Document qkVjELQV6K2bwxky88yEwKrgE
'SE^r*tenant
~V
/
V. S. HAFAL ENGINEERING EXPERIMENT STATION Annapolis, Maryland
Front Tor Flat
Director. Bureau of Ships. Superintendcat, U.S. Naval
DEC 131340
Accdtny.
Subjcctt Monthly Report ofTests -November 1940.
Inclosurot
(a) Suaaary of Reports Submitted. (B) List of Tests Incomplete. (C) addenda to Alphabetical Index of
Tests Dated 31 October 1934. (D) List at Tests Reported During J'onth
Biding 30 November 19a0.
1. Inclosures showing status of experimental end test work arc submitted.
A. T. Church
1l
i
/
sirroooi
CRMC-M&S-003719
Sr"
; ii M - I
iaJ..
~V
v-rd. RATAL EHGIRKERIHG EXPERIMENT RATIOS Annapolis, dryland
sumar of reports assigned and submitted this month
Inspection Tasts
Tests brought forward from October 1940...................................212 Tests assigned.................................................................................. . ..................... . Tests reopened .......................... ..................................................... ................................. Tests cancelled .................................................................................. ............................. Tests closed out ..................... ................................... Tests remaining open ......................................................... ......................
99 2 0
78 235
Reports submitted ...................................................................... Supplementary reports submitted .................................. Total reports submitted ................................ .......................................... ,/Oi Othor Tests
Tests brought forward from October 1940 .......................... Tests assigned ........................................................................................ Tests reopened .......................................................................... Tests cancelled ............................................................................... Tests completed ........................................................
277 2
279
455 45 0 3 34
473
Tests incomplete (listed in inclosure B) Tests complete but hold open awaiting financial adjustment
(listed in inclosure B) Tests assigned and completed during month and listed in
inclosure B for record purposes .......................
458 14 3 473
Reports submitted ................................................ Reports submitted on tests completed but hold open awaiting
financial adjustment ...................... Reports submitted on tests assigned and completed during month ... Supplementary reports submitted .................................. Total reports submitted ..........................................
26
8 3 26 63
Summary
Inspection reports submitted this month ..........................
Other
" * <
Total * *
*"
* fiscal year prior to this month.
fiscal year ....................
279 63
1359 1701
342
NOTE:- Requests for copies of reports of tests should be submitted to the Bureau of Ships prior to thu completion of the test.
d
-33-
IB'dOSCRE (A)
CRMC-M&S-003720
SUT0001
____
______
--N
-fcS. RATAL EUGINEERIHG EXPERIKEN. .TATION
Annapolis, Maryland
Report of tests for month ending 30 November 1940
Serial number and prior-
Amount of deposit
by ex hibitor, if or.v.
Dato 1 No. Name of article or of letter material tested., authoris Name of firm sub
ing test. mitting same.
B-3533 B
11-23-40 * JJ52(1) (DTs4)
Paint,heat-res1st.,alum. Pratt & Lambert,Inc.,mfr.
Remarks on status and per cent of completion. Probable date of report of tost.
Arrangements for test underway.
Initial of Test Officer
JGO
/
TESTS COMPLETED AlTP REPORTS StJBUITTED
5158 8562 8-817 B-979 B-990 B-2453 B-2574 B-2604 B-2643 B-3209 B-3237 B-3253 B-3256
-B-1264 B-2751 B-3257
B-13-.Q B-2768 B-3281
B-1927 B-2872 8-333*1
8-2259. B-2440 B-2476 B-2953 B-2993 B-3144 B-3341 B-3342 B-3343
B-3353 8-3354 B-3379
parcelled
B-2342 B-2841 B-3259
o
32- IKCLOSURE (B)
CRMC-M&S-003721
SUT0001
r>S. HaVAL EHGIMEERIMG EXPERrTNp-fTATION v--' Annapolis, Maryland
Report of test* for month ending 30 November 1S40
3-3355 A
8-20-26 DD287/S51(7-24-Ds t
8-25357 4 250.00 10-24-40 A S47 (9-14-DYs-2)
B-3358 --
10-17-40
A Aer-E-431-RY,l-l/2,JJ7G1
QK(40S9)
8-3359 $ 100.00 10-24-40 A Aer-E-431-RY,L2-5/JJ7
Pistons,exper.,fai l<ai-X-2 type-inspection of,from Winton 8 1/2*1 l/2Diesel engine- OSS SNAPPER.
Await.m&tl.
Pump,Yiking-for N2 k 02
Prelim.report
services- Viking Pump Co. made.
Gasoline.Fuel,avia..Lead Report V sub. content of- Method for detcrm.-Coopero.tivo tests.
Gasoline.Fuel,aircraft eng- Type appr.tests of for conform.with bpcc.AM9527,9530,9531-kichfield.
Gompl.A Rep. Await.finon.adj.
B-3360 % 100.00 10-24-40 A Acr-E-431-RY,L2-5/jJ7
Gasoline.fuel,aircraft eng- Type appr.tests of for eonformwith "pec.AN9527, 9530,9531- Sinclair.
Cotnpl.4 Rep. Await.finan.adj.
B-3361 B
-- 10-24-40 JJ52(15) (DYa-4)
Compds..rust prev.Types BAC- H.D.Spec.l^adGulf Oil Corp.
Mat1.not reed.
B-3362 B
-- 10-21-40 Aer-E-431-RY,JJ7G1
QK (6263}
B-3363 --
10-17-40
B JJ52-(15) (9-4-DYS4)
B-3366 --
10-23-40
B QP/^cC(2 ) (1) (Dir) (DYs )
B-3369 U 500.00 10-24-40 A C-S0s-76673(10-15-DYs-2) C-S41-5
3-3371 A
_
IS/WIB (11-14-0*}
Gasoline,fuel,avia.eng. Spee.AH-9530- Standard Oil t*o.of Indiana.
Test held up at request of exhibitor.
Compd..preservative-Used Underway . in laying up ships,NY Harb .15 Dee.
Welding of Silicon-Sronse Awaiting matl. Investigation of.
Crankshaft- for Martin
Underway 25/C
Motors Diesel eng.- Cont.
HOs-76673- Torsion tests.
Melding process-4ual.of for weld,soot blower elements-- Pug.Sd. NYd.
Underway 8Q
B-3372
10-25-40 Tills,lub.,Aircraft eng.
B Aer- B-431-RY,ddl4,0?'(4066} Spec.iiS-9532- Onion Oil
Co.of Calif.
Matl.not reed.
B-3373 B
7-23-40 Oil,lub.,Symbol 5190JJ14 (7-10-SS) Union Oil Co.of Calif.
Matl.not reed.
B-3383 B
10-24-40 JJ32 (0Ys-4)
Insul.,Plpe cov.4 Blocks Matl.not reed. 85/5 magnesia,precision molded-Plant ub.& asc.'Gc*.
-28-
A
rFJ
JBL JGO JGO
JGO
JGO JGO JGO BR UCS
(res
(BR JGO JGO JGO
SUT0001
CRMC-M&S-003724
NaVAL ENGriraSING EXPEZULXi MATTOX Annapolis, Maryland '1
Beport of tests for month ending 30 November 1940
3-3075 B
--<
8-20-26
DD287/S51(7-24-Ds)
3-3077 i 200.00
8-21-40
A S47 (8-8-DYs)
B-3064 B
B-3086 B
8-20-26 DD287/S51(7-24-Ds)
8-21-40 S39-2(SS)
B-3093 A
8-26-40 SS/S48-24 (DYs)
B-3094 t 450.00 11-25-24 A L5/SP16 (11-14-Ds)
B-3104 A
B-3126 B
-- 8-29-40 S51-3(G)(8-28-DYs)
9-4-40 S48-23 (8-28-DYs)
B-3128 B
__ 9-3-40 S48-23(8-26-DYs)
B-3131 A
B-3138 A
B-3142 B
B-3150 B
B-3161 B
-- 8-27-40 S48-10(DYs)
-- 9-6-40 BOs-73837
.. 9-5-40 S87(l)(8-27-DYs)
-- 8-24-40 JJ*3 (7-11-DYs)
-- 9-3-40 JJ33(l)(8-19-DYs)
B-3152 B
-- 8-29-40 JJ33(l) (8-6-DYs)
Tubes,boiler- from OSS NOKTH/JXPTOH A C-RIDLOY
m**'
Natl.reed. Underway 10jJ.
Pump,centrif.close coupled Completed.
motor drivcn-Frederick
Report being typed.
Iron & Stool Co.,oxhib.
Tubes,boiler,failedU.S.S. SAMPSON.
Unde may 20$.
Insul..Lagging,heat trons. Underway. factor-Galv.steel,fibrous glass it asbestos coverings
Valve,red.,air dome loaded Matl.not redd. T^pe 36H4- Foster Eng.Co.
Pump,emerg.feed,11 ^c8"x8" Compl.A Rep. Conts.68770 A 73366- N.Y. await.finan.adj. SB Corp.-0rds.423-24,a2a-2a, 425-10,*26-10-li.T.Davidson Co.
