Document qkrLn5OLEwgJLY5XDZOqZG22G

Installation Guide TRANSITE RING-TITE PRESSURE PIPE U51 Johns-Manville r "TRANSITE is a Johns-Manville registered trademark for its brand of asbestos-cement products. "RING-TITE is a Johns-Manville registered trademark for its rubber-ring, pipe joints. l HowThis Guide Can HelpYo\iu THIS booklet was written especially for the men who direct and do the actual work of handling and installing Transite Ring-Tite Pressure Pipe. It explains how to install Transite Pressure Pipe under average conditions so as to comply with the "Standard Johns-Manville Laying Specifications." This guide is not intended to supply design information nor to assume the responsibility of the Engineer (or other customer representative) in establishing procedures best suited to indi vidual job conditions so as to attain satisfactory performance. Engineers, Superintendents, Contractors, Foremen, and the laying crew will find much to guide them in following speci fications so as to result in the most satisfactory installation of Transite Ring-Tite Pressure Pipe. The booklet will also be of help in determining pipe needs when ordering. The physical (or chemical) properties of Johns-Manville TRANSITE Asbestos-Cement Pipe represent typical, average values obtained in accordance with accepted test methods and are subject to normal manufacturing variations. The indicated minimum values are as shown. This information is supplied as a technical service and is subject to change without notice. Check your Johns-Manville Customer Service Center or local representative to assure current information. TABLE OF CONTENTS (For Index see Page 98) Receiving and Handling .............................. Excavating Trench....................................... Supporting Pipe........................................... Lowering into Trench ................................ Assembly of Pipe and Coupling ................. Use of Short Lengths.................................. Cutting and Machining Pipe...................... Assembly at Fittings................................... Thrust Blocks at Fittings .......................... T3 cp 5" (i/>i 0) o o o 00 WARRANTY & WARRANTY LIMITATIONS "Johns-Manville warrants that our products are manufactured in accordance with the applicable most recent literature referenced material specifications and are free from defects using our specifi cations as a standard. The limit of our ability for failure of any of our products to meet the foregoing warranty or for breach of any other warranty, express or implied, shall be to supply an equiva lent amount of products for any materials returned to us within one year of shipment and found to be defective by us. Due to the widely varying conditions under which our products are used or installed, we offer no warranty, express or implied, as to their merchantability, length of service life or suitability for any particu lar purpose. In no event shall we be liable for incidental or conse quential damages. No person other than the Division Manager is authorized to bind us for any further warranty obligation beyond that stated in this paragraph." COPYRIGHT 1969 JOHNS-MANVILLE CORP. Installation at Hydrants............................ Service Connections.................................. Backfilling and Tamping............................ Pressure Tests--Leakage Tests................... Repairs to Damaged Pipe.......................... Pulling Pipe through Casings ................... Bridge Crossings......................................... Appendix................................................. 3 Receiving and Handling Pipe Shipments INSPECTION Each pipe shipment should be inspected with care on its arrival. The pipe was carefully loaded at the factory, using methods acceptable to the carrier and it is his responsibility to deliver in good order. It is up to the receiver to make certain there has been no loss or damage. The tally sheet which accompanies each shipment provides a complete list of all the items included. Check the load against the tally sheet and report any error to the transportation agent immediately and have proper notation made on delivery receipt. A bright yellow instruction sheet is included with each load as a service in reminding the man on the job of the following points in checking off the load: 1. MAKE OVERALL EXAMINATION OF LOAD. If load is intact, ordinary inspection while unloading should be enough to make sure pipe has arrived in good condition. 2. IF LOAD HAS SHIFTED or shows ROUGH TREAT MENT then EACH PIECE must be CAREFULLY IN SPECTED for DAMAGE. 3. CHECK TOTAL QUANTITIES of each item against TALLY SHEET (pipe, couplings, rings, fittings, lubri cant, etc.) 4. Any DAMAGE or missing items MUST BE NOTED on DELIVERY RECEIPT and returned to transporta tion company. 5. Also - NOTIFY CARRIER IMMEDIATELY - and make claim in accordance with their instructions. 6. DO NOT DISPOSE OF ANY DAMAGED MATERI AL -- carrier will notify you of procedure to follow. 4 Receiving and Handling Releasing the Load for Removal FIG. 1 -- Truckload Truck shipments are secured with load binders and are usually released by the driver. FIG. 2- Carload In freight cars, straps are used to make tight shipping units. To release the pipe, cut the straps with heavy wire cutters, snips or a fine-tooth hacksaw. For either rail or truck shipments the couplings, if shipped separately, are stowed in a separate area or lined up to re semble full lengths of pipe and secured at the top of the load. Rubber rings are packed in cartons. Cartons should be opened, rings checked against the tally sheet, then put in a safe place to insure against loss. - 5 MT-Pipe-lnstall-000816 Receiving and Handling HANDLING PIPE The means by which TRANSITE pipe is unloaded in the field is the decision and responsibility of the customer. The use of mechanical equipment simplifies and speeds up the unloading of larger sizes. .. and usually provides extra protection against damage in handling. We suggest that: 1. Pressure Pipe larger than 12" diameter be unloaded with equipment. 2. Gravity Pipe larger than 18" diameter be un loaded with equipment. WEIGHT* OF PIPE AND OF COUPLINGS (Weight in Lbs.) Size Pipe Inches Class 100 Pipe Per Length** Cplg. each Class 150 Pipe Per Length** Cplg. each Class 200 Pipe Per Cplg. Length** each 4 54 7 65 ' 7 80 7 6 133 ii 146 11 173 12 8 200 14 225 18 269 19 10 277 16 361 27 419 29 12 350 24 490 42 579 47 14 480 37 650 64 767 73 611 ,16 46 806 81 . 995 92 *Weight rounded to nearest pound. Pipe lengths used In this table--10 ft. for 4"sizes; 13ft. for all other **Does not include coupling. TABLE A UNLOADING Hand-Passing Hand-passing (without ropes and skids) should only be used on small sizes of pipe. As a general rule, 75 lbs. is enough weight for one man to handle repeatedly. Therefore two men, one at each end, can pass pipes weighing up to 150 lbs. Pipes heavier than this should be lowered with ropes and skids. (See Table A, for weight of pipe.) 6 Receiving and Handling Using Rop s and Skids As noted above--we suggest that Pressure Pipe larger than 12" diameter be unloaded with equipment. TRANSITE pressure pipe in diameters 12" and less can be easily unloaded from trucks and cars with ropes and skids. (Caution: Pipe should be lowered all the way down the skids and not allowed to roll free in any part of its travel.) Center rope on pipe and fasten the rope on the side opposite that on which you plan to unload. Pass rope over entire load. Put rope in eye hook and stand back as shown in the drawing (Fig. 3). Care should be taken to keep all workmen out of the path of the pipe as it comes down the skids. .jp-sisA FIG. 3Chock-block loose pipes as shown by arrow Pipe should be lowered one length at a time. For larger pipe, ram's horn should be used. See Fig. 4. 7 Receiving and Handling Receiving and Handling Nested rows, sometimes used where pipe is shipped unbelled, can also be unloaded with skids and ropes. In this case, leave the chock blocks in place until the top row is rolled off, into the sling, and lowered--see Fig. 5. Then remove the chock blocks and lower the bottom row chocking loose pipes as before. UNLOAD THIS ROW FIRST mr IT h* tendency to slip. Canvas slings are easy to place and are usually available in widths that will support pipe properly. FIG. 5 -- Leave chock-blocks in place while unloading top rows. Using Mechanical Equipment HOOKS Do not use hoist hooks for lifting single lengths ... They can damage the coupling groove and the pipe end. Slings--For single lengths If a sling is used, center it and adjust it so as to prevent the pipe tipping or sliding out. If pipe is to be balanced in a single loop, keep the loop tight as in Fig. 6 (especially in the smaller sizes) so as to prevent slipping. In general, use single loops with the heaviest pipes only, because greater weight reduces the 8 FIG. 6 -- Keep single loops tight -- especially in the smaller pipe sizes Fork equipment is often used to advantage in unloading either entire units or parts of a row. If a part of a row is taken at each lift, chock blocks should be used to hold the balance of the row. 9 MT-Pipe-lnstall-000817 Receiving and Handling Receiving and Handling LOADING TRANSFER TRUCKS Selecting and Preparing the Truck Use flat, stake-bodied trucks because they permit side loading and unloading. Table B can be used to determine the number of lengths of pipe that can be carried by trucks of various capacities. Lay two timbers, spaced same as factory load, on the floor of the truck for each tier of pipe. This will prevent damage to pipe by bolt heads or uneven bottom. If factory units-are being reloaded with mechanical equipment, the necessary timbers will of course be tied in with the units so that no other timber will be required. Do not use short-bodied trucks which allow pipes to extend, unsupported, for more than one-third of their length. If a tailgate is used, make certain it is adjusted so that pipe can not ride on a sharp edge. Generally pipe is stacked on the transfer truck in the same manner as it was stacked for shipment from the factory. Any chock blocks that may have been removed during unloading should be replaced in the re-loading. FIG. 8 -- Locate binder chains close to timbers--not in the middle of the pile. Use pads to protect pipe as shown. Secure each tier with two chains and load binders. Locate them within 4" of the dunnage as shown in Fig. 8, NOT in the middle of the pile. DISTRIBUTING ALONG TRENCH In stringing out pipe, keep these points in mind: Feet Per Tori and Lengths Per Truckload (including couplings) 1. Line pipe as near the trench as possible to avoid excess handling later. Feet Per Ton Number Std. Lgths * Per Truckload 2. If trench is open, it is advisable to string pipe on the side Pipe Size 4 6 Class 100 328 178 Class 150 278 164 Class 200 227 138 Class 100 5 Ton 10 Ton 164 328 68 136 Class 150 5 Ton 10 Ton 139 278 63 126 Class 200 5 Ton 10 Ton 113 227 53 106 away from excavated earth, wherever possible, so that pipe can be moved easily to the edge of the trench for lowering into position. 8 121 108 90 46 93 41 83 35 70 3. If trench is not yet open, find out to which side excavated 10 88 68 58 12 63 50 42 14 50 37 32 34 68 24 48 19 38 26 52 19 38 14 28 22 44 16 32 12 24 earth will be thrown--then string out on the opposite side. (Leave room for excavator.) 16 39 29 24 15 30 11 22 9 18 4. Place pipe so as to protect it from traffic and heavy equip * Based on 10 ft. lengths for 4 " and 6 " sires, 1 3 ft. lengths for sizes 6 " thru 36 ment. Also safeguard it from the effect of any blasting that O TABLE B O O oo 10 may be done. 11 MT-Pipe-lnstall-i Receiving and Handling About Couplings and Rubber Rings 1. In those cases where pipe has not been factory-belled, the couplings, especially in the small and medium sizes, should be stored at a central point so as to avoid loss. 2. Store all rubber rings at a central point and distribute as needed. Keep them clean, away from oil, grease, excessive heat and electric motors which produce ozone. 3. If rubber rings are not to be used immediately for installa tion, store them in their cartons, as shipped, in a cool dark place and out of the direct rays of the sun. STOCKPILES Stockpiles should always be built up on a flat base. If mechan ical equipment is being used for handling, the unit bearing pieces provide an excellent base. If unloading by hand, secure two timbers for a base. Set them on a flat area, spaced same as factory load. Nail stop blocks at each end. Build up the stock pile in the same manner as it was stacked for shipment, trans ferring dunnage and chock-blocks from load to stockpile. Keep pipe grouped by sizes and classes. Put short lengths in separate piles where they will be readily available. Excavating the Trench ABOUT OPENING THE TRENCH As a general rule, do not open the trench too far ahead of pipe-laying. Avoiding long stretches of opened trench will often pay dividends. For example: It may reduce, or even eliminate, pumping or sheeting; It minimizes the possibility of flooding the trench; It reduces caving caused by ground water; It helps avoid frozen trench bottom and backfill; It reduces hazards to traffic and workmen. On most jobs it will be desirable to keep excavation, pipe lay ing and backfill close together. Belled Pipe a Time Saver Pipe which has been belled ahead either factory belled or belled on the job, (see page 32) speeds up installation because of faster in-trench assembly--especially valuable in trench condi tions where it is desirable to "get in and out" quickly. Where belling is to be done on the job, the pipe crew can get started, even before the excavator has opened trench, by completing one half of the assembly "on top". Curves in Line of Trench Curves can be made without fittings since the Ring-Tite coup ling permits the pipe to be deflected after assembly. The maximum recommended deflection that can be taken at any one coupling is given in Table C AND SHOULD NOT BE EXCEEDED. MT-Pipe-lnstall-000819 FIG. 9 -- Assemble straight, then set the free end over 13 Excavating Trench Minimum Radius of Curvature for Pipe on Curves Excavating Trench MAX. OFFSET PER 13' LENGTH apply to couplings belled on the job site. For factory-belled couplings, use one-half of the above deflections or offsets. TABLE C How to Use 1. Find the radius of the proposed curve by actual measure ment or by making a sketch to scale. (See diagram above.) 2. Check the table to make sure the radius is not too small. For example: Assume the radius will be 188 ft. and that 8" pipe in 13 ft. lengths will be used. Under the 13 ft. column the figure nearest 188 ft. is 186 ft.