SAFETY AND LOSS PREVENTION MANUAL
FO* CONTRACTORS
FOR USE ON ALL CONTRACTED WORK IN THE TEXAS DIVISION
)
DOW
ambulance" FIRE
ACCIDENTS EMERGENCIES
DIAL
666
THE DOW CHEMICAL COMPANY
Corporate Engineering & Construetion.Serviees *February, 1967
J
3ZZ3P3lL
Ndid mi Adlibs sudiinn
62: TT 0002-0T-AUN
SAFETY AND LOSS PREVENTION MANUAL
FOR CONTRACTORS
FOR USE ON ALL CONTRACTED WORK IN THE TEXAS DIVISION
)
t /
-
Mr is the abjective of Corporate Engineering
and Construction Services to Establish and maintain an active, successful accident preventi.on program that will ultimately result .in
top safety performance by contractors doing 7`" work for the Dow Chemical Company'
Z/Q`d 3ZZ3V3lL
THE DOW CHEMICAL COMPANY
Corporate Engineering & Construction Services
* February, |W7 (Supersedes Safety Manual for Contractors dated July, 1965)
Ndid ntn A3iite subinnin
02:TT 000S-0T-AUN
INDEX
SAFETY RULE
PAGE
Introduction
1
1. General Safety Rules............................... ...... 2
2. Emergency Procedure........................... 5
3* First Aid-Injuries ^Reports................................... 6
4. Individual Action.............................
9
5. Vehicles and Traffic..................................
10
6. Protective Equipment and Clothing................... 13
7. Fire Protection...................................................... 15
8. Machinery, Cranes, Tools and Equipment.... 17
9. Ladders and Scaffolds..................... 26
10. Danger, Warning &. Caution Togs..................... 31
11. Safe Work Permits........................................
35
12. Excavations, Floor Openings, Barricades.... 37
13. Radiation................................................. 14. Demolitian.............................................
38 39
Z/P0'd 9ZZ9P9T<L
w&Jid nun A3iite swtinuri
0:TT 000S-0T-AUN
' 1
. -
. --.
-
-
INTRODUCTION
This safety manual contains the minimum safety rules and procedures for performance of work by contractors and . their subcontractors as required by the Texas Division, The Dow Chemical Company, Contractor assumes and has the full responsibility and liability for the safety of its agents, servants and employees and for the compliance of. its subcon tractors and anything contained herein does not relieve the contractor of such responsibility or liability. The Dow Chemical Company is hereinafter referred to os "Owner," The Owner will be represented on construction as defined in the contract and hereinafter reFerred to as "Owner1* Repre sentative."
Safety rules and procedures ore an integral part of each contract and must be carried out fully, as any other specifica tion for the job. The contractor will be held responsible for his subcontractors conforming with these safety rules and pro
cedures. Any exception to the rules set forth herein must have prior written authorization from the Owner's Represen tative,
.Contractors and contractor supervision unable or unwill ing to secure personnel performance in keeping with these rules will not be acceptable* Contractor employees who " exhibit o poor attitude toward safe work and ' safety proce dures will not be acceptable, Employees leaving a job due to safety violations will not be allowed to return to any Owner's work without proper authorization from the Owner, The con tractor's safety record will be one criteria used to judge his qualifications for bidding.
In addition to the rules set forth herein, contractors working in or near an existing operating facility must be cognizant of and conform to Owner's safety rules For that area and any federal, state or local laws governing.
Should any procedure set forth herein conflict with
applicable federal, state or local lows, the latter will'
apply,
I
SS/S0'd 3ZZ3P3lL
Ndid mi A3iite SNdiinn
0:TT 00S-T-AdN
}
NEPAL SAFETY RULES
1 The contractor shall actively and adequately pro-
afe working performances on the part of his employees.
II participate in activities to this end,- such as con-
safety organizations, (e.g,, Contrcctorff Safety
! of Brazosport), incentive oward programs, contractar-
irograms, etc. It is expected that each contractor
induct hjs own safety programs to best suit his parti-
aeds.
--
1.1 American Standards Association, Z 16.1 stan"Recording and Measuring Work Injury Experience" 3 used as a guide to classify contractor injuries.
2 Prior to starting any field work an each job, the . Representative will conduct o pre-job safety con-
\th an authorized representative of the contractor, ipresentative, available subcontractors representaid Owner's Safety Department Representative, when e. At this time, the nature of any chemical hazards ia| safety rules for the area will be reviewed with the Representative and the contractor wi 11 be provided nted copies of area rules where applicable. The safety check sheet" form (see sample ) will be pre~ the Owner's Representative and a copy furnished jn tractor.
3 An effective system of indoctrination and educaemployees fn safety and loss prevention is expected contractor. Contractors shall inform ad their employees ety rules and all safety procedures before working in an plant.
3.1 Contractors shall Inform all of their employees of tion and use of nearest safety shower, eye bath and :y equipment such as gas masks, fire extinguishers and cets.
Contractors shall use a regular system of work in to defect ond correct hazardous conditions, safety ifions and unsafe working practices.
DATE:
JOB; C 0 NUMBER
c E*.*c s Construction department
PRE-JOB SAFETY CHECX 'SHEET
- 91WC;
.. CONTRACTOR____________________ ,,
1. Siaidartf Eatotfoncy .ipd. lolly wnil*rltood?
3
3. Fir* and aabvldride
nu*ibv,i known?
i, Arfi (bp poliibl* evacuation riaiifnfltprf?
Tt. Ta. .l
u
J. Sira pfor.ei.Ofl ftquiftmmi OtlOOuOt* acvipmaxl?
iftd *IOM IMdo lor provi.ion of
To. I j
t. Spyqial ulaty nilti *d lifnMl (or lki ora* kraiart? (Or*!* will irov-dr ertrltd iptciel >Uai <Mi*r vollibio.l
t ;;i
7. Na(v ! cKm.cel or tposial h*w4 lor orr ravifwad with Prfliwti RapttttVlfdiT*?
e, $p4((ol |n{ft^ flquipmiAl (or that mm known? 9. jhavan and fy* W#H locAtieni known^ IQ Sfll* -4,1. rm>l ontffr.tootf? (Q|,ifaO>atf plot*!.) hj gb**n known?) 11. Rod Tog rule vndtfiiMd? 13. ore* Jvaignotwd? 13. C(**'ct*r noH*ld rwl* known' U CrOno inipoOliOA 00* tfilrOil till pfoefdu,* uodoMMOtf?
To. To. Va, T-. 13 r* p Til Yc. n v. .
IS. D f&w hove g copy of and unfairand 'Sol*ty K Loil Pr*wf*t<M Mwuol far Cort?foWr*"
16 Art you* Svbc*ai*ac*ort MI< ol *bo rulal aid granlum?
T-.0 Tn
No No O No (J Nd
No P
NO P
No Q No Q No No No No Q No rj No
No 0 No Q
-
CatiTrOOIOr Pcprt.anlOliva Owtr'i freprta*nfot*v* Praca.i Rap'ilarieriva Qwor`trS4liy R*e*tionw
Oat* Dot* Con Doia
&vfef9ntraftar &ufac0Alracta* Sykaonl'aftfr Sobcinlt*JC?r
Dow Doit Pol* Dt
3 2
S2/90"d 3ZZ3P9lL
Ndid mi A3iite sNdiinn
0: TT mZ-l~m\A
l.l Orderliness is o basic requirement- for all jobs f be maintained at all times. Special attention must
to maintaining clear walkways and roadways, re trash, removal of slipping and tripping hazards and tacking of materials. Contractors must make every i keep mud, slush or other slippery substances off of ids. In cases where this cannot be avoided/ con must clean the roadways immediately.