Gage,boiler water lcvcl- Matl.not reed. L.J.Sordo Co.,Ine.,cxhib..
Traps,stm.optn bucket,Cl. Matl.not reed. B, Typo approval testKielcy & Mucllor.Ine.
Traps,Steam,redesignedType approval test Armstrong Maoh.'orks.
Matl.not reed-
TTcld.neok flanges-uu.Stds. Rep.C made. B-19S- laves.of strains. Continuing.
Beaters,deacrating-Cont. Underway. NOs-73837- Elliott Co.
Theraom. ,meoh.-Vfoston Electrical Instr.Co.
Underway, about Dee.16.
Compounds,onti-seiseI.H. Grancell.
Report in prep.
Pack.,asb.high pres.rod General .tsb.A Rubr.Div. Raybestos-Manhattan.Inc.
Underway.
Packing,plastic,for dogs for watertight closuresJohns Manville.
Underway.
^CS JBL TfCS J00 JBL JBL
JBL JBL JBL TCS JGO JBL JGO JGO JGO
-25-
-
SUT0001
CRMC-M&S-003725
SUTOOOl
CRMC-M&S-003
ii
li
it
(it-
I
U.S. NAVAL ENGINEERING EXPERIMENT STATION Axmapolia, Maryland
Report of tests for month ending 30 November 1940
n 3-2938
8-20-26 Tube.boiler- Failura-flf- Underway 30%
B DD287/S51(7-24-Ds) U.S.S. WYOMING.
3-2939 --
6-21-40 Tubes,boiler, for
B AT23/S51(6-1-Mh)(SS) CSS KAUQA (AT23)
Underway 25j!
B-2940
6-19-40 Tubes,economizer- for
Underway 25%
B CL42/SS1(4-10-Mh)(SS) Boiler *8- SAVAHKRK(CL42)
B-2942 B
-- 7-16-40 Insul..Ferro-Therm- Propos.Underway 75% S39-l(7-2-SS) test for oorros-resist. Amer.Flange A fg.Co.,Inc.
B-2943 --
7-23-40
C JJ46-1(21) (6-18-S3)
Metals- 5-point Deephard process for hardening wear.surfaces of machy-
Matl.reed. Underway.
Foote Bros.Gear A Mach.Corp. O
B-2944 B
-- 7-13-40 SS170/S51 (5-15-SS)
Springs,valve- Failure of Report in prep. USS CACHALOT (SSI70)
B-2945 A
-- 7-22-40 JJ46-1 (25)(SS)
Metals,Steel.molybdenum Vanadium- Beth.Steel Co.
Prel.rep.made. Continuing.
B-2946 <3 B
7-20-40 Fittings.flared tubeS48-23(5-14-SS) Parker Appliance Co.
Matl.not rood.
B-2947 B
8-20-26 Tubes,boiler- Failure ofo Underway 30# DD287/SS1(7-24-Ds) USS ZANE.
B-2958 t 100.00
7-24-40 Bearings,roller- Rollway Underway.
B
S43-2(7-16-SS) Bearing Co.,Inc.
iO% compl.
o 3-2964 A
-- 7-29-40 Metal.propeller,alloyJJ46-l(l)(6-27-SS) Mang-Hi-Copper(Pre Mn)
Underway 50^
B-2971 3
--
7-30-40 Compd..joint A thread. 848-23(SS) high temp.-I.H.Grancell
Underway.
B-2973 B
-- 7-30-40 341-3(6-28-SS)
Eng.,Diesel fuel-Fuel in- Teat oompl. jec.sys.-Eiseraann Magneto Rep.75# compl.
Corp.
B-2967 | 200.00
5-6-39 Meters.fo- Oalib.for
Sep.B made.
B 051 (5-1-Ds) trials Maritime Com.Hulls Continuing.
--
53-58 A 110- BH SBADD Co.
B-2988 t 125.00
7-25-40 Bade.,asb.high pres.rod Underway.
A JJ33 (2)(7-ll-SS) perfected brand-0.S.Rub.Co A
B-2990 vJ B
- 5-2991 B
-- 7-15-40 S19-l(7) (6-25-SS)
-- 7-22-40 Sl9-1(7) (7-17-SS)
Painta,heat-resi3t.-Thur- Underway. Ua-Lox- It.7J.Kellogg Co.
Paint.heat-resistingGlidden Co.
-23-
Underway. -
wes wes WCS TfCS
/
WCS
wes WCS wes WCS JBL WCS JGO WFJ
jBL
.
JGO JGO JGO
-
CKMC-M&S-003727
SUT0001
pt tT.S. BAVAL ENGINEERING EXPERIMENT STATION Annapolis, Maryland
Report of tests for month ending 30 November 1940
o B-2823 ___
6-29-40 Weld- Elec.cable stuff. Report in prep
B S62-2(6)(6-3-Sw)(SS) boxes- Devel.of procedure
Wade of free mach.steel,
" Cl.A- H.D.Spec.46S17.
BR
B-2829 B
6-27-40 S47 (6-4-SS)
8-2840 A
6-20-40 JJ46-6(SS)
B-28S5 --
6-17-40
B N102-29360 (6-28-SS)
Pump,Gerotor,f.o.service Underway 80%. hand oper.-Gerotor Kay Co* About 1 Jon.
Castings,alum..Anodised- Data being C1.2&5- Corros-resist.of. assembled.
Gages,pres.differential- Test underway. Crosby Stm.Gage it Valve Co.
JBL
wes
JBL
C
B-2856 A
-- 6-27-40 Couplings,flex- Croeker- Underway this month JJ43 (4-22-SS) Wheeler EleC.Mfg.Co.
B-2862 i 100.00
5-6-39
B QS1 (5-1-Ds)
Meters,f.o.- Calib.for trials Maritime Com.C-L Type Cargo Vos.67-71 Federal SBfeDD Co.172-176.
Continuing. Rcp.D made.
JBL JBL
B-2864
--
7-6-40 Valve,relief.constant back Underway,
B S48-24(6-13-SS) pres.- Foster Engr.Co.
o B-2873 $ 50.00
7-6-40 Oil,gear,hydraulic,new
ompl. Rep.
A S72-9(7)/jJ14(10)(E12-1) std.- Std.Oil Co,of Cal. Await.finan.adj.
JBL JGO
B-2877 A
8-20-26 DD287/S51(7-24-Ds)
8-2878 B
7-10-40 S40(5-22-SS)
B-2903 * 100.00
5-6-39
B QSI (5-1-Os)
Meters.cond.- Calib.for trials BAHLGRFH(DD187)
Report B made. Continuing.
Boise isolator- Johns Manville Sales Corp.
Arrangements underway.
Ueters.f,o.- Calib.for
Continuing.
trials Maritime Com.Hulls Rep.C made.
102-5-Beth.Hulls 1*81-84.
JBL JBL JBL
B-2912 B
B-2915 C
-- 4-27-40 SSl^S (SS)
7-15-40 S43-2 (7-2-SS)
Oil,lub.,Std.Oil of H.J. 200 hrs.on DD eng. Essolube HD in Diesel eng. with 3080 oil.
Bear.,Phenolic type,for motorboat strut A stern tubes'A pump shaft bear, serr.* Richardson Co.
Hat!.not reed.
WFJ JBL
B-2918 B
-- T-l-40 Apparatus- Viscosimeter, Underway. S87(2)(6-7-SS) Brookfield Synchro-elec.
JGO
B-2926 A
-- 6-22-40 JJ46-10 (6-15-SS)
1-2937 # 150.00
7-20-40
B WC63-66/S55-5(T)-462
Shafts,for blower serv.Colmonoy overlay processWall-Colmonoy Corp.
Meters,f.o.- Calib.for trials Maritime Com.Hulls 63-66- Ingalls SB Corp.
-22-
Arrangements underway, 10^.
Rep.B made. Continuing.
(JBL (BR
JBL
1t
CRMC-M&S-003 728
SUT0001
I
U.S. NAVAL ENGINEERING EXPERIMENT STATION Annapolis, Maryland
Report of teats for month ending 30 November 1940
r>
B-2752 -- <
5-15-40 Weld.of cast,alum.-Proe. Matl.not reed.
B QP/ffelding/L5(3-12-Sw)SS appr.test for- N.D.Spec.
46A1,C1.2- General Sled.Co
(7CS (BR
8-2778 B
B-2783 A
B-2785 B
--
Engines,Diesel-Atlasoo
300 hrs.on suit.
Injection system for.
test,90$t compl.
6-14-40 Shaftings,Superfinish proc.Arrangements S43-1 (l)(6-5-SS) for finish.bear.surfaces, underway.
4-12-40 S44(4-8-UKB)
Propeller,experimental, cast,in copper-nickelsilicon- To be tested in 45* aircraft rescue boat.
Underway 805?
CO 4
SS
WJ
wes
B-2793 A
--
4-27-40 S41-3(SS)
Bearings,Diesel engine A Lauson.G.V.,Carter.A WJ related problems in lubri- Atlas eng.reed.& ea tion- Investigation of. inspect.-Month.rep * sub.