--checking to the right we find this is equal to 4 degrees of deflection at each coupling. (Referring to Table C shows that 4 degrees is satisfactory for 8" pipe.) 3. Then, by checking the offset column above, we find that the required curve can be made by offsetting each 13 ft. length 10.9". Note: If the radius had been shorter, say 125 ft., the deflection at couplings would be too great and the curve should be eased up or short lengths used if they were available. The table (see second column) shows that 6%' lengths on a curve of 125 ft. radius would give 3 degrees deflection per coupling. If the offset exceeds the maximum recommended deflection, the curve is too sharp to allow the use of full lengths. When short lengths are used, the maximum deflection at each coup ling cannot be any greater than for the full length--but, since there will be more couplings in the same length of line, a sharper curve can be made. (See Fig. 10.) 14 Vlff(1,1' i 1 TOTAL OFFSET = 20.4" BY USING TWO HALF LENGTHS FIG. 10--Short lengths allow sharper curves WIDTH OF TRENCH Sometimes a wide trench will be necessary. In other cases the soil will be such that a narrow cut could be made. Whatever width may be used at the top of the trench, be sure that, at the pipe-level, it is kept between the maximum and minimum widths given in Table D, page 16. There are two reasons for this: 1. About Loads on Pipe--The wider the trench at the top level of the pipe, the greater the earth load on the pipe will be up to the transition width. To determine the exact loads on pipe, consult the engineer. It is desirable to keep earth loads on pipe lines at a minimum. Therefore, keep within the maximum width shown in Table D. As the drawing shows, no additional earth load will result from wide, slop ing trenches so long as the extra width is kept above the pipe. It's the width at the top level of the pipe that im poses the extra earth load. TRENCH CAN BE WIDENED ABOVE THE PIPE. -THERE WILL BE NO INCREASE IN THE EARTH LOAD. MT-Pipe-lnstall-000820 Excavating Trench Excavating Trench hand digging just behind the fitting location will keep the trench-wall solid and undisturbed. This will simplify thrustblock construction later on (see page 53). 2. About Working Space--On the other hand, a trench that is too narrow will make assembly difficult and slow. Further more, a poor job may result. Lack of space also prevents checking of field-assembled rubber rings. In addition, if there is not ample room, backfill cannot be tamped so as to support the pipe-line properly as described on pages 71-77. Use Table D to determine the minimum width. If sheeting is used, maintain the minimum trench width inside the faces of the sheeting. Trench Widths at Top Level of Pipe PIPE SIZE (In Inches) 4 6- 8 10-12 14-16 TRENCH WIDTH (In Inches) Minimum * Maximum 18 28 20 32 24 36 30 42 *Widths should be maintained within these limits. Wherever, it seems necessary to exceed these limits, provision should be made for the additional load imposed on the pipe. TABLE D r* DEPTH OF TRENCH NOTE: In specifying the depth to which pipe is to be laid, the engineer will have considered such things as frost penetration, surface loads and earth loads. In those cases where this has not been done, weather recordsand local experience as to depth of frost penetration together with engineering refer ence books covering surface and earth loads im posed on pipe can be used to establish the depth of trench. MT-Pipe-lnstall-000821 Plan Ahead for Thrust Blocks At changes in direction a tee or bend may be needed and even tually a thrust-block will be built. Do not try to machine dig for thrust-blocks as the excavator will usually dig too far and damage the bearing surface of the trench. A small amount of 16 17 ......3^ Supporting the Pipe To provide proper support for a pipeline, the installing crew must make sure that the trench bottom is as uniform and continuous as possible. The couplings must not support the pipe. See Fig. 12. a ~~n RIGHT B RIGHT wrong ss 0 10 wrong tr FIG. 12 Fig. 12 shows the difference between the right and wrong kind of support. At "A" and "B" the pipe is supported for its entire length and the couplings are kept off hard bottom with tamped backfill. At "C" the couplings rest on hard bottom. This is wrong! This pipe straddles from coupling to coupling and is supported only at the ends. "D" is also wrong! The pipe rests on a "high spot" and will be supported only at such high points. These lengths (C and D) will carry much less backfill load than the continuously-supported pipes. ip mr* iir=^ tr5'4* Effect of Soil Conditions Before a firm, level trench bottom can be prepared, the nature of the soil must be taken into account. General--Pipe installations are made in a wide variety of wet and dry conditions of loam, swamp, clay, sand and wet soils. In this booklet the words "stable" or "firm" will indicate good or fair trench conditions such as normally damp loam, sand, clay, etc. The word "unstable" will indicate poor trench conditions such as soft mucky soils, dry lumpy soils, etc. In such m wr* Supporting Pipe cases soils should be stabilized or tests should be made to prove that the soil is capable of supporting the pipe line. (Some conditions are so bad that other means of support must be designed--such as mats, piles, etc. When such conditions occur the design engineer will have decided what method of support to use and will have included it in his specifications.) The actual supporting strength of any soil must be judged, on the job, by individual experience or by having tests made. Unique Clay Soil Conditions-In a relatively few geographical areas there is a type of clay soil that is drastically affected by extremes of saturation and dryness. In changing from totally saturated to a completely dry condition, these clays are subjected to extraordinary shrinkage. This shrinkage is usually seen in the form of wide and deep cracks in the earth's surface and may result in damage to underground structures, including pipe materials. The clay forms a tight gripping bond with the structure, subjecting it to excessive stresses as the clay shrinks. In such areas, the engineer should establish whether the condition exists to a degree justifying special precautions. If it does, then it is good engineering practice with all pipe materials to avoid the bonding action by using an envelope of a minimum of four inches of tamped sand around the pipe line. Rock Conditions--In rocky ground, the trench is dug 6" deeper than pipe-grade and then the bottom is brought back up to trench grade with tamped soil. PREPARING THE TRENCH BOTTOM If soil conditions are stable, and the trench bottom is of a material that can be cut true and straight, pipe can be in stalled using the uniform trench bottom for support. Bell holes must be dug to provide a minimum clearance of 2" be low the couplings. See Fig. 12B. MT-Pipe-lnstall-000822 18 nr* 19 Supporting Pipe minimum clearance of 2" below the couplings. See Fig. 12B The trench bottom must be straight, free of bumps or hollows and at the correct grade. As the pipe is laid, any irregularities in the trench bottom must be levelled off or filled in with tamped soil. See Fig. 12. The trench bottom may also be prepared by digging at least 4" deeper than pipe grade and then bringing the trench bottom up to grade with selected refill material tamped to provide the proper cushion for the pipe. If the trench bottom is extremely hard (such as shale, ledge, some types of hard pan, etc.) or is loose, stony soil where there is the possibility of pipe being subjected to "point" contacts, the trench should be excavated at least 6" below trench grade and then brought back to grade with selected, tamped soil. Where the type of clay soil conditions described on page 19 is encountered, the pipe should be enveloped in a minimum of four inches of sand. In such instances trench bottom must be dug at least four inches deeper and then brought back to grade with tamped sand. In unstable (soft) soils it will be necessary to dig deeper and refill with selected material (such as gravel or crushed stone) until pipe grade is reached. The design engineer should be consulted whenever soils are encountered about which there will be doubt as to the adequacy of the support provided. When spreading refill soil on the trench bottom, make sure that coupling holes are left deep enough to provide a mini mum clearance of two inches below the coupling. This allows room for tamping beneath the coupling and assures that the line is being supported for its full length, not at the couplings alone. USING EARTH MOUNDS Earth mounds can be used for pipe support if the trench bottom is firm, and, if firm mounds can be built that will 20 -A ttU -U -U U U U U U iU U U iU iU llU U i Supporting Pipe hold the pipe from settling--during assembly and after-- until finally backfilled. Do not use earth mounds in mucky soil (such as in swamps), or in wet, mushy trenches. Even good soil will sluff down when water-soaked. Extremely sandy soils may be unsatis factory for mounds unless backfilling is done immediately. (Such soils dry out quickly and may let pipe down on the couplings.) Damp, loamy earth or sand is best. Locate the mounds so that they will be under the "sup porting points" which are indicated by wide, black marks stencilled on the pipes. (There are two marks on each length.) The sketch shows how the mound is made. For making mounds use soil free from rocks, large stones, lumps of clay or frozen material. Unless the trench is sheeted, or tends to cave in, an easy way to get the soil is to shave it down from the trench wall. FIG.14 The mounds should run right across the trench--and be at least 6" along the length of the pipe. (Skimpy mounds will not hold pipe in position.) When about the right thickness tamp it lightly with the flat of the shovel. Then check to make cer tain it is high enough to provide a clearance of at least 2" under the coupling. NOTE: If water tamping is to be used (see "Backfill and Tamping" page 74) the mounds should be built up somewhat higher to allow for settlement that will occur when water is flushed into the trench. 21 i'l-hriilBillilit,! Hili'.liilwtfJlIa.nw'C j^/ ^ i Lowering Pipe Into the Trench Lowering into Trench The overall speed of installation can usually be increased if the trench crew and the "top" crew know their job and work to gether. For example: 1. The pipe-laying crew should have trench ready for pipemounds, or bottom, should be so placed and graded that a minimum of last minute adjustment is required. 2. The top crew should have pipes lined up, ready for lower ing, ahead of time. If pipe is to be lowered with ropes, spot the lengths as close to their final position as possible--so as to cut down on movement in the trench--(where it is usual ly more difficult than up on top.) 3. The top crew should "service" the pipe crew by having rub ber rings, lubricant and assembly equipment ready to pass into the trench without delay when needed. gi!=r; support points on the pipe so they can be pulled free after pipe has been lowered. In lowering, tie stop-knots on the end of each rope and stand on them to prevent slippage (see Fig. 15). Stakes can also be used as anchors (see Fig. 16). NOTE: Coupling grooves must be clean before as sembly can be made (see page 24). There it will save time to keep dirt out of the couplings in low ering belled pipe into the trench. This can be ac complished by lifting clear and lowering with me chanical equipment; by hand passing over edge of trench in small sizes, or by using ropes and rolling down skids in medium sizes. Where the trench passes through paved areas, or where sheeting is used--take two turns of the rope around each end. This pro vides better control of the pipe as it passes over the hard edge and starts to drop. Lower slowly and avoid striking couplings or machined pipe ends against rocks or boulders that may be imbedded in the side. PASSING BY HAND-WITHOUT ROPES Lowering with Mechanical Equipment In hand passing, use only one man at each end. (More men will only get in each other's way and increase the possibility of Although all but the largest sizes can be lowered by hand with dropping pipe.) 75 lbs. is considered a reasonable weight for ropes, mechanical equipment is generally faster and requires one man to lift repeatedly--so this method should only be used for pipes weighing up to 150 lbs. fewer men. A cable can be used from an excavator boom, but this ties up the excavator and slows progress. Transite assembles quickly and the contractor may find it to his advantage to use Lowering Pipe with Ropes separate equipment for lowering and assembly. This is a matter of judgment, available equipment and trenching conditions. Using two to four men, pipes weighing up to 800 lbs. per length In lowering with mechanical equipment, slings of wirerope, i can be lowered with two ropes--one at each end. In deep, slop chain or canvas are recommended (see page 8). Pipe tongs are ing or crumbly trenches, skids will help keep dirt out of coup also popular and offer the advantage of quick release with lings, If pipe is laid on earth mounds, place ropes clear of the nothing to pull out from under the pipe barrel. MT-Pipe-lnstall-000824 22 23 fP Assembly of Ring-Tite Pressure Pipe The Ring-Tite assembly is a sliding assembly in which the lubri cated pipe-end slides under the rubber ring and into the coup ling. The machined shoulders and the compressed, locked-in rings keep the pipe ends separated, automatically providing for expansion and flexibility. NOTE: Although bells could be faced in either direction, the general practice is to face the belled ends forward, in the direction of laying. This helps keep dirt out, because the bell of the pipe already "in the line"doesn't move during assembly. Belling forward also prevents soil from being "plowed" in to the bell of the next pipe, which does move dur ing the assembly, because the back of the coupling moves toward any loose soil in the trench. FIG. 17 -- Pipe end slides under ring until automatically stopped by shoulder INSERTING THE RUBBER RING When inserting the ring in the groove there are two important points to keep in mind: 1. THE GROOVE MUST BE CLEAN--dirt under the ring will not allow it to seat completely and will cause trouble. One good way to make sure there's no dirt under the ring is to have the next length already lowered before inserting the ring. Then, any dirt that may have worked in during hand ling, can be cleaned out. 2. FACE THE RING IN THE RIGHT DIRECTION--see Fig. 18. Now smooth the ring into the groove, making certain it is faced properly and completely seated, all around. Assembly of Pipe and Coupling FIG. 18 -- Enlarged view, with ring properly faced in groove Before lubricating pipe ends they should be cleaned thorough ly by wiping the entire circumference back to the first shoul