> Temporary buildings and material storage areas set up as neatly as possible tp present an orderly ep-
*>,i Temporary buildings or combustible materials must located under power lines or pipeways. Overnight
of equipment or vehicles is not permitted under power lipeways,
\ Temporary buildings shall be sheeted with non..^material, such as transits or metal siding and
' each must be identified with the contractor's name .
5.3 Contractors1 temporary buildings must be properly i immediately upon placement at the jobsite. A
of four 4" screw anchors a minimum of 2* in the e required. A mimimum of two such anchors ore for portable toilets.
.4 Metal buildings served with electricity must have >f the building properly grounded/ as well as the sersnee switch.
Contractors must furnish trash containers made of ich with metal covers kept in place.
Contractors must report immediately to the Owner's ative by name, those employees discharged for e infractions.
Contractors shod maintain continuous sofety plon-
>ver jabs where circumstances have changed-and new
quire new controls,
''
2.0 EMERGENCY PROCEDURES
.
2.1 The following procedure must be used to call an ambulance, report a __fire/ spill oF hazardous materials or
release of hazardous gases.
.
2.1.1 Dial 666 and state the type of emergency.
2.1.2 Give your name, the nature of the emergency and its exact location including building number and door letter. If applicable.
2.1.3 Stay on the line until sure that the message is understood and confirmed.
2.1.4 Station someone on the road to direct emergency equipment to the scene.
2,1*5 ff the *'666" number does not answer, dial "O".
2.2 Personnel must know the location of any plant alarm horns. In case of a gas release/ .observe the wind direction as indicated by the alarm horn and wind vane Indi cator and proceed to go crosswind. STANDARD EMERGENCY SIGNALS areas follows;
2.2.1 GAS RELEASE
___ __ _(continuous)
Shutdown all of your equipment in operation. Ail safe work permits in that area ore automatically cancelled. Personnel in other areas downwind must be alert for signals in their area or verbal instructions.
2,2.2 ALERT -------------- * - --(series of short blasts) Shut down all of your equipment in operation. AM. safe work permits in that area are automatically cancelled. Personnel in other areas downwind must be alert for signals in their area or verbal instructions.
2.2,3 EVACUATE ---------------- - --- (series of 3 short blasts) Observe the wind direction"arrndfcated*by Htealdnnhorn and wind vane indicator and proceed to go crosswind.
45
SS/2.0' d 3ZZ3ZP3ZIL
u&jid ntn Adnius swbnnin
0:TT 00S-T-AUN
2.4 ALL CLEjAR____
___ (series af 3 long blasts)
is signal is given, personnel may re-enter the work
aFe work permits must be reissued prior to stort-
,3 If operating o motor vehicle in an area where cy signals ore given, turn off the engine, get out jhiele, and be .prepared to leave the area if neceslotor vehicles, other thon emergency units, must not n into on area downwind of a gas release 'Signal. Berlcross plant roods must be honored by all vehicles at
4 The contractor shall notify the proper Owner's tative or his headquarters in person or by telephone is possible that all employees in the area ore accountthat specific employees cannot be accounted for.
. mergency horns ore tested each Monday at 12:00 i ihe "All Clear" signal given first and last in the es - '
$ The Power Plant whistle is sounded in case of a
1ST AID - INJURIES - REPORTS
The Owner's Representative shall be notified ely in the event of any death, occupational disease, injury or potentially signiRcant injury to a contmployee (whether or not it is determined that "lost I be involved) while al work on the Owner's job.
.1 The contractor must thoroughly investigate, i and report all details of an accident and cooperate Owner and "Contractors Safety Council" inspection
.2 A written report must be submitted on every quiring medical treatment of any kind, to the Representative on the job, no later than I0;00 A'.M. t following the injury. Also any near miss, potentially
serious incident or hazardous condition that occurs, must be re potted in the same manner, although no injury to personnel may
be involved. Forms for these reports, "Notice oF Contractor
Accident and Property Loss" are available through the
Owner's Representative, (See sample).
'
3,1.3 All fires must be reported, regardless of dura tion or extent,
3.2 Employees must report ony injury to their immedi ate supervisor even though it may be considered slight,
3.2.1 The contractor will assure that ail injured per sonnel report to a recognized medical facility. A First Aid Station is available at Plant A and the Community Hospital Emergency Room is at Plant B. The Contractor is responsi ble to furnish treatment reports if medical facility other than above is used.
3.2.2 In the event of eye injuries or any serious injury, the ambulance MUST be called*
3.2.3 In the event of accidents, ambulance runs, etc., contractors must exert all possible effort to keep onlookers from the scene. The only personnel required in such areas are those directly engaged in assisting in the emergency,
3.3 Employees must not attempt to remove foreign material from the eyes, except by washing-with water. If foreign material gets in the eye* the eye must be washed immediately with potable running water, preferably at an eyewash station and the washing continued- uninterrupted for at least fifteen minutes. It is vital that the injured em ployee and others who ore able to help him make sure that thorough and complete washing of the eye is accomplished.
The ambulance MUST be ceiled.
3.4 If chemicals come in contact with the body, the affected parts must be washed with running water for at 1cast fifteen minutes. To make sure that adequate washing is ac complished, shoes and clothing covering affected parts must be removed. The Owner's Representative must be consulted
7
93/80'd 3ZZ3ZP3Z1L
uaid ntn A3iite swunnin
T9:TT 0003-0T-A8W
NOTICE or CONTRACTOR ACCIDENT Oft PROPERTY LOU
4 md**ir*w *
* mk
ARH<|ic<irir>c toe. es aiwit*,
4l(N1ltU<
MCIOIHT OH miibBVUI
BeU'#.
_SV* SSMTBCTOi.
L0e,TlO!_
CLOCK WMBEft .
before reuse of clothing and shoes that may have been con
taminated.
.
4.0 INDIVIDUAL ACTION 4.1 Horsapiay in any farm is no# allowed.
4.2 Running in the plant must be avoided except in case of on emergency.
4.3 Personnel must not climb through, under, over or between railroad cars of a train except in the perform ance of assigned duties.
lLlNGINil/RY_,,YEH ;
3
KOI I
iMQtPlHITE ( I
4.4 Personnel must not make inoperative or operate safety devices such as relief valves, deluge valves , gate valves, electrical and mechanical interlocks, guards, elec trical switches, etc.
, -------------------------- ------- ---------------- 4.4.1 Any accidental interruption of lines or equip-
/ ^-------------------------- .----------------------ment in service or any Irregularities observed must be re
____________
ported to the Owner's Representative and/or the Owner's
________ ______________
operating personnel immediately.
' Mow TAicgw.
CATION MBE IT
---------- --------------------------------------4.5 Unsafe shortcuts, such as walking pipelines, sliding down pipe or stanchions and cutting earners to save a few steps, must be avoided.
.ATI] .
4.6 Tools, materials or equipment must not be inten tionally dropped or thrown from one level to another unless adequate precautions have been taken to assure that no injury to persons or damoge to equipment will occur.
4.7 Personnel must not ride a load being handled by o crane. Slings, hooks, etc., must not be ridden, except where a crane basket or a bosun's chair and safety belt are used.
