Document qkd6no7BvNq6eBbgX4MVLjN1K
ARa k -.0678
MULTI-CITY STUDY FIELD REPORT FOR CLEVELAND TENNESSEE AND DECATUR
ALABAMA - BATTELLE DUXBURY ACTIVITIES for
Project Number N100672-01
submitted to
July 9,1999
Prepared by Scott C. Macomber
Battelle 397 Washington Street Duxbury, MA 02332
(781) 934-0571
00101 *
Introduction Page: 1
TABLE OF CONTENTS
1. Introduction................................................................................................................................................ 1
1.1 Survey Specific Approval....................................................................................................................1
2. methods.........................................................................................................................................................2
3. Chronology..................................................................................................................................................2
4. results........................................................................................................................................................... 4
4.1 Sample Matrix Availability..............................................................................................................5
4.2 Onsite Observations.............................................................................................................................. 5
4.3 Instrumentation Results..........................................................................................................:......10
4.4 Communications........................................................................................
12
5. PROBLEMS EXPERIENCED AND RECOMMENDATIONS........................................................................................... 12
LIST OF TABLES
Table 1 Municipalities Sampled and Approvals Granted During Survey Table 2 Chronology of Events on May 2 4 ,1 9 9 9 .......... '.................................... Table 3 Chronology of Events on May 2 5 ,1 9 9 9 ................................................ Table 4 Chronology of Events on May 2 6 ,1 9 9 9 ............................................... Table 5 Chronology of Events on May 27,1999................................................. Table 6 Chronology of Events on May 2 8 ,1 9 9 9 ................................................ Table 7 Collected Samples from Cleveland T N .............................................. Table 8 Collected Samples from Decatur A L ................................................ Table 9 Sampling Site Positions in Cleveland T N .......................................... Table 10 Sampling Site Positions in Decatur A L ........................ :.................. Table 11 GPS Position Verification Results......................................................
.1 .2 .3 .3 .4 .4 .6 .8 11 11 11
Final Field Rpt Cleveland TN Decatur AL
00101
dBaiteiie . . . Putting Technology To W ork
Introduction Page: 1
1. INTRODUCTION
The objective of the sampling task in this study is to collect representative samples for tracelevel analysis of specific FC residuals, to assess sources, dispersion in the environment, and human exposure through the food chain. The cities selected for sample collection will be considered `study' or `control' cites. `Study' cities are considered those areas with FC production facilities or large industrial FC-consumers. `Control' cites do not contain FC production or consumption facilities and are matched to study cities based on general location, population size, and drinking water source.
During the initial phase of the study phone calls were made to municipal agencies requesting permission to collect various matrices of interest. Based upon the level of cooperation received from the municipal agencies, appropriate sampling strategies were developed. The Quality Assurance Project Plan (QAPP) and the Survey Plan contain the detailed information concerning the matrices for collection and methods to be utilized for this process.
The full project sampling scope is accomplished using two field teams: 1) Battelle's Duxbury Personnel collect drinking water, POTW, landfill and urban air samples, and 2) Battelle's Marine Sciences Laboratory (MSL) personnel collect surface water microlayer, bulk water and finfish samples. This report summarizes the Duxbury team effort. A separate report summarizes the MSL activities.
1.1 Survey Specific Approval
Approval was granted in Cleveland Tennessee from the Publicly Owned Treatment Works (POTW), municipal drinking water plant, and Cleveland Fire Department (for atmospheric sampling). Permission was not granted for sampling at the municipal landfill. Permission to sample was granted in Decatur Alabama for the POTW (including air sampling), municipal drinking water plant, and municipal landfill. The Decatur Fire Department denied access to their property for atmospheric sampling. Table 1 highlights the cities visited during this survey and the approvals granted by municipal departments.
