Document qmDvxJwoy5Eqz8DegJd8GBax5
fjttJer?- arganizatian Correspondence
TO A.W. Clements
MLD MINT OR AKRON OOUfTTMUfT k BLDG. MO. Long Beach -
from
F.C. Dilley
FISX-iJ POINT Off AKRON OCPAKTMKNT * RLPO. NO. Long Beach
/'/
DATE YOUR LETTER
!
OATS THIS letter June 11,1974
OSHA
INSPECTION
Mr. Lee- L. Pitchforth, Jr., Industrial Hygienist, U.S. Department of Labor, Occupational Safety and Health Administration visited the Long Beach Plant on 6-10-74. The length of Mr. Pitchforth's visit was approximately 5 hours.
A meeting was held in the Plant ManagerTs office attended by
Production Manager,
Technical Manager,
Industrial Relations Manager, and
Safety Engineer. Mr.
Pitchforth stated his visit was to complete the Questionnaire and for
a quick walk-thru of our plant. The questionnaire is the 18 page form
entitled " Vinyl Chloride, (VC) and Poly-Vinyl Chloride (PVC) Facilities.
To complete this form is quite time consuming and took approximately
3 hours.
After completion of the questionnaire I escorted Mr. Pitchforth
through the plant. We visited the Poly building main floor and control
room. In the control room he asked to talk to an employee for only
about 5 minutes. We selected
Recovery Operator, to
talk to Mr. Pitchforth. He merely explained to the employee the role
of OSHA in the Vinyl Chloride situation. He was interested in determ
ining if our employees were actually informed on all aspects of the
vinyl problems.
After being satisfied in the Poly area we proceeded to the Bendix unit and this operation was explained in detail. At this time we made a quick walk thru of the Compound, Warehouse, and new Vinyl storage areas.
On the summation Mr. Pitchforth made 2 recommendations. He suggested I follow more closly the ANSI Standard on Respiratory Protection pertaining to the fitting of respirators. Also, He suggested either deducting the background figures on OVA reporting or noting the background differential on the report itself. A weekly summary is posted in our Poly building for employee information and on this report he suggested the changes. Also, he mentioned our housekeeping as being excellent and stated that this one item helped cut his time in half in our plant.
This official was aware of our recent Cal/OSHA and State Health Department inspections. Also, he was acquainted with the Health Department official that took air samples in our plant and also of
the findings.
Mr. Pitchforth gave no indication that he would return at a later date.
KED.ACTKI)
F.C. Dilley
M,C 05605
NGC 05606
Attachment 4
QUESTIONNAIRE: VINYL CHLORIDE (VC) AND POLYVINYL CHLORIDE (PVC) FACILITIES
1 General Plant Layout: * Is it an outdoor facility? es except 2nd floor reactor building enclosed.
b. How long has the plant been in operation? Since i960
ig c la the equipment corroded? wo
*4
f
d. Is the equipment in need of maintenance? No maintenance program in force.
Specify: Freventive
e. la the housekeeping good? Yes aspects?__
Poor? In which
Where is the control room located? West side. 2nd floor-of reactor building.
Other pertinent details re general plant layout: Close proximity to American Chemical Company plant.
\GC 05609
COPY
2. Raw Materials a. Indicate the raw materials; Basically all VCM (Homopolymer plant)
bv How are these handled? Closed system of tanks, pumps, and pipeline.
c. What provisions is made for their storage?
.
Silo? _________ Tank? _________ Car?
Bags? __________ Pressure area?
Other? VCM Stored in sphere
and small pressure tanks at process area. (Cars presently unloaded at American Chemical Co. and transferred via pipeline to BFG)
d. What controls are enforced while these materials are in storage? Closed storage system with normal .fire and safety protection. Daily routine leak detection checks with OVA
e. Is entry to storage facilities accomplished with an air supplied mask? Yes
If not, how?
.
. How are withdrawals of raw materials controlled? Via pipeline and pumps
Yes
Closed system?
'____________
Exhaust system? __________________________
Out of doors?
Other?___
___________________
NGC 05610
3. Manufacturing Process What process is.used? Suspension polymerization
VC* Direct chlorination? Qxrchlorination? Other?
