Document r0rRmorvY4eYkK0YeoJ3Ekov

MONSANTO COMPANY W. 0 . Krummrich Plant May 12, 1967 cc : MINUTES OP AROCLOR MEETING Messrs. COMPANY CONFIDENTIAL Messrs. R. E. Howard - G.O. J. R. McClain P. MacDonald - Newport W. B. Papageorge - Annistoi A.C.W. Pemberton - Newport W. J. Wilson D. C. Armstrong 0. W. Ashworth - S. 2nd A. Arp 1 no - Brussels P. G. Benignus - G.O. 0. R. Buchanan - G.O. V. Brawley J. G. Bryant - Anniston H. C. Carder - G.O. C. R. Coleman - Newport P. D. Collins - G.O. J. Cresce - G.O. H. J. Day - G.O. L. C. Fuhrmeister - Anniston H. 0. Hehner - G.O. P. E. Helsler H. J. Horner H. L. Hubbard - S. 2nd N. T. Johnson _ 0.0. 0. A. Meyer G. W, Miller - Anniston J. W. Molloy R. H. Munch - S. 2nd 0..J.S. Perry - Newport H. P. Ray W. R. Richard - G.O. V. W. Saeger - S. 2nd R. A. Steenrod G.O. R. P. Stevens - G.O. J. D. Sullivan - G.O. M. T. White, Jr. _ 0.0. C. M. Williams - G.O. H. L. Williams _ Anniston D. Wood - Brussels R. S. Yates - G.O. A general Aroclor meeting was held on May 9-10, 1967, In St. Louis at the Holiday Inn North. Progress to date and future plans were presented In a com pany effort to meet capacity and quality goals. Minutes of the meeting are attached. R, M. McCutchan Technical ^Services Department 0196029 TOWOLDMONOQ57293 TOPICS COVERED I. The Market Place - 0. R. Buchanan II. Quality A. Comparison - H. 0. Hehner B. Measurement - J. Miller, J. G. Bryant, R. H Munch C. Improvement - J. G. Bryant, D. C. Armstrong D. Storage and Shipping Containers - J. C. Bryant, L. C. Puhrmeister E. Plant Programs - L. C. Puhrmeister, G. J. S. Perry, H. P. Ray III. Capacity A. CED Plans and Timing - R. P. Stevens, R. S. Yates B. Plant Debottlenecking Programs - L. C. Puhrmeister, J. W. Molloy IV. Quality Measurement Program - R. H. Munch V. Future Plans - All groups represented I 0196030 TOWOLDMONOQ57294 ACCOMPLISHMENTS I The Market Place Aroclor sales in 1966 were $19 M and a forecast of $54 H in 1971. Aroclor's return on investment is 20#. This year's production will be approximately 70 W lbs, Monsanto is being given a woi3, d-wide image, with delivery of Aroclors from any of three manufacturing plants, II. Quality ` A. Goals Aroclor quality goals haye been set as follows: 1254: Resistivity Power Factor TCC 1242: Resistivity Power Factor TCC In-Plant 15,000 > ,<.0.5# U0.1) <0.1* 10,000> <0.6# (* 0.1) <0.1 As Packaged 10,000* <0.4#** -- 5,000* <0.9)** -- Delivered 5,000> <0.5# 0.1*** 5,000> <1.0# 0.1 Clear values less than these with Marketing (C. Williams) Do not send these values- to customer. Limits must be defined by lab work, The "as packaged" goal is being emphasized. B. Product Refinement 1. Work at Anniston indicates that thermal chemical chlorides can be reduced to 0.1 ppm by distillation and porocel treatment. With this processing, only Anniston material meets company quality goals.' WGK Aroclor will meet only the electrical properties goal with this treatment, 2. Changes in the current process will be reoommended for each manufacturing location according to each plant's requirements to meet company Aroclor quality goalB. Chlorlnator Conditions 019 60 31 Work by WGK PR&D (D. C. Armstrong) indicates that by altering chlorlnator conditions, the effect of biphenyl variations 1b minimized, and a more stable Aroclor produced. Improve ments in TCC analysis were seen in the laboratory with a reaction temperature of 200C, 0.2# FeCls catalyst, and good agitation. Lime tests were inconclusive. No plant tests to date. 2 II. Quality (Continued) D. Drumming Testing Of clean-surface and coated drums has been carried out at Anniston. Drums Investigated were: 1. Galvanized 2. Dalbon coating 3. Clear phenolic or epoxy phenolic with additive 4. Impregnated series 46 To date the dalbon coated drumB have given the best results In maintaining high Aroolor resistivity values. Increased drum cost Is $5-5 each. Adding attapulgus clay to the drummed product Is not recommended as a solution to quality problems. Galvanized drums require a finished coating Inside the drum to maintain the high quality desired. Confirmation of an aluminized coating used by Bayer was completed. Further work will be continued for optimum cost drums to meet quality reqilrementB. III. Measurements ' A. Studies of power factor