) will not allow the automatic charge sequence to begin.
A
It is the responsibility of the lead operator to see that all precharge checks and precautions are carried out. He should also read the log book at the start of the shift, covering the period since he was last on the job. This will alert him to any changes in formula, mechanical, or operational procedures that may have been passed on verbally. 1. Lead Operator Duties
a. Check level in fresh VCM receiver to see that it is adequate for charge. 80% reading on the level gauge at the panel.
b. Drain water in the recovered VCM receiver to the water stripper. Valves from the recovered receiver are manually opened from the board until pressure rise in the blowdown tank indicates all the water is out and VCM is being transferred. Valves are then manually shut from the board.
c. Fill out the reactor charge sheet. d. Check the hot water tank level and temperature. Tank level should
be 85% and the tank temperature 150p#
Check to see that all valves on the reactor are closed. VAB.0001146562
mmm
wmjmiih
`"in- I rm-
II-(
Operating Manual Old Unit PVC Reactors Page 22
1-2
A
III OPERATING PROCEDURES (CONTINUED)
B. Reactor Precharge (Continued)
1. Lead Operator Duties (Continued)
f. Have
Aft A II
make
on the following:
(1) Dura-Seal* oil level and pressure.
(2) Mechanical seal purge water pressure and rate to the
reactor agitator seal.
(3) and temperature
g Record the readings on the charge sheet as they are trans
mitted by the "A" operator.
.2 AII A II Operator Duties
a. Check Dura-Seal* level and pressure. There are five Dura-
Seal* units. Each individual unit supplies seal oil pressure
to individual reactors. If the units fail, an emergency supply
of seal oil is provided by the emergency seal oil drum that is
nitrogen pressurized.
manually
unit
emergency
Note: When the primary and spare Dura-Seal* oil units are
down and the emergency system is in operation, reactors
are not to be charged until at least one of the Dura-Seal*
oil units is operating. The emergency system is designed
to be a backup system that should be used short term only.
*Registered Trademark
PfPW n.
|E>|| I1
VAB.0001146563
Operating Manual Old Unit PVC Reactors Page 23
1-2
A
III. OPERATING PROCEDURES (CONTINUED) B. Reactor Precharge (Continued) 2. "A" Operator Duties (Continued) When one of the Dura-Seal* oil units is not in operating condition, inform the lead operator so that repairs can be made.
The seal oil level should be checked in both units. The discharge pressure should be checked and be in the range of 205-250 psig. Report the seal oil pressure to the lead operator. b. Check the mechanical seal purge water pressure and rate of flow to the agitator mechanical seal. Pressure should be 180-220 psig. Adjust the water flow rate to that given in the formula.
Report the seal water pressure and flow rate to the lead operator. c. Check the colloid charge tank level to be certain enough is in the tank to complete a charge. Notify the lead operator of the present level. d. Inform the lead operator when checks are completed and the reactor is ready for charge.
*Registered Trademark
VAB.0001146564
Operating Manual Old Unit PVC Reactors Page 24
1-2
A
IH. OPERATING PROCEDURES (CONTINUED)
C. Reactor Charge
fl
This section includes vacuum break and reactor charge. The
reactor charge is one of the most critical operations in terms
of product quality. Care must be taken to assure that all the
raw materials are added in the proper order and amount.
Procedure 1. When evacuation and precharge checks are complete, the
lead operator can move the interlock mode selector to "charge". 2. The lead operator should take the following steps and see that the following conditions are met before charge: a. VCM transfer should be in auto. b. Recovered VCM charge should be in auto. c. Fresh VCM charge should be in auto with either the
primary or spare pump selected for charge. d. Hot water charge should be in auto. e. Colloid charge should be in auto with either the
primary or spare pump selected for charge. f. Select recipe to be charged by dialing recipe number
on the recipe selector on the board. g. Push meter reset button, which resets all charge
meters.
r
VAB.0001146565
Operating Manual Old Unit PVC Reactors Page 25
A
III. OPERATING PROCEDURES (CONTINUED) C. Reactor Charge (Continued) 2. h. The charge light will now come on if all the following conditions are met: (1) The fresh VCM storage tank, hot water tank, and colloid charge tank all have a level adequate for one complete charge. (2) One reactor is in charge mode. (3) The reactor being charged has at least 28.5 inches Hg vacuum. 3. When a charge light is obtained on the panel, the lead
k
operator will inform the "A" operator to stand by for breaking vacuum. The lead operator will break vacuum by: a. Manually opening the reactor VCM charge valve from
the board. b. Manually opening the reactor charge valve from the
board. c. Turbine meters will start counting as VCM flows into
the reactor. d. As soon as a positive pressure is indicated in the
reactor, close the VCM charge valve.
mmm
m
VAB.0001146566
Operating Manual Old Unit PVC Reactors Page 26
1-2 A
hi. OPERATING PROCEDURES (Continued) C. Reactor Charge (Continued 4. The "A" operator will then watch the pressure gauge at the top of the reactor. When the pressure rises above zero, start checking the following: a. Inspect manhead visually and listen for escaping vapor. b. Check safety disc gauges for pressure. Any pressure indicates a leaking or ruptured disc. c. Turn flush water (injection water) on sprayhead. The purpose is to keep spray heads free of resin. Set rate according to recipe. d. If all checks okay, notify lead operator. If not, notify lead to hold on charge until problem can be corrected. 5. The lead operator can now push the charge button. In rapid sequence, the following occurs: a. Reactor water charge valve opens. b. "A" hot water pump starts, valves open, and water starts into the reactor.
i
c. The valves from the fresh VCM receiver to the VCM charge pump and discharge valve open.
VAB.0001146567
rnmmmm
Operating Manual Old Unit PVC Reactors Page 27
1-2
III. OPERATING PROCEDURES (CONTINUED)
Reactor Char
Continued)
5. d. At set point No. 1 on water meters:
(1) BUnit hot water pump starts and discharge valve
opens.
(2) The colloid charge pump discharge valve will
open and pump will start. The preset amount of
colloid will be pumped into the reactor. When
the colloid meter set point is reached, the
colloid charge pump will cut off and the
discharge valve and reactor colloid charge
valve will close.
The lead operator will turn
steam during colloid and water charge to
assist reactor heatup.
At set point No. 2 on water meter, the reactor VCM
charge valve opens and the VCM and recovered VCM
charge pump start.
f At set point No. 3 on the water meter "B" hot water
pump stops and discharge valve closes. This allows
time for all VCM to be charged to the reactor before
the water charge is completed.
A
mm wmmmw
mmwii..... .
VAB.0001146568
Operating Manual Old Unit PVC Reactors Page 28
1-2
A
hi. OPERATING PROCEDURES (CONTINUED) C. Reactor Charge (continued) 5. g. When VCM meters reach the set point (two meters running in tandem, first to reach the set point cuts pump off and closes valve), the VCM pump, and reactor VCM valve close. This action also starts "B" hot HLO pump and opens discharge valve. h. At set point No. 4 on the water meters, hot water pump stops and the valves 41ose. 1. At set point No. 5 on the water meters MAn hot water pump stops and the valves close. At this time the main dump valve also closes. 6. When the automatic charge sequence has been completed, it is safe to charge the initiator. 7. The reactor "A" operator charges the initiator by flushing the initiator charge pot into the reactor with 50 counts of high pressure service water.
8. The lead operator will now record the final reactor temperature. Adjust reactor temperature set point to setting called for in the formula and put temperature controller in "autoM position.
D. Polymerization Polymerization is the phase of the reactor cycle in which liquid VCM is converted into solid PVC. This portion of the reactor cycle is mainly accomplished by accurate instrumentation. The primary area of responsibility for the
VAB.0001146569
Operating Manual Old Unit PVC Reactors Page 29
1-2
A
III. OPERATING PROCEDURES (CONTINUED) D. lead operator is coordination of the activities of the "A11 operator. The "A" operator is required to kill the reaction when polymerization has progressed to the point that product quality is satisfactory.
p
1. Lead Operator Duties a. Change the interlock mode selector to "polymerization". Monitor the temperature and pressure closely until the reactor reaches the desired set point and lines out. b. Cut off steam valve to jacket at two to four degrees below set point, depending on the rate of temperature rise. c. Have the liA." operator sample the reactorvl hour after reaching heat up. A fresh air mask must be worn and personnel cleared of the general area before sample is taken. d. Examine the resin. At this stage of the reaction, the resin should be formed into individual, separate particles. Notify the shift supervisor if you notice the following: (1) Stringers-- Resin particles are stringy and stuck together. (2) Hard Particles--Gritty resin particles which are harder and larger than most.
nrr--itt"""**"
......................
........... ....... 1 1..........................
............. 1
--------- nmwwwwn^iMMaMw<wpmrwiiiiin -iT-
VAB.0001146570*
------------ ------------------------------------------- -
Operating Manual Old PVC Reactors Page 30
m. OPERATING PROCEDURES (Cont.) d. (continued) If either of the above conditions are observed, have the "A" operator take samples every fifteen minutes until the shift supervisor makes the decision as to what corrective action should be taken. e. It may become necessary to remove the inerts. Inerts in the condenser will cause the reactor pressure to rise as the blanket condenser and do not allow VCM vapor to be condensed. Under these conditions, less heat can be removed even though the con denser water flow will be full open. Vent the inerts through the main condenser valve to the recovery system. Start the compressor and put the pressure controller in manual and close the control valve. Open the reactor condenser valve and recovery valve. Set the controller on 35 PSIG and put it back in automatic.
VAB.0001146571
Operating Manual Old Unit PVC Reactors Page 31
1-2 A
hi. OPERATING PROCEDURES (CONTINUED) D. Polymerization (Continued) f. Irregularities during polymerization;
(1) May
initiator. Slow heatup can also be caused by no steam on reactor jacket or the cooling water valves may be open. Contact the shift supervisor condition persists.