,1
PVCj Polymerization? See 3a* Wet? Yes Drv?
% Other?
j...
b* What is the method of recycle for the unreacted vinyl chloride? Unreacted VC removed as vapor, then- compressed and condensed to liquid.
c* In what form Is the finished product?
Powder? Yes (resin)
Pellets? Yes (compound)
Gas?
Other?
d. Bov is it shipped?
50 lb* baes* boxes, hopper trucks, hopper cars. '
e. What are the container sizes?
50 ib. bag to 180,000 lb. hopper cars.
NGC 05611
advance copy |
4 Controls for the Containment of VC and/or Control of Reaction
a. What controls are utilized? Polymerization in pressure vessel, temperature
Describe: Polymer**6^ jacketed, water cooled. Additional cooling
controlled,
source considered proprietary information.
Are. the controls arranged to fall-safe^ Yes
,
b. Are two sources of supply provided for?
__________________________
Cooling water? Tower supply; fire water back up.
Electricity? Twin loop supply from outside power source. No in-plant emergency power source.
Compressed air? Dual compressors.
Refrigeration?
'.
Are they automatic? Cooling water - manual valve; Electrical-
automatic; compressed air - manual valve.
c* Where is the control room/area located? building.
West side, 2nd floor of reactor
Is it at positive pressure with respect to contaminated areas? Yes
Ie it at least 200 feet from major VC storage or processing? Approx.200ft.
d Are written control/startup/shutdown procedures available to
Batch process - covered by routine procedures.
operating personnel?
._______________________________________
NGC 05612
- ADVANCE COPY
' ;
1,11
5 Ventilation
*. What is Che type of ventilation system? Pressured control room. Louver intake and powered exhaust blowers for enclosed area of reactor
butlding.
Is It adequate? Control room pressure maintained at 0.20 inches H2P.
Reactor building-one air change per 2.5 minutes at normal blower speed and one
change per 1.6 minutes at high speed.
*
,
bk Where is the air exhausted? Control room exhaustswithin reactor area.
-Reactor area exhaust to atmosphere at roof level.
Is the air treated before exhaustion?
No
How?
c Is makeup air introduced in sufficient volume to maintain correct
operation?
see 5 (a) above.
Where does the makeup
30ft. NW of building.
* Is it treated?
air come from? How?
Control Passes
room intake approximately through furnace type filter.
Is it heated in the winter?
Yes (control room)
d. Is the entry air to the control room treated?
How?
_____
*________________
NGC 05613
6. Waste Materials
a. What Is the disposition of waste materials? Solid waste to public landfill. Waste water to sanitary sewer.
Burled? Where?
Burned? How?
Cltv dump?
Other? Public landfill
Describe* Waste polymer and waste compound
Treated?
No
_ ._
Estimated amount
Specify*
How7 1,000 to 1,500 pounds per day.
*
Other pertinent specifics relative waste materials! k
< '
-
NGC 05614
7. Sanitation
a Vhat sanitation facilities are provided?
Shower? Change room?
Yes Yes
Vashroom?
Yes
Individual lockers?
Lunchroom?
Yes
Yes
Drinking fountains?
Yes
Toilets?
Yes
b* Comment on location, accessibility, adequacy, utilization, condition, etc. of pertinent sanitation facilities: (Inspector made no comment prior to plant tour).
I
NGC 05615
X
Exposure to VC
<
a. In which activities is there a potential for exposure to VC? vc
pynnWp. potential in polymerization and drying area jobs. PVC exposure potential in resin bagging and loading area and in certain compounding jobs.
How many employees are involved in each activity? 8 people per shift in
poly/drying area: 2 charge operators, 2 recovery operators, 3 helpers, 1 dryer
operator, (continued below)
.t
^
What is the length of the potential exposure time? Per shift: Charge
operators - 4 hrs; recovery operators 5 hrs; helpers 5 hrs. dryer operator 1 hr.
b. . Are the activity areas regulated? Not posted, but only regular
Indicate which-
employees and authorized visitors permitted.