der. This allows lubricant to be applied directly to pipe surface. It will not function over caked dirt. Johns-Manville Ring-Tite lubricant should be applied to the en tire circumference of the pipe back to the stop shoulder. (This includes the nose, taper and machined surface as shown in Fig. 19. j Apply lubricant thoroughly using either the hand, a cloth pad, a sponge or a glove. See illustrations, floating should be about the thickness of a brush coat of enamel paint. Use lubri cant as it comes from container--stir ifnecessary but--DO NOT THIN IT. NOTE: Johns-Manville Ring-Tite lubricant has been tested and approved for use in potable water ser vice. Do not use non-approved lubricant which FIG. 19 -- Apply lubricant to entire circumference, back to the stop shoulder 25 Assembly of Pipe and Coupling Assembly of Pipe and Coupling RIGHT - Lubricant applied evenly. ASSEMBLY METHODS General Various methods are used--for example: 1. A bar and wood block can be used to assemble smaller sizes. A bar does not work well in loose sand, hard shale or soft muddy bottom--nor on tamped soil over rock. 2. Pullers can be used under all conditions. There are two types: (1) a "lever" puller which pulls from on top of the pipe and (2) a "friction" puller which pulls from both sides of the pipe. Their use is described on following pages. NOTE: "Stabbing" or "popping" is not recom mended. In this method the pipe is suspended and swung into the bell. This method is not recom mended. Hand Cloth Sponge Glove l/VROIMG -- Too much Iubricant -- unevenly applied. Sufficient lubricant is ineluded to do the job. DON'T WASTE IT. Lubricant Requirements The following table gives the number of BELLED pipe lengths that can be lubri cated from a 114 quart can of lubricant. PIPE SIZE 4 6 8 10 12 14 16 BELLED PIPE LENGTHS PER CAN 128 88 68 52 36 26 24 ASSEMBLY WITH BAR AND WOOD BLOCK With the pipe properly supported, line up the bevel-end so that it just "snugs" all around into the ring in the bell. Drive the bar in for purchasethen, using a wood block, shove the pipe home. See Fig. 20. The wood block gives a straight "center-line" push and also protects against dam age by the bar. ~ns--=---------- _ FIG. 20 CHECKING FIELD ASSEMBLY With the ring completely seated in a clean groove and with pipe-end properly lubricated, the ring can not be displaced during assembly. To make certain that the field work is being done properly, the ring position should be checked with the feeler gage shown in Fig. 21. O O O 26 oo 27 MT-Pipe-lnstall-' Assembly of Pipe and Coupling Insert the gage as shown in Fig. 22. The clearance (see arrow) proves that gage is touching the ring. Slide the gage all the way around the coupling. As long as the ring can be touched by the gage it is correctly assembled. ASSEMBLY WITH LEVER TYPE PULLER With rubber ring correctly inserted in a clean groove in the belled couplings, anchor puller to installed pipe length by set ting binder chain in slots on puller base-see Fig. 23. (If pipe is laid on levelled trench bottom, dig a small channel under the pipe for clearance for the chain.) FIG. 23 -- To complete assembly anchor puller to installed length (A) and pull length being installed (B) into bell 28 Assembly of Pipe and Coupling The pipe to be installed should be lined up, ready for assembly and have end cleaned and lubricated. Wrap the pulling chain around the barrel of the pipe to be in stalled, fastening with grab hook as in Fig. 23. With the pullinghandle forward to provide travel for the pull, engage pulling chain in hook on puller-handle and pull pipe into bell until movement is positively stopped. Check the field-assembled ring with the gage. See Fig. 22. ASSEMBLY WITH FRICTION PULLER The friction puller consists of two jack bodies connected with chains so that there is one jack body at each side of the pipesee Fig. 24. The length of the chains can be adjusted for vari ous pipe sizes. Make the initial adjustments as shown in Fig. 25. The jack bodies should hang halfway up the pipe (the hor izontal diameter). Once adjusted, no change is needed until pipe size is changed. Insert ring completely in a clean coupling groove of the belled pipe. Check line-up of pipe to be installed and clean and lubri cate the end. Move it into position for assembly (nose of pipe just started on to ring). OPERATING HANDLES COUPLING HOOK JACKSHAFT JACK BODY FIG. 24 -- Friction type coupling puller--in position for pipe assembly Set the puller on the pipe to be installed as shown in Fig. 24 with both jack bodies all the way back on the shafts so as to 29 Assembly of Pipe and Coupling have enough travel for the pull. (To slide jack bodies, release the catches as shown in Fig. 28.) FIG. 25 -- Supporting chains can be lengthened or short ened as needed. "Figure eight" link (in circle) opened to change length of coupling chain. At right (see A) remov able pins, passing through chain links, allow adjustment of binder chain length Engage coupling hooks at each side of coupling and then an chor the puller, as follows: 1. Cross the long chain under the pipe as in Fig. 26 (dig a chan nel for chain if pipe barrel is on levelled trench bottom.) 2. Bring the ends up and around (keep the chain tight) and join with the grab-hook. 3. Take up slack by pulling back as in Fig. 27. Insert the puller handles in their sockets and move them in the same direction at the same time--pulling the pipe to which the puller is fastened into the bell until movement is positively stopped. Assembly of Pipe and Coupling released by giving it a kick, at the top toward the coupling. This loosens it so it can be unhooked. FIG. 28 FIG. 29 Reset the puller for the next assembly by holding the release catches back with the thumbs and sliding the jack bodies to the starting points at the ends of the shafts. See Fig. 29. (Use the coupling as an anchor for doing this.) Check the field assembled ring position with the gage. See page 28. TRANSITIONS FROM SIMPLEX TO RING-TITE For Class 150--Simplex To make a transition from an existing Simplex line to RingTite, first bevel the nose of the Simplex machined pipe to allow the ring to start onto the pipe easily. Line up a belled length of Ring-Tite as in Fig. 30. Insert rubber ring in coupling groove, lubricate Simplex pipe end. Set puller as shown and pull RingTite pipe onto Simplex. (A friction puller can also be used or, in the smaller sizes, a bar and wood block if bottom is suitable.) The Ring-Tite pipe can now be belled at the other end so as to have "bells forward"--or it could have been "double belled" before lowering. Check the field assembled rubber ring position. MT-Pipe-lnstall-' Release the tension on the shafts by inserting the jack handles ahead of the release catches as in Fig. 28. The binder chain is FIG. 30 -- Transition from Simplex to Ring-Tite. Beveling the nose of the Simplex pipe will make assembly easier--(See Fig. 35) O o 31 o 00 Assembly of Pipe and Coupling Igf* r- Assembly of Pipe and Coupling For Classes 100 and 200--Simplex 1. Machine the end of 4", 6" and 8" Class 100 and 4" Class 200 Simplex pipe in the field with a machining tool with blades and holder set for Ring-Tite dimensions. 2. For other sizes, adaptors are available from accessory manufacturers. tf^ ir* 0s**4 0^ LUBRICATING FOR UNDERWATER ASSEMBLY Although not generally recommended, underwater assemblies are sometimes necessary. As noted on page 24, the usual prac tice is to have bells "forward" in the direction of laying. In this case the pipe to be assembled into the line will be above water-- for lubricating. DOUBLE LUBRICATION IS RECOMMEND ED. To do this, lubricate thoroughly as described on page 25; wait 4 to 5 minutes and then RE-LUBRICATE--then IMMED IATELY lower and assemble. If the end to be joined is a spigot end already immersed, double-bell the next length to be lowered (see page 33 for bell ing on the job.) Insert the ring in the groove and then lubri cate all exposed surfaces of the ring. Then lubricate the im mersed spigot heavily and assemble IMMEDIATELY. The for ward end will then already be belled--so proceed with double lubrication as in the preceding paragraph. BELLING PIPE General Although pipe can be belled in the trench, it is usually done "on top". This speeds up the "in trench" assembly and, if all belling is done on the job, enables the crew to get started bell ing, even before the excavator has opened trench. BELLING WITH BAR AND WOOD BLOCK Set the coupling over the nose of the pipe so that the ring is partly started onto the taper--see Fig. 31. Note that the bot or* 0^ 0^ 0^ 0^ 0^ 0^ 0^ 0^ 0*** 0^ 0^ 0--8 0^ 0^ 0r* 0^ 0^ 32 0^ tom of the coupling is angled about Vi" toward the pipe. Shove home with bar and block. Check ring position with gage. See page 28. FIG. 31 -- Belling with a bar. Bottom of coupling should be approximately 'A inch forward on pipe at start of as sembly as shown on left. Note: The block can be 2" x 4" or 4" x 4" (as shown). A 4x4 requires less care to locate the bar at the right point as it is driven in. BELLING WITH LEVER PULLER Set puller 4' to 6' back so as to have the least chain angle and, therefore, the straightest pull. Anchor puller4o pipe with binder chain (Fig. 32). Adjust the light connecting chain so that the coupling hooks hang at the horizontal diameter. (This adjustment need be made only once for each pipe size.) Set coupling over nose of pipe with ring resting on pipe taper. In this position it will be easy to support the coupling by leaning against it, leaving hands free to place the coupling hooks in position. (Handle should be forward [dotted line Fig. 32] so as to provide travel for the pull.) Hold hooks firmly against side of coupling while helper drops puller chain into hook on puller handle. (A 2x6 board can be substituted for the coupling hooks if preferred.) As the pull is started, the coupling should be held slightly cocked with bot tom about V2" ahead of top (See A, Fig. 32). 33 MT-Pipe-lnstall-000830 Assembly of Pipe and Coupling FIG. 32 -- Note that puller is set well back from the coupling. This reduces the chain angle and results in the straightest pull. Pull the coupling on with a smooth, even pull. Control the rid ing angle of the coupling by pressure of foot or knee. Don't jerk. Coupling will stop, automatically, when it reaches the stop shoulder--do not force beyond that point. Check ring position with gage. See page 28. BELLING WITH FRICTION PULLER Adjust the connecting chain so that the coupling hooks hang at the horizontal diameter of the coupling. Anchor puller to pipe as described on page 29. Place coupling so that rubber ring rests on pipe taper. Engage coupling hooks at end of coupling. Move both operating han dles in the same direction at the same time--this keeps coupling moving straight with a minimum of cocking to left or right. If severe up or down cocking takes place, the hooks are too low or too high. Re-adjust to pull on center. If coupling is removed to re-adjust, re-check ring seating and re-lubricate pipe before starting again. Once correct adjustment is made, no further 34 Assembly of Pipe and Coupling changes should be necessary for that pipe size. To release jack bodies and binder chain see pages 29-30. Check rubber ring position with gage. See page 28. NOTE: Belling by "Popping On" is not recommend ed. This is the method in which one sits on the pipe, holds the coupling 10-12" away, in line with the nose, and then pulls it hard onto the nose. This method is not recommended. 35 *r. MT-Pipe-lnstall-000831 Use of Short Lengths Short lengths are used in Ring-Tite lines-- --at rigid structures --at rigid joint fittings --on curves --to replace a section of installed pipe --to make closures and locate fittings exactly. Short lengths are not required at Ring-Tite fittings. With RingTite fittings, full lengths can be used because the rubber ring joint at the fitting provides the necessary flexibility. With rigid joint fittings and at rigid structures short lengths are required in order to provide a flexible joint close to the fitting or structure. As shown and explained in Fig. 33, short lengths may be machined-over-all (MOA) or machined-each-end (MEE). Fol lowing is a listing of the lengths and type of machining avail able: For 4" and 6" (10 ft. lengths) ....................... 3'3" MOA 3'3" and 6'9" MEE For 6" (13 ft. lengths)........................................ 3'3" MOA 3'3" and 6'6" MEE For 8" thru 16"....................................................3'3" and 6'6"MOA 3'3" and 6'6" MEE MACHINED OVER-ALL m Note that-- FIG. 33 -- Short lengths 1. The Ring-Tite coupling requires a pipe surface that is ma chined to a specific diameter--assembly on rough, unma chined pipe should never be attempted. Machined-over-all short lengths (MOA) can be cut at any point on the pipe barrel and used because they are accurately machined the entire length for Ring-Tite assembly. (See page 43 for meth ods of cutting pipe). # - * 36 \ Short Lengths 2. As a general rule the number of all short lengths on a job is limited. Therefore, they should be set aside and used only as planned when the pipe order is placed. 3. The use of a Transite adaptor normally eliminates the re quirement for a short length at the fitting. J Use of Short Lengths* Note: See page 48 Table F to determine need for short lengths at rigid joint fittings. WHERE USED 4'',6" & 8" PIPE 10" THRU 16" PIPE At Rigid Structures 3'-3" or shorter 6'-6" or shorter On Curves Use shorts or randoms, machined-each-end, on curves if use of standard lengths will exceed maximum deflection as recommended on page 16 and if planned on when order was placed. Do not use machined-over-all pipe on curves as it will be needed for tie-ins and locating fittings. Making Closures and Repairs Use of short lengths will depend on situation--see section beginning below. Locating Fittings Exactly See section beginning page 41. *The Transite MJ-B adaptor (used for both mechanical joint and poured bell fit tings) eliminates the need for a short length. TABLE E USING SHORT LENGTHS AT CLOSURES To make a closure between two pipe ends, various combina tions of short lengths can be used as long as the final piece in serted is machined-over-all or has ends "long machined" so that couplings can be pulled completely on to the ends of the pipe. NOTE: Using a nipple less than twice the coupling length plus 2 " is not practical in making the final closure. Nipples that are too short can be avoided by using another MOA length at A, cutting it so that final nipple is long enough to handle. 