4.8 Personnel must not walk, drop or jump onto a transit# roof. Where a permanent platform or walkway is not provided, a temporary walkway or spread footing shall be used to distribute the load over a lorge area of the transite,
8
"
9
SS/60'd 3ZZ3ZP3ZIL
Ndid ntn A3iite suunim
T:TT 00S-T-AdN
4.8*1 Contractors installing transits roofs, must use a ary walkway or sproad footing, or may use safety nets the erection area. Safety nets must be of acid resistant al and designed and erected specifically for the purpose ;hing a man who might fall. All safety nets must be ind and tested prior to each use.
VEHICLES AND TRAFFIC
'
>*f Personnel working on Owner's property will eom-
rh aN safety rules and signs regarding traffic and ve-
at all times.
--
.2 The maximum speed limit on open roads in the plant liles per hour and 10 miles per hour within block limits, otherwise designated by signs*
.3 Vehicles must not pass a plant bus in either direciile it is stopped on plant roadways for the purpose of
v discharging passengers except, after coming to a ./stop, the vehicle may proceed around the bys at no an 10 miles per hour, provided the way is clear.
.4 Smoking will not be permitted in vehicles in desigNO SMOKING" areas.
.5 Hauled material that overhangs the sides or ends of must be red flogged at the extent of the overhang, lust net be hauled from a single suspension cable that free swinging beyond the sides of the truck. Dragging ling material and objects along plant roadways is pro- *
.6 Fuel tanks on motorized equipment must not be filled te engine is running or when welding or other hot work ! done nearby. Smoking will not be allowed during the
operations,
7 Motorized equipment such as trucks, dozers, cranes, etc., must not be left running and unattonded.
8 Equipment such os welding machines, pumps,-etc.,
shall not be transported with the engine running.
5.9 All equipment must be in safe mechanical working condition at all rimes. In addition to complying with state requirements as to brakes, lights, signals, horns, muFFlers, etc., vehicles must be periodically inspected by o represen tative of the contractor. Necessary repairs and adjustments must be mode prior to their use on Owner's property.
5.10 The use of flatbeds, stakebeds, etc., as trans portation for personnel will not be permitted unless odequote safety provisions are made and the vehicle is odapted for that purpose, In any case, the number of personnel must not cause overcrowding.
5.11 Riding of "Cherry Pickers", yard cranes or winch trucks, is permitted only when adequate safety provisions such as Seats, platforms, rails, etc*, are provided for passengers.
5.12 The maximum number of people who may ride in the cab of a pickup fs three. Personnel riding in the back must be seated on the floor of the bed, or on approved "builtin" seats.
5,13 Pedestrian paths and walkways must be used when ever provided. In their absence, personnel using streets and roadways must walk facing approaching traffic.
5-14 The fallowing rules must be observed by personnel in the operation of crones, cherry pickers, winch trucks and similar equipment having booms or extended loads in excess of 15 feet in front of or to the rear of the equipment.
5.14.1 5top at oil stop signs,
5.14.2 At Intersections, when the equipment is to pro ceed straight across a main thoroughfare or tum either way, the operator must stop; the flagman must get off the equip ment, clear all traffic, then flag the equipment through the intersection or around the corner,
5,14,3. before entering, any thoroughfare, street, road.
10 yJ
9Z/QX`d 3ZZ3P3X<L
Ndid nun Adiite swunun
T:TT 00S-T-AbW
rom a work oreo within o block, the flggman must ie traffic and Flag the equipment onto the road.
.14,4 All booms or loads extending more than 15 Feet marked or flagged with high visibility materia/ when on plant roads. Traveling speeds must be safe and , depending upon loads, traffic, road conditions, etc.
.14.5 A flqgman must be provided and swinging of ust be controlled with o tag line when moving in a conrea or where load swinging would present a hazard to
el.
, |4,6 Loads or vehicles that extend out of the normal es require flagmen or escorts,
,14.7 Contractors must check vertical clearances on e to be used prior to moving equipment or high loads.
Safe working distances will be observed by all consonnel when working near overhead electric power d D.C. power lines and bus,
.15,1 When mobile equipment (cranes, draglines, tickers, winch trucks, etc.) is used near overhead nes or D.C. bus bars, the following listed safe workmces shall be observed!
. Five feet minimum clearance - circuits up to 480
volts. (Telephone wires and cables are not hazardous
but must not be contacted Or damaged.)
'
Eight feet minimum clearance - 480 volts to 2400 volt circuits, open wire unprotected on fnsu/atorsD.C. power lines and bus bars - 15,000 volts shielded or armored power cables on messenger cables in pole lines.
Sixteen feet minimum clearance - 15,000 volts and 132,000 volt bare-(uninsulated) bus. in 132. KV sub1stations and conductors on 132" KV power tines,..
When it is necessary to work over a power line or D.C. bus or within the above listed minimum safe working distances, it sholFbe the contractor's responsibility to notify the Owner's Representative prior to performing any work.
5.16 Contractors must determine from the Owner's Re presentative when and which roads are to be used, prior to moving extremely heavy loads.
6.0 PROTECTIVE EQUIPMENT AND CLOTHING
6.1 The contractor ond his employees shall recognize the importance and use of special protective equipment and clothing.
6.1.1 The contractor shall be responsible for knowing and enforcing Special CXvner area or jab rules requiring spe cial personnel protection,
6.1.2 Contractors shall provide their employees with the proper protective equipment required.
6.2 Approved safety glasses with side shields are a minimum requirement on all contractor jobs at all times.
6.2.1 Approved safety glasses with side shields must Mf!(! federal requirements (GGG-G-513) for drop ball testing and safety code for polarized "Strain" pattern.
6.2.2 Employees wearing contact lens must wear chem
ical goggles.
'
6.3 Chemical goggles, approved prior to their use, are required for working in or entering certain chemical areas which are posted with signs, or while doing chipping or power tool cleaning work an pressurized lines or equipment which con tains hazardous chemicals.
6*3,1 All employees working in the vicinity of chemi cals- must know where the nearest safety shower and eye bathing facilities,ore.located*-
12 13
Z/ll'd 3ZZ3P3ZT<L
Ndid nun A3iite swbnnin
:TT 00S-T-AdN
.3.2 When qhemicol type goggles are in use, the id must- be around the back of the head, not around fy hat.
.4 Approved plastic safety hats are required for all ror work. The use of metal safety hats is prohibited.
.4.1 Approved plastic safety hats must fulfill requite-* i Federal Specification GGG-H-J42C. The major lent in this specification $ays, "The specimen must id the drop of an 6 pound spherical weight, approx3.8 inches in diameter, from a distance Of 5 feet, breaking the hat, bottoming out or breaking suspenMost skull caps, scalp guards, bump helmets,etc.,
meet this test. Safety hats shall not be drilled or ' for ventilation holes, or edges trimmed off hats,
5 The contractor shall fijrnish and be responsible of his employees wear air hoods, or equivalent, sup\filtered air, when sandblasting or applying volatile Aterial inside tanks, rooms or any other area not ;ly ventilated.
6 Safety belts or harnesses, with lifelines attached, ; worn by employeeswhen performing work in elevated . where the use of scaffolds or lodders is impractical e slip might result in a serious fall.
7 Personnel must wear owner approved life jackets
vise be protected by handrails or lifelines when work-
water wherein a drowning hazard exists.
i Employees are expected to wear personal clothing fe and proper for their job. Wearing of canvas shoes, r houseshoes and working in an undershirt, shorts or to the waist is prohibited. Safety shoes ore strongly ided.