B-2797 A
6-25-40 compd.,rust prev.,Brilco- Underway. JJ151C11 (Ml5) Brilco Laboratories,Inc.
JGO
B-2806 A
-- 6-25-40 S43-l(5-28-SS)
Coupling,clutoh,Type P30 ISO- <onway Clutch Co.
Matl.not reed.
JBL
B-2810 B
6-21-40 S39-1 (6-13-SS)
Inaul., Felt, Ho closed, for boiler uptakesEagle Pichcr Sales Corp.
Underway-.
JGO
B-2811 B
-- 6-24-40 Jd33(l)(6-5-SS)
Pack.,compd.,jt.scaling, Duroloid- N.'A.Proc.Co.
Underway.
JGO
B-2812 i 75.00
6-22-40 Insul.cement,Cl.B- TTebers Samples reed.
JGO
B JJ32(6-13-SS) 48- Forty-Eight Insul.Inc. Underway this month.
B-2813 B
.6-21-40 Engine, intern, combust!on- Program prep. Matl. SFJ
S41-5 (SS)
Fiedler Injec.sys.for.
ready. Await.nozzles
9-2814 B
** 6*24*40 Filters S5S-2(5-17-SS) Diesel fuel oil
Matl.being obtained. WJ
B-2819 B
--
4-27-40 Oil,lub.,Texas Co.#303 SSl-S(SS) in Diesel engines.
Test caapl.Sog.4649 471 hrs. Removed. *finton control run 3080 oil,520 hrs.
75FJ
B-2820 3
4-27-40 Oils,lub.-Sinclair "Gasoon * Abeyance SSL-3(SS) in Diesel engines.
WJ
B-2821 C
-- 6-27-40 0ompd.,jt.sealing- Tite- Underway. JJ33 (1)(6--14-SS ) _ seal-Radiator Specialty o.
JGO
B-2822 B
-- 6-27-40 Pack.,stern tube,semi-met. Underway. JJ3S(6-20-SS) Sym.1405- Crane Pack.o.
JGO
SUT0001
CRMC-M&S-003729
53L- :3Mi
/I. -;Jf> Jffi
KAViiL EHGIHEERIHG EXPERIHEHT ^~TION Anuapo1 i* , liaryland
r-'N Report of tests for month ending 30 iJovenbcr 1940
S-2639 3
---
5-11-40
QPAXC (4)(1) (SS)
reld.electr.,Appr.C-Mo steel- Deter.of timewV current relations of.
Assembling matls.for test.
j-2640 B
-- 4-19-40 JJ14 (4-8-SS)
3-2642 B
5-10-40 JJ33 (4-9-SS)
3-2648 A
5-9-40 JJ46-(0) (5-2-SS)
B-2666 B
-- 5-17-40 jj-13Gle (4-25-SS)
B-2667 --
5-13-40
B QP/Eelding/L5(3-12-Sw)SS
Oil,lub..Diesel eng.Improved non-corrosive RPM brand of.
CFR 3050,91 hrs. Month.rep.sub.
Pack.,plastlc,for dogs for watertight closuresHound Packing Co.
Underway.
Alloy- CollalloyColonial Alloys Co.
^Teldj Await .oatl. Metlt Underway 75#
Glasses,gage,rd.Red Line Arrangements type- Corning Glass TOcs. underway.
Teid- Cast mang-vanadium Matl.nOt reed. alloy steel-. Prcc.approv. test- General Elec.Co.
B-2668 A
5-14-40 348-10 QP/Wc (S3)
Petals- batl.for stean serv.- Install.to operate at superheater outlet temp.9S0*F A pres.about 1500 lbs.per sq.in.
Report made. Continuing.
B-2701 --
3-29-40
B QP/frC (4) (l)(5-8-SS)
Weld-Electr.Tiephosco phos-bronze- Suit.testVictor EquipmentCo.
Awaiting new material.
B-2715 B
-- 5-14-40 Pack.,plas.fibrous,Sym. Underway. JJ33 (4-22-SS) 1106,1107,1432,1433Johns Manville Sales Corp.
B-27S3 B
-- 6-5-40 Connector,flex.for pres. Arrangements JJ33(2) (5-24-SS) gages-Paekless i'et.Prod. underway.
B-2737 A
-- 6-26-28 JJ7-6/L5 (6-13-S)
Oil,lub..aircraft enginePeriod between changes of in Patrol Aircraft- Samp, from Patrol Squad.26.
Rep.C sub. Continuing.
B-2747 $150.00
5-29-40
B Aer-E-431-HT, JJ7G1,
QK (633)
Grease .Sinclair HT water- Compl.A Rep.
resist.-Type appr.test-
Await.finan.adj.
Bu.Aero.Spec. M-372.
B-2748 A
--
6-11-40 Metal, lead-lithiumJJ46-5 (SS) bearing.
5 compositions under test.
B-2750 B
-- 8-20-26 Header.boiler, USS AKDD287/S51(7-24-Ds) TARES* Exam.A test of.
Underway 20#
-20-
BR
VFJ
JGO
(wes (BR
JBL (vres (BR HCS
BR JGO
JBL JGO
JGO
KCS wes
CRMC-M&S-003730
' S. NAVAL EHGIHTERIHG EXPERIMENT-STATION Annapolis, "aryland
Report of tests for month ending 30 November 1940
3-2488 % 300.00
3-28-40
3 S>.7/L5 (9-14-SS)
Pump,rotary,fuel it lub.
Matl.not rood.
oil,Cl.N3,N2,02 services-
Quimby Pump Co. jtzhAb.
.1-2490 C 100.00
3-27-40
B 843-2/L5(2-20-SS)
Bearinfs,roller- Roller Bearing Co.of .uaerica.
Underway.
3-2-.91 --
3-28-40
A P0240/41,Ll-2/NP(3-28-F)
Compd.,preservative,thin film (Polar)- for !achy. Devel.of spec.for.
Report A sub. Continuing.
3-2428 $ 187.50
5-6-39
B QS1 (5-1-Ds)
Meters,fo- Culib.for trials Continuing. C-2 Diesel cargo vessels- Report D~ made. Maritime Com.v22-25,Tampa #33-36- Tampa SBieEngr.Co.
3-2529 3
-- 4-6-40 S48-10 (4-1-SS)
- 3-2531 A
-- 4-9-40 S41-6 (SS)
3-2532 --
4-9-40
3 QP/%C-4(1} ("*-2--SS )
Indicators,sight flow.for Underway. low pressure steam drains.
Clutch,free wheelingMercury Clutch Corp.
Underway.
`-eld-^lectr.Lincoln Fleot- Report in prep. weld 9HT C-l!o 3/l6"ctl/a" dia.Cl.B- 'Jual.test of.
B-2540 A
-- 4-10-40 S62-2/L5(12-18-SS)
Transformer,heat(HV unit) Report completed. for stress-reliev.it heat treat.of welded pipe jts.TToatem i cider Corp.
@
3-2541 A
-- 3-28-40 Feedwater,boilerProJ.Order 238/40 Inves.of problems.
Underway.
8-2543 $ 140.00
4-9-40
B 841-3/L5(12-26-SS)
Indi cator, 1. C.E . -Slype appr.tcst- Trill Ind.Co.
Compl.A Rep. Await.finon.adj.
3-2544 3
4-9-40 Valve,plug type,for gaso- Katl.not reed, JJ45(2) (SS) line serv.- Barrett Mach.Co.
3-2584 A
-- 4-24-40 S48-10 (Sw)(SS)
Joints,piping,weldedBcvc-1.procedure to test by Magnetic powder i'eth.
Report A sub.
3-2606 3
-- 4*24*40 S39/L5 (12-29-SS)
Jnsul.,Felt,woven glassU.S.Asbestos Division, Raybe sto s-J*anhattan, Inc .
Underway.
3-2628
Oral
Engine,Diesel,'.'inton 12cy1,201A- Tests of eng. parts & lub.oils in at New London,Conn.
Test continuing.
-19-
JBL JBL JGO JBL
JBL JBL 3D 32
JGO UFJ J3L SR JGO TJ
CRMC-M&S-003 731
SUT0001
Ji,
fi
h /E :
mi
ii
ft
DOCUMENT REQUEST FORM
ACCZSSIO* KDBEB
BOX NUMBER ^/<f
mcurtvM
*
(J.. "5. AJ&utf-L *Cs/\^ir\ee.ciy\&
SEGMENT NUMBER *
&j-
INITIAL Wc'S
DATE
NUMBER Or PACES
X-
,
(vidvi. vS-
fi(e^ N?ifc/i.r.
*>
SUT0001
CRMC-M&S-003 732
/ } iT { r ir~ n
KAVsX ENGINEERING EXPERIt'ENT jSTATIOH Annapolis, Maryland
Report of teats for month ending 30 November 1940
3-1583 B
7-14-39 JJ14/L5 (7-8-Da)
Oil,lub.,SUPERSOLV Lub.Ad Await.new lub.
A Top Oil "D"- Portable
oil.
Plating & Equip.Co.
