PROGRESS REPORT
TECHNICAL SERVICES DEPARTMENT
ANNISTON. ALABAMA PLANT
REPORT MO. 1
DATE February 24, 1969
TITLE) OBJECTIVE)
ANNISTON PLANT DEPARTMENTAL HASTE AUDITS
To Identify the major waste components from all the operating department! end to provide reliable flow date ao that waete lossee can he accurately calculated.
PERSONNEL) E. G. Wright (H. F. Taffea)
REPORTED BT) E. G. Wright
SUMMARY;
At the praaant time both the waste treatment plant and the neutralization pits are operating at near capacity. During certain periods these systems are overloaded. These audits will provide data to show whara thaat loaaaa actually are and provide some Ineight as to how these losses can be reduced. The reduction of Home of these lossee will provide for better operation of the waste treatment plant as well as tbs neutralization pita.
The taat pariod will last for two weeks In aach oparatlng departmtnt. Flow measurement will be made a minimum of three times In aach department so that a good average flow rate can be determined. The sampling will be done In the same manner In which It is now done. Accurate data will be collected on production rates so that tha loesaa can be related to this. Sample data ahaate and drawings showing sampling points era attached at the end of this report.
FUTURE WORE: 1. After Identifying these waste materials, efforts will ba made to deter mine methods by which these losses can be reduced.
2. After cowpletlon of ell of the audita, a comprehensive report will be Issued.
ANNISTON
bmr
E. G. Weigh Technical Services Dept.
MCNS 059995
u
Anniston TSD Progress Report 370*740
Pege 2
1. Slopling Procedure*:
The sampling program will continue to operate as It la operating presently
(la. sample* will ba taken at th* same point* at which they ara presently collected). These sample* will be 24 hour composite sample* In most case*, however 4 hour cosposlta* will be collected at the hold tank* In the Hlran department. These sample* will be collected using the small Randolph Peri staltic pumps which ara now being used. A detailed account of where the samples will be collected and what they will be analysed for Is Included In the description of each departmental audit.
2. Flow Measurements:
Flow measurements will be taken using a method developed at the WGK Plant. A known concentration of Lithium Chloride solution will be metered Into the
desired sewer. At some point downstream sables will ba collected from the sewer. These samples will be collected using a high speed Randolph Peri staltic pump. The flow maasuraswnts will be made a minimum of three times In each department to insure that an accurate average flow Is determined. Lithium Chloride was chosen for these flow measurements because it Is not normally found In the plant sewer system and because It can be datectad using readily available analytical method* and lnstruswntation.
Departmental Audits
1. Chlorine Department:
The chlorine department will not be audited because of the shutdown of th* facility. However, samples from the east limestone pit will be analysed for mercury because of th* toxicity of this material.
2. HC1 Department:
Background: Th* primary waste product* from this department era HC1 and organic (Aroclor) material. Preeantly, the HC1 department 1* eewarlng approximately one-third of the production or 30 R pounds per day (based on theory). This causes problems with th* operation of th* east limestone pit. These losses are Intentional because the department Is trying to purge organic material from the HC1 system in an attempt to produce Staley Grad* (organic free) HC1. Programs are now underway looking for a better method to remove these organics.
Sampling Points: (Sea attached drawing)
A. Influent to Limestone Pit B. Effluent from Limestone Pit
C. By-pass Ditch D. Total Plant Effluent
ph, ph,
ph, ph,
Analysis X HC1, Hg, X organics X HC1, Hg, X organics
X HC1, Hg X HC1, Hg, X organics,
PO^
MOSS 059996
Anniston TSD Progress Report 370-740
Pege 3
2. HC1 Deportment: (continued)
Flow Measurement: The Lithium Chloride solution will be metered Into the ecld sewer es close to the HC1 deportment as possible. The diluted samples will be collected at the manhole located just southwest of gate No. 6 (sea attached drawing) The Biphenyl department probably will contribute soma of this flow, but It won't affect the calculations of HC1 losses from the department. Accurate records will be kept on production rates so that losses can be correlated to production rates.
3. Paranltrophenol Department:
Background: The major waste products from the PNP department are PNP, NaCl, PNCB, ONCB, MNCB and NaOH. These materials account for approximately 15-201 of the
total loading to the waste treatment plant. This amount varies with the efficiencies of the carbon adsorption towers. By doing this audit and care fully noting the operating conditions. It Is possible that some of the varlebles in carbon tower operations can be defined.
Sampling Points: (See attached drawing)
Analysis
A. Toxic Sewer from PNP
PNP, PNCB, ONCB, MKB, NaCl, C.O.D. ph
Flow Measurement: The Lithium Chloride solution will be metered Into the toxic sewer (southwest corner of PNP structure) at the sane point at which the settles are collected. The diluted sang>les will be taken downstream In the toxic sewer above where the Nlran department ties Into the sewer (see attached drawing). The flow In this sewer Is malntelned et a relatively constant rata so the three flow mea surements which are planned ehould give a reliable average flow.
4. Aroclor Department:
The primary wastee from the Aroclor department are organic materials and HC1. These wastes originate from spills, pump laaks, or when the department Is being cleaned up. Due to the recent concern over chlorinated Biphenyl (Aroclor) compounds being found In the tissue of soma animals and the effects of these compounds on the palatablllty of fishes. It is necessary that the quantities of this material being lost Is determined.
Sampling Points: (See attached drawing) A. Manhole adjacent to Porocel Column
Analysis
Organics, X HC1
Plow Measurement: The Lithium Chloride solution will be entered Into the manhole Immediately
north of the south maintenance shop. This will Include the flow from the Chlorine department es well as the phosphoric acid neutralisation pit. The flow from the phosphoric ecld pit Is known. The flow from the Chlorine department can be measured by the Lithium Chloride dilution method, and then the flow from the Aroclor deportment can be calculated.
MOMS 059997
u
Anniston TSD Progress Raport 370-740
)
Paga 4
3. Parathlon Department:
Background: Tha primary waste producca froai the Parathlon department ara Ethyl and Nathyl Parathlon, Ethyl and Methyl Intarmadiata, acetone, Faranltrophanol and Inorganic aalta (la. HeCl, HAjCOj, NaHCOj). Acetone la tha largeat C.O.D. contributor In tha department. A program la underway at tha preaent time experimenting with waya of reducing these loseee. This program con sists of applying a lower vacuum on tha condensation reactor. If thla program la successful, thera should ba a large reduction In C.O.D. loading to tha waste treatment plant. The reduction In C.O.D. loading will result In more efficient and eaalar operation of tha waste treatment plant.
Sampling Points: (Sea attached drawing)
Analysis
A. Still Jat Haadar
X HCl, Intermediate, C.O.D. ph
B. Cone Tank Overflow
PNP, C.O.D., Parathlon, Acetone
C. Peed to Basins
PNP, C.O.D., Parathlon, Acetone, ph, Sue. Solids
D. Incinerator Scrubber Water X H3PO4
Plow Measurement: The flows at tha cone tank, still Jet headers, and tha lnclnarator acrubbar are metered by rotomaters. These readings will be noted carefully during the waste audit period. However, Lithium Chloride will ba used Co check on these valves by measuring the total flow from the Parathlon department. The actual flow to the aeration basins will be measured using the magnetic flow meter located In the influent feed line from the hold tanks to the basins.
br Attach.
E- G. Wright
HONS 059998