) Fixed blade knives used os tools of the trade must d in sheaths while not in use.
7.0 FIRE PROTECTION
7.1 Accumulation of trash, oilyrags, combustible ma terials and similar fire hazards of any nature will not be per mitted,
7.2 The area around welding operations must be kept free of flammable material of all kinds (wood, paper, cordboard, flammable liquids, etc.)- On some jabs it may be necessary to hav one of the workmen already assigned to the job to observe the welding operation and control the occur rence of fires.
7.2.1 There must be a Fire extinguisher or water hose easily accessible for each welding, cutting, burning or other such operation, located rn close proximity to the operation. It is the contractor1* responsibility to obtain the required fire extinguishers for his welding operations throughthe Owner's Representative. Contractors are also responsible to arrange, through the Owner's Representative, for the recharging and reseating of extinguishers immediately after eoch use.
7.2.2 Special care must be taken during overhead welding operations to safeguard personnel andprevent falling spark* from starting a fire.
7.3 All tarpaulins shall be fire-retardant and identi fied as such by stenciling: "FR-treefed (date)'Wifh a mini- mum of 2" letters in diagonal corners. In lieu of this treatment, fire-proof blankets such os fiberglassor asbestos ore acceptable.
7,3.1 Contractors must inspect and test all tarpaulins at least once each six months to be sure that they are still fire retardant. Tarpaulins needing it, must be retreated or re moved from the plant Immediately, At this time, the tarpau lins must be re-stenciled in the same manner as in 7.3 above.
7.4 Fire plugs, extinguishers, hose racks and other emergency equipment, shod not be covered or blocked and Fire equipment lopes must always be kept clear.
14 15
25/ST'd 3EESP3]:L
wdid mi ABiius swdiTiin
: IT QQZ~l-mU
T,5 All heating units For offices, shops, work areas, - roams, etc., must be in good working order and periy inspected. Gas units must bo provided with "Flame* rotective devices and electrical units must be grounded, iting units must be turned off at the end of each work day.
',6 Flammable or explosive type material such as fuel, toner, etc., must be properly contained, clearly ed, separately stored and kept clear of work areas, riate warning sign; must be provided in storage areas,
.7 AM cans used for transporting or transferring gasofuel must be labeled by Underwriters' Laboratories or Mutual Laboratories,
.8 Fuel storage tanks, filler hoses and the dispersing or container must be properly grounded,
.S.l A quick closing shut-off valve is required on the ng end of fuel hoses.
.8.2 Smoking, welding or ony spark _pr flame-pro-
^ration must be stopped in the immediate area during
y operations.
'
,9 Welding rod cabinets presenting a fire or safety will not be permitted. Cabinets of fireproof materials d with strip heaters are recommended. If light bulbs
they must be securely guarded with adequate spacgard to the cabinet and to stored material. Metal must be grounded in on approved manner.
10 Volatile materials must not be applied near an me. IF Such materiol is to be applied in a vessel, or oriy ventilated, confined area, only explosion^rpof ,d connections will be used. The contractor must e such oreos os "No Smoking, "
11 Heating equipment for freeze protection of eonjst be approved by the Owner's Representative prior to
7. (2 Welding or cutting torches and hoses must not be
connected to cylinders when stored in any enclosure or build
ing, When work is shut down and equipment is unattended,
close all valves at the gas and oxygen cylinders, bleed lines
and check five minutes later for pressure build-up. If there is
no buildup, bleed hoses at the torch, remove hoses from
cylinders and store. _Np smoking will be permitted during tiis
shutdown procedure,
.
7.13 Gas and oxygen cylinders must be handled with care, properly Supported in an upright position away from any source of heat or flame and securely tied off* All oxygen cylinders not in use must have their cops in place and stored
as above,
7.13.1 Oxygen cylinders in storage and not in use mast be separated from gas cylinders by a fire retardant parti tion or o minimum distance of 10 feet.
7.13.2 When gas and oxygen cylinders are lifted by hoisting equipment, a basket, cradle or similar handling de vice must be used. Cylinders must not be lifted by the valve protection caps.
7*1-4 All "No Smoking" restrictions in specifiedareos must be strictly observed. Smoking is not permitted in ve hicles in designated "No Smoking" areas.
7.15 Compressed gases, including air, must not be used for cleaning of clothes, the body or work oreos. Oxy gen must not be used for pressure testing purposes -
7*16 Adequate ventilation must be provided when cleaning agents are used.
7.17 Contractors must not dump flammable or toxic materials into sanitary sewers or waste water system without prior clearance of the Owner's Representative.
8.0 MACHINERY, CRANES, TOOLS AND EQUIPMENT 6.1 The safe designed capacity of any tool or piece of
16 17
Z/X`d 3ZZ3P3X<L
Ndid ntn Adiite swdnun
:TT QQZ-T-AdN
')
'ent must not be exceeded. Tools or equipment'must modified in any manner that reduces the original safety
1,2 Ail contractor owned, leased or rented equipment i in safe mechanical working condition to render safe at a! I times.
>. 2,1. Equipment must be inspected by contractor super ior to its use on a job and periodieially thereafter to hot it i$ In safe working order. Crane Inspections must litted in writing to the Owner's Representative using ner's "Hoisting Equipment Inspection" form. (See Samipecial attention must be given to such items as cables,
booms, blocks, hooks, grounds, electrical cords and ievices. Equipment must be shut down before repairs or ents are made.
.2.2 Defective tools and equipment must be removed iob immediately and if repairable, must be properly "i jfore reuse on Owner's job.
.2.3 Machinery, tools and equipment must not be d without oil guards end safety devices in place and ling properly.
.2.4 The contractor has the complete responsibility e operation when using hoisting equipment to moke he contractor shall verify weights of loads to be lifted. I shall be lifted which exceeds the Manufacturer's pacify of the crane. When one of the following conirevail, the contractor must submit in writing, using ier's "Critical Lift Check Sheet", (see sample), an
the safety planning for the lift to the Owner's itative, prior to starting the lift.
The load exceeds 80% of rated load chart for crone. The load exceeds 50% of rated load chart for crane, and possible failure would endanger existing facil ities. Two booms are required to make the lift. Poles or derricks- have been erected for this specific lift. _
HQlSTtNC: U|UIPHKNT
INSPECTION
OWNER
DATE _________ EQUIPMENT NO.
manitacthrEr/moDel_____________________
MAXIMUM CAPACITY
____
SERIAL NO. __________________________
DATE OF MANUFACTURE
COUNTERWEIGHT FOR NORMAL USE ___
BOOM LENGTH FOR NORMAL USE _____
counterweight for capacity lift
BOOM LENGTH FOR CAPACITY LIFT ,,
CAPACITY CHART ON FILE __________
1. 2. 3. 4. 5.
.6.
7
S.
9,
10. 11. 12,
13, j4,
15. 16. 17. Ifl. 19. 20. 31. 22 33. 24. 25. 26. 27.
26, 29.
COHniTIOM
Identification end high visibility markings
Hooks (pins-swiveli)
Boom shelves end blacks (strips) Traveling block (pln$*greaie fittings)
,,------------
Cable drums (firing end becket)
Heist lock (catch on brakes) Clutches (bands-pins-cotter pins)
-------------------------
Whip line (condition of cable)
--
Load line
Boom line Beam and Job pennants Main boom (structural members - pins)
i. '
Jib (structural mbeir$ - plna) Gantry (A-frime) - (pin*-sheave**traps)
..
