Document qmKxbn4dORN9d8B45z3rq5Z8G
CHAPTER 37
the absorber. In the rectifier selective condensatic^ipc/ai^yjtliepcpnc^ 's tration.of the, absorbent in the condensate being much 'greater , than its 5
edfieefitrhtidn' in'.the entering;vapbr mixture; rectifier;condense is;dripped ~
bhcK to'!ffie;generator.*' v.:
v': 1 .
.Jjjr^e.r^ippf.Refrigerating effec.t .to;heat inputV^tiie, perfprqoanqe ratiOjbfi
commonly..used.'.efficiency measure of absorption machines) is(only. 40,^.
45 p.er.(;ejit: with.' the, ordinary ammonia; absorptiph.system and;, aside,Virom ilie inherent disadvantages involved .in.dhe.use qf a toxic, and .explosive!
refrigerant, this is not sufficiently; high to inake dt competitive xyitli' other,
types of systems when used' in air conditioning appficatibns,':.,.Therefpfej
Recently, several absorption .systems using hygroscopic brines of salts such
as lithium' chloride or lithium bromide3 (solids in the pure state) As absorb
ents 'and;water';aS the refrigerant 'halve been `developed`1 Such systems are limited'tB higher temperature applicat'ions but, thermodyriaifhically, havS
Fio. 8. Diagram of Lithium Bromide Water Absorption System
the advantages ,o'f, a refrigerant with a high latent heat of vaporization, gnd[| nonypiatile^bsorfiehts with a large negative deviatioii from Raoult's ta^
None.pf;the absorbent is carried off with tbe refrigerant from the genefatorj anRi the performance ratio ranges,as high as 75percent.. Both the refriger-
antand the absorbedt,are non-toxic and npn-explhsiye and the performanfig ratip"does, not,vary, greatly between. 20 percent of capacity and full ` load-
Tins mcreased efficiency places operating costs in.'cbmpetitiori with other,
forms of refrigeration in many high temperature'applications such'
conditioning..;
'` .
i
.
;;i,fr.`'.'
One, ,fonn pf, lithium-broinide-water ; absorption system is . shown . hchefi
maticaili,yly;:;min;;Iri'ilgg,,.8o;;wwiwthi tmhe ggcexnteciraaitmor,. aquDud... cWondenser shown; loc__a_ted . in:/ high.pressure s1he"ll and1 t1h1e. e--v--a---p- o--raintokria<nndi>abVsqiorbnerininaal.rlqw^,nprorosgciuirrfet Ss. h^f;
The. .water,,to.,be cooled. flows to.the, evaporator ,1 from the.jpad
.
small portion of it. is flashed into vapor thus cooling the regaining,watef,. which is, then returned by,pump 2 to the load. 'Die pressure in the. lqjfi.
side .shell and,-therefore, the .temperature of.the water paaiing-,through;th?i!
shell is controlled by the temperature and concentration of the lithium
Refrigeration
841
bromide brine sprayed over absorber coil 3. The water vapor flashed in the evaporator chamber is absorbed by the strong salt solution to form a weak solution which drains from the low pressure chamber and passes through solution pump 4. From pump 4 a portion .of the weak brine is delivered through the heat exchanger 5 to the high pressure shell and the remainder is mixed with the strong solution through eductor 6 and delivered back to the low pressure shell. Heat applied at the generator 7 boils off the water vapor earlier condensed in the absorber and returns the brine to its original concentration. The condenser 8, also located in the high pres sure shell, liquifies the water boiled off by the generator and this condensate is returned through a liquid loop to the evaporator. The re-concentrated solution is returned from the high pressure shell through the heat exchanger 5 to the eductor 6 where it is mixed with a portion of the weak solution and pumped to the absorber with the mixture at a still relatively high concentra tion.
Ice Systems
Cold water systems using ice as the cooling agent have been installed in some theaters, restaurants, funeral homes, churches and other places where short hours of operation and high- peaks of cooling demand make this type of system desirable. A comparatively small quantity of ice in the water cooling tank of such a system can release refrigeration at a rela tively rapid rate. For instance, neighborhood theaters having a peak demand of 1,200,000 Btu per hr (100 tons refrigeration) have found 8 ton capacity ice bunkers satisfactory.
- In operation, the water in the air conditioning system is circulated over ice placed in an insulated box, and is cooled to the 38 or 40 deg range or higher, if desired. This cold water is pumped from the ice bunker to air cooling coils or spray type air washers. The blowers, coils, air washer or air handling sections are the same as those parts in any system employing cold water as a refrigerant.
The ice water cooler or ice bunker is usually built at the installation in a location where it can easily be iced. It can be constructed of any de sired material such as concrete, steel, or wood with an adequate amount of insulation to save the ice from one period of use to the next. The basic requirement is that the tank.be durable and water-tight.
The temperature of the water is controlled at a predetermined point by a thermostat in the supply line. If the temperature drops too low, a part of the return water is by-passed directly to the sump and is not cooled over the ice. In the larger systems it is customary to install an overflow control which, as the ice melts, discards the excess water through an econo mizer coil, the surface of which is large in relation to the flow so that the water is warmed to 60 F or more as it is discharged from the system.
. In an attempt to lower initial equipment cost and operating expense, or increase the refrigeration capacity of an existing air conditioning system, storage refrigeration has been utilized in a few applications. Some of the methods which have been adopted include the storage of refrigeration m the form of chilled water, chilled brine, ice on evaporator coils4 and the accumulation of thin sheets of ice on copper plates in a steel tank.6 If the Peak load factor is low as compared with a long period of operation, such as m a restaurant, or if the hours of operation are short but the usage factor mgh, as in a church, then it is possible to consider storage refrigeration, ^his method of accumulating refrigeration frequently makes it possible to use low cost off-peak electric power. Power costs may also be reduced by