(2) Long Reaction Time --Caused by low initiator
level, weak initiator, long heat up, low reactor temperature setting or chem wash . solution in the batch. If there is only slow reaction and the resin checks okay, the shift supervisor will give word on what to do. If caustic is in the reactor, the batch will turn slightly yellow and coarsen. If this is found to be true, kill immediately with the amount of short stop solution specified in the formula. (3) Simultaneous Temperature and Pressure Rise--Check cooling water temperature and valves. The reactor is producing more heat
remove Also could be an overcharge of initiator. Notify shift supervisor for instructions.
VAB.0001146572
HiM
m
m
Operating Manual Old Unit PVC Reactors Page 32
1-2 A
III. OPERATING PROCEDURES (CONTINUED) D. Polymerization (Continued) 1. Lead Operator Duties (Continued) (4) Simultaneous Temperature and Pressure Drop-- The cooling water valves are probably wide open. This happens more often in freezing weather when relays freeze up. Throttle manual valves until malfunction is found and corrected. (5) Agitator Kicks Out or Power Failure-- Most power failures are of short duration (seconds to two minutes), and the reactor pressure does not have time to build to a dangerous level. If outage is prolonged, the pressure will build. If this situation occurs, fallow the procedure in Section III.C.3, which outlines action to be taken during emergency shutdown (such as during a power failure). 2 "A" Operator Duties
a. When charge is complete, recheck water injection
rates through the cleaning nozzle and seal flush.
b. On instruction from the lead operator, resin samples
will be taken from the reactor. This normally occurs
1 hour after heat up. If the first sample shows
formation of undesirable resin particles, additional
samples may be called for every fifteen minutes
until a decision is made about what to be done
with the batch.
VAB.0001146573
mm
iinMim .1 hwwwh--w--
Operating Manual Old Unit PVC Reactors Page 33
III. OPERATING PROCEDURES (Cont.)
D. PolymerizatIon (Cont.)
2. MAM Operator Duties
When taking a sample from the reactor a fresh air
mask must be worn and personnel cleared of the general
1-2
A
c. When the lead operator instructs the MAn operaor to do so, the batch is killed by adding short stop solution to the reactor. The amount of short stop solution and the procedure for adding it depends on the product. The kill procedure is as follows; 5305 (Normal) - 1% gallons AMS 5305 (CTA) - 3h gal. AMS/3^ gal. Naugard 5425 - lh gal. AMS/2% Naugard initially and again at 17 0F 5465 - 2% gal. AMS/3^ gal. Naugard initially and again at 170^F. 5385 - 1% gal. AMS/3J5 gal. Naugard. It is very important that the proper amount of short stop solution be added since it effects the quality of the resin. High pressure service water is used to pressure the short stop solution from the initiator pot into the reactor.
3. Emergency Shutdown The following parameters are to be maximum limits on a runaway reaction. The reaction should be killed with AMS if either one of these parameters are exceeded.
VAB.0001146574
Operating Manual Old Unit PVC Reactors Page 34
1-2
IH. OPERATING PROCEDURES (Cont. )
D. Polymerization (Cont.)
3. Emergency Shutdown (Cont.)
Resin
Maximum Temperature
Maximum Pressure
5385, 5425, 5465
142P
145 PSIG
5305 (CTA)
155F
155 PSIG
5305 (Normal)
162PF
165 PSIG
A runaway reaction immediately after charge and heat-up indicates
that the reactor condenser may be plugged, and that the reaction
myst be killed.
A
AMS (N. 0.)
short stop system. CAUTION: N.O. is a highly poisonous orange-
colored gas. A Scott Air Pack must be worn while killing a reactor
with NO short stop system.
The runaway reaction myst be killed immediately if either one of
the pressure or temperature limits listed above exceeded. If
the reaction is allowed to exceed these limits, it may not be
controllable and result in a relief valve or rupture disc discharge
to the atmosphere. The following steps are to be taken during
emergency shutdown:
(a) AMS to kill each reactor
Each reactor has a pot located at grade, containing AMS
The AMS is injected into the head space of the reactor
with nitrogen by opening the appropriate control valve
from the control room. The handswitch for the control
valves for each reactor is located next to the reactor
agitator start-stop handswitch on each reactors control
station.
VAB.0001146575
Operating Manual Old Unit PVC Reactors Page 35
1-2
111. OPERATING PROCEDURES (Cont.)
D. Polymerization (Cont.)
3. Emergency Shutdown (Cont.)
(a) (2) Use the nitric oxide (NO) system short stop if the
AMS does not kill the reaction. There are six
cylinders of NO that can be released for D-300, D-400
D-500 & D-600. D-70U has 12 cylinders of NO which
can be released. The NO system can be activated at the
reactors by manually opening the correct valves.
(b) Use nitrogen to pressurize the Dura-Seal* unit emergency seal water drums with their respective systems must be opened manually.
(c) There will be sufficient air in the air system surge tank to operate valves for approximately fifteen minutes. It will be necessary to use the nitrogen backup system to operate valves after fifteen minutes. The surge tank should be valves off before the backup nitrogen system is activated.
(d) Monitor each reactor for pressure rise. If the pressure continued to rise, the following steps are to be taken:
(1) Equalize the reactor with any other empty or killed reactor of the same type product.
(2) If the pressure still continues to rise, vent through the main condenser valve to the recovery system and the recovered VCM receiver.
(3) If this will not releive the pressure buildup, then equalize the reactor with a reactor of different type resin.
A
* Registered Trademark
mmmmm
ix-i v -Jinn
...... >.*
VAB.0001146576
Operating Manual Old Unit PVC Reactors Page 36
1-2 A
III. OPERATING PROCEDURES (CONTINUED) D. Polymerization (Continued) 3. Emergency Shutdown (Continued) (d) (4) If steps 1, 2, and 3 above fail to relieve the reactor pressure, the Belief valve vent system will allow the reactor to vent off and on thrv the relief valves to control the pressure.
Note: Step (4) is to be the last resort. Under the new EPA law, any venting must be reported and could result in a fine.
E. Recovery and Steam Stripping The reactor is ready for recovery when certain conditions are reached in the reaction process. The conditions under which recovery will start are:
Pressure Drop---There is not enough unreacted VCM left in the reactor maintain run pressure. A pressure drop is accompanied by a drop in the cooling water flow to the reactor jacket and condenser
Runaway--Reaction has increased to the point that it has
outrun the capabilities of the cooling water to control.
Temperature and pressure will both rise when this occurs.
Follow instructions on each product formula as to the exact
conditions at which the reaction is killed.
VAB.0001146577
Operating Manual Old Unit PVC Reactors Page 37
1-2 A
III. OPERATING PROCEDURES (CONTINUED) E. Recovery and Steam Stripping Temperature Rise--Pressure Drop--This is the ideal recovery situation and indicated proper initiator loading. The reaction will peak and slightly outrpun the capabilities of the cooling water. This situation gives the best recovery conditions since there is less VCM to be recovered and more converted to resin.
Quick Kill--A reactor is sometimes killed on specific products to meet certain customer specifications--lower dry time (higher plasticizer absorbtion). The reactor is killed with a specified amount of the short stop solution at a specified set of conditions. The short stop solution mixture stops the reaction chain. On a quick-kill batch, it is very important to guard against resin carryover to the recovery system. An injection of defoamer will help to control foaming. A fast recovery is also important and will affect the dry time. 1. lfAf> Operator Duties
When notified by the lead operator that the recovery conditions specified in the formula are met, the "A"
k-
operator will take the following steps: a. Check the hydroquinone injection system to make sure
that the proper valves are open and hydroquinone level is adequate.
VAB.0001146578
mm
mm
mm
Operating Manual Old Unit PVC Reactors Page 38
1-2 A
m. OPERATING PROCEDURES (CONTINUED) E. Recovery and Steam Stripping (Continued) 1. "A" Operator Duties (Continued) b. Check the blowdown tank level and pressure. Level and pressure must be low to allow the automatic drain on the water circulation pump to operate. c. Check the water levels in the seal water separators and knockout drums. These levels are controlled automatically but should be checked before startup. Knockout drum level should be at or below the mid-point of the inlet to the vessel. The seal water separator level should be at or below the mid-point of the inlet to the vessel. d. Check the backflow pressure controller. It should be set at ten inches Hg vacuum. e. Check to see that the flush to the knockout drum and seal water separator level are on. f. Notify the lead operator that the recovery system is ready to start up. g. Steam header pressure should be greater than 100 psig. h. Reactor steam line should be checked and reactor steam valves should be checked to make sure that they are opening correctly. i. Fill out once per shift the recovery system checklist.
VAB.0001146579
Operating Manual Old Unit PVC Reactors Page 40
1-2 A
hi. OPERATING PROCEDURES (CONTINUED)
E. Recovery and Steam Stripping (Continued)
.2 Lead Operator Duties (Continued)
f. (4) When the reactor is at 215 F, open the
emergency cooling water to the condenser.
(5) Hold the reactor at this stage for 25 minutes
(6) The reactor must be recovered to a vacuum.
Extend the hold time if necessary.
(7) Record the inches of mercury vacuum reached on
the batch sheet.
(8) If a vacuum pump kicks out and will not
restart, shut off the corresponding compressor
to prevent VCM from backing up into the other
vacuum pump.
(9) blowdown
time as recovering a reactor.
g Watch the temperature of the reactor condenser.
h. When stripping conditions specified in step f are
met, steam stripping is complete.
i. When steam stripping and recovery is complete, the
recovery system is shut down as follows:
(1) Push stop buttons for the recovery compressors
72-711, 72-712, or 72-792. This also stops the
vacuum pumps.
(2) Push stop buttons for seal water pumps 72-033
and 72-032. This also stops hydroquinone
injection pump.
VAB.0001146580
Ht
Operating Manual Old Utiit PVC Reactors Page 41
1-2 A
III.
OPERATING PROCEDURES (Cont. )
E. Recovery and Steam Stripping (Cont.)
2. Lead Operator Duties (Cont.)
i. (3) Push stop buttons for the water recirculation
pumps, 72-031 and 72-431.
3. Recovery System Troubleshooting
a. High Compressor Outlet Temperature
Probable cause is poor or no water recirculation in
knockout drum
Check K. 0. pump
discharge pressure. Check VCM feedback controller
setting. Controller setting should be at 25 inches Hg.
b. High Compressor Discharge Pressure
High pressure can be caused by:
(1) Plugged Condenser-- Have lead operator report problem
to the shift supervisor.
