Document qkx494xMG6ZVXRo9K0jey5mXG
Big Bend Station -- Unit No. 1 Riley Turbo Furnace Boiler Capacity -- 2,865,000 lbs/hr Peak Cap. -- 3,100,000 Ibs/hr 2600 psig operating -- 1000/ 1000F
Engineering and Construction by STONE & WEBSTER ENGINEERING CORPORATION
MANUFACTURING ASSOCIATES--JC-N BROWN LAND BOIL
ERS LTD, British Commonwealth of Naiions EOSTER WHEEL
ER LTD Canada: RILEY DODDS Al.STRAl.lA LIMITED, Aus
:rana and New Zealand; CH AUDRO \ \ tRI ES PIERRE 8ROU-
HON. Belgium and Luxembourg, SCDiETE D EXPLOITATION
D U SI N E S METALLURGIQUES F r ; o : e Spam and
rtuga I
R8-000137 1/17/02 NUECES
RILEY STEAM GENERATORS PACKAGED BOILERS FUEL BURNING EQUIPMENT RILEY STOKER CORPORATION. WORCESTER. MASS.
Boiler No. 1 for Tampa Electric's Ij New Big Bend Station...
...another Riley Coal - Fired (
TURBO FURNACE BOILER
The 2,856,000 Ibs/hr. Riley boiler recently ordered by Tampa Electric Company for its' new Big Bend Station is Tampa Electric's third Riley Turbo Fur nace Boiler equipped with Riley Ball Tube Mills. The new unit follows No. 5 (1,650,000 Ibs/hr-in operation) and No. 6 (2,700,000 Ibs/hr-under construction) at Francis J. Gannon Station.
Significant operating characteristics of the TURBO FURNACE are: low fan power; uniform gas, metal, and steam temperature traverses across the furnace width; low carbon loss; reduction of the flyash disposal problem.
Twenty-four Riley DIRECTIONAL FLAME BURNERS, all on one level, are easy to observe and to operate. Ignition is fast, easy. Flame patterns are stable.
Three 12' x 16' Riley BALL TUBE MILLS, each with a normal capacity of 120,000 pounds of coal per hour, assure an ample supply of pulverized coal. An important reason for the selection of Riley Ball Tube Mills is the substantial sav ings realized on maintenance costs.
The Riley Turbo Furnace Boiler, the Riley Directional Flame Burner and the Riley Ball Tube Mill are products of years of SPECIALIZATION in turning "dead" fuels into "live" steam -- it's Riley's ONLY business.
A careful survey of your plant by a qualified consulting engineer could result in substantial savings in your power costs.
RS-000138 1/17/02 NUECE8
BILEV STEAM GENERATORS PACKAGED BOILERS FUEL BURNING EQUIPMENT
RILEY STOKER CORPORATION. WORCESTER. MASS
SALES OFFICES--A'o^querque Atlanta. Baton Rouge. Boston,
Charlotte. Chicago Cincinnati. Cleveland. Detroit. Denver
Honolulu Houston Jacksonville. Kansas City. Los Angeles
New York. Philade c" a Pittsburgh. Portland, Salt Lake City.
San Francisco
St Louis, St Paul. Syracuse.