1-1666 $ 75.00
8-5-39
B JJ32/L5(7-31-Ds)
B-1673 B
-- 8-3-39 JJ46/L5 (7-27-Da)
B-1682 A
8-19-39 S46-5/L5 {7-17-Ds)
Inaul.,block,Eagle Super- Report a sub. temp- Eagle-Picher Sales Co.
.41oy,Cu-di (70-30) International Nickel Co.
Data being assembled.
Tubing,finned,used in heat trana.app&ratusDeter.optimum design for.
Extended inves. Report B sub.
'FJ
JGO V.'CS JBL
B-1690 A
2-4-37 S41-S/L5 (2-2-Ds)
B-16S3 A
-- 8-12-30 JJ14/LS (8-11-Da)
B-1695 --
6-14-39
B QP/VTelding/L5( 7-27-Ds )
Piston assembly.permanent Rep.E sub.- #4 pist. r.TJ
mold casting with bevelled discon. 5253 hrs.
rings- for T.'inton submar #8 resumed on 5474 eng.,
ine Diesel engines.
1372 hrs.
Compd.,rust prev.- Polar as substitute for Navy type- Investigation of.
Report If sub. Sontinuicg.
JGO
Teld.eleetr.- KOP-R-ARC
75JC completed.
shielded arc,copper- Suit,
test- Krebs A Co.,exhib.
BR
B-1707 B
-- 8-18-39 A13-3 (11-1-Ds)
V.cld.rods for hard-facing /.waiting matl. steam valve discs A seatsSuit.test- Last-Evor Bet.Co.
B-1736 B
-- 8-19-39 JJ33/L5(8-8-Ds)
Pack.,plas.non-motallicwith asb.A wire jacketsJohns BanvillcCorp.
Underway. Partial rep.sub.
B-1737 B
-- 8-15-39 Pack.,plas.metallic, John Underway. JJ33/L5(8-10-Ds) Crane 250- Crane Pack.Co. Partial rep.sub.
B-1738 5 125.00
8-21-39
B JJ33/L5 (8-15-Da)
B-173i B
.. 8-30-39 S47/L5(6-30-Da)
B-1768 A
9-12-39 JJ46-1/L5 (9-8-As)
B-1788 A**
--
8-10-39 Or&l.Bueng
B-1789 --
9-6-39
B S55(9-2-Ds)
B-1808 3
9-15-39 S48-23/L5(7-24--Da)
Pack.,asb.high pres.rod- Underway. Style 8219-- Garl^jck Pk.Co. Partial rep.sub.
Valve,Governor,pamp Grove Regulator eo.
Report a made. Retest underway*
Metals,Steel,18*8 Cr-Ni Fatigue tests with Ag- Lebanon Stl.Fdry. underway.
Cyl.heads,cast alum.-Suit. Test completed. of-Ainton 201A Diesel eng. Rtp.75^ compl.
/
Indicator,dissoiv.oxygen- Hot yet underway. Serv.test of- NRL,"aoh.,DC
Valves,plug- Reed Roller it Co.,exhib.
-15-
Underway S0.
BR JGO JGO JGO JBL
^FJ JGO JBL
SUT0001
?
!
i
/'
CRMC-M&S-003733
-=* r--
i3l .aff
r r"
ttS. NAVAL ENGINEERING EXPERIMENT STATION Annapolis, Maryland
Report of testa for month ending 30 November 1940
B-1345 B
B-1384 B
B-1387 B
5-5-39 S3S/L5 (8-2-Os)
5-10-39 JJ33/L6(5-3-Ds)
5-18-39 QS13 (5-9-Ds)
Insul.,glass fiber feltUnion ^abcs.i Rubber Co.
W-V"
Pack.,plas.met.coil form met.foil jicket-V/iLVEASE
Report in prep. Report in prep.
Filters,oil- iJial.of samp, Report U sub. oil from U.3.Coast Guard. Continuing.
B-1388 B
-- 5-17-39 JJ33/L5(5-ll-Ds)
Pack.,plas.metal.,coil form,metal.foil jacket, Sea-ho armored Nek Seal Stylo 501- Sea-Ro Pk.Co.
Underway. Partial rep.sub.
B-1415 B
B-1471 B
5-25-39 S19/L5 (5-3-Da)
6-13-39 S48-23/L5(S-19-Ds)
Coating,protec.,Condenser Underway 507* tubes-Phelps Dodge Prod.Co
Traps,steam,impulse typewith integral strainerYarnall-'Varing Co.
Repor^in prea*-
B-1477 B
s
B-1494 B
6-7-39 S48-23/L5(3-17-Da)
5-23-39 S39AS (5-1-Da)
Valves,plug,for fo,feedwater & steam servieesKuchlcr-Euhn Co.,Inc.
Extended service test underway.
Insul.,block,molded asbes. Underway. ONIBESTOS- Union Asbestos Partial rep.sub. A Rubber Co.
B-1496 B
5-26-39 JJ33/L5(5-22-Ds)
B-1600 B
-- 6-13-39 JJ41/L5 (6-2- Ds)
B-1506 $ 125.00
6-21-39
8 JJ33/L5 (6-12-Os)
B-1517 B
-- 6-27-39 S48-23 (5-5-Ds)
B-1624 A
-- 6-29-39 S41-5 (6-27-Dq)
Pack.,valve stem,square braided- The Darcoid Co.
Tool,silver brazing,for Cu & Cu-Ni alloy tubes.
Pack.,asb.high pres.rodAsbes.Fibre Spinning^.
Valves,boilor bjow-offL.J. Bordo Co.,Inc.
Liners,cyl.,chromiumplated,Diesel engineVan dor Horst process.
Underway.
Underway 60^
Underway. Partial rep.subMatl.not reed.
5274 hrs.on 5474 engine.
B-1542 B
B-1558 A
B-1S76 B
-- 6-24-39 Alloy,alum.east.- Nat'l JK6-6/LS( 3-15-Da) Bronze & Alum.Fdry.Co.
Prelim,rep.made. Continuing.
-- 7-10-39 Alloy,silver brazing,Easy- Pre 1ia. rep.made.
JJ46/L5(6-15-Ds) Flo )}5- Handy A Harman.
Continuing.
-- 7-11-30 S48-24/L5(6-30-Da)
Valves,plug,for boiler blow-off A feedwater serv.- Barrett Mach.
-1*1-
Underway 75%
JGO JGO JGO JGO
res .JBL
JBL
JGO
JGO NCS JGO JBL tiFJ
VCS rcS JBL
CRMC-M&S-003734
SUT0001
SllTOOOl
CRMC-M&S-003735
-*S3. RATAL ENGINEERING EXPERIMENT-STATION Annapolis, Maryland
Report of teats for month ending 30 November 1940
3-996
--
1-16-39
B QP/ftelding/LS (12-28-Do)
3-1016 B
4
4-23-38 S39/L5 (4-19-Os)
3-1017 B
3-1063 B
11-25-24 L5/NP16 (11-14-Ds)
-- 7-5-38 JJ33/LS (6-28-Ds)
Weld- Qual.tests of GE Co . Report submitted
7752 4 W54 electrodes for Await,class I matl.
C1.A4B C-Mo electrodes.
for retest.
Insul.,Blanket,turbiffit Fiberglas brand- Owensmorning Fiberglas Corp.
Underway.
Tubes,boiler- Condition of- USS TULSA.
Report in prep.
Pack.,flex.met.-Garlock Styles 5347 4 5348Garlock raekingCo.
Underway.
BR JGO WCS JGO
3-1075 B
1-23-39 Jj46-l/L5(12-1-Ds)
Metals-BoIt matl- Bueng. Spe c .43B14(INT) , lVl/38Inter.Nickel Co.,Inc.
Matl.not reed.
B-1089 B
8-2-38 S41-VS82(7-22-yo)
Engine,Diesel powerboat Norfolk type- Senr.test of rubber mounting.
Report completed.
^ B-1095 Os W
3-1126 B
8-20-26 DD287/S51(7-24-Ds)
-- 11-30-38 A5-7/DD (10-28-Yh)
Tubes,from #13 boiler U.S.S. SARATOGA.
Tube,boiler.failed- USS LAMSON- Examination of.
Report in prep. Report in prep.
B-1144 4 85.00
3-3-39
3 S87(A )/L5(1-10-Ds)
# B-U46
-- 12-13-37 JJ33^L5(11-19-Ds)
Thermom.dist.read.dialThoaas A.Edison,Inc.
Pack.,comp.asbes.sheetwith neoprene binderssub.by voridus mfrs.
Prelim.report sub.
Report A sub. Rep.B in prop.
WCS
WFJ
WCS WCS JBL JGO
B-1156 B
3-1158 A
B-1169 B
-- 2-28-39 Compd.,anti-seise, ORBA JJ14/L5(9-3-Ds) brand- E.L. Orndorff.
-- 3-9-39 Feedwater,boiler- Design S56-5(3-7-0s) of appar.for dissolved oxygen determination.
3-11-39 JJ3S/L5(3-6-Os)
Pack.,gaskets,boiler 4
pipe flange- SPIROTaLLIC Johns kanville Co.
Underway.
Report C sub. Continuing.
New samples to be submitted.