(2) Plug in the Line from the Condenser to the VCM Collect
Tank-- Line will have to be pulled and cleaned.
(3) High Level in the VCM Collect Tank
(a) Switch transfer pump to manual.
(b) Check level of the recovered VCM receiver--
east or west.
(4) High RVCM Receiver Pressure
(a) Switch receiver
(b) Check line pressure to the RVCM receiver to
be sure line is not plugged.
(5) No Cooling Water to Condenser--Check inlet and outlet
water valves.
(6) High Seal Water Temperature--This temperature should be
110 + 10. Check seal water pump for flow and
pressure and check filter pack.
VAB.0001146581
Operating Manual Old Unit PVC Reactors Page 42
1-2 A
III. OPERATING PROCEDURES (CONTINUED) E. Recovery and Steam Stripping (Continued) 3. Recovery System Troubleshooting (Continued) c. VCM and does not have a 30 to 70 psi discharge pressure (1) Check seal water flow. (2) Check seal water separator water level and adjust as necessary. (3) Check seal water temperature--below 80F water will condense the VCM vapor and cause displacement of the water seal around the compressor cone. d. Recirculation water pump 72-031 goes out (mechanical-electrical).
(1) Under normal operation, recirculation water
pump 72-031 circulates water through the water recirculation cooler and into recovery knockout drum 45-027. Crossover piping is provided so that, if recirculation water pump 72-031 fails, recirculation water pump 72-431 will be valved to circulate throught the recirculation water cooler and into recovery knockout drum 45-027,
mmmmmmrn
mmm
VAB.0001146582
*
Operating Manual Old Unit PVC Reactors Page 43
1-2 *
III. OPERATING PROCEDURES (CONTINUED)
E. Recovery and Steam Stripping (Continued)
3. Recovery System Troubleshootin Continued)
Note:
Normal operating temperatures for the recovery
system during stripping are: (a) Reactor Condenser- 215-225 oF (Peak
Temperature) (b) 45-027 Knockout Drum Outlet-122-128 oF
(c) 45-017 Knockout Drum Outlet -90-115F
(d) Compressor Outlet- 130-140F
The lead operator must monitor these
temperatures on the multipoint recorder and
have the "A11 operator check out and correct
deviations.
e. Reactor Foaming (carryover)--When foaming is
detected, the r,AM operator will:
(1) Inject defoamer into the reactor to reduce
slurry surface tension and lower the reactor
slurry level. It may become necessary for the
lead operator to shut down one compressor to
slow the recovery. If excessive foaming
occurs, shut down recovery and thoroughly flush
the entire system with water until clear. All
flushing must be done to the water stripper tanks
/
VAB.0001146583
Operating Manual Old Unit PVC Reactors Page 44
1-2 A
III. OPERATING PROCEDURES (CONTINUED) F. Reactor Dump and Rinse When the recovery of the reactor has been completed, the slurry is ready to be dumped to the slurry blend tank(s) that has been designated by the shift supervisor. 1. Atl A ft Operator Duties a. Check the selected blend tank or tanks to make sure it will hold the batch. b Check to see that the blend tank sewer valve is closed and Air Sparger* aeration air is on. Check the slurry transfer pump valving to make sure the flow will be going to the correct line. d Place the coarse overflow collector into position. Inform the lead operator that the dump can begin. Monitor the dump tank level until the flow to the pump and discharge from the reactor have leveled out to a steady rate. f Add the formula amount of calcium stearate to the dump tank.
^Registered Trademark
VAB.0001146584
Operating Manual Old Unit PVC Reactors Page 45
1-2 A
III. OPERATING PROCEDURES (CONTINUED) Reactor Dump and Rinse (Continued)
.2 Lead Operator Duties
a. Select the blend tank to be used by opening the appropriate control valves in the slurry transfer lines. The valves will be operated by pushbuttons located on the recovery control panel under the "Slurry Dump" section as follows: CV-1517 To T-501 CV-1518 To T-407 CV-1520 To T-747 CV-1502 To T-502 CV-1519 To Small blend tank manifold
b. Check the sewer valve on the reactor to be sure it is closed. Turn on Sweco* screener
d Check the Sweco* exhauster to be sure it is running It should be running continuously. Turn the interlock mode selector switch to the "dump" position.
f informs dump can begin, place the slurry transfer pumps, 72-496 and/or 72-497, in the "run" position. The level in slurry dump tank 89-007 is automatically controlled.
*Registered Trademark
PH
VAB.0001146585
Operating Manual Old Unit PVC Reactors Page 46
1-2 A
III. OPERATING PROCEDURES (CONTINUED) F. Reactor Dump and Rinse (Continued) 2. Lead Operator Duties (Continued) g. Five minutes after the start of dump, open the reactor vent to the atmosphere. h. When there is no slurry flow through the sight glass, the reactor is rinsed according to formula instructions. Reactor is empty when agitator shows no load amps and sewer bullseye shows no flow. & When dump and rinse are complete, place the slurry transfer pumps in the stop position. This shuts down the pumps, 72-496 and/or 72-497.
Chem Wash and Rinse Chem wash and rinse is not done as a matter of routine on all
determined is needed the formula states what the lead operator is to
After the reactor has been rinsed during the dump cycle, it is ready to be chem washed. The chem wash cycle is necessary to remove polymer buildup from the reactor condenser, walls, baffles, and agitator. If polymer buildup is allowed to remain in the reactor, it continues to grow with each successive charge. Buildups will contribute to high gel, low quality resin, and will make reactor dumping very difficult if they get large enough to break off and plug dump valves and lines.
^Registered Trademark
VAB.0001146586
Operating Manual Old Unit PVC Reactors Page 47
1-2
III. OPERATING PROCEDURES (CONTINUED) G. Chem Wash and Rinse (Continued) Operators must exercise caution during chem wash due to the caustic in the solution. If any solution should get on an operator, flush immediately with water. Caustic feels slick to the touch and will start burning the skin just a few seconds after contact. If the solution spray over the body, immediately get under a safety shower and remove your clothing. If any should get in the eyes, flush eyes for at least fifteen minutes but until all the burning stops and report to your supervisor. Procedure 1. The lead operator will check and make sure the reactor sewer valve is closed. 2. The lead operator will then place the interlock mode selector switch to "clean and rinse." 3. The lead operator then checks to see that cleaning solution tank 45- is at leat 85% full. 4. The lead operator then opens the valves from the cleaning solution pumps, 72-961 or 72-962, to the reactor condenser cleaning nozzle. The atmospheric vent on the reactor should be closed. All other reactor valves are closed. 5. The lead operator then opens the suction valve, CV-122 for the cleaning solution pumps, 72-961 or 72-962. Note: The cleaning solution pumps will start only if one of the suction valves, CV-122 or CV-125, is opened. VAB.0001146587
Operating Manual Old Unit PVC Reactors Page 48
1-2 A
p
III. OPERATING PROCEDURES (CONTINUED) G. Chem Wash and Rinse (Continued) Procedure (Continued) 6. The ReactornAn operator willcheck to see that the cleaning solution heater temperature controller is set at 190F. 7. The lead operator will then turn on one cleaning solution pump 72-961 or 72-962. 8. When the chem wash has been flushed through the reactor condenser, the lead operator will:
9
CAUTION: The atmospheric vent valve must remain closed.
a. Shut off cleaning solution pump. Close pump suction valve CV-122 from the cleaning solution tank.
b. Open chem wash return valve on reaactor. c. Open cleaning solution pump suction valve CV-125
from the reactor. d. Close valves to the condenser cleaning nozzle. e. Open valves to the reactor cleaning nozzle. f. Restart the cleaning solution pump. The chem wash
solution should now be circulating from the bottom of the reactor back to the reactor cleaning nozzle. g. The reactor agitator remains on.
VAB.0001146588
Operating Manual Old Unit PVC Reactors Page 49
1-2
A
III. OPERATIHG PROCEDURES (COHTINPEP)
6. Chem Wash and Rinse (Continued)
Procedure (Continued)
9 The lead operator will recirculate the chem wash solution
through the reactor for five minutes and will them pump
the chem wash solution back to the cleaning solution tank
by:
a. Opening CV-124
b. Closing CV-123. This sends the cleaning solution
pump discharge to the cleaning solution tank.
10. The "A" operator should monitor the cleaning solution
pump and notify the lead operator when it loses suction
(check pressure gauge on pump discharge).
11. The lead operator will not shut off the cleaning solution
pump.
12. The lead operator will then check the cleaning solution
tank level indicator to see if all the chem wash solution
has returned. If any solution is lost or accidently
dumped to the sewer, notify the utilities operator.
The spilled solution must be neutralized to avoid
upsetting the chemical balance in the lagoons.
13. The lead operator will now close the reactor cleaning
valves and open the condenser cleaning valve and the
reactor sewer valve.
14. The lead operator will cut on both hot water charge pumps
and flush through the condenser to the sewer for ten
minutes.
VAB.0001146589
Operating Manual Old Unit PVC Reactors Page 50
r-2 A
III. OPERATING PROCEDURES (CONTINUED)
G. Chem Wash and Rinse (Continued)
Procedure (Continued)
15. The lead operator will then close the condenser cleaning
valve, open the reactor cleaning valve, and flush the
reactor to the sewer for ten minutes. Reactor is empty when agitator shows no load amps and sewer bullseye is empty. 16. The lead operator will now close the reactor sewer valve. 17. Because of water dilution and resin accumulation, chem wash mast be disposed of and fresh caustic pumped to the cleaning solution tank once per week. Follow the procedure outlined under "Used Chem Wash Solution Disposal".
H. Full and Partial Swirl To assist in the production of quality resin, particularly low gel, it has been found that, by filling the reactor with water and agitating, the gel count is markedly lower. Swirl is performed when specified in the formula. 1. Full Swirl In this swirl, the reactor is almost completely filled with water. Lead Operator Duties a. Turn the interlock mode selector switch to the "swirl" position. b. Opens the reactor main charge valve and water charge valve. c. Starts both hot water charge pumps.