Swing lock
-------- ------- -------
Hydraulic or sir system Lighting system Piloting
^-- -----------------------
---
Drive chains (tension)
--...
Tire* (air pressure-damage)
,
Steering mechanism Counterweights Cab, platforms, teeps, etc* (access)
-----------
....
Fire extinguisher
-----
Boom hoist safety deviee
,-- -------------------
Power lowering - whip line Power lowering- load line
---- -
Boom beat pins
Housekeeping
INSPECTOR _ AUDITED BY
18
)
19
9Z/PT`d 3ZZ3P3l<L
wdid nun Adiite swbnnin
:TT 00S-T-AdN
CHECK LIST FOR CRITICAL LIFTS
. #/W. 0. 9 m
DESCRIPTION
\TION _______________________________________ REPRESENTATIVE _________________________
NNINCDATA;
1, CONTRACTOR
___________
2. SUPERINTENDENT _____________________
3* SUPERVISOR RESPONSIBLE FOR LIFT
DESCRIPTION OF ITEM TO BE RAISED
`JoR HOISTING EQUIPMENT TO BE USED
L. ,,
.
EQUIPMENT & LIFT RELATIONSHIP
L, OPERATING RADIUS___________________
2. BOOM LENGTH
3. ALLOWABLE LOAD (FROM LOAD CHART)
4. RATIO OF LIFT TO ALLOWABLE LOAD
Slack VI#t far
Critical Lifts
ri* 3
, COHPtTlflN OP HQiaTlHB EflUIWENT V Mr-Cltfe:
A- HAS EQUIPMENT BEEN ftElNSPECTED FOB THIS ltpt?
8. HAS AU EQUIPMENT 1 RICCINC BEEN INSPECTED AND FOUND IN ACCEPT
ABLE CONDITION FOR THIS LIFT?___________,,___________________ _
S. CUTS ANCHORS i CUTS:
A. ADEQUACY OF FOUNDATION FOR FOOT BLOCKS
tt. ADEQUACY, HUMBER, AND LOCATION OF CUTS 4 ANCHORS
______
C. TOOT BLOCKS ARE TO BE ANCHORED
I). CONDITION op ALL CABLE, INCLUDING SPLICES, CLAMPS, TUMBLES, AND
OTHER HARDWARE
_
10* STABILITY OF CROUMft AKtAi
a. check soil bearing allowable load B. WILL MATS BE REQUIRED?
___________
C. ANY UNDERGROUND INSTALLATIONS NEEQlNC SPECIAL TREATMENT.
11. OPERATORS.! WHAT IS OPERATOR'S CaPLRIENCE o:< THIS EQUIPMENT AND THIS TYPE QF LIFT?
12. REMARKS:
20 21
SS/ST'd 3ZZ3P3lL
wdid nun Adiite swbnnin
:TT 00S-T-AdN
Ike fur 1 Ufta
. CLEARANCE 1ETUEEN ROOM A LIFT , CLEARANCE TO SURROUNDING FACILITIES
Pt(t 2
CHEDULE or OPERATIONS (INCLUDE TIKE FOR RIGGING A EQUIPMENT NSPECTIOWS)'.
S_TOK CRITICAL Lir: JAD EXCEEDS SOI OT LOAD CHART FOR CUN* OR DERRICK" JAU EXCEEDS SOX or LOAD CHART, AND FAILURE WOULD ENDANGER AISTING FACILITIES_________________________________________________________ 40 .ROOKS ARE REQUIREDJLES OR DERRICKS HAVE SEEN ERECTED FOR THIS SPECIFIC LIFT.
<T OF CRITICAL LIFT MAS OBTAINED!
:red scale weight_____________________
\LCULATED INDEPENDENTLY BY HORL THAN ONE SOURCE*
. SOURCE______________________ ..
WEIGHT______
SOURCE-
WEIGHT
! lift is AN EXISTING ITEM (BEING IB10VED OR DEMOLISHED), THE
11CKT IS TO E RECALCULATED, TAKING INTO ACCOUNT AU. KODIFICA-
I0NS INCLUDING INTERNAL AS WELL AS AN ALLOWANCE FOR SCALE,
iOlMLNT, SLUDGE, INSULATION, LIQUID, ETC.
source SOURCE
weight
WEIGHT
Check Llat for Critical Lift*
Neehlnf In chin tulnUilm and/or icCtpimt 0/ thli GtlECX LIST la to be considered relieving Che Cantractora of any reapanalhlllty for a safe 4p*r*Clon.
y'_
RESUME OF ACTUAL SCHEDULEI DATE or LIFT____________ INSPECTIONS COMPLETED-- LirT STARTED_____________ PERMANENT SUPPORTS CONFUTED. TOTAL TINE_____________
22 SS/9T'd 3ZZ3P3lL
23
Ndid nun Adnids SNdiinn
:ll 000S-0T-AUN
2.5 If burning of lugs or other such flame producing 15 may be required during crane hoisting operations, icrtfs for proper safe work permits must be mode before ig operation begins.
\ ,
3 Equipment with exposed gears, belts, couplings, etc. !
jrovided with proper guards.
-
;
4 All pressure vessels of construction equipment must <$taticolly tested annually. Items in this category are seeding 6 inches (inside diameter) and with infernal al operating pressure exceeding 15 PSl or those pro* t a relief valve with a setting greater than 18 PSIG or ure disc whose bursting pressure is greater than 25
; '
,
j
I
4.1 These tests must be performed during the month yr each year by the owner or lessee of the equipment. Ives must be removed and the vessels hydrostatically Ane and one-half times the maximum allowable work: :of the unit. A thorough visual external inspeebe made.
.
\ j i j
4.2 As a parr of these test procedures, relief valves iroperly sized and set for the vessel involved and
for proper operation, apart from the vessel test.
| !
8.4.6 Contractors will paint or stencil the assigned equipment number in plain view on the equipment. Number? shall'-be white, approximately 3" high on a green background. The green background will remain for 1967 and will be changed each year o$ directed.
8.4.7 Equipment arriving in the plant for the first time after the January test period each year must be tested at that time and retested the following January.
8.4.8 Equipment such os cranes, dozers, tractor-floats, etc., having pressure vessels, must be visually inspected upon entry to the plant and must meet the above test requirements within ten days.
8.5 Electrical tools and equipment operating at more than 32 volts must be properly grounded. Certain test equip ment such os oscilloscopes, vacuum tube voltmeters and signal generators, as well as certain areas where exposedd.c, equip ment is used, do not require grounding and proper operational procedures must be ascertained from the Owner's Representative in the above areas.
8.6 Only 32 volt or less electrical service is to be used in connection with drop lights when working inside metallic vessels.
1.3 Metal identification tags must be attached to ves bearing pressure setting, date of test, name of conducting test and initials of person conducting the
8.7 When arc welding is being done inan area restrict
ed by a safe work permit, the grounding lead must be connected
to the work within the limits os provided in the safe work
permit.
'
4.4 Contractors will Furnish the Owner's Representc- !
8.8 Any contract provision for connection to an
it certificate for eocb piece of equipment. Each
! Owner's plant services for construction use must be cleared
*e must be signed by the test conductor and a re-
, with the Owner's Representative. The turning off and on of
ive of the company owning the equipment.