JGO JGO JGO
B-1180 B
-- 3-13-39 S43-2/L5 (2-16-Ds)
^---
~1-1I81 Reopened
5-27-39
A JJlVLS (4-10-Ds)
Bearing strips,RYERTEXphenolic brand- Joseph T.Hyerson 4 Son,lne.
Cil.lub..used,from #2 4 #5 units- USS ASTORIA.
-12-
Uhderway.
Report H sub. Continuing.
JBL JGO
CRMC-M&S-003736
rs8. RATAL ENGINEERING EXPERIMEN""STATION Annapolis, Maryland
Report of teats for month ending 30 November 1940
3-996
--
1-16-39
B QP/SVelding/L5 (12-28-Da)
3-1016 B
-- 4-23-38 S39/L5 (4-19-Da)
3-1017 B
11-25-24 L5/kP16 (11-14-Da)
Vie Id- Qual.tests of GE Co . Report submitted
VT52 A 7754 electrodes for Await,class I matl.
Cl.AAB C-Mo electrodes.
for retest.
Insul. .Blanket, turbtewFiberglas brand- OwensCorning Fiberglas Corp.
Underway.
Tubes,boiler- Condition of- DSS TULSA.
Report in prep.
BR JGO WCS
3-1063 B
. 7-5-38 JJ38/L5 (6-28-Da)
Pack.,flex.met.-Gar}ock Styles 5347 A 5348Oarlock raekingCo.
Underway.
JGO
^ 3-107S WB
-- 1-23-39 JJ46-1/L5(12-1-Ds)
Metals-Bolt matl- Bueng. Spoc.43B14(IMT), 12/1/38Inter.Nickel Co.,Inc.
Matl.not reed.
WC*
B-1089 B
__ B-1095
O
B-1126 B
-- 8-2-38 S41-3/S82(7-22-Yo)
8-20-26 DD287/S51(7-24-Da)
-- 11-30-38 A5-7/DD (10-28-Yh)
Engine,Diesel powerboat Norfolk type- Serv.test of rubber mounting.
Tubes,from #13 boiler D.S.S. SARATOGA.
Tube,boiler,failed- USS LA1IS0N- Examination of.
Report completed. Report In prep. Report in prep.
WFJ WCS WCS
B-1144 r 85.00
3-3-39
3 S87(A)/L5(1-10-Da)
B-1146 VB
-- 12-13-37 JJ33/L5(11-19-Da)
Thermom.diat,read.dialThomas A.Edison,Ino.
Pack.,comp.aabeasheetwith neoprene binderssub.by varidus infra.
Prelim.report sub.
Report A sub. Rep.B in prop*
JBL JGO
B-1166 B
3-1168 A
B-1169 B
-- 2-28-39 Conoid.,anti-seize, ORBA JJ14/L5(9-3-Ds) brand- E.L. Orndorff.
----- 3-9-39 Feedwater.boiler- Design S56-5(3-7-Da) of appar.for dissolved
oxygen determination.
3-11-39 JJ33/L5( 3-6-Da }
Pack.,gaskets.boiler A pipe flange- SPIROTALLIC Johns Manvillo Co.
Underway.
Report C sub. Continuing.
New samples to be submitted.
JGO JGO JGO
B-1180 B
3-13-39 S43-2/LS (2-16-Da)
'-4-1181 Reopened A
5-27-39 (4-10-Ds)
Bearing strips,HYE5TEZphenollc brand- Joseph T.Ryerson A Son,Inc.
Oil,lub..used.from #2 A #3 units- CSS ASTORIA.
Underway.
Report H sub. Continuing.
JBL JGO
-12-
} 1
^S. HAVAL ENGINEERING EXPERIHHJT-STATION Annapolis, Maryland
1
s~\ * Report of tests for month ending 30 November 1940
B-689
9-30-38
B S48-24(R)/L5(7-15-Ds)
B-704
--
10-5-38
B QP/Welding/L5(9-14-Ds)
Valves, reducingKlipfel Mfg.Co.
Weld- 1/8" dia.Aeristreld Phos-Br electrodes and retest of,in 5/32" dia. sise- Lincoln Elec.Co.
High pressure valves not reed.
Test completed. Report in prep.
/
JBL
BR
3-708 A
-- 9-28-38 SS/S41 (9-21-Da)
Engines,2-cycle,double acting Diesel- Inves.to determine means of re storing excessively worn cylinder liners of.
Thermit meth.compl. BR Colmonoy arc.weld.inves. underway. Await.auth.for flame harden.of lining deposited by arc weld.
o B-748 B
10-13-38 JJ46-1 (10-10-Ds)
Metals- Low alloy corros- Weld.test compl. resist.steel- Inves.for Other tests under possible usefulness for way. boilers it oth.pres.vessels
(WCS (BR
B-791
--
11-4-38
B Q?/Ttelding/l.S( 10-20-Ds )
Weld- Qual.test of Wilson Rep.sub.- Awaiting
Alloyrod A&B carb-molybde- Class I m&tl.for
num welding electrodes.
retest.
BR
B-792 Reopened
11-4-38
B QP/i7elding/L5 (10- 14-Ds )
Weld- Qual.test of Champ Rep.A made. Blue Devil 85 it Red Devil Await.matl.for re 75- Carb-molyb.electrodes. test,Class I matl.
BS
B-860 B
11-22-38 S92/L5 (8-15-Da)
Joints- Inves.of avail, means of silver brazing in restricted locations.
Report B sub.
B-872 A
-- 12-7-38 Water- Treat.of in closed Underway. S41-5 (11-29-Ds) cool.sys.with chromates.
B-866 . B
-- 10-14-38 JJ33/L5(10-12-Ds)
Pack.,cond.tube, copper foil- Various infra.
Report in prep.
B-908 B
| 400.00 12-18-38 S47/L5 (11-15-Ds)
Pump,rotary gear,for J1 & ill- Schutte & Koerting
Exhib.making modifications.
B-934 B
1 125.00 12-27-38 S39/L5 (12-21-Ds)
Insul.,Super UnibestosCnion Asbes.ARubber Co.
Underway.
B-9S8 B
-- 12-7-38 S45-3/L5(11-25-Ds)
Purifiers,oil,for Diesel eng.lub.oils- Determine effect A suitability ofYoungstown-Miller Co*
Prel.rep. 2/6/*0 hep .B 4/12/40-
Final Rep.C sub.
BR
JGO JGO JBL JGO WPJ
B-967 B
B-969 B
-- 1-5-39 JJ46/L5 (8-12-Ds)
' -- 12-28-38 QP/7*lding(12-7-Ds)
Metal- al-Ni-Bronze Chase Brass it Copper Co*
Data being assembled.
WCS
Weld- Carb-Holyb.steel- Rep.E-1 made. stm.pipe- Proc.appr,test Continuing. Boilers- NYds*Phila.,M.Y., Norfolk,Pug.Sd.A Mare Isl.
-11-
(WCS (BR
CRMC-M&S 003738
i
17. S. NAV*L ENGINEERING EXPFklKENT STATION ' s. Annapolis, Ifeiryland
Beport of tests for month ending 30 November 19**0
A
d*403
6-21-38
B DD4I5-20/S48(6-10-Ds)
3-432
~
6-28-38
B S48-24(K)/L5(6-17-0s)
B-457 A
-- 6-17-38 S48-23/L5 (3-1-Os)
Radiators,ste.im heatingsub.by Navy Yard,Boston.
Valves, reducing- -- O.C.Keclcley Co.,Inc.
`'ompds., scaling,turbine casing, sub.by var.nfrs.
Underway as oppor tunity permits.
Exhib.making changes.
keport J sub. Continuing
JBL JBL JGO
3-4SB A
-- 6-17-38 Compds.,scaling,thread 548-2345 (3-1-Os) Joints,sub.by var.nfrs.
Report I sub. Continuing.
JGO
3-463 B
-- 6-22-39 JJ33/L5 (6-7-os)
Packing,plas.non-graphitic,Report in prep, with braid.asbes.JacketThe Allpax Co.,Inc.
r'3-466 Reopened
2-4-59 Insulation,hockwoo1,Im
Underway.
B S39/LS(1-30-Ds) proved TUCOMJL- Tuco Co.
B-490
--
7-19-38
B QP/Uelding/LS (6-29-Ds)
reld. electrodes,Phos-Br. Edco Rrocess- Eccles It Davies JAa.chy.Co.
SO% completed. Recommended for cancellation.
JGO JGO BR
B-494 B
-- 1-20-38 JJ33P5 (1-17-Ds)
Insul.,pipe coveringKockwool- NOS 38?5c of 12/1/37- Revision of.
lie commended for cancellation.
JGO
B-504 B
$ 50,00
7-30-38
JJ42/L5(7-15-Ds)
Nut,self-locking- Boots Aircraft Nut, exhib.
Beport in prep.
JBL
B-655 Reopened
2-1-39 Stressindlcating
A JJ43/L5 (8-11-Os) devices- Bolts.
@
Rep.P made. Ct'g.
''TCS
Test washers fwd.to
various ships & Nyds.