Give the rationale for establishing these:
. c. Are all employees generally aware of the hazards presented by
VC or PVC? Yes. Employees informed at hiring and on a continuous basis through safety meetings, bulletin board notices, etc.
To what extent is labeling or posting of signs used to appropriately X Inform or warn employees? No posting.
(a) Continued: Potential PVC exposure: 3 operators per shift involved. Resin bagger/loader - 5 to 6 hours per shift:; Compound Henschel operator 7 hours per shift; Compound relief operator - L hour per shift.
NGC 05616
- - . ADVANCE COPY
9* Protective Clothing and Equipment*. a. What articles of protective clothing and equipment are the employees provided? Coveralls, impervious suits for vessel entry, safety glasses, gloves, hard hats, rubber footwear for vessel entry. ear plugs and faceshields yhere needed.
Are they required to wear or use these?
Yes
*
Do they wear or use these? Specify Yes
b. Do employees change into work clothes upon arrival at the plant and back into street clothes before departing? Yes
c. .. Do they shower at the end of the day?
d. Do they wash hands and face before eating lunch?
Where do they eat lunch? Lunch room ( remote from process area) f. How are clothing and equipment articles cared for? Clean coveralls
provided daily - separate lockers for clean and dirty garments.
(1) How often cleaned?
Daily change provided.
How?
Garments laundered once per week
Where? Rental garments; contract supplier.
(2) Are they decontaminated after use? see f. (1) above
Which use?
When?
___
Where?
056/7
________]
I~
"""----r
advance copy
9m Protective Clothing and Equipment*--Continued
g. How often are the articles replaced? As necessary by contract supplier.
What determines replacement?
Normal wear_____________________________
* Respiratory protection devices are covered In question 10--omit here,
NGC 05618
10. Respiratory Protection
*
a. What kind of respiratory protection devices are provided?
Self-
contained breathing apparatus; air supplied respirators; organic
cartridge respirators with particulant filter. Huisance dust respirator
provided in dusty areas.
Are the respirators provided specific for protection from VC or
PTC? ______________________________________________________________________________________
.
*
Explain* Self-contained and/or air supplied respirator used in con-
centrations above 50 ppm; organic cartridge respirator used in areas
for vessel entry.
What respirators are utilized by the employees?
All of above as
dictated by job requirement arid individual situations.
b. *Tb there a training program for employees which Includes the
K
proper wearing of respiratory protection devices?
Yes
c. How often are the respiratory protection devices checked for
efficiency and effectiveness?
All respirators monthly.
, If applicable, how often are cartridges or cannisters replaced? Cartridges replaced daily. Cannisters replaced as dated or used.
d. Other comments:
NGC 0561`>
11, Maintenance and Decontamination Activities
a What procedures are established for maintenance and decontamination? Any equipment which has contained VC Is exhausted prior to any entry
by either production or maintenance personnel. Written procedure and safety, check list employed.
Are there periodic inspections for the:'
Ventilation system?
Visual-
Process equipment?
Yes
`
Piping and fittings?
Yes
Other?
What transpires when leakage occurs? Personnel alerted. breathing apparatus obtained if necessary, problem area isolated and repair made
as soon as possible.
c. What provisions are there for the protection of employees in cleanup of leaks or spills, maintenance or repair operations on contaminated systems or equipment? Protective clothing, footwear, gloves, eye' protection, respirators.
What protective clothing and equipment are utilized?
See above
Air supplied suits? No Gloves? ______________________________Yes ___________ Yes
Respirators? , Others? ______________________________________________________
Clothing d How are employees decontaminated after work is completed?
change, -shower.
\GC
*
**
-i
.
**
-
ADVANCE COPY!
i " _______ i -- - -- i ' j
.r
.
II* Maintenance and Decontamination Actlvltlesr-Contlnucd
a* Are maintenance repair cleanup crews available during all shifts?
Maintenance crew available on day shift and on Call-out basis at night. Production personnel handle minor, maintenance during night sfiifte, .
i
NGC 05621
ADVANCE COPY J
'' r
j
12. Fire Protection
a. What provisions are made for fire protection?
All buildings sprinkled
and equipped with fire hoses and hand extinguishers. All buildings
connected to a common fire' alarm system.