VAB.0001146590
Operating Manual Old Unit PVC Reactors Page 51
1-2 A
m. OPERATING PROCEDURE (CONTINUED) H. Full and Partial Swirl Lead Operator Duties d. (1) Adds 1400 counts of water to D-300, D-400, D-500 and D-600 reactors. (14000 gallons) (2) Adds 2000 counts of water to D-700 reactor (20000 gallons) e. Cuts off pumps and closes valves. f. Agitates for ten minutes g. Opens sewer valve and dumps 2. Partial Swirl This swirl procedure is the same as the full swirl except for the amount of water used. Charge 700 counts, (7000 gallons) for D-300, D-400, D-500 and D-600. Charge 1000 counts (10,000 gallons) for D-700. Then follow the same procedure as the full swirl. I. Colloid Solution Makeup The properties of polyvinyl chlordie (PVC) are strongly dependent upon the type and quality of the colloid solution used. The colloid solution must be very accurate and consistent every time it is prepared. The colloid solution is a one and one-half (1%) percent solution of Dow F-50 Methocel* in water.
^Registered Trademark
m mmmmm
VAB.0001146591
Operating Manual Old Unit PVC Reactors Page 52
1-2
A
III. OPERATING PROCEDURES (CONTINUED) I. Colloid Solution Makeup 1. Lead Operator Duties As soon as the lead operator is notified by the "A" operator that the colloid storage tank level is below the stright wall, he will schedule the "A" operator to make up colloid solution as follows: a* When the "A" operator indicates that the makeup tank is empty, schedule the "A" operator to make up a new batch of colloid solution as soon as possible, b. During the first part of the colloid makeup procedure when notified by the lead operator, the "A" operator will open the hot water charge valve to the makeup tank and the lead operator will start one hot water charge pump and the discharge valve associated with the charge pump to transfer hot water to the colloid makeup tank. When the water reaches the desired amount, the "A" operator will notify the lead operator to stop the hot water addition. 2. 11A" Operator Duties The "A" operator aids in colloid solution transfer by notifying the lead operator when the colloid charge tank needs to be refilled.
r* VAB.0001146592
Operating Manual Old Unit PVC Reactors Page 53
1-2 A
III. OPERATING PROCEDURES (CONTINUED) I. Colloid Solution Makeup (Continued) 2. "A" Operator Duties The "A" operator aids in colloid solution transfer by notifying the lead operator when the make-up tank is empty.
When notified by the lead operator, the "A** operator makes up a new batch of colloid solution by the following procedure:
Bring 3 bags of Dow F-50 Methocel* powder (50 pounds per bag) to the top of the colloid makeup tank. Rinse the colloid makeup sewer until it is clean. Open the hot water charge valve into the colloid makeup tank. Notify the lead operator to start the hot water charge pump to put in the tank. When the makeup tank is about H full, notify lead operator t shut off pumps (this is approximately 72 counts). Start the colloid tank heater and the tank agitator Heat the water in the tank to 180F.
Registered Trademark
VAB.0001146593
Operating Manual Old Unit PVC Reactors Page 54
1-2
A
III. OPERATING PROCEDURES (CONTINUED) MHRi I. Colloid Solution Makeup (Continued) .2 "A" Operator Duties (Continued) e. When the heater is off, add the methocel powder very slowly with the agitator still on. Each bag should take about one minute to add. If the powder is added too quickly, it will form lumps and not dissolve properly. Carry the empty bags to a trash container. f. Allow about thirty minutes to let the agitator thoroughly mix the powder into the hot water. Check the mixture for lumps and continue to mix if lumps are present g When the mixture to the tank until the outage is 3 inches from the top of the tank. h. Start the colloid tank cooler. Close the cooling jacket valve when the colloid solution reaches 85F i. Check the temperature after four hours of cooling. If the temperature is 85F, close the cooling jacket valves and turn off the agitator. If the tank is still cooling, leave the agitator on until the tank has reached 85F. It is very important to cool the colloid solution completely each time to produce a good quality colloid solution. j Caution: Spills of colloid solution are slick and present a dangerous slipping hazard. VAB.0001146594
1-2
Operating Manual Old Unit PVC Reactors Page 55
IH. OPERATING PROCEDURES (CONTINUED) J* Hydroquinone Solution Makeup Hydroquinone is injected into the recovery system to short stop the chain reaction and polymerization of vinyl chloride. If the hot VCM gases are allowed to flow through the recovery lines with out any inhibitor, they continue the reaction that was started in the reactor and rapidly fill and plug the recovery lines. Plugged lines in the recovery system are very time consuming to pull and clean and cause considerable amounts of downtime.
Adequate and accurate injection of hydroquinone eliminates this problem. Hydroquinone (commercial name Tecquinol*1) comes in a powder form and must be put into a solution with water for our use.
When the hydroquinone solution level is low, a new batch is to be made. Each batch should last approximately one month.
1. Lead Operator Duties
I
i*
As soon as it is determined that the hydroquinone storage tank is low, the lead operator should schedule hydroquinone makeup between reactor recoveries. 2. "A" Operator Duties When notified by the lead operator to make up a new batch of hydroquinone solution, the "A" operator does the following: a. Weight up twenty pounds of hydroquinone powder.
* Registered Trademark
VAB.0001146595
Operating Manual Old Unit PVC Reactors Page 56
HI. OPERATING PROCEDURES (CONTINUED) J. Hydroquinone Solution Makeup (Continued) 2. "A" Operator Duties (Continued) b. Turn off hydroquinone metering pump suction valve and, with the nitrogen turned on and the vent closed, drain the remaining heel to the sewer and rinse with water to the sewer. c. Add water to the mixing drum until it is within 2-3 inches from the top. d. Turn the agitator on and add the hydroquinone powder. Mix thoroughly. e. Transfer the hydroquinone mixture to the charge tank using the drum pump. f. Close the vent and open the nitrogen to the charge tank. Maintain 1-2 PSIG on the charge tank. g. Make sure the valves are lined up to the hydroquinone metering pump. 3. Safety Precautions Rubber gloves and full face shield must be worn while handling and transferring hydroquinone dust and liquid. Hydroquinone dust can irritate and seriously damage the eyes. First Aid -- In case of contact, immediately flush eyes with water for fifteen (15) minutes. Notify the plant nurse. Flush skin with water and wash clothing before reuse.
VAB.0001146596
Operating Manual Old Unit PVC Reactors Page 53
1-2
III. OPERATING PROCEDURES (CONTINUED) K. Used Chem Wash Solution Disposal Procedure 1. The shift supervisor must have given instructions to dump the used chem wash solution and make up a fresh batch. 2. The lead operator will instruct the "A" operator to open the tank drain valve, CV-137. The "A" operator will open the valve using a locally mounted handswitch mounted on the south side of the tank. 3. As soon as the tank is empty of solution, the "A" operator will open the three-inch process water valve to the cleaning solution tank to flush out the tank to sewer. Then the operator will close the process water valve and the tankfs drain valve. 4. Make up a new batch of cleaning solution. Notify the P-1 operator to transfer new caustic to the tank.
Note: Notify the utility operator that the cleaning solution has been dumped to the sewer.
VAB.0001146597
Operating Manual Old Unit PVC Reactors Page 58
1-2 A
III. OPERATING PROCEDURES (CONTINUED) L. initiator Handling and Storage In the conversion of vinyl chloride monomer to polyvinyl chloride resin, an initiator is needed to start and help sustain the reaction process. The Aberdeen plant uses peroxide-type initiators. The physical properties of the type resin needed to determines the type of initiator to be used. All of these products must be kept in cold storage because of rapid dangerous decomposition rates at room temperaOures. The initiator is a skin and eye irritant and must be handled accordingly.
Safety precautions for all types of initiators are basically the same, with some differences in hadling temperatures and explosive limits. 1. Safety Precautions in Handling Initiator
a. Always wear impervious gloves. b. Avoid contact with skin or clothing (will bleach out
clothes). c. Do not leave initiator unattended when not under refrigeration. d. If initiator is spilled, soak up with absorbent material. e. Dispose of empty containers immediately. Leave cap off
and split the side of this container.and store away from the unit in an open area. f. Bring only what is necessary to the production area. Do not allow the amount in the reactor area freezers to exceed one day*1s comsumption.
VAB.0001146598
1-2
Operating Manual Old Unit FVC Reactors Page 59
III. OPERATING PROCEDURES (Cont.)
L. g
Handline and Storage (Cont.) If a partial or full jug of initiator is found sitting out, it may be water, but always handle and dispose just as if it
were initiator.
h. If spill on skin area, wash with large amounts of water.
If splashed in the eyes, flush with water fifteen (15 minutes)
and notify your supervisor. Do not use oils or salve on eyes.
i. Should any initiator catch on fire, use water to cool the
surround area. However, if the fire is spreading and likely
to ignite other initiator set the portable fire monitor and get
out of the area since an explosion is very likely.
2. Physical Characteristics
EHP
ust be
stored at a safe temperature below 20F to prevent rapid decom
position of the material which occurs at approximately 50F.
Lupersol L-ll catalyst must be stored at a temperature not below 15F because it freezes if stored below 15F for extended periods of time. These types of catalyst are not self ignited because they contain 75% product and 25% OMS, odorless mineral spirits.
VAB.0001146599
Operating Manual Old Unit PVC Reactors Page 60
1-2
III. OPERATING PROCEDURES (CONTINUED) L. Initiator Handling and Storage (Continued)
3. Initiator Storage Freezers
The walk-in freezers and one chest freezer have been
installed for initiator storage at temperatures down to -30F. Each freezer has two independent refrigeration
compressors with one to be held in reserve. This is to
insure continuous operation at the temperature set point
High temperature in any freezer will activate the air
horn and beacon flasher alarms. An automatic defrost
system controlled by time clocks will provide frost-free operation.
d Operating Conditions
(1) Temperature
The temperatures are adjustable. They can be set from -30F to +30F.
(2) Alarms
The chest and the walk-in freezers on high
temperature setting will activate the red
horn This is the same
for all freezers in the plant,
alarm
present setpoint is 17F (+ 2).