by Research have turned up a number of variables which must be investigated and/or controlled. B. It has been found that bubbling oxygen through Aroclor may be a measurement of Its stability (Dr. Munoh). C. A more sensitive thermal chemical chloride test has been developed In Anniston plant efforts to measure Aroclor upgrading. IV. Capacity A. CED plans for Aroclor expansion at MCL (from 10 H #/yr to 17 M #/yr) were submitted to Newport for comments and suggestions. B. Preliminary planning for Anniston drumming, warehousing, and storage facilities Is underway. Storage capacity is to be Increased from 71 M gallons to 255 M gallons. C. The Delaware River plant is no longer being considered as a Bite for Aroclor expansion (only $l6,000/yr savings). D. Present sales forecast and Aroolor Increase indicate a major expansion of 4o M #/yr liquid Aroclor would be required at WOK. 019603? TOWOLDMONOQ57296 -3- GOALS AND FUTURE WORK PR&D (D. C. Armstrong) 1. Assist in plant demonstration of optimum chlorinefor operating conditions. 2. Assist as needed in closing Btorage tank system. 3. Find optimum conditions for continuous chlorination system, 4. Define process requirements to meet quality goals. EDC 7/15/67 ----11/ 1/67 -- Manufacturing and TSP WOK 1. Quality a. Basket removal results (in progress) b. Individual chlorinator profile (in progress) c. Earth vs. Bauxite treatment d. Qranular vs. pulverized FeCla catalyst e. Optimization of chlorinator conditions 8/ 1/67 9/ 1/67 8/ 1/67 9/ 1/67 1. Temperature 2. <f> catalyst 3. Lime charge 8/ 1/67 8/ 1/67 8/ 1/67 2. Investigate recycling recovered biphenyl and Aroolors. 10/ I/67 3. Nitrogen purge on tanks (design). 8/ 1/67 4. Capaoity a. Chlorine Bupply limitation (installed) b. Distillation revision (temporary) 0. Flexibility (temporary) d. Storage evaluation e. Blend system (design and installation) Anniston 1. Quality 9/ 1/67 8/ 1/67 7/ 1/67 7/ 1/67 10/ 1/67 01V6033 a. Plant test bauxite treating column b. Complete work on optimum container and loading facilities c. Upgrade piping in storage (isolate systems) d. Nitrogen'blanket storage and treating tanks 8/ 1/67 12/ 1/67 2. Capacity--debottleneck stills (design for indirect firing) 3. Railroad spur installation 9/ 1/67 TOWOLDMONOQ57297 .4 - AnnlBton (Continued) 4. Chlorlnator capacity check (feed data to CED) 5. Install and chedk ln-llne cell 6. Investigate vacuum HC1 removal for crude Aroclor Newport ` 1, Capacity a,, Biphenyl expansion from 5.4 to 14,7 R lbs/yr b. Aroclor expansion from 10.0 to 17.0 R lbs/yr 1. Off-gas Bystem 2. External cooling on ohlorlnators ?. Better agitation o. Remove chlorlnator baskets d. Increase still capacity 1. Entrainment reduction 2. Heating and cooling Improvement e. Increase storage for electrical grade Aroolor, use Ns blanket 2. Quality a. Better loading facilities b. Column treat (depending on Anniston work) c. In-line testing d. Better TCC test and procedure CED 1. Storage tank package at Anniston (scope and estimate) 2. Increase Aroclor capacity - Alternatives: (estimates for review) a. Debottlenecking and expansion at both WOK and Anniston b, 4o H lbs/yr expansloh at WOK 5. Anniston warehouse project (complete after expansion decision) Research _ 1. Round robin testing at plant locations 2. Standardization of resistivity and'power factor measurements EDC 15 to 18 mos after approval 6/ 1/68 8/ 1/67 6/ 1/67 6/15/67 8/ 1/67 10/ 1/67 0l<)603i> TOWOLDMONOQ57298 -5 - Research (Continued) EDC 3. Work with customer on dielectric Aroclor capacitors it. Firm up work on causes of Instability . Marketing 1. Maintain 100# of market in UfS,,A. and U.K. 2. Supply rest of world except EEC 3. Increase non-domestic sales Create global Monsanto Image 5. Create preference for askarel transformers over petroleum and dry-type units 6. Establish manufacturing position In Japan 7. Maintain 25# excess global capacity by Improved forecasts 8. Continue to Improve communications with Manufacturing, Research, and Engineering Other Commitments 1. H. C. Carder - Tank car fleet requirements (N. L. Sample) 2. H. J. Day - Recommend minimum inventories 3. H. C. Carder requests a monthly report of sales versus actual capacity by H. J. Day or M. T. White for domestic locations. 0196035 TOWOLDMONOQ57299