B-560 B
B-S62 B
-- 11-25-24 L5/NP16 (ll-l<*-Ds)
-- 8-16-38 S19/L5 (8-2-Da)
Liner,cyl.- HELENA- Cont. Beport in prep. NOs-55897- F.lJorso St Co.
Coatings, NO-OX-ID-IZED Underway BOfi, reenforced fabric wrapperCorros-prev.cov.for propel shafts- Dearborn Chem.Co.
tres
res
B-S8S v 260.00
6-22-33 Ball bearings -
B BBOPEN. S43-2/LS(5-12-Ds) Bearings Co.of America.
Katl.not reed.
JBL
B-691 A
--
Oral Bueng.
Engine,2-cyl.commercial Diesel- Devcl.for use as 150-hp powerboat engine
Eng.671701,500 hrs. TFJ on reliab.test* 80 hrs. with rpm oil- Total 939. Replacement blower ordered
B-592 B
3-604 B
$ 250.00
8-29-38
S48-24(R)/L5(B-16-De)
-- 8-6-38 KP16 (7-21-Os)
Yalves,red.,Cl."ca" and "d"- Atlas Valve Co.
Metals- Bate growth of matls.when subjected to high temp.steam.
-10-
Exhibitor making changes.
Underway 50>*. Add. samps.reed.-Tests in steam underway.
JBL rCS
/
CRMC-M&S-003739
t^S. NAVaL ENGIKESHIliG EXPTRiyrKT STATION Annapolis, Maryland
Report of tests for month ending 30 November 1940
B-220 1 200.00
4-22-38 Traps.thermo,, Sterling
B Reopen.S48-23/L5(3-4-Ds) Engineering Co.
Underway.
3-267 B
4-29-38 Separator, ste-un-'DriH"* S48-23/L6(3-22-Ds) Steiun Valve Sales Corp.
Exhib.to submit nev/ valve.
B-277 A
2-4-37 S41-5A5 (2-2-Ds)
Liner,cyl.-Devel.of test Report A sub. satis.type for Linton 8x10 Diesel en;.- Red.oil consump.
B-278 B
B-280 B
5-7-38 Pack..plas.non-grnphitic JJ33/L5 (S-2-Ds) Various nfrs.
-- 4-30-38 S39/L5 (4-22-Os)
Insul.,85# magnesia. formed flanged coversPlant uubber & Aab/Rks.
Final rtp.in prep. Partial rep.aub.
Report in prep.
B-288 B
-- 5-14-38 JJ46/L5 (5-3-Ds)
Hold- Suit.test of hardfacing reds #10 for gas wtld.a $110 for elec.are eld.- Coast Metals,Ir.c.
Reported
B-298 /S B
-- 5-13-38 lietals- Cr-.cp test of JJ46-l/L5(4-13-Da) Ferrous- Timken Co.
Underway 75# Vfeld.test underway. Matl.rep.in T-2668.
B-300 B
B-343 B
B-375 3
5-18-38 S43-2/LS(4-3-0a)
5-25-38 JJ33/L5 (5-3-Ds)
-- 5-4-38 Eeqa. EN8/2/79601
Bdaring matl.- The Amor. Brake Shoe L Foundry Co.
Continuing.
Pack.,semi-metallic,Sym. Underway. 1400- Union Asb.4 Rubr.Co.
Evaporators.Kleinschmidt vapor compression type distilling plant.
Exhib.making chgs. in compressor.
B-386 $ 300.00
6-8-38
B S41-3/S82/L5(5-16-D*)
3-398
-- 12-27-37 S39/LS (12-18-Os}
Couplings.flex.-Thomas Flexible Coupling Co.
Service test underway.
Insul. .Cement,water-proof Report in prep. coat.-INSlLEOT}. A EaGLE INSULSEAL- J.Manville Sales CorpEagle-Picher Co.
B-399
--
6-24-38
- B QP/^elding/LS (6-7-Ds)
~e lding-Elbow fittingsSult.test of- Taylor Forge & Pipe Lories.
lieport A sub*
B-401
--
6-27-38 Held- Columbium bear.4-6# Matl.on hand
SB
QP/rfaldlng/L5V6-9-Ds ) Cr-Mo steel (0.50/ Eo)
--/ B-602
6-18-38 Pack..Gaskets,spiral wd. Underway.
8 JJ33/L5(4-15-Da) meta l.asbe s .-Aror Corp.
J3L JBL "FJ JGG JGO BE
HCS JBL JGO JBL JBL JGO
BE BE JGO
/
SUT0001
CRMC-M&S-003740
/, iU /*
'1/
Fi*
u.s BaV.X ENGINEERING EXPERIMENT STATION
.Ampolis, Varyland
Report of testa for nonth ending 30 November 1S4G
9913 A
1-1*1-38 JJ48-1/L5 (1-8-Dsj
Metals,wrought eurb.steel Data being (killed)- Creep tests of assembled.
CS
9977 B
3-6 B
B-7 B
2-1'j-38 S44 (1-21-Ds)
9-22-37 JJ32/L5 (9-16-Ds)
| 175.00
1-4-38
JJ33/L5(12-29-Ds)
1-21-38
JJ33/L5(12-29-Os)
`Tel ding Of manganese^* bronze propellers.
85t completed. Continued.
Insul.,cement,hard-finish Report in prep. Prep.by EES- Vor.mfrs.
Pack.,Sea-Ko Nek-Seal,
Report C sub.
Style 5051 fc Sea-Ao Super Indefinite.
heat Spiral Style 503-
Sea-Ro Packing Co.,Inc.
BR JGO JGO
B-10 B
-- 12-1-37 JJ32/L5(11-26-Ds)
Insul.,cement,Plant 600 & New sample to Covcrkotc brands- Plant be sub.- Report Rubber A Asbestos TJorks. A in prep.
JGO
3-32 B
-- 2-21-38 S72-2(V) (2-l-D*>
Insul.,85> magnesia pipe covering- Coraparativo tests of various brands.
Report in prep.
JGO
B-42 B
B-61
B-84 B
2-28-38 Jj/Sol4er(2-23-Ds )
-- 1-29-38 SS182-4/S-.1 (1-21-Do)
-- 2-21-38 S39/L5 (2-14-Ds;
Solder,silver.medium temp, (Cadsa.ua silver)
Noise elia.-Subm.maln propul.plants- Sd.Anal.
Insul..Rockwool blanket pipe covering No.100Baldwin-Eill Company.
Underway 5QS&
Rep.D sub. Continuing. Report in prep.
-cs JBL JGO
B-108 B
3-15-38 JJ7-3/L5(12-3-Ds)
B-146
--
4-2-38
B QP/Eieldin^LS (3-31-Ds)
Punas,f.o. Effect of low Report A sub.
JBL
viscosity on capacity.
Underway as oppor.permits.
"isId- Effects of arc length Report A sub.
oh properties of Si-Cu
Await.add.mat1.
alloy and pure nickel.
BR
B-161 B
-- 4-7-38 JJ33/L5 (3-2-Ds)
B-186
--
4-13-38
B QP/r.el&in%/LS (4-12-Ds)
Pack.,valve stem.QP self- Underway. setting- Q-P Signal Co.
Veld- jibuldough Powder for use as backing matl. Metal Bond Ffg.Co.
Underway. Prelim, test completed. Report in prep..
JGO BB
B-190 3
B-209 A
-- 4-13-38 JJ33/L5(4-5-Ds)
i 450.00
4-14-38
S48-23/L5(4-7-Ds )
Pack.,elastic net.Type CAR NDS 33P25a- Linear Packing & Rubber Co.
Underway. Partial rep.sub.
Talves,redesigned Foster Rep.A sub. type EFSH excess pres.gov. Hep.B in prep.
Foster Engineering Co.
JGO JBL
SUT0001
CRMC-M&S-003741 / i - I bad t
V jl '`-I?
P-S. lATiO. ENGINEERING EXPERIlCTT^gTATION Annapolis, Maryland
Report of testa for month ending 30 November 1940
3562 B
Reopened JO-25-39 S48-24/L5 (7-5-Ds)
Valves,plug,for fuel oil A feedwater servicesHomestead Valve i'fr.tCp.
Sta.valves rot'd to factory for modification.
J9L
9564 A
9-24-37 S62-2(V)/L5 (9-3-Ds)
9594
--
9-27-37
B QP/r:eldin^L5( 9-14-Ds }
9598
9-27-37
B QP/~elding/L5( 9-la-Ds )
9604 A
--
Oral
9685 B
-- 10-20-37 S39/L5 (10-6-Ds)
Bearings,liicorta'Nostinghouse Etl! Co.
Add.tests to be
JBL
made. Prelim.rep.sub.
^eld- CRS to Bronze-Proo. Natl.not reed. approv.test- NYd,Phila.
("CS (BR
"eld-Brass to Led.Steel- Natl.not reed. Proc.appr.tost- NYd,Phila.
(VCS (BR
Gears, reduetionHoise tests on ships.
Reps.9604-26427 sub.- Continuing.
JBL
Iasul..Pipe 4 flg.oovers- Final rep.in
Unibestos- linion asbes
prop. 1 Jan.
tos t: Rubber Co.