VAB.0001146600
Operating Manual Old Unit PVC Reactors Page 61
IH. OPERATING PROCEDURES (CONTINUED) L. Initiator Handling and Storage (Continued) a. Operating Conditions (3) Compressors The compressors for the freezers are located in two interconnected sheds 50 feet north of the freezers. The compressors for the chest freezer and the west and middle walk-in freezers are located in the west shed. The compressors for the east walk-in freezer is in the east shed. The compressors in the west shed are numbered 1 thru
6.
(a) No. 1 and No. 2 compressors serve the middle walk-in freezer.
(b) No. 3 and No. 4 compressors serve the west walk-in freezer.
(c) No. 5 and No. 6 compressors serve the chest freezer on the west end.
The compressors in the east shed are numbered 7 and 8. They serve the east walk-in freezer. (4) Compressor Shutdown Conditions (Automatic) (a) Freezer Temperature (b) Compressor low oil level (c) High or low compressor pressure
A
VAB.0001146601
Operating Manual Old Unit PVC Reactors Page 62
1-2
A
III. OPERATING MANUAL (CONTINUED)
IH
|n
L. Initiator Handling and Storage (Continued)
a. Operating Conditions
(5) Circuit Breakers
(a) West compressor shed--located on north wall
(1) Compressor panel-- the compressor circuit
breakers are numbered in sequence 1 thru
6.
(2) Fan panel-- the fans are numbered 2, 3, 5,
and 6.
(3) Auxiliary Panel--contains lights, defrost
controls, alarms, fans and defrost time clocks.
(b) East Compressor Shed- located on north wall
(1) Compressor panel--the compressor circuit
breakers are numbered 1 and 2. The fans
are numbered 7 and 8.
(2) Auxiliary Panel--contains lights, defrost
controls, alarms, and defrost time clocks.
(6) Defrost Cycles - Adjustable
In the walk-in freezers, each compressor switches to
hot gas bypass every six hours to provide a defrost
cycle. This is controlled by a time clock.
(7) Freezer Capacity
(a) East walk-in freezer - 600 gallons
(b) Middle and West walk-in freezers - 550 gallons
(c) Chest freezer - 100 gallons
VAB.0001146602
^--I--I-
.
-- I.
-------------------------------------- II
'---------------------------
i
hi mm.. . ______
____________
Operating Manual Old Unit PVC Reactors Page 63
III. OPERATING MANUAL L. Initiator Handling and Storage (Continued) 4. Design and Operational Functions Each freezer is provided with two refrigeration units each which are capable of maintaining the desired freezer temperature. Both units can be run simultaneously to allow a check on compressor operation. The temperature element in each freezer is connected to a mercury switch which starts and stops the compressor. These are adjustable and can be set for different temperatures.
Each compressor has a timer which activates a solenoid valve in the hot gas line to send hot gas directly to the evaporator to allow for the defrost cycle. The fan normally runs with the compressor but is off during the defrost cycle. The east middle and west walk--in freezers defrost every six hours, and the chest freezer defrosts every eight hours. The water-cooled condensers on each
*
compressor in the west compressor shed have water bypass to allow continuous flow and prevent freezeup during cold weather. The condensers also have inlet and outlet valves to allow for acid cleaning. Condenser cooling water ia normally supplied by and returned to the cooling tower. During shutdowns and power outages, a bypass valve from the well/city water can be opened to supply
VAB.0001146603
Operating Manual Old Unit PVC Reactors Page 64
1-2
A
III. OPERATING MANUAL (CONTINUED) L. Initiator Handling and Storage (Continued) 4. Design and Operational Functions (Continued) water pressure. If the condensers are put on the well water, open the block valve in the manhole at the west end of the cooling tower to divert the water to the
The condensers on the east walk-in freezer are air cooled and are not tied in to the cooling water system. 5. Daily Operational Checks a. Each compressor oil level by maintenance b. Temperature recorders by Chief Operator. c. Frost buildup on freezer coils by Chief Operator. NOTE: Manual defrost instructions are on the inside
front of each time clock. NOTE: Due to the explosive nature of this initiator,
formal approval must be obtained from the
*
operations superintendent and the mechanical superintendent before any changes are made to this operation.
TW WiT*r
IPRP
"nwumMuiwo* hum wo
IMi-PHIS
HWHSHHHH
VAB.0001146604
Operating Manual Old Unit PVC Reactors Page 65
1-2
4
III. OPERATING PROCEDURES (Cont.) L. Initiator Handling and Storage (Cont.) 6. Emergency Procedure for Initiator Freezers If the power should go off, do not open the freezers but do the following: a. Notify the shift supervisor to find out the reason for the power failure. (1) If trouble is inside the plant, the supervisor will survey the situation and estimate how long theuautage will be. Freezers should hold temperature from 3-4 hours, depending on what is in them, the outside temperature, and how many times the door is opened. (2) If trouble is determined to be outside the plant, the shift supervisor will notify the proper people on the call list. (a) The duration of the outage will be determined. (b) If outage is expected to be over three (3) hours, Joan Pope will arrange for purchase of dry ice. b. If a compressor should fail and it is not an electrical problem, get in touch with maintenance as soon as possible.
VAB.0001146605
Operating Manual Old Unit PVC Reactors Page 66
III. OPERATING MANUAL (CONTINUED)
L.
6.
b. (1)
If the problem cannot be fixed, try to move all initiator to other freezers. If not possible get dry ice.
1-2
A
NOTE: If compressors should go out on a freezer,
make sure the fans are turned off to that
freezer. Middle freezer 1 and 2 fans, west
freezer 3 and 4 fans, and chest freezer
5 and 6 fans. The east freezers have two
fans, nos. 7 and 8, whose switches are
located in the new panel located on the north
wall of the east shed.
c. Notify the following if an emergency should arise
with the initiator freezers:
Jim Barton - 369-4755
Pete Markey- 369- 6019
7. Circle Chart Responsibility and Change Schedule
a. Thev Chief operator on each shift will check the charts
to be sure they have ink and are rotating. b. The Chief operator on the 7pm-7am shift will place new
charts in the recorder and trun in the previous
day's chart to the shift supervisor.
VAB.0001146606
Operating Manual Old Unit PVC Reactors Page 67
A
III. OPERATING PROCEDURES (CONTINUED)
M. Reactor Pressure Check
Prior to the startup of a reactor after an extended outage or
following a maintenance outage such as replacing a main dump
valve or rodding out the condenser tubes, the reactor wist be
hydrostically pressure checked. This is to insure that no
leakage occurs at the reactor, either inward or outward.
Procedure
1. The lead operator sets up the pressure check as follows:
a. Place the reactor mode in "emergency" to gain use of
both the charge water valve and the rinse valves.
b. Open both hot water charge pump discharge valves.
c. Open the reactor charge water valve.
d. Open the main charge dump valve.
e. Open the emergency vent valve.
2. The lead operator then turns on both hot water charge
pumps and fills the reactor.
3. The "A" operator stands by to notify the lead operator
when the water comes out the atmospheric vent, showing
that the reactor is full.
4. The lead operator then shuts down the hot water charge
pumps and closes all valves. This must be done
immediately to avoid overpressuring the reactor and
blowing the rupture discs.
5. The "A" operator then increases the reactor pressure by
charging water into the reactor through the initiator
injection system.
VAB.0001146607
1-2
Operating Manual Old Unit PVC Reactors Page 68
m. OPERATING PROCEDURES (CONTINUED) M. Reactor Pressure Check (Continued) Procedure (Continued) 6. The lead operator monitors the reactor pressure from the control room and instructs the "A" operator to shut off water addition when the pressure reaches 130 psig. 7. The "A" operator then checks the reactor for leaks at the reactor bottom and top side. If an flange or gasket has been changed, check these very closely. 8. The lead operator then monitors the reactor pressure. If the reactor holds 130 psig for ten minutes, the pressure check is terminated. If the reactor loses pressure, instruct the "A" operator to bring the pressure back up to 130 psig with the high pressure service water and reinspect the reactor for leaks. NOTE: Do not charge a reactor that will not hold pressure. 9. When the pressure check is completed, the lead operator dumps the water in the reactor to the sewer. The reactor is now ready to start evacuation procedure. N. Reactor Cleaning and Entry 1. Reactor Manhead Opening Procedures One of the most critical parts of the operator's job is the opening of the reactor Lenape* manhead. Following is a list of procedures that must be followed by the "A" operator or anyone else when opening a reactor manhead.
K
VAB.0001146608
1-2
Operating Manual Old Unit PVC Reactors Page 6 9
m. OPERATING PROCEDURES (CONTINUED)
N. Reactor Cleaning and Entry Procedure a. Check the pressure gauge and/or bleed valve for pressure or vacuum. b. Unlatch Lenape* lock on Lenape manhead roll-bar and drop down. NOTE: If the reactor has pressure when the roll-bar arm is lifted, the pressure will start escaping. If this should happen, notify the lead operator.
c. Slowly raise manhead four to six inches and hold in that position.
d. Call lead operator and have him cut on the reactor evacuation ejector to pull air inward through the manhead.
e. Finish raising the manhead. f. Change "0" ring on manhead. g. Look at the bottom of rupture discs to determine if they are
plugged with resin. h. If the bottom manhead is to be opened, inspect the bottom
of the reactor through the open manhead. The reactor should contain no liquids. i. Go to the bottom of the reactor and make sure that the safety chain and jacking bolts are in proper position on the bottom manhead.
*Registered Trademark
VAB.0001146609
Operating Manual Old Unit PVC Reactors Page 70
1-2
A
III. OPERATING PROCEDURES (CONTINUED)
N. Reactor Cleaning and Entry (Continued)
Procedure (Continued)
j. Maintenance will remove the bolts and open the manhead.
2. Reactor Cleaningnand Entry
This section willLcover precautions taken prior to entry
and during entry and cleaning of the reactor'. The
following is a check list stating conditions which must
V C ICL uy
C11UCJ. xug
sheet is to be filled out and placed at the reactor.