; the supply shall be done only by authorized Owner's Person
nel .
1.5 The Owner's Representative will forward each
'e to the CE & C5 Construction Department central .
8.9 Gloves must not.be worn while using grinders,
-2402, where an equipment number will be assigned
drills, saws or any tools where gloves ore apt to become en
ertificate will be.kept on file. The contractor will
- tangled.
ed of the assigned number by the Owner's Represen-
24 25
Z/L\'d 3ZZ3V3lL
Ndid nun Adiite swbnnin
:ll 00S-T-AdN
10 Loose clothing must not be worn while working jocbinery,
11 Personnel must nor crank any machinery with their
'
12 Hose connectors and adaptors must be of a start-* lyFacture and used only for the type of_service
4"
12.1 In order to insure positive locking at all times, rs must be in good condition and not abused. Sand** ; connections shall be the safety lock type which accidental disengagement.
!2.2 Air pressure on pneumatic tools must be bled are tools are disconnected from air supply.
! . !
'
, .
3DERS AND SCAFFOLDS
All ladders must be of the proper length and in ;ion before using them. All unacceptable ladders ..mediately removed from Owner'sproperty.
i I >
;
, I Ladders are not to be pointed with anything other r paint or linseed oil.
.2 All straight ladders must be tied off or held and -s higher than ten feet must be tied off at the top or e bottom by another workman.Personnelmust not he top step of any step ladder.
! , |
!
.3 Wien climbing o ladder, personnel must face the d keep both hands Free For climbing.
,4 5et straight ladders so that the bottom is out from al about one*fourth of the distance from the upper the bottom.
j
,5 A|J ladders must be provided with ngn-skid adjust or properly supported on a level surfoee.
9.1.6 The area around the bottom of all ladders must be free from slippery substance and tripping hazards.
" 9,1.7 Ladders are not to be used os pencil or scaffold boards.
9,1.8 The top section of extension ladders are not to be used by themselves.
9.2 The use of ^9 soft annealed wire should be mini-* mized on scaffolds.
9.2.1 When *9 soft annealed wire is used, a minimum oF two separate strands must be used to tie scaffold handrails, braces, etc. Hie ties must be crossed to form a lack and pre vent slipping in any direction,
9.2.2 Do not reuse #9 soft annealed wire for any pur pose.
9.3 Makeshift scaffolds such as boxes, crates and drums must not be used.
9.4 Wood scaffolding, aluminum ladders, aluminum scaffolds ond aluminum pencil boards are not permitted except in special coses as specified in job specifications or by prior written approval from the Owner's Representative.
9.5 The following rules apply to all patented metal scaffolds.
9.5.1 Scaffolds must be erected with proper Fixtures made for eaeh type of scaffolding. Scaffolds and associated equipment must not be modified in any manner that reduces the manufacturer's designed performance.
9.5.2 All scaffolds and allied equipment must be kept in good repair,
9.5.3 Equipment that is damanged or deteriorated to the extent that it i$ unsafe shall not be used. Such equipment shall be removed from the Owner's property.
26 27
SS/8T'd 3ZZ3ZP3ZIL
Ndid ntn A3iite swdnuri
P:ll 00S-T-AdN
.4 Compensate For unevenness of ground by using ;crews in addition to proper blocking.
.5 Do not force braces to Fit. Adjust evenness of itil the proper fit eon be mode with ease.
.6 Use ladders when climbing seoFFold rather than iraces and hand rails.
.7 Horizontal diagonal bracing shall be used at i intermediate levels of thirty feet to prevent : all scaffolds.
.8 Planking overhang shall be 3-5/8" on staekup I" x 4" wood cleats shall be nailed ocross-top of
t each end outside end frames, 2" x 2" cleatssholl underside each end of plank with 2--1/4" stgve bolts*
.9 The moximum span for guying or tying off oil fixed :very 18* of elevation.
The following rules apply to rolling tower scaffolds:
; !The minimum base dimensions For towers shall be
.2 Towers of o height greater than three times the oase dimension must be guyed or tied off while being jsed or dismantled.
sufficient help.
j
: 9.6.7 Do not extend adjusting screws beyong the limits specified by the equipment manufacturer.
j
j 9.6.8 The minimum size for casters shall be 6". Scaf
J folds higher than 251 must be stabilized either with outriggers or hand lines while being moved.
; 9.6.9 Horizontal,diagonal bracing is to be used at the
r bottom and at intermediate levels of 30 feet,
' . 9.6.10 Do not use knee braces or cantilevered brackets
on rolling towers.
; , 9.7 The following rules apply to suspended scaffolds:
; . 9.7.1 Chains or 1/4" (minimum) steal cable shall be
used to support suspended scaffolds. All suspended scaffolds
'
shall be anchored to prevent swinging. Chains soused shall be made of not less than 1/4" links* and shall be inspected
immediately prior to each use.
J
i *1/4" proof coil loading chain
j Safe Load
700 lbs.
5/16" proof coil loading chain
j Safe Load
1,360 lbs.
5/16" proof coil loading chain
Proof-tested Safe Load
2,720 lbs.
5/16" proof coil loading chain
Unlimited Safe Load
5,440 lbs.
.3 Caster brakes must be applied when not in mo-
9.7,2 The suspended support must be insulated when ore
welding is to be performed from platform, thus avoiding acci
.4 Towers must be free of men, material and equip**
dental arcing and subsequent failure. -
.
re being moved. Care must be exercised while
.5 Surface area where tower is being moved shall rubble or any material that may cause the tower to
I 9.7,3 Block and falls shall be a minimum of hvosheaves
i for 3/4" rape and the minimum size rope shall be. 5/6", Add
j resistant rope shall be used in acid or caustic areas. Tail ropes
j shall be placed in an open container for protection while used
in an Ocid area or above operating machinery, pumps, etc.
All ropes and blocks must be inspected and tested prior to each
.6 Do not attempt to move a rolling tower without ;
29 28
SS/6T'd 3ZZ3P3lL
wdid nun Adiite swum in
P:TT 00S-T-AdN
d taken down and stored Inside at the end of each work
I
'.8 The following rules apply to all scaffolds:
,
j' .B.l Scaffolds and related material shall be carefully
ed at regular Intervals and particularly just before using,;
>.8.2 Provide sufficient sills Dr1 underpinning on all }
ds to be erected on filled or otherwise soft ground. Seaf-t lards shall not be used for this purpose. '
'.8.3 All scaffolds must be plumb and level at all times.'
?.8.4 Anchor running scaffolds to wall approximately
28r of length and 18* of height. Use additional care
ising pulley arms.
.
J
?.8.5 Handrailing and access ladders must be used on ; ffolds regardless of height. Scaffolds higher than 30` columns, tanks, etc., must hove access ladders con- [ d on the Inside, unless a ladder cage is provided. Hand* , ust be at a height sufficient to provide maximum person-
') " .
9.8.9 The normal size of planking shall be determined from Table I, These values are far planks with the wide face op, with the loods concentrated at the center. Loads given in the table are net. Allowance has been made for the weight of the planking. If select structural coast region Douglas fir, merchantable structural square and sound southern pine is used, the loads may be increased 45 percent.
9.8.10 Planks used for platforms .shall be of uniform thickness, laid dose together. These plonks must be over lapped at the bearers. An overlap of at least two feetmust be allowed with the bearing in the center of the overlap. When plonks overhang a bearer more than one tenth of the length of the span, the plonks must be securely fastened to the bearer at the apposite end to prevent tipping.