Table 1. Municipalities Sampled and Approvals Granted During Survey
City
Decatur, AL Cleveland, TN
Study or Control Study Control
Fire Department (Air Sampling) NA
[
NA = No Approval Received
Air sample collected
POTW
[* [
Drinking Water Plant
r
[
Municipal Landfill
r
NA
Final Field Rpt Cleveland TN Decatur AL
1Baitene 00.1020 . . . Putting Technology To Work
methods Page: 2
2. METHODS
The collection of environmental samples is conducted according to Standard Operation Procedures (SOP's). The SO P's used in the M ulti-City Study were written by Battelle and are used to train personal prior to conducting field activities and also serve as a reference documents while in the field. These documents, along with the QAPP, serve as the guidance documents for the collection of field samples. The methods used for collection are summarized below. The collection of position data (latitude and longitude) was completed at each sampling location using a Garmin 12XL GPS unit according to Battelle SOP 3-164-01. Instrument accuracy was validated by comparing an acquired position versus a position of known location. The collection of air samples was completed using a General Metals Model PS-1 atmospheric sampler. The sampling was conducted according to Battelle SOP M3-MC-F-1.1. The use of this system allows the separate collection of particulate and vapor phase compounds using a glass fiber filter for particulate matter and a polyurethane foam PUF for the vapor phase. W ater samples from drinking water supplies, PO TW 's, and landfills were collected according to SOP M3-F-2.0. Surface water samples were collected via direct submersion, tap water and drinking water supplied by the municipal plant were collected via a valve system, and effluent was collected using either a bucket or small sampling beaker. Sediment samples were collected using Battelle SOP M3-F-7.0. Both sludge and sediment were collected using a stainless steel spoon.
3. CHRONOLOGY
Tables 2 through 6 provide a detailed chronology of the events that occurred each day of the survey. The times recorded for the collection of each sample matrix has been transcribed from the sample collection log, all other times have been estimated based on the events of the day. All times have been recorded in Eastern Standard Time.
Table 2. Chronology of Events on May 24,1999
0615 0900 1130 1145
1300 1400
1500 1545 1600
1630
Battelle Duxbury personnel depart Boston. Arrive in Atlanta, GA and meet with Kim Andrews. Arrive in Chattanooga, TN. Pick up rental van and proceed to Federal Express to retrieve sampling materials. All materials present and accounted for. Depart Chattanooga and proceed to Cleveland, TN. Arrive in Cleveland and check into hotel. Proceed to have kick off meeting over lunch. During the meeting it is discovered that more sampling materials are required for air sampler. Arrive at fire station and place air sampling unit behind building for sample collection. Conduct calibration of air sampler and start sampling for 12hr period. Meet with Paul Pitts, the assistant manager of the water division of Cleveland Utilities. He provides maps, directions, and informs the managers of the plants of our scheduled arrival. Return to hotel. Battelle Columbus contacted and more supplies are scheduled for shipment to Chattanooga.
Final Field Rpt Cleveland TN Decatur AL
0 Battelle 001021 . . . Putting Technology To W ork
Chronology Page:3
Table 3. Chronology of Events on May 25,1999
0730
Arrive at the fire station, air sampler did not stop at end of 12hr period. Sampling event
concluded at 0745. Cleaned sampler and placed the PUF and filter blanks into the
samDler. Blanks remained in sampler for ~30 seconds, they were then placed in storage
Table 3 Continu ed or shipment.
1UW
/iLiiive at Cleveland Utilities Wastewater Treatment Plant (WWTP). Discuss sampling
with Mr. Mike Ward who was the supervisor for the shift, no significant issues raised.
1015 Collect post centrifuged sludge. Used stainless steel spoon for collection
1030 Collect chlorinated effluent sample via old steel pail. Collection assistance provided by
plant employee. Complete collection at 1055. Following collection of sample Kim
Andrews departed the team to return to Columbus.
1100 Benchmark discovered at the WWTP, inquired about the coordinates from the plant
employee. He contacted a member of the city engineering department who provided the
coordinates for the benchmark. The coordinates are, N 3518'35.0" W 8547'54.0".
1210 Arrive at Hiwassee drinking water plant. Spoke with Chris Wiles who is the manager
of the plant water quality lab. Collect raw untreated river water and post filtration
drinking water from water quality lab.