Procedure
a. The reactor must be empty
and flushed with water.
b. The O2 content must be greater than 20 percent.
c. The VCM content must be less than 10 ppm.
d. The top and bottom manways mast be open.
e. The nitric oxide (NO) piping must be disconnected
at the bottles.
s
f. The following lines must be blanked or disconnected.
(1) Main eight inch dump line.
(2) Four inch steam stripping lines -- D-700 has
two four inch steam stripping lines to be
blanked or disconnected.
(3) Six inch condenser lines.
(4) Four inch chem wash and rinse line to
condenser.*
(5) Four inch chem wash and rinse line to reactor.*
*When preparing to blank or remove blank in chem wash line, lock out cleaning solution pump, open chem wash line to reactor, and bleed line at discharge of pump before breaking chem wash flange.
VAB.0001146610
Operating Manual Old Unit PVC Reactors Page 71
1-2
III. OPERATING PROCEDURES (CONTINUED) N. Reactor Cleaning and Entry (Continued) Procedure (Continued) f. (6) One inch initiator injection line. (7) Six inch VCM charge line--only on D-700 reactor. g. Lock out and tag agitator breaker. h. Test agitator switch. i. Special precautions and safety equipment that may be
needed are:
(1) Impervious suit (2) Plastic mats on the bottom disk to prevent slipping.
(3) Continuous flow fresh air mask. (4) Rubber gloves.
(5) Scaffolding for work above bottom level. (6) Two-way radio communication plus manway watch. (3) Safety harness
(8) 12 volt explosion proof light.
h
j. While cleaning the buildups from the baffles and blade, take extreme care not to scratch the reactor walls. These walls have been polished to eliminate giving the
resin being formed during reaction a place to create a buildup. NEVER SCRAPE THE WALLS.
K. Around the shaft at the bottom of each reactor is Acarbon throttle bushing. The purpose of the throttle bushing is to protect the reactor seal from resin. The seal water flush will not be effective if the throttle bushing or
A
VAB.0001146611
Operating Manual Old Unit PVC Reactors Page 72
1-2
III. OPERATING PROCEDURES (CONTINUED) Reactor Cleaning and Entry (Continued) Procedure (Continued) k. holder is damaged. If there is any buildup in this area it is the Maintenance Department's responsibility to remove it. Operators are NOT to clean the throttle bushing. Damage to the throttle bushing may cause seal failure. 1 If hammer and chisel are required to clean the reactor, be careful of chisel placement to avoid it kicking back out of the buildup and causing personal injury. m While in the reactor, check the safety discs for buildups, nozzles for plugs, and the bottom of the condenser for plugging. n When internal job is completed, remove scaffolding from the reactor and store nearby. Remove any loose buildup on the reactor bottom and close the bottom manhead. Clean up any debris, rags, etc. The job is never complete until the area is clean. Filters There are numerous filter packs in the Old Unit PVC Reactors. matter the flow stream. In doing so, these filters gradually become clogged and dirty which causes a restricted flow and poor filteration. Except in cases of high contamination, these
A
mm-Li
II y+*+l
VAB.0001146612
Operating Manual Old Unit PVC Reactors Page 73
1-2 A %
m. OPERATING PROCEDURES (CONTINUED)
0. Filters filters must be changed out on a regular basis to prevent equipment damage and product contamination. This procedure will list the filters to be changed, the type filter element to be used and any safety precautions and methods to be used. 1. Dura Seal Oil Filters Type: Micro-Kleen II, 75 micron, 10 inch Change: Performed by maintenance NOTE: Each Dura-Seal unit and reactor has a spare filter. If it is necessary for operations to switch from a fouled unit to the clean one, follow up to make sure the filter element is changed out. 2. Reactor Gear Box Oil Recirculation Filters Type: Micro-Kleen II, 75 micron, 10 inch Change: Performed by maintenance NOTE: Filters can be changed out only when agitator is turned off. 3. Charge Water Filters Type: Diamond Filter Tube, 10 micron, 30-inch Change: Performed by operations
VAB.0001146613
Operating Manual Old Unit PVC Reactors Page 74
1-2
A
hi. OPERATING PROCEDURES (CONTINUED) 0. Filters 4. Seal Water Filters Type: Diamond Filter Tube, 10 micron, 30 inch Change: Performed by operations. NOTE: A large amount of resin carry over into the knockout tank will force an early charge. Filters must be changed out immediately after any resin carry over to prevent resin settling out in the filter pack. If neglected, the entire filter pack will have to be removed and drilled out. NOTE: A continuous flow fresh air mask must be worn when opening a vessel or line that may contain VCM. 5. Vinyl Chloride Charge Filters Type: Diamond Filter Tube, 10 micron, 40 inch Change: Performed by operations NOTE: Extreme caution must be exercised when changing these filters since the filter pack and filter elements are full of VCM and under pressure. Steps to be taken are: a. Close inlet and outlet valves of filter pack to be changed.
wmmmm MVimm
VAB.0001146614
mm
Operating Manual Old Unit PVC Reactors Page 75
1-2 \
4
III. OPERATING PROCEDURES (CONTINUED)
o. Filters (Continued)
5. b
Have lead operator pull a vacuum on the blowdown
tank using the recovery system.
Open the valve on the 2 inch line to the blowdown
tank.
d Open the valve on the blowdown tank.
The top of the filter pack will get cold if there is
flow to the blowdown tank. If VCM is not coins to t
blowdown tank check the valves to make sure they are
open.
f After it has been determined that flow is going to
the blowdown tank, open the 1 inch steam valve on
the bottom of the pack.
g Recover the filter pack until all cold spots disappear and the pack is hot on all surfaces.
h
blowdown
Put
on fresh air mask and remove filter pack manhead.
i Remove the old filters and install clean filters. Be
sure and install a complete set of filters. Any
permit
VCM to the reactor.
j Replace the filter pack o-ring before replacing the
manhead. Tighten manhead evenly to insure no
leakage. Open vapor to pack. Check for leaks. If
none, open inlet and outlet valves.
VAB.0001146615
Operating Manual Old Unit PVC Reactors Page 76
1-2
4
III. OPERATING PROCEDURES (CONTINUED)
O. Filters (Continued) 6. Recovered VCM Filters Type: Diamond Filter Tube, 10 micron, 30 inch Change: Performed by operations. Note: Take the same precautions and use same procedure as stated in #5 Vinyl Chloride Charge Filters. Note: The VCM recovered filters may become plugged and require frequent changing.
P. Housekeeping Good housekeeping is a major portion of any task to be under taken, and no task can be called complete until the work area has been cleaned. Return all tools and materials used to their proper place and do not leave lying around to create a safety hazard.
The housekeeping of the reactor area is the responsibility of all people working there.
VAB.0001146616
Operating Manual D-700 PVC Reactors Page 77
4
IV. EQUIPMENT INDEX
A. Reactors
1. Polymerization Reactors 45-755
a.
Vessel used to react VCM to PVC in a water suspension.
b. Description
Vertical-mounted, bottom-agitated vessel, 13-foot diameter
by 28 foot straight wall height (37 feet overall height),
jacketed, and with top-mounted condenser. The reactor is
stainless steel, and the cooling water and steam jacket
is carbon steel. Approximate capacity is 29,000 gallons.
c. Normal Operating Conditions
The reactor produces various resin types, operating in a
pressure range of 28.5 inches Hg vacuum to 155 psig and a temperature range of 80-225F.
d. Design Conditions
Temperature, F Pressure, psig
B. Heat Exchangers
Shell
Jacket
250 200 200(and full 45
vacuum)
1. Reactor Condensers 55-556
a. Purpose
To remove the heat of reaction from the polymerization
reactor by condensing VCM vapor.
i*
* i VAB.0001146617
Operating Manual D-700 PVC Reactors
Page 78
1-2
A
IV. EQUIPMENT INDEX (CONTINUED)
B. Heat Exchangers (Continued) b. Description Each of the reactor condensers are vertical, mounted on top of the polymerization reactors. Cooling water (shell side is used to condenser VCM (tube side). Each condenser has 2700 tubes which are ten feet -long by one-inch diameter Materials of construction are stainless steel clad for all in contact with VCM.
c. Normal Operating Conditions
Condensers operate in a temperature range of 80-225F and
pressure range of 28.5 inches Hg vacuum to 155 psig during
the reactor cycle.
d. Design Conditions
Temperature, F Pressure, psig
Shell
250 120
2. Cleaning Solution Heater 55-557
Tubes
250 200 (and full
vacuum)
a. Purpo s e
To heat and maintain chem wash solution temperature during
chem wash of the reactors.
b. Description
Horizonal-mounted shell and tufaer type heat exchanger.
Steam is on the shell side, and chem wash solution (caustic)
is on the tube side. Surface area of 214 square feet is
VAB.0001146618
Operating Manual D-700 PVC Reactors Page 79
1-2
A
IV. EQUIPMENT INDEX (CONTINUED)
B. Heat Exchangers (Continued)
2. Cleaning Solution Heater 55-357 (Continued)
b. Description
provided by 79 tubes 14 feet long by 3/4-inch diameter.
The tubes are stainless stell, and the shell is carbon steel.
c. Normal Operating Conditions
Steam temperature and pressure on the shell side will
vary. Cleaning solution on the tube side is estimated
to enter at 175F and leave at 190F with a pressure of 125
psig.
d. Design Conditions
Temperature, F Pressure, psig
Shell
175 400
Tube
200 400
C. Tanks and Vessels
1. Initiator Injection Pot 45-778
a. Purpo s e
To inject initiator into the reactor D-700 during charge.
b. Description
Vertical-mounted, two-foot straight wall height with one
and one half feet diameter, approximate capacity 15 gallons,
stainless steel construction.
c. Normal Operating Conditions Temperature near 70F and 180-260 psig.
d. Design Conditions 300F and 450 psig.