9,8,1] All nails used in scaffdd construction shall be driven lull length. If double headed nails ore used, they shall be driven to the first head only and moy not be used on plat forms or walkways. No nail smaller thon 8d shall be used In this construction and enough nails must be driven to support the designed loods. The design must be such that no nail Is subject to a direct pull.
>,8.6 Scaffolds must not be used as material hoist or For mounting derricks without first determining the :nd stresses involved.
'*8.7 Erect scaffold in such a manner that ladder is ble and lined up from top to bottom.
?.8.8 Lumber used in the construction of platform shall _ lood quality and reasonably straight gained. It shall : from Injurious ring shakes, checks, splits, crass grains, ! d knots, knots in groups, decay and growth character- ` ihich materially decreases the strength of the lumber. ig shall not be painted all over, os this would conceal . feels. Scaffold boards shall be Identified by painting nd. Ail scaffold boards shall be used exclusively for rpase. Nothing less than 2"x4" material shall be . handrails on wooden scaffolds.
9.8.12 Where beams are used In scaffolding, the sche
dule of loads shown in Table 11, shall be followed. Loading on
cantilever type beams used for tool and material hoists is
shown in- Table 111. It should be noted that the loading at the
center of bearing point is 4 times os great as the load being
lifted and the beoring should be checked to ascertain if It will
support the contemplated load. The inboard end of the beam has a force upward of twice the load and must be securely
fastened with no nai|$ in direct pull.
.
9.3.13 Platforms shall be kept clear of slippery sub
stances ond tripping hazards.
.
10.fl DANGER. WARNING AND CAUTION TAGS
10.1 Danger Tags (Red) 10. U Toinsurethat operating status of equipment is not
30
SS/0S'd 3ZZ3P3lL
Ndid mi A3iite swbnnin
P:TT 00S-T-AdN
TABLE I AFE CENTER LOADS FOR SCAFFOLD
PLANK IN POUNDS
SIZE OF PLANK
2 X 10
2 x 12
3 x 10
3 X 12
In
Dressed To
Dressed to
Dressed To
Dressed To
1 SVi
1% x lltt
2% X 9 Vi 2*9 i llMz
256 309 667 -607 192 232 500 505 1 .153 166 400 464 128 155 333 404 110 133 286 34$
116 250 303
TABLE II CENTER LOADS ON TIMBER USED AS
BEAMS IN POUNDS
LENGTH OF SPAN IN FEET
S 6 8 10 12 14 16 20 24
. 440 290 210
' 725 575 420 330 260 215 780 650 470 360 290 240 190
1400 1150 850 660 530 450 370 270 190 2190 1620 1350 1050 860 710 600 450 320 2800 2S30 1950 1530 1250 1050 890 670 510 2100 1730 1290 990 810 580 560 410 290 3290 2750 2120 1530 1300 1070 900 670 490 4525 3940 2920 2300 1880 1570 1340 1000 660
TABLE III iFE LOADING FOR SIMPLE MATERIAL r ON CANTILEVER BEAM IN POUNDS
length of Cantilever (6) in feet
2 3i 4 5 6 7 8
220 160 105 80 85
495 320 260 190 150 125 105
740 490 360 285 230 190 160
1325
875 650 515 420 350 300
1765 lies 865 68S 560 470 400
dimension from front bearing to rear anchor mutt be equal to or an Cantilever proejetion "8" in table.
32 i
; changed while it is being used or worked on, red danger togs ; rnu$t be attached to the controls so that personnel will know not | fo use them. These tags must be used to protect personnel ex : posed.lo hazards of equipment and must be respected by all per ! sonnel, The personnel responsible for the operation of equip1 menf or their designee must clear and tag the equipment. Any i personnel whose safety could be endangered while working on : this equipment must affix their tag. Violation of red danger
fog rules will result in disciplinary action up to and including ' refection from any work on Owner's property*
1 10.1,2 No control such as a valve, switch, clutch, etc. is to be operated by anyone while a red danger tag is attached.
; IF o control must be operated intermittentlysuch os for testing , equipment, the red danger tag must be properly removed before each operation. Attachment of danger tags to equipment con
trols does not mean that equipment has been cleared to work on.
f When work is to be done on tagged^ut equipment, personnel
responsible for the operation of the equipment are responsible j for clearing the equipment and making it safe for others to : work on.
i 10.1.3 Whenever the operation or use of any equipment
j may endanger anyone, a request must be made to supervision of
the group which operates the equipment to clear and tag the equipment. "Clearing1' means making the equipment inoperable and safe for others to work on. The authority to dear and tog equipment may be delegated by this supervision to any qua lified personnel after supervision has assured themselves that the person delegated can property clear the particular job involved.
10.1.4 After the group which operates the equipment has cleared and tagged the equipment, each worker or group of workers who may be exposed to the hazards must tag the equipment for their protection. When red danger tags are attached to equipment by persons other than those responsible for its operation, prior approval from the person responsible shall be obtained.
10.1.5 As the individual jobs have been completed, i each worker or group of workers must remove their tags imme-
j diateiy. .
i 33
/
SS/TS'd 3ZZ3P3lL
Ndid nun Adiite swbnnin
:ll 00S-T-AdN
) _ ' `Y
),|.6 The group responsible for the equipment must <eir tag first and remove their togs last.
<.1.7 Red danger tags may be removed only upon ation of the person designated on the tag, except in
wing specific instances. The supervisor of any perfails to remove o red donger tag when a job has been ad may authorize the removal of the tag by another n his organization after he ha? determined to his 3 satisfaction that the equipment can be operated in anner. Authorizations across line organizations is lissible except for those cases where Section 10.1.5 individual jobs have been'completed, each worker of workers must remove their tags immediately,") i violated ohd no supervision in the violating organs in the plant. In such cases, the Operating Depart-ervisors must contact supervision In the violating oron to obtain authority t remove the tag. The Op3epartment supervisor must First determine that the nt can be operated in a safe manner and that all rating workers have left the immediate area. In & on the tog entitled, "Removal will be ordered by
__ , " it is permissible to designate some classifi\h "os foreman, electrician, pipefitter', etc., in,, special individual's name,
j
j
1
!j
: I 1 I
:
.l,$ At the discretion of the supervisor, locks may on valve and switches in addition to, but not rered danger tags.
.1.9 Togs removed must be filled out and turned in 'wner's Representative.
. 2 Warn? ng Tags (Green)
-,.
.2.1 When it i$ necessary to convey instructions or ion prior to Operation of equipment controls, green 3" tags are to be attached to the controls.
.2.2 Green "warning" tags should be removed when ns set forth on the tag hove been met.
10.3 Caution Togs fWhite)
10.3.1 Whitecaution tags are affixed to mechanical or electrical equipment by the Owner's Representative to pre vent Operation of such equipment by anyone until items on the fag have been completed.
10.3.2 The tag providesspaees for meggering, rotation, final alignment and-lubrication-of equipment. When appro priate action has been taken, then personnel performing the work signs and dotes the tog,
10.3.3 When tagged equipment is released to the Owner, a representative of operations and the Owner's Repre sentative sign the tag which is kept by the Owner's Represen tative until fob completion,
11.0 SAFE WORK PERMITS
II. I Sofe Work Permits issued by the Owner to con tractor personnel are required for certain hazardous locations and conditions. These permits are designed to provide o means of checking at the job site the safety of such jobs as, ' -utnot limited to, entering closed vessels; working on electrical gear; performing hat tap work; welding, cutting on, brookingintt or repairing pipelines or vessels in operation or under pressure or that have contained hazardous materials. These permits also cover work involving the use of flameorsporkproducing equip ment in hazardous areas or near an open ditch and work on machinery.