1420 Arrive at State access area located on Hiwassee River. This access area was used to
collect surface water and sediment samples.
1450 Collect surface water and sediment sample at Site 1.
1520 Collect surface water and sediment sample at Site 2.
1535 Collect surface water and sediment sample at Site 3.
1630 Collect Site 1 tap water from room 107 of Baymont Hotel.
1700 Commence spiking of field spike samples
1820 Prepare samples for shipping.
2015 Collect Site 2 tap water from an Amoco gas station/convenience store located at the
intersection of Routes 60 and 75.
2145 Collect Site 3 tap water from Tennessee Jack's Caf.
Table 4. Chronology of Events on May 26,1999
0800 0830 0915 0930
1115 1200
1210 1430
1440
1510
Collect GPS locations at the three tap water sites. Depart for Chattanooga. Arrive in Chattanooga. Finalize shipping logistics. (Samples were repacked in garbage bags because of leaking water). Copies made of Chain of Custody Sheets. Rendezvous with Rosanna Buhl at the Chattanooga Airport. Ship Cleveland TN samples via Federal Express to their respective destinations. Picked up air sampler supplies (filters, PUF's, and field spike samples). Depart for Decatur, AL. Receive phone call from Marcia Nishioka. The client and Decatur Utilities manager Kem Carr agreed to a confidentiality agreement that would allow us to sample from the POTW and the drinking water plant. Call Kem Carr to confirm sampling approval and inform him that we are expecting to begin sampling within the day. Arrive at the Dry Creek WWTP and meet with Ed Buyers the plant supervisor. Begin calibration of instrument.
Final Field Rpt Cleveland TN Decatur AL
- . Putting Technology To W ork
Results Page: 4
1540 Air sampling initiated. 1600 Arrive at hotel and begin preparing water-sampling bottles for the following day.
Table 5. Chronology of Events on May 27,1999
Table 5. Continiied at Dry Creek WWTP. Collect air sample, air sampler stopped automatically
auci x 2 hours. Clean unit and collect QC samples including an extra field spike sample.
0930
Collect effluent sample using 500ml-sample collector that the facility provided. The
sample was collected from the spillway that led to the discharge pipe. The effluent is
discharged -500 feet into the river where the channel exists.
1015 Jim Meares collected liquid sludge from a collection tank using a plastic jar. No GPS
location recorded; the collection tank was ~500yds from the air sampling location.
1045 Arrive at Decatur Water Plant. Collect raw and final processed drinking water.
Samples collected in the water quality lab of the facility; Richard Blackwood was the
technician on duty during our collection.
1125 Collect quiet water body sample from the Northwest comer of Flint Creek. The area
was located across from the Decatur Country Club. It was north of Country Club Lane
S.E. by -200-300 yards.
1300 Collect surface water and sediments at sites 1, 2, and 3 from the Riverwalk Marina
complex located on the Tennessee River.
1410 Collect tap water from Site 2 located at the Decatur Boat Harbor (within Riverwalk
complex).
1435 Arrive at Morgan County Landfill. Present site manager Richard Terry, with a request
letter that was required prior to our collection of samples. Following a terse discussion
we proceeded to the leachate pond unsupervised and collect leachate sample.
1550 Collect Site 3 tap water from a Texaco gas station/convenience store on Route 67 in
Decatur.
1635 Collected Site 1 tap water from room 207 of the Hampton Inn.
1710 Field spike samples were processed, samples segregated, and coolers packaged for
shipping.
Table 6. Chronology of Events on May 28,1999
0645 0945
1030
1300
Depart for Chattanooga. Arrive in Chattanooga, paperwork completed for sample shipment, coolers repackaged for shipment. Arrive at Federal Express and ship all samples and equipment to there respective destinations Depart Chattanooga for Boston.