JGO
9708 B
-- 11-8-37 S39/L5(10-20-Ds)
Insul.,glass wool,for in takes .boilers A casingsOwcns-Illinois Glass Co.
Report B sub. Underway. Report C in prep.
JGO
9725 A
11-3-37 Propellers- Determine S44/L5 (10-19-Ds) suitable materials for.
Formal rep.sub. Continuing.
9754
--
11-17-37 Voiding- Voidability
B Q?/r?eldingA6(ll-13-Ds) of iron alloys.
70 completed. Awaiting add.mo.tr.
9790
--
12-6-87
B QP/5Telding/L5 (11-30-Ds)
"eld- laves.to deter.suit, Completed. of root 4 face bends to Report in prep. qual.welders to work with Hl-Cu,Cu-Ni,C-Jfo steel 4 Mg-Br with Phos-Bronse.
Ti'CS BR BR
9803 B
9884 B
9846 A
$ 85.00
12-9-37
S87(A)/L5 (11-12-Ds)
-- 11-11-37 JJ33/L5(ll-5-Ds)
-- 2-4-37 S41-5/L5 (2-2-Cs)
Thermometer,diet.reading Unproved thermom.
dial- U.S. Gage Co.
to be submitted.
Pack..Allpax Style #1coil form- allpax.Inc.
Underway. Indef. Partial rep.sub.
Pistons- Desi^i,develop ; Cancellation test EE cooled,in 'Vinton recommended.
8x10 S/M Diesel for suit.
JBL JGO VFJ
9865 B
12-3-37 L1-2/NP1S (8-2-Di)
Piping .valves,fittings 4 Report B sub. joints for use with Freon Continuing. refrigerant- laves.of.
JBL
9898 B
-- 12-31-37 S47/LS-2(12-10-Qs)
Seals.rotary pump and turbine shafts- Invos., development 4 test of.
Underway. Extend. inves.-Rep.B manu script completed,.
JBL
SUT0001
CRMC-M&S-003742
ir a
iii-Jir
/*-
im
& tL
SUTOOOl
CRMC-M&S-003743
1 /* a..i. i / Out / ' '7
9783 A
9833 B
8865 B
8866 B
8867 B
8868 B
8906 B
8912 B
8935 3
8936 B
9002 B
9005 3
9007 B
9027 3
9030 C
9105 B
RATAL ENGINEERING EXPnHIJIENT station Annapolis, Maryland
Report of testa for south ending 30 November 19*0
-- 4-8-37 Engines,Diesel powrS41-3/S8VL5(4-6-Ds ) boat- Calibration of.
Report C being reviewed.
"TJ
-- 2-10-37 JJ3S/L5(2-9-Da)
Pack.,Sym.1104- Testw'of Determine mnx.i minimum lubrication required.
Report in prep. 1 January.
JGO
-- 2-20-37 QP/L5 (12-17-Da)
Tubes,condmser- Tests in Extend, inves-- Cond. "CS experimental condensers. reinstalled- Underway.
-- 1-13-37 JJ33/L5 (12-22-Ds)
Pack.,Gaskets.manhole555 Guardian brand Garlock Packing Co.
Underway.
JGO
-- 1-12-37 JJ33/L5 (12-22-Da)
Pack..plastic net.A nonmetal. Sym.1106,1107 and 1*34- Garloek Pack.Co.
Underway. Indcf. Partial rep.sub.
JGO
$ 125.00
1-13-37 Pack.,plas.iet.Sym.l432 4 Underway. Indef.
JJ33/L5 (12-22-Da) 1*33- Garloek Pack.Co.
Report a sub.
JGO
ma 3-837 346-VL5 (1-11-Da)
Condenser- Est'b.improved Report 0 sub. design by exper.tests in Continuing. ord.to prev.tube failure.
CS
t 125.00
3-13-37 Pack. ,8-mi-me-t.Sym.1400- Underway. Indef.
JJ33/U (3-3-Da) Stylo 7305-Garlock Pk.Co. Report A sub.
JGO
~ 2-15-37 S62-2(H)/L5(i-26-Da>
Pack.,plas.stuff.tubeJU Style kX-2054- Johns Eanville Soles Corp.
Recommended for cancellation.
JGO
2-19-37 JJ53/L5 (12-22-Ds)
-- 4-1-37 icrEf46]Qlf
Pack.,&sb.high pres.rod- Rep ...a sub. Final Belmont Pack.A Rubber Co. report in prop.
Fuels.Dicsel,aircraftinvestigation of.
Carbide compl. Report 25;* compl.
JGO TJ
-- 4-12-37 Flanges, with ring QB/L2 (1-30-Da) joint facings. -
Reopened
4-14-37 Alloy, Phos-copper-
JJ47 (2-17-Ds) Kestinghouse EcE Co.
Underway. Underway.
''CS
res
4-20-37 QP/r.elding (4-19-Da)
Teld- Invts.of effect Of SO/i completed. heat-treatment on welded brass t brouse structures.
BR
-- 4-20-37 S56-I/L5(10-19-Da)
-- 5-5-37 JJ14/LS (5-H-Da)
Feedwater-Effect of vent, Not yet underway. feed lines on reduction of dissolvee oxygen content.
Corros- Seduc.of in closed Report C sub. cooling sys.- Diesel eng-- Continuing, using Water-soluble oil.
JGO JGO
SUT0001
CRMC-M&S-003744
I:
i /Aa4 > / ~1J
NAVAL ENGINEERING EXPERIMENT STATION iinn'xpolis, Maryland
Report of tests for month ending 30 November 1940
7851 B
2-19-36 S48-23/L8(2-14-Ds)
Conncc.flex.bulkheadfor steam pipingFostcr-'-heoler Corp.
Awaiting ur c au' s action
7870
2-28-36 JJ46-l/L5(2-27-Ds)
Steel,carb-molybdenum, as rolled- Creep tests, Babcock A V.ilcox Co.
Report in prep.
8061 A
Reopened
4-4-36
S48-23/L5(4-l-Ds)
fittings,silver solder & sweated, for high pres sure air systems.
Continuing
8069
4*
5-8-36 S48-24(R)/L5(3-21-Ds)
Valves,pres.reducingOpcration of in series.
Underway SG%, Indefinite.
r\ 8103 w' Jk
5-l*-36 S48-23(5-l-i-Ds)
Joints.pipe- Maintaining tightness with steam at 600f-,750*F. temperature.
Rep.C made. Rccom. cont'g. along different lines.
8181 B
-- 6-12-36 QPAldin6< 11-25-Ds)
"elding,Scale-resist.alloy Matl.not reed. 25% Cr-20% Ni- Proc.approv. test- NYd.Mare Island.
8212 B
-- 6-19-36 JJ33/LS (6-12-Ds)
Packing,flex.met&llicStyle 360- J.M.Corp.
Underway. Indef. Report in prep.
8428 B
-- 9-5-36 ` JJ33/L5(8-6-Da)
Pack.,flex.met.rod A semi- Report F sub. met.stern tube-Styles 33CC Final rep.in prep. A 39CC- Felt Prod.Mfg.Co. 1 Jan.1941.
8478
--
9-19-36
B QP/Telding/L5 (9-8-Ds)
Told- Froc.approv.test- Matl.not reed. Scale-resist.alloy (25^
Cr-20 Hi)-Charleston NYd.
8480 B
-- 9-19-36 QP/Neldlng/>LS( 9-9-Ds )
Teld- rroe.approv.testsCorros-resist.steel (CRS Gr.l)- Charleston NYd.
Matl.not reed.
8561 B
-- 10-27-36 C&37/S48 (6-20-Ds)
Pack.,compressed asbes.
Sheet- Inves.to develop meth.of test- Var.exhib.
Extended. Hew sample being submitted.
8732 B
-~ 11-12-36 S39/L5 (10-2e-Ds)
Pack.,asb.cloth,plain A Report in prep. wire reinforced- Var.mfrs.
8739 B
8764 B
_
8778 B
-- 12-30-36 JJ33/LS (11-27-Ds)
-- 12-7-36 JJ33/L5 (10-23-Ds)
-- 1-16-37 JJ33/LS (12-22-Ds)
Pack.,Gaskets- Pressure- Recommended for filled- Alls Gasket,Ltd. cancellation.
Pack, .valve stem,high pres.- J.Crane Superseal ^6AM- Crane Packing Co.
Report A sub. Final rep.in prep.
Pack.,asb.high pres.rod- Report A sub. Hclios 303-'Crandall Pk.Co..Final rtp.in prep.
-4-
JBL
res
res
JBl res
(TCS (BR
JGO JGO
(res (BR (TCS (BR JGO
JGO JGO JGO
JGO
CRMC-M&S-003 745
SUTG001
CRMC-M&S-003746
1
T,,st No.
