REQUEST FOB PROJECT
QOTAORXDGNES SPRAY BRIER
Attached are Reason Sheet and Scope of Work fee? the drier capacity required for Quinacridones in late 1964* (See letter V. H. Chalv.psld. to R, A, Sagemah * 2/15/63*) Please authorize preparation of project.
Of the driers considered (Heated Screw, Rotary Double Cone Vacua, Turbullzar, Scraped Vacuum) only tray or spray drying were found suitable.
Technical Section economic comparisons show that at 600M lbs ./year QA, net return on the differential investment (Spray versus Tray Driers ) is above 9$s at ?80M lbs ./year, about 20$. These figures will be verified by Operations prior to project preparation.
The project contains provision for a vibrating hopper to
receive preescake fro the new Shriver press to feed to, the drier# thereby eliminating manual handling of QA presscakes. ' <
The minimum spray drier (7 ft.) has capacity in excess of ivm lbs./year QA. This will eliminate a future space problem versus tray driers.
No yield improvement is claimed for spray drying since the losses in multiple handling tray drying, although evident, cannot be established quantitatively.
All equipment specified has been tested successfully on
full scale tests.
'
'
-- f/3.- M MESIEY 6 ~ -----------------------TECHNICAL SECTION
JMW/tmj attach.
,. V '* ' , " '
N40631
REAS.O...N. SHEEi--Tw PRESENT FACILITIES AMD TO Mf EXTENT THET ARE IH&BEQPBTE:
Two existing vacuum dryers in the Quihacridone Plant have
23.6M lbs ./year drying capacity versus the 6o4M lbs ./year plant crude
capacity. The additional crude is dried in Newark driers and re
turned Tor dispersion milling at Newport. Newark drying capacity
now being used will be required Tor Newark products in late 1964. PROPOSED WORK;
Purchase and install .a seven Toot diameter Bowen. Spray
Dryer, presscalce feeding equipment and auxiliaries.
REMARKS:
1. Spray drying is specified since it is economically, operationally
and quality-wise the most desirable.
2. The minimum size spray, drier will have capacity in excess of
II lbs ./year QA.
3* The Bowen drier is specified because of its unique atomizing
disc system.
'
4. No pollution problems will result from this project.
DUP050054441
SCOPS OP WORK
1, Purchase and install Carrier Mfg. Co, vibrating hopper
a. Hopper
~$15M
)
b. Support steel 1M
) 5000#
c. Power - 2 - 1 hp motors ) - else tr0lf starters
d.' Pads
e. Purchased water hose connection (ln)
Hopper to be installed to take cake from Shriver filter and feed Sfoyno pump, install on first floor A-27 under Shriver.
2. Purchase and install Bowen Spray Brier System* - $43M System includes (a) ESoyno feed pump v;/var.table drive . lb) Spray drying chamber (cj Direct fired gas burner (8XA. [Safety) td) Instrumentation for dryer
(e) Structural steel if) Bust collector
... "(g) Mlnimian duct vjork
Install in present PI'S Storage Area adjacent to A-27 Bldg. (*). Print attached to E, H. ICo3.b's copy.
>
2a. Moyne feed pump (1) Provide power for 2 hp motor (2) Provide, mounting pad j3) Provide 2U S/S piping (smooth line) to atomiser (4) Provide special throat opening
2b. Spray toying chamber (7.5 x 7.5 x 16*) ~ Chamber# ducts and steel 5000# 1) Provide pads for structure 2) Provide access steel 3) Provide purchased water line (1")
14 > Provide 10 hp power for atomiser 5} Install duet work 6} I'rovide 1/2 hp power for small auxiliaries .
2c. Direct filled gas burner (PIA Safety)(4* x. 6* x 10s) 1) Provide access steel 2) Provide mounting pads 35 Provide power to 1 hp blower
! 4i Provide auxiliaries to safety features 5) Provide fresh air intake installation.
6j Provide installation, for duct work to. dryer 7) Provide gas line to burner
. Burner, duets and steel 1500# 2d, Instrumentation for dryer
(1) provide 110 volt power* (2) Mount panels (provided by vendor)
2e Structural steel (1) Mount as required
DUP050054442
-2 -
2f. Dust collector (61 x $* x 18*) 3.) Provide pads for structural steel 2 ) Provide 1/2 hp power for auxiliaries 3 3 Provide 110 volt power for lights and timer
14} Provide access steel
5 5 Provide 100 psig compressed air 6} Provide 10 hp for blower 7) Provide 2 doors in collector (1 door normal).
8) Provide installation, of exhaust line duct work 9} Provide spare bags and holders 10) Feeder valve 3. Eelocate PTS Storage Area* Collector and accessories
Pigment
*5000 .
DUP050054443