37 MT-Pipe-lnstall-' Short Lengths Use St p Marks When Joining Two MOA Pipe In most cases the length used at A is machined-each-end, with shoulders to automatically stop and center the coupling. How ever, if A is MOA then there is no shoulder--in such cases stopmarks must be made to make certain coupling is correctly cen tered over the pipe ends and that rubber rings are in the correct sealing position. The stop-marks are necessary for this since the ring checking gage will not aid in locating the rings with rela tion to the pipe ends. "X" in Fig. 34 gives stop mark locations. A bar is sometimes used at the stop-mark to make certain the coupling does not move too far on to one pipe. FIG. 34 -- Closure made by installing any length at A. Then cut a machined-over-all section to length for closing gap. If A is MOA then stop mark must be used to make certain coup ling is centered over nice ends. (See insert detail.) Bevel Field Cut Ends The field cut ends are then beveled for ease in assembly. To do this use a coarse wood-rasp to form a taper approximately the same as that on the factory beveled end. A machining tool can also be used for beveling field cut ends. Then, round the nose (see insert, Fig. 35) to allow the rings to start sliding more easily. o o o 00 00 38 Short Lengths FIG. 35 -- Use a coarse wood rasp to bevel field-cut ends Lubrication and Assembly To make assembly simpler, double lubrication (that is,--after lubricating once, wait 4 to 5 minutes or longer and re-lubricate) is recommended when making a closure so the rings will slide easier. In any case lubrication should always be closely fol lowed by assembly as coupling may "freeze" if left longer than 30 minutes. After inserting rings, lubricate heavily all exposed surfaces of the rings. Then double lubricate both pipe ends back nine inches so that couplings can be pulled completely onto the pipe until they are just flush with pipe ends, DO NOT PULL FURTHER. Final Assembly The insertion piece is then placed into the gap, and the coup lings are pulled onto the ends of the pipe already installed, completing the closure (see Fig. 36). Assembly effort (greater with two rings) can be eased by "wobbling" the couplings slightly as they are being pulled. Operating the handles of the friction puller in alternately opposite directions will cause coup ling to wobble. Check rubber ring position with gage. See page 28. FIG. 36 -- After insertion piece is placed in gap, couplings are pulled onto ends of adjacent pipes. A coupling puller is used for this purpose Using Field Machined Pipe For Closures Standard or random sections (either full length or by cutting as needed) can be used for making closures if a field machining tool equipped with an extension cutter is on the job so that the ends can be machined the full length of the coupling. Each end is then double-lubricated and the couplings pulled all the way on as described under Lubrication and Assembly on page 39. The section is then inserted into the gap and the closure made. L D.1111111 jc FIG. 37 - Field machined (at B) pipe used in making a closure. Make standard assembly at A. Swing pipe into line and pull coupling (B) into position Only one end need be "long machined" if trench is open so that at least one of the already installed pipes can be shifted temporarily to one side--see Fig. 37. First make a standard as sembly at the offset pipe (A)--(no extra machining required). Next, double lubricate and pull a coupling all the way on to the long-machined end (B). Then swing both pipes into line and complete the closure. Removing Pipe From Line If the reason for the closure is to replace a pipe section, the couplings are removed by breaking off as follows: Short Lengths Remove the pipe from the trench and the rubber rings from the adjacent pipe ends. After the pipe ends have been wiped clean, the gap is ready for a closure. TO TIE-IN OR TO LOCATE FITTINGS EXACTLY Note: For assembly at fittings see section starting on page 46. To locate fittings exactly or to tie into fittings already in a fixed location, combinations of MEE and MOA pipe may be used as shown in Figs. 39 and 40. (If an adaptor is joined to MOA pipe, stop-marks will be required to accurately position the coupling--see page 39.) r DESIRED FPNAI______ J FITTING LOCATION . I LAST FULL LENGTH TQ SHORT LENGTH MEE Q~MOA CUT TO FlTl LAST FULL LENGTH MOA CUT TO FIT FIG. 39 -- To locate fittings exactly various combinations of machined-over-all or machined-each-end pipe can be used IF A RING-TITE FITTING IS ALREADY IN A FIXED LO CATION, the tie-in is made by installing a full length at the fit ting first, and then making the closure between this length and MT-Pipe-lnstall-000833 FIG. 38 -- First widen trench for room. Hit coupling a series of smart blows with the ball end of a ball-peen hammer along each side. This splits coupling for easy removal. Never use a sledge ham mer. Pipe ends could be damaged. 40 FIG. 40 - When tying into a Ring-Tite fitting (already in a fixed posi tion) install a full length at A and make a closure at B (see Page 39) 41 pip Short Lengths If a poured bell or mechanical joint fitting is already in a fixed location, this results in a "rigid joint" at the bell, requiring a quarter or half length (see page 50). In this case the method shown in Fig. 41 is used to tie into the fitting. y mat --------------------------- B --Jf -4__ t_i_ Jl_i_ nr FIG. 41 -- When a rigid joint fitting is in a fixed location make tie-in by assembling MOA pipe at fitting and making closure as shown Cutting and Machining Transite Pipe TRANSITE pipe can be cut with hand pipe-cutters which use a cutting edge and hand saws. Approved snap-cutters may also be used. USING PIPE-CUTTERS Pipe-cutters which provide a true cutting action by means of a blade (not rollers) offer a means of making fast, accurate cuts. The cutting tip of the blades supplied should be of tungsten carbide, which will make a maximum number of cuts before needing to be sharpened. There are various designs of cutters available that provide this type of long-lasting cutting blade. The frames of these cutters are adjustable to a range of pipe sizes. They are spaced around and attached to the pipe with roller wheels which are forced in to the pipe so as to "track in" squarely on the first revolutions and automatically follow the cut thereafter. See Fig. 42. Instructions are usually included with the cutters. In addition to standard vises, pipe can be held for cutting by twisting a bar tightly in a rope, or chain, loop (Fig. 43)--or by using a chain type pipe-wrench. DIRECTION OF ROTATION BLADE HOLDER j I FIG. 42 -- This diagram shows the typical arrangement of cutters using a true cutting blade--not rollers FIG. 43 -- Placing pipe across the trench provides plenty of room for operating the cutter 43 MT-Pipe-lnstall-000835 FIG. 44 -- Typical machining tool. Use a factory-machined pipe end as a gauge to set cutting blades of machining tool. As the blade starts in on D2, the ring sealing area, machine about V4", then check to make certain no "springing" has occurred, and that final dimension will be correct. (Dimension, page 95) USING MACHINING TOOLS Field machining tools are available for machining the rough pipe barrel of Transite Pipe when it has been cut--or for ex tending the Ring Sealing portion (D-2, Fig. 44) for use in making closures. There are various designs of field machining tools all utiliz ing the same basic principles consisting of: --an adjustable arbor which is inserted into the pipe barrel and acts as a mandrel upon which the turning handle operates. --a turning handle with blade holders. --and tungsten carbide tipped blades. See Fig. 44. Field machining tools should be used in accordance with the manufacturer's instructions. The following suggestions are general and apply to all machining tools. 1. Use a factory machined end as a guide for setting blades. 44 Cutting and Machining 2. Turn handle clockwise; never turn backwards when blade is in contact, as blade may break from carrier. 3. Check dimensions of field machined end (dimension table on page 97) to assure that machining tool did not loosen during operation. See Fig. 44. 4. Round the pipe nose with a coarse wood rasp to allow the rings to start easier. See A, Fig. 44. OCCUPATIONAL SAFETY AND HEALTH As a result of investigations into dust levels generated by various methods of field cutting and trimming "Transite" asbestos-cement pipe products, the following methods can be used to field cut and trim "Transite" Pipe Products. 1. Manually operated cutting and machining tools as de signed especially for use with asbestos-cement pipe and available from various manufacturers. 2. Power driven cutting and machining tools. 3. Hand sawing. 4. Hand rasping. 5. Hammer and chisel (such as used to make a lateral tie- in into a sewer or storm drain). We do not recommend the use of power driven circular saws that utilize abrasive discs (masonry blades) unless the oper ator and anyone directly assisting him is using a respiratory protective device that complies with the U.S. Bureau of Mines Schedule 21-B. Respirators that comply with this specification are available from the following manufacturers, as well as others: 1. American Optical Co., Southbridge, Mass. 2. Mine Safety Appliances Co., Pittsburgh, Pa. 3. Welsh Mfg. Co., Providence, R.I. 4. Willson Products Div., ESB Inc., Reading, Pa. MT-Pipe-lnstall-000836 Assembly at Fittings SUPPORT OF THE FITTING Fittings should be supported independently of the pipe. Wood skids can be used for this purpose. They help to align the fitting with the pipe end during assembly. They make it easier to as semble the fitting onto the pipe end. FIG. 45 -- Wood skids can be used to support fittings and help align fitting during assembly. Note: valves may require concrete-block anchorage--see page 60. Temporary supports (which are to be removed) should not be used because their removal, later, may result in throwing the weight of the fitting on the pipe. Set fittings on supports that will remain in place. Gate-valves, reducers and fittings with different diameters re sult in thrusts in the line. They may be supported on wood blocks if the line pressure is low. If considerable thrust, due to high pressure, is expected, the valve or other fitting should be set on, and anchored to, concrete blocks as shown under "Thrust Blocks," page 53. Hydrants should be set on solid, permanent foundations which act as thrust blocks as well as hold-downs against frost-heave-- see page 60. 46 Assembly at Fittings USE OF SHORT LENGTHS Short lengths are to be used at each bell of each poured bell or mechanical joint fitting as outlined on page 42. Where adaptors are used, as described on next page, note that use of the Transite adaptor eliminates need for a short length because the adaptor itself is a short length which provides a flexible coupling close to the fitting. ADAPTOR REQUIREMENTS The following types of adaptors are available. (Table F indicates which, if any, adaptor is needed.) 1. MJ-B Adaptor--For connecting Transite to Mechanical Joint and Poured Bell Fittings. See Fig. 46. In ordering show size and class of pipe to be connected--as--MJ-B Adaptor--8"150 (etc.). MJ-B Adaptors for use with butterfly valves may require special machining. 2. Class to Class Adaptor--is a transition piece used to: 1. Change from class 100 to class 150 Transite in sizes 4" and 10"-thru-16" (not needed for 6" or 8"). 2. Join class 100 Transite to class 150 Ring-Tite fittings, in the same size range as above. In ordering show size only as--Cl. to Cl. Adaptor--10" (etc.) 24" 24" MJ-B Adaptor Class-to-Class Adaptor i:l> _ A -- Poured Bell Fitting FIG. 46 -- MJ-B Adaptor at -- g _ Mechanical Joint Fitting 47 iiuuuuuuuuummmtvmmw MT-Pipe-lnstall-i Assembly at Fittings Assembly at Fittings Short Length and Adaptor Requirements at Fittings Note. MEE shorts are available on order for pipe sizes 4" & 6" in 10' Igths. These can be cut in two for use into poured bell fittings (see table). As noted on page 36, the standard shorts for these sizes are 3'-3" and 6'-9" for making tie-ins and repairs. Pipe Size and Class Ring-Tite Hub TYPE OF FITTING Mechanical Joint Requires Machined Pipe Surface Poured Beil 4"-100 -150 -200 Cl to Cl Adaptor'!' MJ-B Adaptor 3'-3" MOA 3'-3" MOA 3'-3" MOA (1) 3'-3" MOA (1) 3'-3" MOA 6"-100 -150 -200 -- 3'-3" MOA 3'-3" MOA (1) 3'-3" MOA 3'-3" MOA (1) 3'-3" MOA 3'-3" MOA 8"-100 -150 -200 MJ-B Adaptor 6'-6" (2) MJ-B " = MJ-B " 6'-6" (2) 6'-6" Machined Surface only Following are adaptor requirements for sizes 10"-12"-14" and 16" Class 100 " 150 " 200 Cl to Cl Adaptor'!' -- -- MJ-B Adaptor MJ-B " MJ-B " MJ-B Adaptor MJ-B " MJ-B " tSome manufacturers are supplying Class 700 Ring-Tite fittings for which no adaptor would be needed. (1) 6'-6" lengths (MEE) cq.n be cut in two. Unmachined barrel will fit info bell. (2) Full lengths (MEE) can be cut in-two. Unmachined barrel will fit into bell. TABLE F machined to the Ring-Tite pipe end profile and is assembled in to a standard Ring-Tite coupling. Provision should be made for resistance to thrust on the steel side of the adaptor. FIG. 47A -- 4"-12" Adaptor FIG. 47B -- 14"-16" Adaptor ASSEMBLY AT RING-TITE FITTINGS The bells of Ring-Tite fittings, like the Ring-Tite Couplings, have grooves in which rubber rings are placed. The fittings are installed with the same sliding assembly as that used for the couplings. Full lengths can be used at Ring-Tite fittings be cause the rubber ring joint at the fitting is flexible. Use an un- STEEL TO RING-TITE ADAPTOR COUPLING When a transition from standard steel pipe to TRANSITE pipe is required a Steel to Ring-Tite adaptor is used. A. Set puller well away from fitting to give least chain angle and straightest pull. Follow with bar as shown. See text. In sizes 4" thru 12" the adaptor is made to the standard RingTite coupling profile (See Fig. 47A). One end is machined for the normal assembly with TRANSITE pipe. The other end is machined to allow for a sliding assembly onto the steel pipe. A special diameter v-ring is provided for the steel end assembly. In the 14" and 16" size the adaptor is made to a bell-spigot profile (See Fig. 47B). The bell end is assembled onto the steel pipe, again, using a special diameter v-ring. The spigot end is B. Change puller as shown. Pull pipe into fitting to complete this assembly and to join to a tee or any other fitting. FIG. 48 -- Assembly of Ring-Tite Fitting o o 48 o oo co 49 MT-Pipe-lnstall-000838 Assembly at Fittings NOTE: USE RING-TITE RINGS ONLY. Dimen sions are designed for R. T. rings-and no other ring should be used. To assemble a Ring-Tite Fitting --Clean groove in bell, removing dirt, excess tar, bumps and burrs. --Insert rubber ring completely in groove. --Anchor puller on adjacent pipe length. --Lubricate pipe end as described on pages 25-26. --Wrap pulling chain around the fitting and pull it onto the pipe end. (Some fittings have lugs on the side of the bells al lowing assembly with coupling hooks instead of puller chain. --Use a bar as shown on page 33 to aid in guiding and pushing the fitting into place, and to prevent pull-out of last coupling assembled. --Check ring position to complete assembly. ASSEMBLY OF MECHANICAL JOINT AND POURED BELL FITTINGS Assembly of fittings other than Ring-Tite requires the use of short lengths (page 36) or adaptors (page 47) at each bell. Joints can be mechanical, or sealed with lead, or sulfur-base (self-caulking) compounds. Standard tools and methods are em ployed. The following suggestions will assist in achieving the best results. Assembly of Mechanical Joints 1. Clean dirt off pipe end. 2. Lubricate pipe end and entire rubber gasket. 