4. RESULTS
The initial survey of the Multi-City Study resulted in the collection of the majority of the samples described in Tables 3 through 5 of the QAPP. Also collected but not included in Tables 3 through 5 of the QAPP were samples for the client and a third laboratory specified by the client. The collection of these samples tripled the number of water and sediment samples taken. The samples were collected and processed in the same m anner as those intended for Battelle. The following sections describe the results of the sample collection effort that occurred during
Final Field Rpt Cleveland TN Decatur AL
O Battelle 00102 . . . Putting Technology To Work
Results Page: 5
this survey. Tables 7 and 8 provide a list of the samples collected including sampling locations and sample DD's. Tables 7 and 8 do not contain the Quality Assurance samples collected along with authentic samples.
4.1 Sam ple M atrix Availability
Per client instructions no food items were collected during survey. Due to scheduling and permit issues no finfish were collect during this survey. The collection of POTW influent was not collected at either Cleveland or Decatur due to health concerns. Both POTW influent streams available for sampling contained biological hazards. In both cities, the staff at the facilities indicated that the chlorination process occurs following secondary treatment.
Neither landfill leachate nor an alternative sample was collected for the municipality of Cleveland, TN. The reasoning that an alternative sample was not sought after is based on the following information. A discussion with the manager of the landfill in February resulted in the denial of permission to collect a sample. During this discussion it was revealed that the leachate from the landfill is pumped to the POTW for treatment. During subsequent discussions with Cleveland Utilities an offer was made to remove a manhole cover that would allow us access to the leachate as it is pumped in from the landfill. However, because we had not been granted permission it was decided that we would not collect the leachate sample. With the sample unattainable and the leachate pumped from the landfill it reasoned that the leachate would not be migrating from the landfill and entering a nearby water source. Therefore, no alternative site was collected.
Also to be collected, but not included in the QAPP, was a sample of quiet/undisturbed surface water. This sample is intended for use in a long-term transport study that is currently being conducted. In Cleveland we were unable to collect this sample because access was unavailable to the pond selected as a sampling site as it was located on private property. A sample was collected at Flint Creek in Decatur.
4.2 O nsite O bservations
Cleveland, TN: The drinking water plant withdrawal location is approximately 2 miles east/northeast of the plant in the Hiwassee River. The location of the surface water site is at the end of Eades or Eads road. One spelling was observed on a local street sign and the other displayed on a local map. The site is a small state access area located at the tip of the peninsula. The area appeared highly utilized by the local population for recreational activities.
D ecatur, AL: The Riverwalk M arina complex where surface water and sediments were collected is located adjacent to the Highway 72 bridge that traverses the Tennessee River into Decatur. This area is a highly active marina complex, several people were observed fishing from the banks. Several dead catfish were observed along the shore. A semi-softshelled turtle of unknown species was observed at Site 2. At the Morgan County Landfill the leachate sample was collected from a recently constructed collection pond. This previously sampled pond
Final Field Rpt Cleveland TN Decatur AL
f ! Baitene 001024 Putting Technology To W ork
Results Page: 6
(December 1998) was surrounded by vegetation and access would have been extremely difficult. The pond sampled during this survey contained a variety of wildlife living in and or around it. Several turtles, multitudes of insects and larvae, and various birds were observed feeding at the pond.