VAB.0001146619
mm
mmmm
m*
1-2 A
Operating Manual D-700 PVC Reactors Page 80
IV. EQUIPMENT INDEX (CONTINUED) C. Tanks and Vessels (Continued) 2. AMS Emergency Kill Charge Pots 45-780 a. Purpose To provide a means for injecting short stop solution into D-700 reactor to stop the reaction in the event of a power failure or loss of agitation, b. Description Vertical mounted three foot straight wall height, two feet diameter, capactiy approximately 60 gallons, stainless steel construction, c. Normal Operating Conditions 150 and 400 psig. 3, Cleaning Solution Tank 45-776 a. Purpose To provide an adequate amount of chem wash solution during reactor chem wash, b. Description Vertical-mounted, flat top, cone bottom, eleven foot straight wall height, eleven foot diameter, approximate capacity 8800 gallons, carbon steel construction. c. Normal Operating Conditions Atmoshperic pressure and 60-190P
VAB.0001146620
1-2
A
Operating Manual D-700 RVC Reactors Page 81
IV. EQUIPMENT INDEX (CONTINUED)
C. Tanks and Vessels (Continued) 3* Cleaning Solution Tank 45-776 d. Design Conditions 250F and + five-inch water pressure, 4. Reactor Evacuation Ejector Cyclone Separator 45-768 a. To remove any condensate present in the motive steam to the reactor evacuation steam ejector.
High efficiency horizontal separator, Anderson LS-6-175 fourteen inch outside diameter, 34 inches long, carbon steel construction with stainless steel internal baffles. c. Normal Operating Conditions Steam in is 125 psig and 353F, d. Design Conditions 650 and 175 psig. Filters Agitator Seal Water Outlet Filters 64-763. 64-764 a. Purpose To remove dirt and scale from agitator seal water. b. Description Filterite model LM010S--3/4HP, cartridge type, stainless steel element, cotton filter.
VAB.0001146621
Operating Manual D-700 PVC Reactors Page 82
1-2
4
*
IV. EQUIPMENT INDEX (CONTINUED) D. Filters 1. Agitator Seal Water Outlet Filters 64-763, 64-764 c. Normal Operating Conditions 7,5F and 230 psig d. Design Conditions 105F, 350 psig, $ GPM, particle size retention size 10 microns. 2. Mechanical Seal Purge Water Inlet Filters 64-757, 64-762 A. Purpose To remove dirt and scale from mechanical seal purge water, b. Description Filterite model 12 UM0525-2-2UM, cartridge type, stainless steel element, cotton filter- no. C10AK120A. 3. Cleaning Solution Strainer 64-756 a. Purpose To remove PVC particles from the cleaning solution. b. Description Ten-inch Winston line strainer, carbon steel construction- stress relieved. c. Normal Operating Conditions 2 psig and 180F. d. Design Conditions 200F, 20 psig, 500 gpm, particle retention on four-mesh screen.
wmmMmmmm
VAB.0001146622
Operating Manual D-700 PVC Reactors Page 83
1-2 A
IV. EQUIPMENT INDEX (CONTINUED)
E. Pumps 1. Mechanical Seal Purge Water Pumps 72-953, 72-954 a. Purpose To supply high pressure water to the reactor agitator seals and the reactor cleaning nozzle flush. b. Description Centrifugal type, Sundyne P2AFH, 15-HP, 3,500 rpm. The casing and the impeller are stainless steel. c. Normal Operating Conditions Rated for 30 GPM at 540 feet of head. 2. Cleaning Solution Pumps 72-951 and 72-952 a. Purpose To supply chem wash solution to the reactors during chem wash.
Centrifugal type, Durco Model Mark II, Group II, 4X3-10/75. 50-HP, 3,550 rpm, stainless steel casing and impeller, c. Normal Operating Conditions Rated for 500 gpm at 185 feet of differential head. F. Agitators 1. Reactor Agitators 51-109 a. Purpose To keep the colloid, VCM and water in the reactor well mixed.
VAB.0001146623
Operating Manual D-700 PVC Reactors Page 84
1-2
IV. EQUIPMENT INDEX (CONTINUED) 1. Reactor Agitators 51-109 b. Description Bottom entering, single speed, four blades at 45 angle, 350 HP, 125 rpm, stainless steel construction. c. Normal, Operating Conditions 25,000 gallons of liquid or slurry in vertical vessel, 28-foot straight wall by 13-foot diameter, at about 120F and 130 psig.
A
VAB.0001146624
Operating Manual Old Unit PVC Reactors Page 85
1-2
V. INSTRUMENT INDEX
A. Flow Controllers
Item No.
Service
Type
Set Point
FIRC-101
Reactor Cooling Water Flow Controllers
Meter run with orifice plate, board-mounted indicators and recorders.
Cascade control; the temperature
controller of each reactor sets the set point.
NOTE: FIRC-101 controls the cooling water to reactor 45-741.
FIC-302
Reactor Steam Stripping Flow Controllers
Flow nozzle with D/P cell, board mounted indicator
20,000 Ibs/hour
FCI-108
Reactor Agitator Mechanical Seal Oil Supply Flow Regulators
Kates Model MFA1-1 Flow Regulator
1.0 gpm
4
NOTE:'* FCi-108 controls the seal water flow to reactor 45-741 double mechanical seal.
B. Flow Totalizers
Item No.
Service
Type
Set Point
FQI-103
Initiator Injection Pot Service Water Flow Totalizer
Neptune Rotating Disc Meter, Local Local Readout
None, totalize1s only
C. Level Indicator
LI-101
Chem Wash Tank Level Indicator
D/P Transmitter, Rosemount, board mounted indicator
None, indication only
D. Pressure Controllers
PIC-325
Recovery System
Absolute D/P Transmitter
Rosemount with Foxboro board mounted controller
35-psig
>
VAB.0001146625
Operating Manual Old Unit PVC Reactors Page 86
1-2
INSTRUMENT INDEX (CONTINUED) i
D. Pressure Controllers (Continued)
Item No.
Service
Type
Set Point
PCV- 100
AMS Emergency Kill System Nitrogen Supply Pressure Regulator
Self-Contained
275 psig
Pressure Regulator
PIC-102
Evacuation Ejector EE-100 Steam Supply Pressure Controller
Local, Fisher 4160 100 psig FR Controller
PCV-113
Reactor Agitator 51Seal Oil Pressure
Controller
Self-Contained
230 psig
Pressure Regulator
PCV-119
Steam Tracing Header Pressure Regulator
Self-contained Pressure Regulator
15 psig
E. Temperature Controllers
Item No.
Service
Set Point
TIRC-101
Reactor Polymerization Temperature Controllers
Resistance Bulb
with Foxboro j
Controller
Determined by Specific Batch Recipe
NOTE: TIRC-101 controls reactor 45-101 polymerization temperature.
TIRC-102
Reactor Stream Stripping Temperature Controller
Resistance Bulb with boardmounted Foxboro Controller
225F
NOTE: TIRC-102 controls reactor 45-101 steam stripping temperature.
TIC-104
o Cleaning Solution Heater Filled System with 190 F
Outlet Temperature Controller
Local Foxboro Controller
A
VAB.0001146626
Operating Manual Old Unit PVC Reactors Page 87
1-2
4
VI. ALARMS AMD SAFETY EQUIPMENT A. Continuous Flow Fresh Air System In order to provide personnel protection, a continuous flow fresh
r
air system has been installed. This system consists of personnel fresh air masks and a constant flow breathing air supply. The supply lines are piped to all affected areas of the plant. The individual hookup stations consist of quick connect/disconnecttype fittings.
h
i
The individual lines to the designated areas are designed to allow a minimum flow of 6 SCFM to each mask at approximately 10-15 psig. An air pressure regulator, shutoff valve, and an air filter are provided at the piping header to each individual area.
The air supply system utilizes two Nash compressors supplying 100 SCFM each at a maximum pressure of 80 psig. Each compressor will supply about fifteen masks with air at one time. The com pressors normally are both in operation at the same time, except in cases of mechanical failure.
The system is equipped with both visable and audible low pressure alarms which are activated at 50 psig. The revolving beacon light is mounted on a pole to give wider visibility, and the horn is mounted at the compressor. An on-off switch is provided at each compressor.
VAB.0001146627
S
Operating Manual Old Unit FVC Reactors Page 88
1-2
A
VI. ALARMS AND SAFETY EQUIPMENT (CONTINUED)
A. Continuous Flow Fresh Air System (Continued) The following job operations will REQUIRE the wearing of a continuous flow fresh air mask supplied through the fresh air lines or a Scott Air Pak: 1. Venting or changing filters in any VCM vessel. NOTE: No vessel or line should be vented unless there is no alternative, such as using pipe or hose to transfer VCM into the recovery system or blowdown tank. 2. Entering any vessel that normally contains VCM, such as reactors,
*
blowdown tanks, knockout drums, receivers, etc. (except for scaf folding construction). 3. Opening large reactor manhead (wear mask until the manway is
*
partially open and the evacuation jet is moving air through the manway). 4. Opening any line that may possibly contain VCM vapors. 5. At ANY location where the VCM concentration is above the current allowable limit. Anytime VCM is detected by sight or smell, the concentration is well above the limits and precaution is mandatory.
VAB.0001146628
Operating Manual Old Unit PVC Reactors Page 89
1-2
A
VI. ALARMS AND SAFETY EQUIPMENT (CONTINUED)
B. Alarms and Switches
1. Amperage Alarms
Item No.
Service
Set Point
AAHL-101
Low or High Amperage to the Reactor Agi tator Motor
Board-Mount ed Alarm
To be deter mined in the field.
NOTE: AAHL-101 indicates abnormal amperage to reactor 45-755 agitator motor.
2. Level Alarms and Switches
Item No.
Set Point
LAH-105
High Level in Clean Cleaning Solution Tank 45-767
Board-Mount ed Alarm
6 Inches from Top of Tank
LSL-106
Low Level in Emer gency AMS Kill Pot 45-780
3. Pressure Alarms and Switches
Switch will close CV-144 and CV-145
3 Inches from Bottom of Pot
Item No.
Service
Set Point
PS-105
Low Pressure in Reactor During Recovery
Switch prevents
8 psig
opening of
reactor dump
valve unless
pressure during
recovery has been
at least as low
as set point.