3. Slip follower ring over pipe end with the slip side facing the bell. 4. Slip gasket over pipe end with small side facing the bell. Assembly at Fittings 5. Socket the pipe in the bell and push the gasket into posi tion making sure it is evenly seated in the socket. 6. Insert bolts and finger-tighten the nuts. 7. Tighten bolts to uniform tightness with ratchet wrench. 8. Tighten opposite bolts in pairs to bring up follower ring evenly all around. Pouring and Caulking Lead Joints Metallic lead should not be over-heated. It is ready for pour ing when it just reaches a cherry red. After making the pour, the lead must be caulked to make up for normal shrinkage and secure a water-tight joint. Use the following suggestions to achieve the best results with Transite Pipe: 1. The "inside iron" is used first. It is important to hold this iron flat to the pipe as shown in Fig. 49. Use a Wz to 2 lb. hammer and strike light, even blows. FIG. 49 -- Note that caulking iron is held flat to the pipe 2. In using the "outside iron" to seal the joint between the lead and the iron bell, caulking just enough to overcome the shrinkage away from the bell. Then go around once more to pack the lead tightly--using firm, even blows. Excess lead at the gate is cut off with a flat chisel--and the lead under neath tightened up with the outside iron. 51 MT-Pipe-lnstall-000839 Assembly at Fittings Adapt r, Ring-Tite to Flange Full lengths can be used with this type of adaptor. Available for Transite pipe sizes 4" through 12" in Classes 150 and 200 and and for 6" and 8" in Class 100. Flange sealing gasket is sup plied with the adaptor. 52 .... . ijLiaiKlailiSiSto'Uiiaiiii-JZ.- Thrust Blocks at Fittings When Thrust-Blocks are Used Thrust blocks should be installed wherever the pipe-line-- --changes direction, as at tees and bends, --changes size, as at reducers (also some crosses and tees), --stops, as at a dead-end, --or is expected to develop thrusts at valves (see page 58) SIZE AND TYPE OF THRUST BLOCKS The drawings on the next page show how the area of a block and the type of fitting-and will usually be indicated by the engineer. The drawings on the facing page show how the area of a block for resisting horizontal thrusts must increase as the pressure and the pipe size increase. The top drawings show two sizes of 90 degree bends in place in a trench. Below each of these is shown the area of the thrust block needed to resist the different pres sures. . First--compare the drawings downward--greater pressure for the same pipe size requires larger thrust-block area. Next--com pare across--bigger pipe size (even though at the same water pressure) requires greater thrust-block area. How to Determine the Required Thrust-Block Area If the size of a thrust block has not been specified by an engineer the following example shows the steps that are taken to determine the bearing area required: First let's assume that the block is to hold against the hori zontal thrust at a 90 degree bend-for 10" Class 150 pipe. Let's further assume that the pipe line will be pressure tested at 200 lbs. The soil, for this example is sand. 1. Check Table G, page 55. Find 10" Class 150 pipe size- moving to the right (to the 90 deg. bend column) we 53 Thrust Blocks at Fittings FIG. 50 54 Thrust Blocks at Fittings find 15,200 lbs. for each 100 lbs. per sq. inch of water pressure. Since we are working on a total test pressure of 200 lbs.--double 15,200, making the total 30,400 lbs. Thrust at Fittings in Pounds at 100 Pounds per Square Inch of Water Pressure Transite Pipe Size and Class 4"--100 150 200 6"--100 150 200 8"--100 150 200 10"--100 150 200 12"--100 150 200 14"--100 150 200 16"--100 150 200 Tees & Dead Ends 1,720 1,850 1,850 3,800 3,800 3,800 6,580 6,580 6,580 9,380 10,750 10,750 13,330 15,310 15,310 17,930 20,770 20,770 23,210 26,880 26,880 90 deg. Bend 2,440 2,610 2,610 5,370 5,370 5,370 9,300 9,300 9,300 13,270 15,200 15,200 18,860 21,640 21,640 25,360 29,360 29,360 ' 32,820 38,010 38,010 45 deg. Bend 1,320 1,420 1,420 2,910 2,910 2,910 5,040 5,040 5,040 7,190 8.240 8,240 10,240 11,720 11,720 13,740 15,910 15,910 17,880 20,590 20,590 22Vz deg. Bend 660 720 720 1,470 1,470 1,470 2,550 2,550 2,550 3,640 4,170 4,170 5,170 5,940 5,940 6,960 8,060 8,060 9,000 10,430 10,430 TABLE G For Class J00 pipe--add 50 for test--total 150. Table shows 13,270 lbs. for Class 100 pipe at 100 lbs. pressure--so increase 13,270 half as much again to obtain thrust at 150 lbs., the answer would be 19,905 lbs. total. 2. Determine the bearing capacity of sand. Table H provides bearing load data that is often used. If the bearing capacity of sand is 2,000 lbs./sq. ft., the total force (30,400 lbs.) divided by 2,000 gives the sq. ft. of area needed (15.2). A bearing area of 4'x 4' (16 sq. ft.) is indicated. OTHER THRUST AND ANCHORAGE PROBLEMS Thrusts in Soft, Unstable Soils In soft, unstable soils, thrusts are resisted by running corrosionresistant tie-rods to solid foundations or by removing the soft 55 Thrust Blocks at Fittings material and replacing it with ballast of sufficient size and weight to resist thrusts. (Table G shows amount of thrust.) Safe Bearing Loads *Johns-Manville assumes no responsibility for the follow ing bearing load data, which is often used. The engineer is responsible for determining safe bearing loads and when a doubt exists, soil bearing tests may be specified. The bearing loads given are for horizontal thrusts when depth of cover exceeds 2 ft. Soil *Muck, peat, etc...................................... Soft clay ................................................ Sand........................................................ Sand and gravel ................................. Sand and gravel cemented with clay Hard shale .............................................. Safe Bearing Load lb. per sq. ft. 0 1,000 2,000 3.000 4.000 10,000 *ln muck or peat, all thrusts are resisted by piles or tie rods to solid S' Z Zu%: and't'1--' -"> TABLE H--Bearing Loads of Soils* Upward Thrusts at Ring-Tite Couplings Where thrusts act upward (as at vertical curves) the weight of the pipe, the water in the pipe and the weight of the soil over the pipe should be determined to make certain that the total weight is sufficient to resist upward movement. If there is not enough soil or if it will not compact over the pipe or it is too soft and mushy to resist movement, then ballast is placed or concrete may be placed around the pipe in sufficient weight and volume to counteract the thrust. (Table J shows the amount of thrust at deflected couplings.) Upward Thrusts at Fittings Where a fitting is used to make a vertical bend (see page 59) anchor the fitting to a concrete thrust block designed to key in to undisturbed soil and to have enough weight to resist up ward and outward thrust, since the new-placed backfill may not have sufficient holding power (Table G shows thrusts at fittings). See also page 61 for Hydrant Bases. % Liununuuuuuuuuillllim Thrust Blocks at Fittings Side Thrusts at Ring-Tite Couplings When the line is under pressure there is an outward thrust at each deflected coupling. Good soil, properly tamped, is usually sufficient to hold pipe from side movement. If soft soil conditions are encountered it may be necessary to provide side thrust-blocks or other means of anchorage. Table J shows the amount of side thrust at Ring-Tite Couplings. In such cases DO NOT RESTRICT THE COUPLING-run blocks, or anchors, to the pipe on each side of each deflected coupling. Side Thrust at Deflected Ring-Tite Couplings Per Degree Deflection At 100 lb. per sq. in. Water Pressure TABLE J Pipe Size 4 6 8 10 Side Thrust (lbs.) 35 72 122 197 Pipe Size 12 14 16 Side Thrust (lbs.) 278 377 486 Anchorage of Pipe on Slopes Pipe anchors on slopes are only needed when there is a possibility of the backfill around the pipe slipping down hill and carrying the pipe with it. Generally, good, well-drained soil, carefully tamped in 4" layers under and over the pipe right up to the top of the trench, will not require anchoring. Where the possibility of soil slippage does exist, anchors, keyed or tied into undisturbed soil, can be used at every third length of pipe. If concrete anchors are cast around the pipe they, of course, become "rigid structures" which require short lengths as de scribed on page 36. This requirement is easily met as follows: In sizes below 6", use a 6'-9" or 6'-6" length for every third pipe; cast the concrete around these short lengths at the center--thus leaving 3' 3", or less, out of each side of the con crete anchor. For pipe sizes 8" and larger, use full standard lengths and cast the anchor at the center of each third length-- thus automatically leaving the required 6' 6" or less at each side. (See also page 77 for backfilling of pipe on slopes.) 57 Thrust Blocks at Fittings Thrust Blocks at Fittings Anch rage f Valves in Line Under pressure conditions given in Table L, all valves (including those in hydrant run-outs) require anchorage against thrust created when valve is closed. LOCATION OF THRUST BLOCKS The location of thrust blocks depends on direction of thrust and type of fitting as shown below. WITH FITTINGS OTHER THAN RING-TITE, SHORT LENGTHS MUST BE USED.- Area of undisturbed soil (arrows, Table L) should be adequate to withstand the thrust loads as found in Table G, page 55. ir** Anchorage of Valves Working Pressure lb. per sq. inch Size of Valve Requiring Anchorage 50-100 ................................. 12 inch and up 101-150................................. 8 inch and up 151-200 ..................................all sizes TABLE L wr* ir** Note anchor rods. CONSTRUCTION OF THRUST BLOCKS 9^ Thrust blocks are made of concrete, usually placed between the fitting and the trench wall. It is important to place the con crete so that it extends to undisturbed (freshly cut) trench wall --soft stuff will not hold. The concrete mix used should be of adequate strength and will often be specified by the engineer. A typical mix consists of one part cement, two and one-half parts sand and five parts gravel. (Washed gravel should be used.) On the smaller sizes of pipe, the construction of horizontal thrust blocks requires only the simplest of forms. The concrete is mixed and placed fairly dry--thus making it easy to shape the block to a wedge with its widest part against solid trenchwall (see Fig. 50, page 54). Concrete should be kept behind the bell of the fitting--do not let it run against the pipe or in the joint. Larger blocks require some form-construction at sides and top to achieve the proper bearing area with a minimum of concrete. If thrusts, due to high pressure, are expected, anchor valves as above (see also page 58). At vertical bends, anchor to resist outward thrusts--see page 56. 58 r. ^ __ i " 'TliWV K 1 'l|'i 59 MT-Pipe-lnstall-000842 Installation at Hydrants Each hydrant run-out is normally equipped with a valve. The valve may be located at the main, at the hydrant, or in between. Whatever location is used, each fitting (branch-tee, gate-valve and hydrant) should be separately supported. When Ring-Tite fittings are used in a hydrant run-out, a single length of pipe can be used to connect two fittings because flexibility is provided directly at the fitting by the rubber rings. Installation of Hydrants Other stresses are sometimes caused by water from the drain in the base of the hydrant washing away the support from around and under the hydrant. Still another consideration in proper hydrant installation is the overturning force that is created when a flexible fire hose is used. When the hydrant is opened, this overturning force tends to cause excessive flexural stress in the lateral pipe from the main to the hydrant. All of these problems can be considerably minimized through the use of a concrete foundation of the type shown in Fig. 53. FIG. 52 -- When Ring-Tite fittings are used in a hydrant runout a single length can be used to con nect two fittings Be sure to brace the hydrant firmly while the Transite connec tions are being made up-and until the final foundation has been poured and has set. Do not make the pipe support the hydrant. Fire hydrants present a special problem when installed in freez ing climates. Frost in the ground causes a heaving action tend ing to raise the hydrant--this sets up shearing stress in the pipe leading to it which, under severe weather conditions, may prove excessive. Some fire hydrant manufacturers taper the barrel of the hydrant so that the frozen soil will pull away and not tend to raise the hydrant, but this device is not always effective. 60 FIG. 53 -- This type of hydrant foundation acts as a thrustblock, as an anchorage against frost-heave and eliminates wash outs from waste-water drain This concrete foundation can be poured around the base of the hydrant after it has been set in position. With the anchor rods set into the concrete as shown in Fig. 53 the block will serve-- --as a thrust block --as a hold-down, or anchorage, against frost-heave and --as a foundation which eliminates wash-outs from the waste water discharged through the hydrant drain. Note that hydrant drain must be left clear when pouring concrete. 61 Installation of Hydrants IF THE FITTINGS ARE NOT RING-TITE (MECHANICAL JOINT OR POURED BELL) USE SHORT LENGTHS OF TRANSITE PIPE TO CONNECT THEM AND HAVE AT LEAST ONE. RING-TITE COUPLING BETWEEN EACH FIT TING TO PROVIDE FLEXIBILITY.-As shown by the typi cal examples in Fig. 54. FIG. 54 -- With rigid joint fittings short lengths are used at each fitting--and at least one R-T Coupling is used between any two fittings joined with Transite Pipe 62 Service Connections Service connections vary in size from small services supplying individual homes, to large outlets for industrial and other users. Transite Pipe can be tapped wet or dry, using standard water works equipment, for the insertion of corporation stops. The largest size corporation stop which can be tapped directly into the pipe is given in Table M. Larger outlet size can be secured by using service clamps (page 66) or bossed sleeves (page 69). Corporation stops should be located at least one foot from pipe ends. If two insertions are made, one on each side of the main, they should be separated (measured along the pipe length) by at least one foot. Multiple insertions made on the same side of the main should be staggered as well as separated by at least one foot. CORPORATION STOPS 1. The machine used should be in good condition. It is impor tant that the boring-bar does not wobble. 