Table 7. Collected Samples from Cleveland TN
Matrix
Sample ID
Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1
MC-121B MC-122B MC-123B MC-124B MC-125B MC-121K MC-122K MC-123K MC-124K MC-125K MC-121H MC-123H MC-124H MC-125H MC-115B MC-116B MC-117B MC-118B MC-119B MC-115K MC-116K MC-117K MC-118K MC-119K MC-115H MC-117H MC-118H MC-119H MC-126B MC-127B MC-128B MC-129B MC-130B MC-126K MC-127K MC-128K MC-129K MC-130K MC-126H MC-127H MC-128H
Approximate Total Volume Collected (L) or
^Sediment Mass (g)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Location Collected
Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Hiwassee Drinking Water Plant Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel Baymont Hotel
Final Field Rpt Cleveland TN Decatur AL
! Baitene 00 1 0 2 5
. . . Putting Technology To W ork
Results Page: 7
Matrix
nn-- vxr,,*.-- o:*.~ u i
Table 7. Continued
Tap Water Site #2 Tap Water Site #2 Tap Water Site #2 Tap Water Site #3 Tap Water Site #3 Tap Water Site #3 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #2 Surface Water Site #2 Surface Water Site #2 Surface Water Site #3 Surface Water Site #3 Surface Water Site #3 Sediment Site #1 Sediment Site #1 Sediment Site #1 Sediment Site #2 Sediment Site #2 Sediment Site #2 Sediment Site #3 Sediment Site #3 Sediment Site #3 POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent
Sample ID
MC-129H MC-130H MC-131B MC-131K MC-131H MC-132B MC-132K MC-132H MC-101B MC-102B MC-103B MC-104B MC-105B MC-101K MC-102K MC-103K MC-104K MC-105K MC-101H MC-102H MC-103H MC-104H MC-105H MC-106B MC-106K MC-106H MC-107B MC-107K MC-107H MC-'llOB M C -llO K M C -llO H MC-111B MC-111K MC-111H MC-112B MC-112K MC-112H MC-139B MC-140B MC-141B MC-142B MC-139K MC-140K MC-141K MC-142K MC-139H MC-141H MC-142H
Approximate Total Volume Collected (L) or
Sediment Mass (g)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 200* 200* 200* 200* 200* 200* 200* 200* 200* 1 1 1 1 1 1 1 1 1 1 1
Location Collected
Baymont Hotel Baymont Hotel Amoco Gas Station Amoco Gas Station Amoco Gas Station Tennessee Jacks Caf Tennessee Jacks Caf Tennessee Jacks Caf Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Hiwassee River Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW.
Final Field Rpt Cleveland TN Decatur AL
Baitene 001026 . . Putting Technology To Work
Results Page: 8
Matrix
POTW Sludge POTW Sludge POTW Sludge Urban Air (Vapor) Urban Air (Particulate)
Sample ID
MC-144B MC-144K MC-144H MC-146 MC-147
Approximate Total Volume Collected (L) or
Sediment Mass (g)
200* 200* 200*
1 Filter
1 PUF
Location Collected
Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Municipal POTW Cleveland Fire Department Cleveland Fire Department
Table 8. Collected Samples from Decatur AL
Matrix
Sample ID
Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Processed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Drinking Water Unprocessed Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1 Tap Water Site #1
MC-221B MC-222B MC-223B MC-224B MC-225B MC-221K MC-222K MC-223K MC-224K MC-225K MC-221H MC-223H MC-224H MC-225H MC-215B MC-216B MC-217B MC-218B MC-219B MC-215K MC-216K MC-217K MC-218K MC-219K MC-215H MC-217H MC-218H MC-219H MC-226B MC-227B MC-228B MC-229B MC-230B MC-226K MC-227K MC-228K MC-229K MC-230K MC-226H
Approximate Total Volume Collected (L) or Sediment
Mass (g)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1
1 1 1
1
1 1 1 1 1 1 1 1 1
Location Collected
Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Decatur Water Plant Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn Hampton Inn
Final Field Rpt Cleveland TN Decatur AL
Baitene 00102
Putting Technology To W ork
Results Page: 9
Matrix
Tap Water Site #1 Tap Water Site #1
T i r u1
Table 8. Continued
l ap Water Site #2 Tap Water Site #2 Tap Water Site #3 Tap Water Site #3 Tap Water Site #3 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #1 Surface Water Site #2 Surface Water Site #2 Surface Water Site #2 Surface Water Site #3 Surface Water Site #3 Surface Water Site #3 Sediment Site #1 Sediment Site #1 Sediment Site #1 Sediment Site #2 Sediment Site #2 Sediment Site #2 Sediment Site #3 Sediment Site #3 Sediment Site #3 POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent POTW Effluent
Sample ID