NOTE: PS-205 senses pressure in reactor 45-755
PS-116
Low Pressure in Initiator Injection Pot
Board-Mounted Alarm
275 psig
PAH-106
High Pressure in Reactors
Board-Mounted Alarm
160 psig
NOTE: PSH-106 indicates high pressure in reactor.
VAB.0001146629
Operating Manual
Old Unit PVC Reactors Patfp 90
1-2
VI. ALARMS AND SAFETY EQUIPMENT (CONTINUED)
B. Alarms and Switches (Continued)
4. Temperature Alarms and Switches
Item No.
Service
Set Point
TAH-101 A&B High Temperature in the Reactors
Board-Mounted Alarm
160F
TAH-101 A&B indicates high temperat
C. Firewater System
The firewater system consists of a deluge system, combustible
hydrocarbon analyzer, and fire monitors with hose connections
1. Fire Monitors
The fire monitors are normally supplied from the city water
system. A tie-in with the firewater system allows the fire
monitors to operate off either water system. There are four
fire monitors located around the perimeter of the reactor
2. Hydrocarbon Analyzer A continuous combustible hydrocarbon analyzer is used to detect major VCM leaks. When the VCM level at any sample point reaches the set point, the deluge system is activated automatically.
3. Deluge System The deluge system is normally supplied from the firewater system. It can be operated on process water. The deluge system is a sprinkler system which will cover the reactors, dump system, fresh and recovered VCM storage tanks, and both floors of the
A
VAB.0001146630
Operating Manual
Old Unit PVC Reactors
Page
91
1-2
A
VI. ALARMS AND SAFETY EQUIPMENT (CONTINUED) C. Firewater System (Continued) 3. Deluge System (Continued) recovery building with a water spray. The deluge system is designed to lower VCM concentrations in the reactor and recovery building area in the event of a VCM leak and as a sprinkler system to help put out fires. The deluge system can be acti vated manually, by the combustible hydrocarbon analyzer, or by thermal sensors.
The revised firewater system contains three new post indicator valves (PIV) and one PIV was relocated. These are valves which have Indicators on them to show whether the valve is open or closed. These valves are used to direct water to either the D-700 reactor area of the V-ll area.
The valves are located at: 1. The southwest corner of the new cooling water tower. 2. East wall of the V-ll building. 3. Two are located at the northwest corner of the intersec
tion of the entrance road and second street. m
D. Fixed Point VCM Monitor A fixed point VCM monitor is used to detect VCM and record the VCM concentration at various locatinos in the reactor and recovery building.
RMPnMi
mmm
mrmmmmmmmmrnmifmw
VAB.0001146631
APPENDIX A EQUIPMENT LIST
Reactors
45-755
Heat Exchangers
55-356 55-357
Educators and Edjectors
EE-101 A, B, & C EE-100
Tanks and Vessels
45-778 45-780 45-776
Filters
64-757 64-762 64-763 64-764
Service Polymerization Reactor
Reactor 45-755 Condenser Cleaning Solution Heater
Reactor 45-755 Jacket Educator Reactor Evacuation Ejector
Initator Injection Pot for Reactor 45-755 AMS Emergency Kill Pot for Reactor 45-755 Cleaning Solution Tank
Mechanical Seal Purge Water Filter Mechanical Seal Purge Water Filter Seal Water Filter for Reactor Agitator 51-109 Seal Water Filter for Reactor Agitator 51-109
Pumps
72-951 72-952 72-953 72-954
Agitator
51-109
Motors
70-951 70-952 70-953 70-954
70-970
Service Cleaning Solution Pump Cleaning Solution Pump Mechanical Seal Purge Water Pump Mechanical Seal Purge Water Pump
Reactor 45-755 Agitator
Package Units
PA-200 PA-201
Service
Emergency NQ Short Stop Bottle Nitrogen Supply Bottle for AMS Emergency
VAB.0001146632
Item No.
Amperage Instruments
11-100 IR-100 IAH-100 IAL-100
Control Valves
CV-100 CV-101 CV-102 CV-103 CV-104 CV-105 CV-106 CV-107 CV-108 CV-109 CV-110 CV-111 CV-113 CV-114 CV-115 CV-116 CV-117 CV-118 CV-119 CV-120 CV-121 CV-122 CV-123 CV-124 CV-125 CV-126 CV-127 CV-128 CV-129 CV-131 CV-132 CV-134 CV-136 CV-137 CV-144 CV-145
APPENDIX B INSTRUMENT LIST
1-2
Reactor Agitator 51-109 Motor Amperage Indicator Reactor Agitator 51-109 Motor Amperage Recorder Reactor Agitator 51-109 Motor High Amperatue Alarm Reactor Agitator 51-109 Motor Low Amperage Alarm
Reactor 45-755 Main Charge Valve Reactor 45-755 VCM Charge Valve Reactor 45-755 Slurry Dump Valve Reactor 45-755 Chem Wash Return Valve Reactor 45-755 Hot Water Charge Valve Reactor 45-755 Sewer Drain Valve Reactor 45-755 Steam Stripping Valve Reactor 45-755 Steam Stripping Valve Reactor 45-755 Colloid Vharge Valve Reactor 45-755 Initiator Charge Valve Reactor 45-755 Reactor Sampling Valve Reactor Jacket Educator EE-101 A, B, & C Steam Val Reactor 45-755 Chem Wash Supply Valve Reactor 45-755 Rinse Supply Valve Reactor Condenser 55-356 Cleaning and Rinse Valve Reactor 45-755 Cleaning and Rinse Valve Reactor 45-755 Evacuation Valve Reactor 45-755 Recovery Valve Reactor 45-755 Evacuation and Recovery Valve Reactor Condenser 55-356 Inert Vent Valve Reactor 45-755 Vent Valve Chem Wash Pumps 72-951 and 72-952 Suction Valve Chem Wash Heater 55-357 Inlet Valve Chem Wash Tank 45-776 Top Inlet Valve Reactor Chem Wash Return Valve to Chem Wash Tank 4 Reactor 45-755 Chem Wash Return Valve Reactor 45-755 Chem Wash Return Valve Reactor 45-755 Chem Wash Return Valve
*
Reactor 45-755 Chem Wash Return Valve Evacuation Ejector EE-100 First Stage Steam Valve Evacuation Ejector EE-100 Second Stage Steam Valve Reactor 45-755 VCM Charge Valve Chem Wash Recirculation Valve Chem Wash Tank 45--776 Drain Valve Reactor 45-755 AMS Emergency Kill System Supply Va Reactor 45-755 AMS Emergency Kill System Supply Va
mm
mmmm
mmmmmmm
VAB.0001146633
PMHMIHMIPV
1-2
Item No.
Flow Instruments
FQI-103
FRC-101 FI-100 FI-102 FI-105
FCV-108
FI-109
0F-106 RO-107 FIC-302
Pressure Gauges
PS-105
PAH-106 A&B PR-106 PT-106 PI-114 PS-116 PAL-116
Rupture Discs
ED-100 RD-101 RD-102 RD-103 RD-104 RD-106 RD-107 RD-108 RD-109
APPENDIX B
INSTRUMENT LIST (CONTINUED)
Initiator Injection Pot 45-778 Service Water Flow Totalizer
Reactor 45-755 Cooling Water Flow Controller Reactor Agitator 51-109 Lip Seal Flush Rotameter Reactor 45-755 Spray Nozzle Flush Rotameter Reactor Agitator 51-109 Mechanical Seal Water
Inlet Flow indicator Reactor Agitator 51-109 Mechanical Seal Water
Flow Controller Reactor Agitator 51-109 Mechanical Seal Water
Outlet Flow Indicator Reactor Condenser 55-356 Cooling Water Orifice Reactor 45-755, Inlet Vent Restriction Orifice Reactor Steam Stripping Flow Controller
Reactor 45-755 Pressure Switch (Prevents dump before recovery)
Reactor 45-755 High Pressure Alarm Reactor 45-755 Pressure Recorder Reactor 45-755 Pressure Transmitter Reactor 45-755 Pressure Indicator (Manometer) Initiator Injection Pot 45-778 Pressure Switch AMS Emergency Kill Pot 45-780 Low Pressure Alarm
Reactor 45--755 Rupture Disc Reactor Condenser 55-356 Rupture Disc Reactor 45-755 Rupture Disc Reactor 45-755 Rupture Disc Initiator Charge Pot 45-778 Rupture Disc Reactor 45-755 Rupture Disc Reactor 45-755 Rupture Disc AMS Emergency Kill Pot 45-780 Rupture Disc Reactor Condenser 55-356 Rupture Disc
VAB.0001146634
p
1-2
APPENDIX B INSTRUMENT LIST (CONTINUED)
Item No.
Safety-Relief Valves
PSV-100 PSV-101 PSV-102 PSV-103 PSV-105 PSV-106 PSV-108 PSV-109 PSV-110 PSV-111 PSV-112 PSV-113 PSV-114 PSV-116 PSV-117 PSV-118
Temperature Gauges
TG-101 TG-102
Temperature Instruments
TRC-101 TAH-101 A&B TRC-102 TR-103 TW-110
Service
Reactor 45-755 Relief Valve *
Reactor Condenser 55-356 Relief Valve AMS Emergency Kill Pot Relief Valve VCM Charge Header Relief Valve Chem Wash Heater 55-357 Relief Valve Chem Wash Strainer 64-756 Relief Valve Chem Wash Return Header Relief Valve Reactor 45-755 Relief Valve Reactor 45-755 Relief Valve Reactor 45-755 Relief Valve Reactor 45-755 Relief Valve Mechanical Seal Purge Water Filter 64-757 Relief Valve Mechanical Seal Purge Water Filter 64-762 Relief Valve Reactor Condenser 55-356 Shell Relief Valve Reactor 45-755 Jacket Relief Valve Reactor Condenser 55-356 Relief Valve
Reactor 45--755 Jacket Cooling Water Return Temperature Reactor 55-358 Cooling Water Return Temperature
Reactor 45-755 Temperature Controller Reactor 45-755 High Temperature Alarms Reactor 45-755 Steam Stripping Temperature Controller Reactor Condenser 55-356 Temperature Recorder Reactor 45--755 Cooling Water Return Temperature