2. In selecting the drill-tap tool-- (a) For best results use a tool that has not been dulled by use on other materials--select a clean, sharp tool and set it aside for use with Transite Pipe only. NOTE: Special Tungsten-carbide-tipped drill-tap tools are available for use with Transite Pipe from your supplier. These will make about twice as many taps in Transite as the regular tool will. Hi (b) BE ABSOLUTELY CERTAIN that the threads on the tap match the threads on the corporation stop. Do not mix iron pipe thread with standard corporation stop threads. Fig. 55 illustrates the effect of mismatching the threads. (c) Check to make sure that the drill portion is long enough to go completely through the thicker wall of Transite Pipe before tapping of the drilled hole starts. 63 .. Service Connections Largest Size Corporation Stop Recommended Pipe SizeCorporation Stop 4"thru 6" Classes 100 & 150; 4" Class 200 W 6" Class 200 8" thru 10" Classes 100, 150 & 200___________ 1" 1" Larger outlet size can be secured by using service-clamps or bossedsleeves, see pages 66, 69. TABLE M If the drill tap tool becomes dull return it to the manufacturer for resharpening, or contact the manufacturer's representative for instructions on sharpening tools in the field. Making the Tap and Insertion 1. Make the tap at least 12" from the end of the pipe. Clamp the machine onfirmly-and at an angle of about 45 degreesas indicated by Fig. 56. Service Connections 2. Use graphite and oil as a lubricant during drilling and tap ping. Mix powdered graphite and linseed oil to consistency of medium weight motor oil and brush it on to the drill-tap combination and also on the corporation stop. 3. DO NOT FORCE drill through pipe wall. Boring-bar should rotate freely at all times-use the follower very lightly -do not force the drill. 4. Transite has a thick wall and will therefore engage more threads of the corporation stop-so the boring-bar must travel farther down in order to thread the corporation stop in properly. When the stop is inserted and tightened, there should be one to three threads showing-no more. (See Fig. 56.) (It may be desirable to make a "shop-tap" ahead of time, and make a new stop-mark on the boring-bar for use m with Transite.) % CORPORATION- IRON-PIPE THREAD USED THREAD USED FIG. 55 IRON-PI PE CORPORATIONTHREAD USED THREAD USED 64 FIG. 56 -- A properly installed corporation stop--showing gooseneck in service pipe and detail of correct number of threads exposed after tightening 5. Always insert the corporation stop with the machine used in drilling and tapping the pipe-even when making a dry tap. (If the dry-tapping machine is used, the stop will, of course, have to be inserted by hand.) 6. Avoid over-tightening of corporation stops--tighten just suf ficiently to make a water-tight joint (50 to 65 foot lbs. with a torsion wrench). 65 Service Connections C nnecting the Service Pipe Always put a bend or "gooseneck" in the service pipe to pro vide flexibility and "give" in the event of a load due to settle ment or to expansion and contraction or other pulling and thrusting that may happen to the service pipe. (See Fig. 56.) SERVICE CLAMPS As shown in Table N, using a service clamp allows greater outlet capacity than is permitted with ordinary tapping. The drilling machines used attach to the corporation stop for drilling pipe either dry or under pressure and they can also be attached directly to the service clamps for drilling when pipe is dry. The clamps should be made of a ductile material and the straps should be flat. Rubber gaskets are required for all pipe sizes and classes. Do not use lead gaskets. Maximum Size of Outlet Recommended with Service Clamps (Inches) Pipe Size 4" 6" 8" 10" 12" OUTLET SIZE (Classes 100-150-200) Single Strap Double Strap i" 1" 1V2" 2" l'A" 2" 2" 2" 2" 2" 14" 16" -- 2" 2" TABLE N Before placing the clamp, file the surface of the Transite to clean off all loose material and provide a hard clean surface. Place gasket and clamp and tighten firmly. Service Connections Lubricate the drill with graphite and oil as described on page 65. Do not force the drill with the follower. CAUTION: The drills used on these machines are quite long-- so be careful that the drill used does not go all the way through and make a hole in the opposite side of the pipe. After removing the drilling machine, re-check the service-clamp bolts to make sure they are still firmly (but not excessively) tightened. HEAVY-WALL COUPLINGFACTORY THREADED OUTLETS These are made available to satisfy either of two needs: 1. To supply a pre-threaded coupling-outlet for customer con venience. 2. To provide greater outlet capacity than can be obtained by drilling and tapping pipe. (See table O.) Heavy tapped couplings are available with either AWWA or iron pipe thread outlet. For AWWA threads it may be ordered direct-threaded or with brass bushings. For I.P. threads, bush ings only are used and may be either brass or galvanized iron. Order should show outlet size, type of thread and type of bushing as outlined below. AWWA THREAD IRON PIPE THREAD DIRECT-THREADED BRASS BUSHING All bushings are threaded into coupling wall and securely bonded with Epoxy cement. BUSHING ONLY Specify either brass or galvanized iron. Assemble into the line in the same manner as a standard RingTite coupling. Position the outlet as shown in Fig. 57 or 58 and 59 according to the service application. 67 Service Connections OUTLET SIZES AVAILABLE 4" Pip 6" thru 16" Pipe AWWA Thread 1" 1 Vi" I.P. Thread 3/i"--1"--1 Vi" Vi"-l W TABLE O Where direct-threaded couplings are used, lubricate threads of corporation stops before inserting. Use a thin paste of pow dered graphite and lubricating oil. Connection for House Service Always put a bend or "gooseneck" in the tubing to provide for flexibility and "give" in the event of a load due to settlement or to expansion and contraction. See Fig. 57. Connections for irrigation Systems Copper Tubing When copper tubing is used as the riser connection to the irri gation valve, install it as shown in Fig. 58. With copper tubing the radius of bend should not be less than shown in table. Outlet Size 3/4" 1" \W' l>/2" Min. Rad. GW 10 Vz'' 15" 21" Service Connections Iron Pipe Thread Connections for Irrigation Systems When iron or brass pipe is used the riser should have a "swing" connection as shown in Fig. 59. TAPPING SLEEVES Tapping sleeves can be used for making large taps in Transite Pipe under pressure. FIG. 61 -- Tapping sleeve 69 Service Connections When tapping sleeves are ordered from the manufacturer, the actual outside diameter of the pipe being tapped, the size of the outlet desired and the working pressure should be specified to assure that the sleeve furnished will be satisfactory. NOTE: Before assembling, pipe barrel should be cleaned thoroughly with a wire brush to provide a smooth, hard surface for the sleeve. Tapping sleeves should be assembled in accordance with manu facturer's directions. Drilling equipment can be bought or rented from sleeve manufacturers who also furnish instructions and/or instructors trained in making such taps. Tapping sleeves should be well supported independently of the pipe during the tapping and the support used should be left in place. Thrust blocks should be used as with any other fitting as described in section starting on page 53. Backfilling and Tamping Backfilling usually follows pipe installation as closely as possi ble. This protects pipe from falling boulders, eliminates possi bility of lifting the pipe due to flooding of open trench, avoids shifting pipe out of line by cave-ins, and, in cold weather, less ens possibility of backfill material becoming frozen. Keep in mind that the purpose of backfilling is not only to pro tect the pipe by covering it, but to provide firm, continuous support that will prevent the pipe settling or resting on,the couplings. The essentials of a first class backfilling job can be summarized as follows: 1. Provide a continuous bed by carefully consolidating ap proved material under pipe and couplings and between the run of pipe and the trench walls. 2. Provide a cushion on top by hand-placing approved material to at least 12" over the pipe--the balance can then be back filled by machine. INITIAL BACKFILL AND TAMPING The first step in providing firm, continuous support for the pipe line is to tamp soil solidly under the pipe and couplings. Choice of Methods Tamping can be done either with tamping bars or by using water to consolidate the backfill material. Hand tamping is best accomplished with damp loamy earth or sand. Water tamping should be used only in trenches that are excavated in soils from which water drains away quickly and at the same time compacts the backfill material. OBTAINING PROPER BACKFILL MATERIAL The initial backfill material used should be free of large stones, dry lumps and, in cold weather, free of frozen lumps. (Dry or frozen lumps will slump down when they become wet or thaw out--leaving the pipe with insufficient support or causing dan- 71 MT-Pipe-lnstall-000849 Backfilling and Tamping gerous settlement. Generally a material that is slightly damp will pack more solidly under the pipe.) Even in fairly stony areas, suitable material for initial backfill can often be shaved from the sides of the trench. Where the type of clay soil condition described on page 19 is encountered the pipe should be enveloped in a minimum of four inches of sand--then the initial backfill completed to at least 12" above the pipe with selected material (see 2, pg. 71). In cold weather, unfrozen material can often be found below the frozen crust of the excavated earth. If the exposed material becomes completely frozen-then dry sand or other unfrozen material should be hauled in. In bogs and marshes, the excavated material is usually little more than vegetable matter--and should not be used for bed ding purposes. In such cases gravel or crushed stone should be hauled in. HAND TAMPING About Tamping Bars Two types of tamping bars are required for a complete job. First a bar with a narrow head, or blade, is used to tamp under the pipe and couplings. Then a bar with a flat head is used to compact soil at the sides. For packing soil under pipe and couplings, tamping bars should not be improvised from two-by-fours, shovel-blades, pickhandles and the like. A good tamping bar should be long enough to handle easily, heavy enough to do the work but not wear out the man, and the right size and shape to pack soil properly. The tamping bars illustrated in Fig. 62 (next page) will do a good job, can be handled easily and are quickly made up in the shop. Flat tampers are standard equipment. Either hand or pneumatic tampers may be used. 72 'V"7vofliwm* Backfilling and Tamping FIG. 62 -- Tamping bars of the type shown at "A" and "B" are used for tamping under pipe and couplings. The flat tamper "C" is used at the sides, between pipe and wall of trench. (Do not at tempt to use the flat tamper in place of A or B--it will not do the work properly) Placing and Tamping under the Pipe A good tamping job can be done more easily than a poor job. The key to it is in the amount of soil that is thrown in--to be tamped under. FIG. 63 (A)--WRONG! Too much soil. Tamp bar cannot compact it properly--and leaves a void under the pipe. (B) -- RIGHT--4" layers of soilwhich tamp bar can force under pipe--thus getting a firm bed This initial backfill is always placed by hand. It should be shoveled in evenly along both sides of the pipe, making a layer about 4" thick--NOT MORE. Then the tamping bar is used to tamp this soil firmly under the pipe. If more than 4" of soil is shoveled in before tamping, the soil can bridge and fail to go under the pipe (Fig. 63A). This may look all right from the ^=JWI|W 73 Backfilling and Tamping surface, but it is easy to see that, when it occurs, support under the pipe is not provided. Next, another 4" layer is shoveled in and tamped. This is re peated until the pipe is firmly bedded in compact soil--see Fig. 63B. Backfilling and Tamping Water is then flushed into the trench. The action of the water seeping through the backfill will tend to compact the soil, pro viding continuous support around the pipe and couplings. Care should be taken not to put too much water into the trench. If trench is flooded, the excess water may float the pipe. FIG. 64 -- When pipe firmly bedded-use flat tamper at sides. Continue flat tamping, in 4" layers, halfway up pipe. Using the Flat Tamper The next step is to provide lateral support by tamping soil firm ly between trench-walls and the pipe. This, too, is done in 4" layers but a flat tamper is used. (The tamper used under the pipe will not work properly at the sides.) Hand-placing and flat-tamping is continued to a point halfway up the pipe-wall, see Fig. 64. When this point is reached, the tamping can be stopped. WATER TAMPING NOTE: Water tamping should be used only in trenches that are excavated in soils from which water drains away quickly and at the same time compacts the backfill material. If water tamping is used the approved backfill material is first hand placed, filling all voids, under and along both sides of the pipe and couplings up to (but never higher than) the top of the pipe as shown in Fig. 65A. 74 FIG. 65 -- (A) Backfill correctly placed by hand filling all voids before water tamping. (B) Wrong--Backfill is m not placed evenly up to, but not higher than, top of pipe. m If the trench bottom is flat or is on a slight grade, the water may be put in at central points where it will reach and seep through all backfill material. If the trench bottom is on a fairly * steep grade, mounds should be made at intervals forming pock ,% ets along the line of trench to assure that the water does not run off before seeping through and consolidating the backfill material. On hill installations, take care to avoid creating voids M under the pipe with the jet probe. m M In Sheeted Trenches If sheeting is pulled after tamping, a hollow space will be left. This robs the pipe of the benefit of support given by tamping. When hand-tamping--if sheeting is pulled, do it progressively while flat-tamping is being done. When water-tamping--pull sheeting progressively while backfill is being hand placed so that it is at the top of the pipe when the water is flushed into the trench. 