MC-228H MC-229H MC-230H MC-231B MC-231K MC-231H MC-232B MC-232K MC-232H MC-201B MC-202B MC-203B MC-204B MC-205B MC-201K MC-202K MC-203K MC-204K MC-205K MC-201H MC-202H MC-203H MC-204H MC-205H MC-206B MC-206K MC-206H MC-207B MC-207K MO207H MC-210B MC-210K MC-210H MC-211B MC-211K MC-211H MC-212B MC-212K MC-212H MC-239B MC-240B MC-241B MC-242B MC-239K MC-240K MC-241K MC-242K MC-239H MC-241H
Approximate Total Volume Collected (L) or *Sediment
Mass (g)
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 200* 200* 200* 200* 200* 200* 200* 200* 200* 1 1 1 1 1 1 1 1 1 1
Location Collected
Hampton Inn Hampton Inn Hampton Inn Decatur Boat Harbor Decatur Boat Harbor Decatur Boat Harbor Texaco Gas Station Texaco Gas Station Texaco Gas Station Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Tennessee River Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP
Final Field Rpt Cleveland TN Decatur AL
0 Baffelie 00.102i . . . Putting Technology To W ork
Results Page: 10
Matrix
Sample ID
POTW Effluent
MC-242H
POTW Sludge DATUf Cl..J --.
Table 8. Continued
MC-244B MC-244K MC-244H
Quiet Surface Water'
MC-284B
Quiet Surface Water1
MC-284K
Quiet Surface Water1
MC-284H
Landfill Leachate
MC-235B
Landfill Leachate
MC-235K
Landfill Leachate
MC-235H
Urban Air (Vapor)
MC-246
Urban Air (Particulate)
MC-247
1Samples are not part o f the Multi-City Study
Approximate Total Volume Collected (L) or *Sediment
Mass (g)
1 200* 200* 200* 1 1 1 1 1 1 1 Filter 1 PUF
Location Collected
Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Dry Creek WWTP Flint Creek Hint Creek Flint Creek Morgan County Landfill Morgan County Landfill Morgan County Landfill Dry Creek WWTP Dry Creek WWTP
4.3 Instrumentation Results
Air samples were collected using a General Metals Model PS-1 air sampler. According to SOP M3-MC-F1.1 the air sampler calibration is acceptable if it is within 10% of the expected results. To determine the acceptable results a calibration was conducted in Duxbury prior to the initiation of the study. The initial calibration curve resulted in an R2 value of 0.997. The calibration curves generated in Cleveland and Decatur had R2 values of 0.997 and 0.996 respectively. The percent difference in recorded values from the initial calibration ranged from -1.92% to 3.70% for Cleveland and 0% to 6.56% for Decatur, respectively.
The location of each sampling site was determined using a Garmin 12 XL GPS, the results are presented in Tables 9 and 10. The accuracy of the GPS unit was verified prior to departure from Duxbury by comparing a benchmark at Battelle versus the measured location determined by the instrument. The difference the true and measured coordinates was 0.01 kilometers. Following shipment to Tennessee the instrument was reinitialized. This was conducted at the Baymont Hotel on May 24th. Within several minutes of the process, the unit was displaying maps and locations of the local area, which indicated that it was working properly. The results of the verifications for each sampling day are presented in Table 11.
The result of the verification for Cleveland was a difference of 0.11 kilometers between the "true" and measured coordinates. Although the verification is beyond the acceptance criteria, the position data for the day will be considered valid because it appeared that while the instrument was receiving data, the Department of Defense might have adjusted the satellite selective availability. The instrument did not record a constant position over a five-minute period and the position appeared to change in a regulated step manner.
The result of the verification in Decatur resulted in a difference o f 1.68 kilometers between the "true" and measured coordinates. The reference point that was used for the verification was that of the discharge for the plant. During the verification the plant manager suspected that the reference position was that of the plant outflow located onsite. Based on the substantial
Final Field Rpt Cleveland TN Decatur AL
Battelle 001.029
- . . Putting Technology To W ont
^
Results Page: 11
difference in positions further investigation was conducted. Subsequently it has been discovered that the position is the termination point of the discharge pipe located in the river. Based on this information verification was not possible for that day.
