Document qkwwv0gdb0pjr4o5e4yovkQ45

DownloadRandom document
4/26/2024 WP responsible for keeping deadline WP that need to deliver Universal PFAS restriction Overall Timeline and Important Milestones ECHA FFF restriction Scope Scope defined for RoI (exclusion WP2 and possible E-use WPW7P) 2 and WP7 Scope defined for Annex XV report (ongoing assessments can still lead to changes in scope i.e. substances/substance groups to be excluded, uses to be derogated etc.) 2nd round CfE Call for Evidence for specific information (15. July - 17. October) Assessment of CfE info only for specific information requested (15. September -15. October) Update of drafts of Annex A and Annex B specifically (15. October- End March) Annex XV report Part 2 (Annexes) Annex A. Manufacture and uses Annex B. Information on hazard, exposure/emissions and risk Phys-chem, Grouping Information on hazards Exposure/Emission Risk Annex C. Justification for action on a Union-wide basis Annex D. Baseline Annex E. Impact Assessment Use and function of alternatives Hazards of Alternatives Monitorability, Practicability Annex F. Assumptions, uncertainties and sensitivities Annex G. Stakeholder information Annex XV Report Part 1 (Summary) 1. Problem identified 1.1. Hazard, exposure/emissions and risk 1.2 Justification for an EU wide restriction measure 1.3. Baseline 2. Impact assessment 2.1. Introduction 2.2. Risk management options 2.3. Response to restriction scenario(s) WP3, WP4 WP3, WP4, WP7 WP4 sub uses WP2 WP6 WP6, sub-WP4s WP4 WP3, WP4, WP5 WP4 WP4 sub uses WP3, WP4 and WP6 2.4. Economic impacts 2.5. Human health and environmental impacts 2.6. Other impacts 2.7. Practicability and monitorability 2.8. Proportionality to the risk (including comparison of options) 3. Assumptions, uncertainties and sensitivities WP7 WP4 4. Conclusion WP0 Finalisation of dossier for submission Lay-out, text combining, proof-reading, final adjustments WP0 Unexpected delay, dossier submission WP0 Ministry involvement (commenting periods) Draft entry text Draft dossier Organizational actions Stitching dossier together Commenting round all MS if desired/needed with ministry Further points to consider Endnote to be used as citation tool Legend WP0: blue WP1: green WP2: orange WP3: yellow WP4: grey WP5: purple WP6: WP7: red/brown First draft = 70 % ready Final draft = 90 % ready First draft (70% Final draft version) (90% version) Final Deadline Jan 22 Feb 22 Mar 22 Apr 22 May 22 Submission 7/15/2021 10/31/2021 Conformity Check First RAC/SEAC discussion Public consultati 9/30/2021 6/30/2022 1/31/2022 11/30/2021 9/30/2021 11/30/2021 4/30/2022 5/31/2022 9/30/2021 9/30/2021 6/30/2022 5/31/2022 8/31/2022 2/28/2022 1/31/2022 11/30/2021 1/31/2022 6/30/2022 7/31/2022 11/30/2021 1/31/2022 4/29/2022 8/31/2022 6/30/2022 9/30/2022 4/15/2022 5/15/2022 6/30/2022 6/30/2022 4/30/2022 8/31/2022 9/30/2022 6/30/2022 4/15/2022 4/30/2022 9/30/2022 4/30/2022 9/30/2022 4/30/2022 8/31/2022 10/31/2022 10/31/2022 10/31/2022 final draft final draft final final final first draft first draft final draft final final first draft final final 10/31/2022 10/31/2022 10/31/2022 10/31/2022 10/31/2022 10/31/2022 11/30/2022 12/31/2022 12/13/2022 Jun 22 Jul 22 Aug 22 Sep 22 Oct 22 Nov 22 Dec 22 Jan 23 Public consultation Second RAC/SEAC discussion Proof reading, connecting loose ends, etc. Submission final final draft final final final draft final final draft final final first draft final draft final final final final final final final final final final final final final CW 22-25 CW26-27 CW28-35 CW36-37 CW46-47 CW44-45 CW49 CW 01-02 CW46-48 CW50-52 Author: Changes in this pe submission only im by notifying them responsible CA (re not defined yet). Feb 23 March 23 Author: Changes in this period up until submission only implementable by notifying them via mail to the responsible CA (responsible CA is not defined yet).