75 MT-Pipe-lnstall-000850 Backfilling and Tamping COMPLETING THE INITIAL BACKFILL Backfilling the approved material is continued, by hand, until there is a protective cushion of at least 12" of cover over the pipe. This completes what is called the "initial" backfill-the thoroughly tamped soil which provides a continuous, support ing bed for the pipe-line. FIG. 66 -- (A) Soil tamped in 4" layers or water tamped to the hori zontal diameter of the pipe. (B) Hanc|-placed backfill completed to at least 12" over the pipe-ready for machine backfill. (C) Couplings can be left exposed for visual inspection during test, if required. (See note below.) Entire tower half of the pipe-line is thoroughly tamped as at "A". Sufficient weight of soil is placed over pipe to prevent movement under test pressure. NOTE: If it is necessary to observe or inspect couplings during a test, only the top half of the couplings need be exposed. It is essential that the complete line, including the couplings, be tamped as described--up to the horizontal di Backfilling and Tamping ameter. Then the pipe is backfilled by hand so as to resist movement due to pressure, leaving the top half of couplings uncovered as shown at "C" in Fig. 66. Even though no deflection is apparent, pipe should be weighted down with good soil at the rate of 1 ft. depth of soil for each 100 lbs. of water pressure. (See table on page 57 for thrusts at deflected couplings.) COMPLETING THE BACKFILL The balance of the backfill, which is usually placed by machine, need not be as carefully selected as the initial material. Care should be taken, however, to avoid the back filling of too large stones which might damage the pipe in dropping in or by being forced down onto the pipe later. This is particularly important if couplings are left exposed (see "C", Fig. 66). Such lines should be inspected, before backfilling, to detect and remove stones which may have fallen in. The possibility of frost penetration should be considered wherever backfill is extremely stony. PIPE ON SLOPES Pipe in trenches on a slope should have extra attention to make certain that the new-placed backfill will not become a "blind-drain," in effect. Until backfill becomes completely consolidated there is a tendency for ground or surface water to move along this looser soil. If this happens to concentrate at one or more places, soil may be washed out from under the pipe, resulting in loss of support and, perhaps, a break. To reduce this possibility the backfill, for pipe on slopes, should be tamped with extra care--and the tamping continued in 4" layers right up to the top ground-line of the trench. 77 MT-Pipe-lnstall-000852 Testing It is good practice, to pressure test portions of a line as it is installed before the entire line is completed. In this way any errors of workmanship will be found immediately and can be corrected at a minimum of expense. All parts of the pipe-line must be backfilled and braced sufficiently to prevent movement under pressure. There are three parts of the line to consider: 1. The run of pipe itself. 2. Thrust-blocks at fittings. 3. Test-ends, used where the pipe-line does not connect into an existing line or structure. HOLDING THE RUN OF PIPE When the line is under pressure there is an outward or upward thrust at each deflected coupling. Good soil, properly tamped, is usually sufficient to hold pipe from side movement on horizontal curves. Where couplings are deflected vertically (as at the crest of hills) there must be enough weight of backfill on the pipe to resist upward thrusts. The weight needed can be determined from Table J on page 57 which shows the amount of thrust at 100 lb. pressure per degree deflection. If the top half of couplings are left exposed for visual in spection, note that the entire bottom half should be backfilled and tamped as described on page 76. If the top of any coup ling is left exposed, all loose stones that may roll in under must be removed and the bottom half of the coupling area backfilled and tamped with good soil before final backfill is begun. AT THRUST BLOCKS Since the purpose of testing is to test all parts of a pipe-line, thrust-blocks at fittings are also subjected to the test pressure. Therefore, all thrust blocks forming part of the finished line should be permanent and constructed to withstand test pressure --and temporary bracing must not be resorted to. 78 Testing Do not test against freshly poured concrete thrust-blocks --allow enough time for concrete to set before subjecting them to test pressure. AT TEST ENDS The open end can be sealed temporarily with a mechanical line cap (blind end coupling) shown in Fig. 67. Line caps are available in all sizes and can be used repeatedly merely by assembling on the last installed pipe length. Line caps are provided with an outlet to serve as an air relief vent or for filling the line--as may be required. The end of the pipe-line must always be braced to withstand the relatively powerful end-thrust that develops under pressure. A temporary thrust-block can be used for that purpose. Table G on page 55 shows that this force may amount to many tons of thrust. 79 Testing The first step is to establish the temporary thrust-block. This can be a timber mat against the end of undug trench, or--if the trench has been opened beyond the point of test--heavy timber can be notched into the sides of the trench, close to the bottom, see Fig. 68. In either case, the soil must be firm and there must be plenty of bearing surface against it, to resist the thrust. (See table on page 56 for Bearing Power of Soils.) FIG. 68 -- Wedge pipe solidly to prevent kicking out--Using a plumb bob over point on pipe will check creeping when pressure is built up The next step is to "fill in" between the end of the pipe line and the mat, or timber. This "fill-in" should be adjust able so that the last pipe length can be forced back to its original position if it starts to move out of the last coupling during the test. Short timbers and wedges can be used, but one or more jacks serve the purpose much better since they are so easily adjusted both before and during the test. (See Fig. 68). The last full length laid should be firmly wedged and braced to prevent kicking out under pressure. (All exposed pipe must be wedged or backfilled, so as to hold it securely in line.) FILLING THE LINE WITH WATER Filling for Both Pressure-Strength and Leakage Tests The line can be filled from any available low-pressure source. The water can be introduced from lines in service directly through valved connections or by temporary connections to Testing hydrants or to taps made in the new line or at the connection in the line cap. All such corrections, however, should be made at the lowest point in the line, if possible. Filling for Leakage Tests Dry Transite Pipe will absorb some water. Therefore, the line must be filled with water at least 24 hours before accurate leakage tests can be made. Volume of Water Required for Testing In some cases water for pressure and leakage tests may be difficult to obtain prior to connecting the pipe line to the source of supply. In these cases, Table Q indicates the approxi mate amount of water per 100 ft. of pipe line which must be obtained from other sources to conduct the tests. VOLUME OF WATER REQUIRED in gallons per 100 feet Pipe Size Gallons* Per 100 Ft 4 82 6 184 8 326 10 510 12 740 14 1000 16 1310 "Approximate--/nc/ucfes on a//owance for absorption and wastage. TABLE Q Relieving Air from the Pipe-Line Air should be vented manually from all high spots in the pipe line before making either pressure-strength or leakage tests. Automatic air release valves are recommended. Compressed entrapped air causes difficulty in pumping up to the required pressure for strength tests. Furthermore, a pipe-line may leak compressed air when it is actually water tight--and if this occurs during a leakage test it will cause erroneous results. 81 MT-Pipe-lnstall-000854 Testing In pipe sizes 8" and smaller, hydrants can be used for venting if air-valves have not yet been installed. Care must be taken, however, to insure that hydrant runoffs have been vented. In the larger sizes air pockets can form along the top of the main and not be vented by hydrants unless the "blow-off' type of branch-tee is used. If ordinary tees are used, air should be vented by tapping corporation stops into the pipe at high spots in the line. If the line is filled from a test-end located at a high point, an additional outlet should be made there so as to relieve air at that point. MAKING PRESSURE-STRENGTH TESTS The purpose of a pressure-strength test is to make certain that the line will withstand normal working pressure plus reasonable excesses that may occur. In a properly designed line, excess pressures will be kept to a minimum by the use of automatic relief valves, slow closing and opening of valves, slow pump starting, and other controls. A test pressure of 50% above the normal operating pressure should, generally, be sufficient, unless the specification calls for greater pressure. The test pressure is built up by using a hand pump or a small power pump. Do not build up pressures greater than specified. This can happen if the pressure is read from a gauge located at a high point in the line. In such cases the actual pressure at low points will be greater. For Converting Ft. Head of Water into Pressure per Sq. In. Feet Head 1 2 3 4 5 6 7 8 9 10 15 Lbs. per Sq. Inch .43 .87 1.30 1.73 2.17 2.60 3.03 3.40 3.90 4.33 6.50 Feet Head 20 25 30 35 40 45 50 55 60 65 70 Lbs. per Sq. Inch 8.66 10.83 12.99 15.16 17.32 19.40 21.65 23.82 25.99 28.15 30.32 Feet Head 75 80 85 90 95 100 110 120 130 140 150 Lbs. per Sq. Inch 32.48 34.65 36.81 38.98 41.14 43.31 47.64 51.97 56.30 60.63 64.96 Feet Head 160 170 180 190 200 225 250 275 300 325 350 Lbs. per Sq. Inch 69.29 73.63 77.96 82.29 86.62 97.45 108.27 119.10 129.93 140.75 151.58 TABLE R 82 Testing MAKING LEAKAGE TESTS The purpose of leakage tests is to verify the water-tightness of the section of pipe-line under test and includes its joints and all fittings. Transite Pipe will absorb some water, therefore the line must be filled with water at least 24 hours before accurate leakage tests can be made. Normal operating pressure is applied for leakage tests, and this should be maintained as constant as possible all during the test. In every case, the pressure at the beginning and at the end of the test should be the same, because, if there is any air trapped in the line, a higher pressure at the end of the test will show more than actual leakage because the air will compress, while a lower pressure will show less than actual leakage because the air will expand. Generally, the engineer will establish allowable leakage and indicate methods and procedures for testing. If not, Table S should be used in establishing whether a satisfactory degree of water tightness has been attained. LEAKAGE ALLOWANCE Gallons Per 100 Couplings Per Hour Pipe Dia (inches) ' 50 Test Pressure (psi) 75 100 125 150 200 225 4 .71 .87 1.00 1.02 1.23 1.42 1.51 6 1.06 1.29 1.51 1.68 1.84 2.12 2.25 8 1.42 1.72 2.00 2.24 2.45 2.84 3.00 10 1.77 2.15 2.50 2.79 3.07 3.54 3.75 12 2.12 2.58 3.00 3.35 3.68 4.24 4.52 14 2.48 3.01 3.50 3.91 4.28 4.96 5.26 16 2.83 3.44 4.01 4.47 4.89 5.68 6.00 *Evaluated on basis of J50 psi, this leakage is approx/mafe/y equal to 30 U. S. gallons, per 24 hours, per mi/e of pipe, per inch of pipe diameter for pipe in 13-foot lengths. TABLE S To determine total loss for a given length of pipe line;--against pipe size and under test pressure, find gallons per 100 couplings per hour. Multiply this by actual number of couplings per hour. Multiply this by actual number of couplings (each fitting bell equals V2 coupling) and then by hours of test duration: For example, one mile of 10" pipe at 150 lbs. for 2 hours = 3.07 gals per 100 couplings per hour. Since there are about 407 couplings in one mile multiply 3.07 by 4.07 giving 12.5 gals per hour, times 2 =: 25 gals allowable leakage In 2 hours. 83 '( Repairs to Damaged Pipe When pipe has been damaged and repair is required, all dam aged material may be replaced in kind or the pipe may be repaired using a repair clamp or other methods authorized by the engineer. 1. Bruises are caused by heavy impact against such things as timber and iron edges, rocks, other pipes and fittings. This can result in a breakdown by crushing of the pipe-wall under the bruise. The weakened spot may blow out under high pressure or may cause seepage through the pipe and a blow-out at some future time. This condition is usually in dicated by bulging and broken structure on the inside surface of the pipe or by cracks. 2. Whether the blow results in a bruise or in a hole through the pipe-wall, some or all of the pipe will still be useable. As shown in Fig. 69, bruises and punctures can be repaired with repair-clamps. 1 ajiJi-t't aj Repairs to Damaged Pipe If a repair clamp is to be used the full circle type with opposed bolt-line flanges is recommended (see Fig. 69) and should be installed in accordance with the manufacturer's instructions. When using a repair clamp the area on the pipe barrel around which clamp will be placed should first be cleaned with a wire -9 brush. Apply Ring-Tite lubricant to the cleaned area--(to help seat the rubber lining smoothly during final adjustments). The two halves of the clamp are then put around the pipe with the nut position on top for easy access. After the nuts have been tightened lightly the clamp should be rotated slightly in the same direction as the overlap of the rubber lining to assure its smoothness. The nuts are then tightened so as to distribute the pull evenly on all the bolts and the repair is completed. 3. If the pipe has been broken cleanly into two pieces the ends can be joined together with a repair clamp. BROKEN BARREL REPAIR WITH CLAMP MT-Pipe-lnstall-000855 FIG. 69 84 FIG. 70 M M 4. Chips that extend more than Vz" in as shown in figure ,9 71 should be trimmed off and the end re-machined with a field machining tool as described on page 44. Test with *9 a knife point to make certain that pipe is sound beyond 85 Repairs to Damaged Pipe the chip--or wet the area with water and, as the pipe dries, a crack will become visible because it remains wet longer. It is advisable, before field-machining, to trim an extra inch off to be certain of reaching undamaged material. 5. Cutting, or abrading, the pipe is another type of abuse that may require repair. This takes the form of gouging, scratching, chipping and scraping actions which cut or wear away some part of the pipe surface. Such damage is caused by carelessly dragging pipe across sharp objects; by dragging heavy, rough objects across the pipe; or by constant friction against protruding bolt-heads, rubbing action of wires, etc. CHIPPED END RING AREA Repair to Damaged Pipe 7. Scratches that run around the pipe will not cause trouble if the rubber ring will fully cover the scratch (see Fig. 72)-- but, if the ring will cross it at an angle, it would cause leakage and should be repaired or trimmed off as described in paragraph 6. 