According the QAPP the minimum distance between sediment sampling sites positions is 500 feet apart. The following results have been calculated using the Garmin GPS. The distance from Cleveland Site 1 to Site 2 is 229.6', the distance from Site 2 to Site 3 is 196.8' and the distance from Site 1 to Site 3 is 360.8'. Sampling at Cleveland did not meet the QAPP requirements. The distance from Decatur Site 1 to Site 2 is 951.2', the distance from Site 2 to Site 3 is 754.4' and the distance from Site 1 to Site 3 is 1,148'.
Table 9. Sampling Site Positions in Cleveland TN
Sampling Location
Hiwassee Drinking Water Plant Baymont Hotel Amoco Gas Station Tennessee Jacks Caf Hiwassee River Site #1 1 Hiwassee River Site #2* Hiwassee River Site #3* Cleveland Municipal POTW Cleveland Fire Department
T= Transcribed data in log
Latitude
N 3516'01.5" N 3 5 H '34.2" N 3 5 H '44.1" N 3 5 1 1 '38" N 3520'38.2" N 3520'40.3" N 3520'40.8" N 3518'35" N 3509'19.5"
Table 10. Sampling Site Positions in Decatur AL
Sampling Location
Decatur Water Plant Hampton Inn Decatur Boat Harbor Texaco Gas Station Tennessee River Site #1 Tennessee River Site #2 Tennessee River Site #3 Dry Creek WWTP (Effluent Sample) Dry Creek WWTP (Air Sample) Morgan County Landfill Flint Creek
Latitude
N 3436'14.7" N 3434'41.4" N 3436'57.2" N 3435'26.9" N 3437'03.2" N 3437'07.1" N 3 4 3 7 '00.1" N 3437'31.5" N 3437'20.4" N 3437'19" N 3433'59.4"
Longitude
W 8445'31.9" W 8453'28" W 8453'20.9" W 8453'28.2" W 8451' 10.4" W 845ri0.8" W 8 4 5 1 '13.1" W 8447'58.2" W 8452'41.9"
Address
114 Valley Road Routes 60 and 75 Routes 60 and 75 Routes 60 and 75 Eads Bluff Road Eads Bluff Road Eads Bluff Road Lower River Road 555 Ocoee Road
Longitude
W 8657'41.7" W 8701'13.5" W 8658'16.1" W 8 7 0 1 '50.3" W 8658'08.2" W 8658'18.7" W 8658'21.3" W 8659'55.7" W 8659'53.8" W 8706'02" W 8657'55.6"
Address
Market Street Route 67 Riverwalk Marina Route 67 Riverwalk Marina Riverwalk Marina Riverwalk Marina Highway 20 Highway 20 Highway 20 Country Club Road
Table 11. GPS Position Verification Results
Calibration Locations
Waypoint Position at POTW GPS Derived Position Difference
Cleveland TN
N 3518'35" / W 8447'54" N 3518'35" /W 8447'58.2" 0.11 kilometers - bearing 93
Decatur AL
N 3438'10" / W 8659'09" N 3437'31.4" / W 8659'55.7" 1.68 kilometers - bearing 47
Final Field Rpt Cleveland TN Decatur AL
HIBaitene ooio3( . . . Putting Technology To W ork
Problems experienced and recommendations _____________________________ Page: 12
4.4 Communications
During the completion of the field survey, several conversations regarding the sampling effort were noted. These communications were conducted between Battelle staff and various municipal employees or the public.
In Cleveland, TN, Chief Gaylor o f the CFD was informed that a donation to the St. Jude's Hospital would be sent directly from Columbus in their name. W e must ensure that this effort is completed. Paul Pitts the Assistant Manager of Cleveland Utilities Water Division provided maps to the facilities and reiterated his offer to allow us to sample the landfill leachate as it is pumped to the POTW.