11.2 Contractor supervision must be in close contact with the progress of work os well as communicating with the Owner's Representative for up to date status of operations. Fur ther, contractor supervision must be certain that all person nel involved are informed as to specific procedures and changes in the situation.
11.3 Safe Work Permits are to be initially requested through the Owner's Representative and issued by the Owner's operating area or facility supervision involved on any job where the Safe Work Permit is applicable. More than one
34 35
3Z/ZZ'd 3ZZ3ZP3ZIL
waid Mtn ABiiya swtjmiM
9:II 00S-I-A.bW
i. Permit may be required on certain jobs which will j| rtained upon obtaining each Safe Work Permit.
.4 Personnel must give a careful and complete desof the work to be done to the person issuing the Safe irmit.
.4.1 Where a job presents serious man hazard due icol, mechanical, electrical, temperature or height 3, it is mandatory that a written, safe job procedure uny the request for the Safe Work Permit. This pros to be signed by the Owner's Representative, Pro>resenfotive, and the contractor, who thereby ogree procedure allows the job to be done safelyr
.5 Directions end restrictions noted on Safe Work must be carefully followed.
,6 A Safe Work Permit must be reissued for a |ob if evidence that conditions have changed subsequent to snee of the original Safe Work Permit.
.7 Permits issued for jobs that last longer than oneday
molly be issued for that fob each day. By mutual eon-
he parties Involved, permits for these jobs may be
-longer or shorter periods of time.
-
.8 Vessels irtan existing facility to be entered must be Fe for personnel by such measures as disconnecting, , or double block and bleed on connecting piping, precautions are impractical, a detailed procedure for ng the work in safe manner must be prescribed as i in paragraph 11.4,1.
.9 Vessels in an existing facility to be welded on, must be positively checked inside for flammable or e gas and/or liquids and Safe Work Permit issued eat is applied.
Owner's Representative, when there is any uncertainty.
11.11 Safe Work Permits are required for all excava tion work done with machinery, i.e., gradalls, draglines, augers, ditching machines, etc.
11.12 All Safe Work Permits in the area affected are automatically cancelled when an ermegeney signal is sounded and must be reissued after the all clear signal,
12.0 EXCAVATIONS,-FLOOR OPENINGS, BARRICADES 1
12.1 Where a safety hazard would be created for the personnel involved, and/or others, excovqtionssuchasditches, trenches, or bell holes should be sloped sufficiently to pre vent cave-ins or slides. If sloping is impractical, ` shoring must be used in cases whenever the vertical dimension exceeds four feet.
12.1.1 Personnel removing shoring after completionof work must not be in the bottom of the excavation. Shoring must be removed in such a manner to prevent cave-in on per sonnel .
12.2 Contractors must provide adequate barricades, covers, handrails, signals, flagmen, or Other appropriate warning devices to protect personnel near any hazardous op eration or excavation. Floor openings, open trenches, exca vations, etc., shall be covered when handrails or barricades do not provide adequate protection to personnel.
12.2.1 Contractors must notify the Owner's Representa tive of necessary obstruction on rood shoulders on the day it occurs.
12.2.2 Contractors must obtain approval-from the Own er's Representative at least one day prior to cutting roads or otherwise obstructing traffic on plant roads,'
.10 The contractor may request Safe Work Permits wn protection. Safety checks by the Owner for danases or chemicals should be requested through the
12.3 Grade lines, ropes, chains, etc., must be suffi ciently marked in order to be visible day or night.
36 37
1
Z/Z'd
Ndid ntn A3"iite subinnin
:ll 00S-T-AdN
.4 No obstrucrionof any kihd, whether permanent or y, is permitted within 8'-9" horizontally From the ie oF any railroad track and within 22,-6" vertically top of the rail. Specific authorization from the Representative as well as blue flags are required '-`oring under or excavating adjacent to ral I road tracks. js must be placed on railroad tracks when the entrance n would present a hazard to personnel cr equipment.
;
.5 In locations where strictly temporary loading or
'9 operations ore to be undertaken, blue flags and j
derails available through the Owner's Representative
used by personnel engaged in these operations to pre- ;
irrunning of the work by a train, Blueiights, avail- j
-n the Owner's Representative, must be attached to <
gs at night. Placement of blue flags and portable
must hove prior clearance with the Owner's Repre- j
e who will in turn notify the Traffic Department,
|
i
',5,1 Blue flags must be placed on the tracks so they j
Jin unobstructed view of the train crew and they must
da minimum of two car lengths (100 Feet) in front of j
/hey are intended to protect. Exceptions to the mini-
tance may be made by the Owner's Representativewhere
) installations do not ollow sufficient space.
c safety hazard due to radiation exists,
13.3.1 Only authorized personnel may enter an area parked by "Radiation Areo" sign.
13.3.2 All areas where radiation hazard exists must be roped off all the way around the area and marked conspicuously by standard signs at o safe distance from the source of radiation. These signs bear the radiation symbol of magenta (or purple) on a yellow background with the words "Caution-Radiation Area."
13.3.3 "Radiation Area" signs must be removed whena radiation hazard no longer exists in the affected area.
13.3.4 Equipment containing a source of radiation must not be handled, uncrated or installed without prior clearance with the Owner's Representative,
14.0 DEMOLITION
14.1 This section specifically covers the demolition (removal) of Facilities that have been abandoned. Due to the inherent hazards in this type of work/ special caremust be devoted to safe procedures, scope understanding and commun ications concerning the safe clearance of work.
1.5.2 Blue flags and portable derails must be removed stely when the hazard for which theywere installed no exists.
lAQIATlON
3.) All state and/or federal laws governing use, storlandling of o radiation source must be complied with.
3.2 A minimum of two qualified people ore required performance of any radiographic work,
3.3 In locations where o radiotion source is used or regulations require that it be marked with a "Radio3tericl " sign . This sigh is for the purpose of informing in the area (hot such material is present, end not that
-
J
j
1
;
.
14.2 It is not appropriate to make assumptions in any stage of a demolition job. Respgnsibllitiesmustbe delegated only to those whose profession qualify them to make the neces sary judgments and decisions that are required to assure the safest passible'prosecution of the job. From start to finish, each person connected with a demolition job must adopt an attitude of "Prepare For Any Possibility."
14.3 The contractor shall make certain that ail lines, services and equipment* hove been cleaned or purged and properly cleared for safe removal. All lines (includingwater and steam) are to be considered hot until pisirive safe clear ance has been obtained.
14.4 Special core shall be exercised to locate and mark old underground or otherwise hidden lines, cables and
38 39
Z/PZ'd 9ZZ9P9TL
w&Jid ntn Adiite subinnin
9:TT 00S-T-AdN
SZ'6 "ItLLQl
)
vers using the best available information and Owner1* .5 The pre-job safety meeting with the contractor, as n Section 1 of this manual, shall devote speeia! afteneplanning the safety aspects of demolition jobs. .5.1 Steps of dismantling and loads to be handled shall wed with the Owner's Representative prior to starting
.5.2 Temporary provision* must be mode where safety eye wash baths and fire extinguishers are being the work area.