8. At other points along the barrel of the pipe (where the Ring-Tite Coupling and rubber rings are not used) a cut or abrasion that is larger than Va" deep, W wide and 2" long should be repaired with a clamp. > 4-LJ TRIM OFF TO SOUND PIPE AND REMACHINE TRIM BACK BEYOND ANY CRACK THAT MAY EXIST (SEE PARAGRAPH 4) FIG. 71 6. On the machined end of the pipe (where water-tightness is attained by sealing with rubber rings) grooves and scratches that run lengthwise, and would be in the rubber ring area, will have to be repaired or trimmed off and remachined. Refer to Fig. 72. Slight scratches (not over 1/16" deep and no wider than 1/4") can be repaired by sanding the sharp edges so that the mbber rings will seat properly on the pipe. Wider or deeper scratches will prevent the ring j i from sealing properly and should be trimmed off. 86 -r / .JjF 87 MT-Pipe-lnstall-000856 MT-Pipe-lnstall-000857 / Pulling Pipe Through Casings When Transite Pipe is to be installed in casings under highways and railroad tracks, skids must be used to prevent the pipe and couplings from snagging on the inside of the casing; and to keep the installed line from resting on the couplings. Skids should be thick enough to allow for clearance between the couplings and the casing bottom. Pulling the Pipe A cable is passed through the casing and the first pipe length and is fastened to a suitable wood crosspiece at the end of the pipe. The cable is then pulled steadily (don't jerk) by a truck winch, tractor or other method until about 2 feet of pipe is left projecting out of the casing for assembly of the next length. (If cable is pulled at an angle make sure that the lead ing pipe end is protected from damage.) The cable is then passed through the next pipe and the two pipes are assembled. Check Rings Carefully Extra care should be taken in checking the field assembled ring location immediately following each assembly as a mis placed ring would be difficult to correct once the pipe has entered the casing. These assembled sections are then pulled into the casing leaving about 2' out for assembly of the third length. This operation is continued until the Transite Pipe is through the casing. Minimum Size Casing Required With Transite Pipe (In Inches) Pipe Size 4 6 8 10 12 14 16 Casing Size (inside diameter) 10 12 16 18 20 24 26 TABLE T 88 Greasing the casing or the skids, especially when installing larger pipe sizes, will make the sliding easier. The casing can be greased by depositing a low grade grease at the end of the casing. Then attach rags to the cable and pull them through so that they act as swabs or spreaders. A rope attached to the cable will make it easy to retrieve. After the line is through the casing it will be necessary to make a closure at one end (see page 37) to tie-in to the pipe already installed. Closure Of Casing After Pipe Has Been Installed Under no circumstances should the ends of the casing be closed or any material installed inside the casing until after the pressure test has been completed and approved by the in spector in charge. After test, the ends of the casing should be sealed off. A generally-accepted field practice is to sack the end of the casing, leaving an opening on the bottom. Sacking is to be placed between the TRANSITE pipe and the casing except that the areas at the bottom between the skids are to be left open. This will keep backfill out of the casing, while allowing for drainage. The casing should not be backfilled with sand. When sand is m used drainage is obstructed and access to the interior of the s casing is made more difficult. Also, if the sand is packed tight, m the load on the casing could be transferred to the TRANSITE pipe, thus nullifying the purpose of the casing. m Under no circumstances should any block or spacers be wedged between the pipe or coupling and the top of the casing. m 9 89 MT-Pipe-lnstall-000858 Using Transite Pipe at Bridge Crossings When Transite Pipe is used at bridge crossings care must be taken to follow the plans of the design engineer. The following information is general and should be of assistance in following engineering specifications. Pipe at bridge crossings should be supported by hangers or supports--two to each pipe length--at points approximately 1/5 of the pipe length in from each pipe end. The method shown in Fig. 73 is typical of those used in bridge crossings. FIG. 73 -- Typical method of supporting pipe at a bridge crossing Whenever thrusts are expected in a line (at changes in direction, at reducers or at valves) bracing must be used to counteract the thrust. If at the point where the line comes from the ground to the bridge (or where it goes back into the ground) there are vertical changes of direction, thrust blocks or an chorage must be used as described in section beginning on page 53. Fig. 74 shows one method of using thrust blocks at vertical changes of direction. 90 using ripe ax Bridge urossmg EXPANSION & CONTRACTION On bridges, allowance for thermal expansion and contraction of the structure is taken care of by expansion joints or gaps. Since the pipe is attached to the bridge (and will expand and contract with it) there must also be provision for expansion and contraction in the pipe line where it crosses expansion joints or gaps in the bridge. For this purpose the Ring-Tite expansion coupling is used. As shown in Fig. 75 the Ring-Tite expansion coupling has one end machined for standard Ring-Tite assembly. The other end (without the groove) is machined for a rolling action to permit free longitudinal movement of the pipe within the coupling. NOTE: The expansion coupling requires the use of an "end-trimmed" MOA length in the rolling end. Cut off the tapered portion of the pipe end to allow greater travel distance on the pipe barrel. Assembly of The Ring-Tite Expansion Coupling Select an un-belled length for use at A (Fig. 75). Bell the Ring-Tite end of the expansion coupling on to it, in the usual way. Check ring position. Next anchor the coupling to the pipe with the clamp--Fig. 75 to assure that all movement will occur at the rolling end of the coupling. NOTE: With the standard expansion coupling a total movement of three inches is allowable. If the total movement at an expansion joint (from fully contracted to fully expanded) exceeds 3" a special coupling must be ordered. The expansion coupling must be set to the same relative posi tion of expansion or contraction as the corresponding expan sion joint in the bridge at the time of assembly. The "midpoint", referred to in Table U, can often be found by examination of the bridge expansion plate which will show evidence of the total movement. If the bridge is in a contracted position the coupling must also be in a contracted position. To do this stop marks are used on the MOA pipe to assure that the pipe end is 91 MT-Pipe-lnstall-000859 using npe at Bridge crossing Location of Expansion Coupling Schematic sketch showing location of Ring-Tite Expansion Coupling in relation to expansion joint in bridge. Pipe B is machined-over-all and with end trimmed to remove taper. (It could also be a standard length if one end can be long machined on job to provide for movement as indicated in sketches below.) Assembly of Expansion Coupling Standard-machined pipe (A) is first belled and clamp attached to coupling and pipe CLAMPs* A //'//V/'/A/S/4TOP MARK / B & Stop mark location (on pipe B) varies with position of bridge. Refer to Table T for stop mark location Setting of Expansion Coupling CLAMP-J . ., STOP MARK -- T When bridge is expanded--pipe (B) must be assembled to same relative position STOP MARK iR / When bridge is contractedpipe (B) must be assembled to same relative position (Sketches show maximum set tings--usually the bridge will be at some "in between" point) FIG.75 92 4 Using Pipe at Bridge Crossing set to the correct position. Table U gives stop mark locations and correct position of rubber rings after assembly. After the stop mark has been made the rubber ring must then be put on the pipe end. RING-TITE EXPANSION COUPLING Settings for Stop Mark and for Final Position of Rubber Ring (in inches) 1. Check bridge position (inches contracted or expanded from mid-point) Pipe Size (inches) CONTRACTED (Bridge Joint Open) Mid Point EXPANDED (Bridge Joint Closed) IV2 1 Vk 0 V2 1 IV2 2. Under that meas urement find STOP MARK LOCATION / 12 (.14-16 vsee also Fig. 75) 3>/2 4 41/2 5 51/2 6 6V2 4 4% 5 5`/2 6 6V2 7 3. Final ring position should check to this distance from coupling face ( Va") ( 12 (.14-16 1% 2 2(4 2% 2% 3 3 Vi 2 2>/4 2>/2 2% 3 3 Vi 3V2 Example: assume 10" pipe and, at time of installation, bridge contracted 1%" from midpoint. Under the 134" contracted column read 3W for 4" thru 12" pipe. Mark this STOP MARK LOCATION on pipe B. Immediately below, against 4" thru 12" pipe find 1%" which is the correct ring distance from face of coupling after assembly. TABLE U To place a rubber ring for the rolling assembly first catch the rubber ring around the bottom of the pipe-about W from the end. Snap it on to the pipe by pulling outward and upward as shown in Fig. 76. Let the fingers slide along the ring--and pull outward just enough to keep knuckles clear of the pipe. 93 / Using Pipe at Bridge Crossing Set the ring at the end of the pipe by sliding it with the fingers (Fig. 77). Leave it at the end of the pipe for assembly. FIG. 77 The MOA length, with the ring and stop mark in place is then pulled into the expansion coupling with a friction puller until the edge of the coupling is even with the stop mark. NOTE: Tighten hangers on the MOA length before assembling the next length so that the position of the MOA length in the expansion coupling is not changed. To check the ring position in the rolling end of an expansion coupling first determine the correct assembled position of the ring in relation to the edge of the coupling--see Table U. Then insert the end of a steel measuring tape under the coupling un til it touches the ring. The figure on the tape at the edge of the coupling will tell if the ring is correctly placed. Slide the tape all around the pipe barrel--do not jab as ring may be knuckled out in a small area. If it is, take it apart and re-assemble. In Cold Climates In cold climates where freezing may be a problem, lines at bridge crossings should be insulated, not only on the bridge itself but also where they enter or leave the ground and until they are below the depth of frost penetration. 94 ii MT-Pipe-lnstall-000860 MT-Pipe-lnstall-000861 TABLE OF DIMENSIONS TRANSITE RING-TITE PRESSURE PIPE A N D COUPLINGS LIoU- 2 97 INDEX INDEX Adaptors-requirements, 47-tableof, 48 Ring-Tite to flange adaptor, 52 steel to Ring-Tite adaptor coupling, 48 Frozen trench and backfill avoiding frozen trench bottom, 13 avoiding frozen backfill, 71 Air-relieving for test, 81 Anchoring pipe in soft soils, 55; pipe on slopes, 57; of valves, 58 Assembly of pipe and couplings-general, 24-35 Assembly at fittings-Ring-Tite, 46 poured bell & mechanical, 50 Gage--for checking rubber ring locations, 28 * Heavy-wall coupling-factory-threaded outlets, 67 Hydrants--installation at, 60 Inspecting pipe shipments, 4 Backfilling and tamping, 71 on slopes, 77 Bars, use of, for assembly, 27, 33 Bedding of pipe, 18-22 Belling of pipe-general, 32 with bars, 32 with friction puller, 34 with lever puller, 33 Bracing pipe for testing, 78 Bridge Crossings, 90 SEE APPENDIX INDEX ON PAGE Til FOR THE FOLLOWING: I. ASSEMBLY USING ROUND CROSS-SECTION RUBBER RINGS II. ADDITIONAL DATA AND INSTRUCTIONS Joints at fittings-caulked lead, 51 Leakage tests-see testing, 83 Lengths of pipe, 95 Levelled trench bottom-bedding pipe on, 19 Lever type coupling puller, 28 Line caps for testing, 79 Loading transfer trucks, 10 Loads on pipe in trenches, 16 Lowering pipe into trench, 22 Lubricating pipe ends, 25-26, 32, 39 Casings, pulling pipe through, 88 Checking rubber ring locations, 28 Clamps-service, 66; repair, 85 FOR PIPE SIZES 18"-36" Machined pipe surface, 36 Machining pipe on job, 44 Maximum recommended deflections, 14 Clearance-under pipe and couplings, 18 Closures, how to make, 37 Connection for house service, 63 \ for irrigation systems (copper tubing), 68 for iron pipe, 69 Corporation stops, 63 Couplings-see Ring-Tite coupling Coupling pullers, friction type, use of, 29 lever type, use of, 28 Curves-how to lay out, 13 offsets for pipe on, 14 Cutting Transite Pipe-methods, 43 Deflections, maximum recommended, 14 Dimensions of Transite Pipe and Ring-Tite coupling, 95, 96,97 Distributing pipe along trench, 11 Drilling and tapping Transite Pipe, 63-67 Earth loads on pipe-effect of trench width, 15 Earth mounds, 20 Excavating the Trench, 13-17 Expansion-Contraction, general, 91 Expansion Coupling, 91 Fittings-adaptors at, 47 making joints at, 49-52 short lengths at, 47 support of, 46 thrust blocks at-size of block, 53 location of block, 59 Friction type coupling puller, 29 IM# M Offsets for pipe on curves, 14 Pressure--strength tests, 82 Pulling pipe through casings, 88 Radius of curvature for pipe on curves, 14 Receiving pipe shipments, 4 Removing pipe from line, 40 Repairs to damaged pipe, 84 Ring-Tite Coupling-general assembly, 24-35 assembly with bars, 27 assembly with friction puller, 29 assembly with lever puller, 28 Ring-Tite expansion coupling, 91 Rock Excavation-bedding pipe in, 19 Rolling Assembly (for expansion couplings), 93 Rubber ringschecking final location, 28 placing of, for expansion coupling only, 93 storage of, 12 Service connections-corporation stops, 63 service clamps, 66 sleeves, bossed, 69 tapping Transite Pipe, 63 Short length and adaptor requirements, table, 48 Short lengths-purpose of, 36 how to use, 36-42 Side thrusts at Ring-Tite couplings, 57 Stacking pipe on trucks, 10 Stockpiles, 12 MT-Pipe-lnstall-000862 98 99 INDEX Stop-mark on M.O.A. pipe, 38 Support of fittings, 46 Supporting pipe--methods of, 18-22 effect of soil conditions, 18 earth mounds, conditions suitable for, 20 levelled trench bottom method, 20 conditions suitable for, 20 Tamping-hand, 72; water, 74 Tapping for corporation stops, 63 Tapping sleeve and valves, 70 Testing, 78 Thrusts at fittings (table), 55 Thrust blocks at fittings--size and type, 53 block location, 59 at test ends, 79-80 Tie in at fittings, 42 Tolerances, 96 Transitions-Simplex to Ring-Tite, 31 Trench excavation-line of, 13 width of, 15; depth of, 17 Underwater assembly of pipe and coupling, 32 Unloading pipe shipments, 6 Valve, anchorage, 58 Weight of Transite Pipe, 6 n TR-62A 6-73 100 Hr MT-Pipe-lnstall-000863