On May 21,1999 a call was received from Kem Carr of Decatur Utilities indicating that he would not allow the sampling to occur at the POTW or Drinking W ater Plant if he was not informed of the client. Following the conversation, Marcia Nishioka was contacted and made aware of the situation. In response to the situation it was decided by the client and Battelle that a confidentiality agreement revealing the identity of the client would be drafted and offered to Mr. Carr. A conversation between Ms. Nishioka and Mr. Carr resulted in an agreement in which the client's identity was revealed in confidence, and in return were allowed to collect samples at the POTW and the drinking water plant. The agreement was completed on W ednesday May 26, 1999. Later on May 26th during a conversation between Mr. Carr and Scott Macomber, the sampling team leader, Mr. Carr indicated that he wanted to speak to the client directly. Mr. Macomber indicated that he would inform the project manager o f the situation. On May 27th Mr. Carr directly contacted the manager of the local manufacturing plant for further information.
Mr. Carr's employees at the POTW inquired several times about what we were looking for during our visit to the facility. During the calibration of the air sampler Michael Deck, an assistant supervisor at the plant asked if we were sampling for Molybdenum. He revealed that the facility had discharge exceedences in the recent past due to local industry input.
There were no other pertinent conversations surrounding the collection of samples at the various facilities that were sampled. During the course of collecting surface water samples in both Decatur and Cleveland, members of the general public inquired about the sampling effort. In each case a general answer was offered and all interested parties were satisfied.
5. PROBLEMS EXPERIENCED AND RECOMMENDATIONS
During the collection of samples from Cleveland TN and Decatur AL the following QAPP deviations were encountered
The QAPP Section 12.2 states that "samples will be shipped at the end of each collection day for next-day delivery". In both cities logistical problems prevented the samples from being shipped on the same day that they were collected. Cleveland samples were collected on Tuesday May 25th and shipped on W ednesday May 26th. Decatur samples were collected on
Final Field Rpt Cleveland TN Decatur AL
0 Battelle oorum . . . Putting Technology To W ork
Problems experienced and recommendations _____________________________ Page: 13
Thursday May 27th and shipped on Friday M ay 28th. Battelle project leaders have indicated that samples can be chilled (on ice) overnight and shipped the following day when adequate time is available, and that this change to protocol will be addressed in an addendum to the QAPP.
The samples collected in Decatur were shipped on Friday May 28th and were not specifically marked for a Saturday delivery, resulting in a 4-day period in transit. Samples were delivered Tuesday June 1st. Prior to the next survey logistical preparations will be in place for Saturday delivery to recipient laboratories.
Battelle's Sampling Task Quality Assurance Officer, Rosanna Buhl, conducted a field audit during these surveys and has prepared an internal report to improve field operations and ensure full compliance with the QAPP and SOPs. In response to Battelle's internal audit, the field crew will redesign several field log forms to help facilitate timely and accurate data recording.
Final Field Rpt Cleveland TN Decatur AL
001032
. . . Putting Technology To W ork
Field Report Addendum - Cleveland, TN and Decatur, AL Atmospheric Sampling Details. The following details are included here to complete the field record with respect to sampler positioning. Cleveland, TN: The air sampler at this site was positioned approximately 4 feet from the fire department headquarters located at 555 S. Ocoee Street. Decatur, AL: The air sampler in Decatur was positioned approximately 3 to 4 feet from the Dry Creek wastewater treatment plant. Surface Water Sampling. The following details are included here to complete the field record with respect to site characteristics. Cleveland, TN: The surface water collected at each of 3 within 2 m of shore in ca. 0.5 m depth. Re suspended bottom sediments were avoided in each case. Decatur, AL: The surface water collected from the local river system was collected at each of the 3 sites within 2 m of shore in ca. 0.5 m depth. Re-suspended bottom sediments were avoided in each case. Additionally, a single "quiescent" water site was sampled within Flint Creek accessed from Country Club Road. The sample was also collected within 2 m of shore in ca. 0.5 m depth. Re-suspended bottom sediments were avoided.
001033