Who Approves the fire protection plan? 1 FIA Insurance, Divisional Engineering. L. A. County Fire Department.
b. Who conducts fire Inspections?
FlA Insurance. L.A. County Fire
Department. Plant Safety Personnel
What is the frequency of the Inspections? monthly,
Bi-annually - quarterly and
c. ' Are there fire Insurance engineers? Yes Give particulars: FIA Insurance personnel are fire ^protection engineers.
ngc o?62
Kovmcz COPY
Employer Monitoring . What Is the. method of sampling? Stationary Bendix total hydrocarbon
continuous analyzer in polymerization area. Portable organic vapor analyzer for specific leak detection.
Are grab samples taken?
Yes
Bendix Micronalr II. , How? Permissible air sampling pump.
Are continuous samples taken?
Yes
How? See above
If sensors are used, where are they located? Bendix sample points:
1 on roof,-3 on reactor floor, 2 at pad level in reactor building.
b. Are personal samples taken?
Yes
, How? Carbon absorption
For.how long? Z|
__ , , * 1 liter/minute What Is the sampling rate? __________________________________
What areas of activity are the employees in when monitored? work areas.
Normal
What percentage of employees are monitored in each area? in polymerization area.
What is the frequency of monitoring? 3 "Platers per week.
c* What method is used to analyze the samples collected in the OVA - total carbon hydrogen flame GC.
monitoring program? Bendix total carbon hydrogen flame GC
Carbon absorption - extraction and GC.
What is the sensitivity? ova t-s PrTM
t-s PPPicr. .S. ppm.
What is the accuracy? QVA - 207., Bendix _ 20%. GC - 10%
d. What Is the disposition of the results of sample analyses? ____
Data tabulated and maintained on file.
NGC 05623
13. Employer Monitoring--Continued Are the employees informed? Yes (Weekly posting of ambient average concentration,
Are .the results recorded? .Yes_____________________
_
Where are the records kept? Bendix ~ strlP chart in control room. Other
records kept in Lab and in Technical Department office. How long are records of the results maintained?
Plan to help as '
long as required by Standard.
Are the results available at all times to the employees?
Yes
i \
NGC 05624
Medical Program
a* What does the in-house medical program consist of? Audiometric, visual, fland X-rays, Bloou and Urine specimen for lead -(Compound employees annually)
O..L..i.v.er fui nction blood test.(Chem-12 and GGTP)
1..1 . --. ----- .
Are physical examinations of employees required?
Xes
Preplacement?
Yes
--
Ypr
Periodical? ___________;_________________________________________
f
What does the physical examination Include? Mr` Pitchforth asked
for a copy of Blank Physical examination form. See attachment.
Is there a medical surveillance program in effect? xes
What does It consist of?
See (a.) above,._______________________
* Does the employee have access to his medical records?
Yes
Is there a physician and nurse on duty at all times?
N
*
- If not, when? Nurse on day shift only ; doctor one day per week
and on call. - How many employees are trained in first aid?
f
4 per shift.
b.. What satellite-support medical facilities are readily available?
St. Francis Hospital
What is the distance to the nearest hospital which would be . 6 miles to St. Francis Hospital
readily available at any time? ________________________________________________
Would adequate, appropriate, medical services be available
there?
Yes
Is there a contract or working agreement in force with this facility? Yes (Pjant doctor -is- on-hospital staff) -
Other comments* _________________________' ' '_____________________________________
15 Emergency In the event an emergency should occur for any reason within the. operation whereby employees are Involved, what plan would be Implemented? Plant has established emergency procedures.
t
a. Is there an evacuation plan?
Yps
b* Are there definite emergency procedures established to include
authorization for Individual control of assigned personnel? Polymerization area foremen control- polymerization.
c. Is there a mutual support plan for outside assistance in the event
of a catastrophic Incident such as fire, explosion, massive eplll? *$fes. Carson Community Inaustry Emergency System.
A Explain: Communication system established among area industries end L. A.
County .Fire Department t.o inform of any major emergency and place each
. company in best possibles.position to help each other.
NGC' 05626
NGC 0562**