3-2706-R JGO
B-2706-S JGO
B-2706-T JGO
B-2706-0 JGO
B-2718-A0 JGO
B-2718-AH JGO
B-2718-AI JGO
B-2736-H JBL
B-2737-D JGO
B-2738-B JGO
B-2747 JGO
B-2751 VGS
B-2793-B WJ
B-2802-AC JGO
cr
B-2802-AD JGO
B-2602-AE JGO
\ f HAVAL ENGINEERING EXPERIMENT NATION Annapolis, Maryland
List of tests reported during month ending 30 November 1940
Nov.
14 Oarlock Packing 'o. ,contr.- Acceptance recommended.
15 Cont.73606- Boilor gaskots for Kare Island,CalifGarlock Packiug Co.gcontr.- Accepta nee recommended.
IS Gont.73606- Boiler gaskets for Sowall's Point,Va.- Garlock Packing. Co.,contr.- Acceptance recommended.
26 Cont.73606- Boilor gaskets for Navy Yard,*5ash.,DC- Garlock Packing Co.,oontr.- Acceptance recommended.
5 Lub.oil- Cont.N0d-108S withGeneral Motors Corp.- Samples of used Texaco 3065 taken during and at completion of 360-hr.run and 48-hr
full power run.main eng.5626- No recommendations.
19 Lub.oil- uont.NOd-1085 with General Motors orp.- New and used Texaco 3065 taken during Z2-hr.run,main eng.5628- BARNEGAT A
BISCAYNE- Vo recommendations.
29 Lub.oil- Gont.NOd-1085 with General Motors orp.-Sample of used Texaco 3065 taken at completion of 24-hr.full power min,main engine 5628- BAI1JEGAT & BISCaYNE- No recommendations.
25 lister,cold water,for Newport News SB&DD Co.Order H-385-1193Vbrthington-Gamon Meter Co.,contr.- Rejection recommended.
20 Lub.oil draining interval- Extension of See report for recommendations.
18 Par-Al-Ketone engine preservative compound- Cont.VI56s-16468Quaker Chemical Products Corp.,contr.- Acceptance recommended. .
5 Sinclair Opaline high temperature water resistant grease, sub.by Sinclair Refining Co.,Inc.- Considered unsuitable for Naval use.
26 See report for recommendations.
Bethlehem Steel Co.
28 the month of October 1940 - No recommendations.
8 Lub.oil- Samples of new Texaco 3065 oil from OSS THRESHERAcceptance recommended.
6 Lub.oil- Cont.73802-Texaeo 2190 and 3065 furnished by Ihe Texas 1Co., for ^Sar Dept.,St.Louis,No- Acceptance recommended.
20 Fort Hason.Calif.- No recommendations.
-00374T
SUT0001
SUT0001
CRMC-M&S-003748
O . HAVaL ENGINEERING EXPERIMENT Annapolis, Maryland
TION
List of tests reported during month ending 30 November 1-40
.'est :io.
Nov.
-2834-3 JBL
27 Beth.Steel Corp.Order R-71S-442-E-5366 on Leslie Jo.- Pressure Reducing valves- Acceptance recommended.
3-2834-C JBL
29 Reqn.l031-Cont.N251s-6O566- Valves, pres sure reducing- for NYd, Puget Sound- Leslie Co.,mfr.-Acceptance recommended.
3-2835-D(l) 27 Cont.NlSls-40908- Reqn.13-1044- H.P.air reducing valves for HYd, JBL Norfolk- Foster hngr.Jo.,contr.- Acceptance recommended.
/
j I t
B-2835-B JBL
B-2855-F JBL
B-2835-G JBL
28 Reqn.908/40- Reducing valves,high pressure air- for NYd.BostonFoster Engr.Co.,mfr.- Acceptance rocommended.
27 Roqn.L-1329 1-41 NSA, Cont.lI244s-25796- for USSDIXIE-'oster Engineering Co.,mfr.- Rejection recommended.
28 Cont.N151s-3S246,Reqn.l-40/Sundry 12645- Pressure reducing valve for KYd.Phila.-Foster Engr.-o.,contr.- Rejection recommended.
8-2839-B EH
B-2842-E JGO
B-2862-C JBL
S Cont.71435- Qualification of welding process for flash Holding alloy tibes- Combustion Engineering Co.,exhib.- No recommendations.
18 Cont.NOs-73829- Fue1-Aircraft-engine,92 octane(leaded 3.5 ml )St,ell Oil Jo.,Inc.,contr.- Acceptance recommended.
15 Meters,fuel oil-After trials SS ZOELLA LYRES.before trials SS REUBEN LYKES- Federal Shipbldg.S Dry DockCo.- No recommendations.
B-2887-C JGO
8 Contract 73858- Asbestos Metallic doth for Charleston- General Asbestos ARubber Jo.,mfr.- Acceptance recommended.
B-2888-C JGO
8 Cont.73859- Hydraulic packing for various Naval activitiesQuaker Rubber Co.,mfr.-Acceptance recommended.
B-288S-0 JGO
B-2889-E JGO
14 Packing,hydraulic- Cont.73859-yuaker Rubber Co.,contr.Aoceptance recommended.
8 Packing,plastic.non-metallic for HYd,Charleston,S.C.-Cont.73860 Crane Packing Co.,contr.- Acceptance recommended.
B-2889-F JOO
26 Packing,plastic metallic,Symbol 1434,for NYd,Puget Sound,Order #5 Cont.73860-Crane Packing Co.,contr.-Acceptance recommended.
B-2890 JGO
B-2891-J JOO
20 Cont.HOs-73861,Plastic metallic packing for Various yards- Ahe Allpax Co.,contr.-Acceptance recommended.
26 Cont.73862- H.P.metallic rod packing and stern tube packing for Mare IsL.Ord.9,10,11- Felt Produdts ilfg.Jo.- Accep.recommended.
B-2892-H JGt>
27 Packing,flaX,for NYcs.Uare Island- 0rd.#l and Charleston Ord.^llOont.73863- Clinton Kfg.Co. Acceptance recommended.
-7-
_
CRMC-M&S-003749
SUT0001
Test Bo.
3-2895-BU JGO
3-2895-BV JGO
3-2895-NW JGO
B-2895-BX JGO
B-2895-BT JGO
B-2895-BZ JGO
B-2895-CA
C JGO B-2895-CB JGO
B-2895-CC JGO
B-2895-CD JGO
B-2895-CB JGO
B-2895-CF JGO
B-2896-C JGO
B-2896-D JGO
B-2903-C JBL
B-2905-G JGO
B-2929-G JBL
t NATAL ENGINEERING EXPERIMENT iTION Annapolis, Maryland
List of testa reported during month ending 38 November 1940
Bov.
,7 Packing.braided asbes.rod- Garlock Packing "o..contr.A mfr.Cont.73866- Acceptance recommended.
8 Packing,braided asbes.rod- Cont.73866- Oarlock Packing Co.,contr. A mfr.- for NYd,Phila.(7)- Acceptance recommended.
12 Paeking,plastic metallie,for NYd,Boston-Cont.73866- Oarlock Packing Co.,oontr.- Acceptance recommended.
12 Packing,braided asbes.rod- ^ont.73866- Garlock Packing eo., contr.t mfr.- Acceptance recommended.
14 Packing,braided asbes.rod- Cont.73866- Garlock Packing o.,contr. A mfr.- for NYd,Bremerton,Rash.(7)- Acceptance recommended.
15 Packing,braided asbes.rod-Cont.37866- for various NYds.-Garlock Packing Co.,contr.A mfr.-acceptance recommended.
20 Cont.73866- Plastic metallic packing- Garlock Packing Co.,contr.Acoeptance recommended.
19 Pecking,plastic metallic,for NYd,Boston- Cont.73866- Garlock Packing yo.,contr.-Acceptance recommended.
19 Paeking,braided asbes.rod,Cont.73866- Garlock Packing Co.,contr. A Mfr.- for HYd,Boston,Mass.- acceptance recommended.
26 Cont.73866- Packing,braided asbes.rod- for NYd,Brooklyn- Garlock Packing Co.,contr.A mfr.- Acceptance recommended.
28 Cont.73866- Braided asbes.rod packing for NYd,Bremerton,Wash.Garlock Packing Co.,contr.- Acceptance recommended.
29 Cont.73666- Hydraulic packing for San Diego- Garlock Packing Co. Acceptance recommended.
22 Cont.73867- Qmnpressed asbes.sheet packing for Puget Sound #5Johns Kanville,contr.- Acceptance recommended.
27 Cont.73867- Plant fiber sheet packing for Norfolk- Johns JSsrille mfr.- Acceptance recommended.
25 Motors,fuel oil- Calib.after trials SS EXECUTOR, Beth,#1483- Befor trials SS EXAMHIER,Beth.*1484- Sth.Steel Co.,builder- No recommend
12 t'ont.HOs- 73783- Motor gasoline (Motor Fuel V) for U.S.Naval Acade emy- American Oil Co.,contr- Acceptance recommended.
15 Cont.N220s-54059- MI Reqn.NSA. 2123(40) Sched.1813, Pressure reduc ing valves-- Grave Regulator Co.,contrAcceptance recosssended.
-8-
I.n----n
- r --r
mr--r - - -
-
i*,,,, WMnMi *,nii;ilfc
/
/
CRMC-M&S-003750