Document qk7DEe62b0EnO45KNk9bm21Rn

ADDENDUM TO S.P.C.C. PLAN RCRA HAZARDOUS WASTE CONTINGENCY PI,AN October 14, 1988 VAB.0001224223 ADDENDUM TO S.P.C.C. PLAN RCRA HAZARDOUS WASTE CONTINGENCY PLAN October 1988 A PREPARED BY: son Environmental Coordinator CERTIFIED BY / r^Ui i , J Theodore F. Lyon P. E. MS No. 9680 / VAB.0001224224 ADDENDUM TO S.P.C.C. PLAN RCRA HAZARDOUS HASTE CONTINGENCY PLAN Contents I. INTRODUCTION II. EMERGENCY COORDINATOR in. EMERGENCY PROCEDURES IV. ARRANGEMENTS WITH LOCAL AUTHORITIES v. AREAS COVERED BY CONTINGENCY PLAN VI. REPORTING VII. AMENDING EMERGENCY PROCEDURES VIII. EOUIPMENT A VAB.0001224225 9 RCRA HAZARDOUS WASTE CONTINGENCY PLAN I. INTRODUCTION Section F, Subpart D (402.7-50 to 402.7-56) of the Mississippi Hazardous Waste Management Regulations require an owner or operator of a hazardous management facility to have a contingency plan for his facility. The Contingency Plan must be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned release of hazardous wastes to the air, soil, or surface waters. The plan includes provisions for an emergency coordinator who will assess the possible hazards of any spill, fire or explosion of hazardous waste. The Emergency Coordinator will implement the Contingency Plan if he deems the emergency situation threatens human health or the environment. Hazardous wastes which are managed at the Aberdeen Plant are waste phthalic anhydride, API sludge, waste barium, cadium or lead stabilizers, and any waste mixtures containing significant amounts of barium, cadmium, or lead stabilizers. The areas of the plant which are covered under the Contingency Plan are the hazardous waste drum storage area, the API separator and slop oil tank. II. EMERGENCY COORDINATOR At all times, there must be at least one employee on the facility premises or available to respond within a short period of time to an emergency situation involving hazardous wastes. This person has the responsibility for coordinating hazardous waste emergency response measures. The Emergency Coordinator must be: 1. Familiar with the plant layout. .2 Familiar with the location and characteristics of the hazardous wastes handled. 3. Familiar with hazardous waste related operations and activities at the plant. 4. Familiar with hazardous waste related records within the plant. 5. Familiar with all aspects of the plant*s Contingency Plan. 6. Have the authority to commit the resources necessary to implement the Contingency Plan. VAB.0001224226 RCRA HAZARDOUS WASTE CONTINGENCY PLAN II. EMERGENCY COORDINATOR - Continued The following people will serve as emergency coordinator for the area affected by a hazardous waste emergency. DRUM STORAGE AREA AND COMPOUND AREA PLANT EXTENSION HOME PHONE Ted Nickerson - Primarv Charles Worlow - Alternate Frank Jeanson - Alternate Bruce Trego - Alternate Bob Seymour - Alternate Doug Skokna - Alternate 3635 3657 3637 3618 3606 3607 3610 369-9025 369-2269 1-324-2329 1-327-8673 369-4412 1-327-0679 API SEPARATOR Ted Lyon - Primary Dan Miller - Alternate Frank Jeanson - Alternate Eruce Trego - Alternate Bob Seymour - Alternate Doug Skokna - Alternate 3622 3625 3637 3618 3606 3607 3610 1-329-2721 369-6005 1-324-2329 1-327-8673 369-4412 1-327-0679 In the absence of the department heads, the department head will designate another person to perform his duties. This designee will become the primary Emergency Coordinator for the area affected by a hazardous waste emergency. A III. EMERGENCY PROCEDURES The plant has an emergency plan wThich is implemented in the event of any plant emergency. The plan is included in Section 1.23 of the Plant Safety and Health Manual. In addition to this plan, the Emergencv Coordinator must evaluate any emergency situation involving hazardous wastes and determine if the RCRA Hazardous Waste Contingency Plan is to be implemented. If the plant is implemented, the Emergency Coordinator has the following responsibilities: A. Take all reasonable measures necessary to ensure that fires, explosions,and releases do not occur, recur, or spread to other hazardous waste. These measures include, where applicable, stopping processes and operations, collecting and containing released waste, and removing or isolating containers. B. Monitor for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other equipment, wherever this is appropriate, if the facility stops operation In response to the emergency. C. Provide for treating, storing, or disposing of recovered waste, contaminated soil or surface water, immediately after the emergency* D. Ensure that in the affected area(s) no waste which may be incompatible with the released material is treated, stored, or disposed of until cleanup procedures are completed. If there are any questions concerning the proper handling of hazardous uff CJct?e"16^ifeU&M waste SP111 should be cle*W&0001224227 RCRA HAZARDOUS WASTE CONTINGENCY PLAN IV. ARRANGEMENT WITH LOCAL AUTHORITIES The following verbal agreement has been trade with the local fire department: If outside assistance is required and requested, the firemen who come into the plant will operate under the guidance and leadership of the Shift Supervisor involved with the emergency. V. AREAS COVERED BY THE CONTINGENCY PLAN A. Hazardous Waste Drum Storage Area The hazardous waste drum storage area is the diked and fenced in area south of the east warehouse. This area is used for the storage of drummed hazardous wastes and ether drummed materials. B. API Separator & Slop Oil Tank The API separator which is located east of the plasticizer tank farm is used to reclaim oils from the waste water generated during the plasticizer operation. Waste oils which cannot be reclaimed are stored in the slop oil tank just south of the API. Waste oil from the slop oil tank is periodically shipped to Stauffer Chemical Company who burn the oil for heat recovery. VI. REPORTING If the Emergency Coordinator determines that the plant has had a spill or fire that could threaten human health or the environment outside of the Plant, the National Response Center f1-800-424-8802) should be contacted immediately. The following personnel are authorized to contact the National Response Center: Safety Director Environmental Coordinator Chief Process Engineer Senior Process Engineer Senior Process Engineer Plant Superintendent Plant Manager Vinyl Operations Superintendent Compound Operations Superintendent Mechanical Superintendent Bruce Trego Frank Jeanson Veldon Messick Rendell Newton Steve Hillman Doug Skokna Bob Seymour Paul Kober Ted Nickerson Ted Lyon 1-327-8673 1-324-2329 1-327-0741 1-328-0904 369-7892 1-327-0679 369-4412 369-7096 369-9025 1-329-2721 In the event that the Hazardous Waste Contingency Plan is implemented, the time, date, and details of the incident are to be recorded in operating records of the unit affected. VJithin 15 days of the incident, a written report of the incident must be submitted to the State Solid Waste Division. The report is to include the following information: 1. Name, address, and telephone number of the plant. A VAB.0001224228 RCRA HAZARDOUS WASTE CONTINGENCY PLAN A VI. REPORTING - Continued 2. Date, time and type of incident (fire or spill). 3. Name and quantity of material(s) involved. 4. The extent of injuries, if any. 5. An assessment of actual or potential hazards to human health or the environment. Estimated quantity and disposition resulted from the incident. recovered material that VII. AMENDING EMERGENCY PROCEDURES The Contingency Plan must be reviewed and amended, if necessary, whenever: A. Applicable regulations are revised. B. The plan fails in an emergency. C. The plant changes in its design, construction, operations and maintenance in a way that materially increases the potential for releases or hazardous wastes or hazardous waste constituents. VIII. EQUIPMENT A. Communications The following communications equipment is available at the plant: (1) two-way radios, (2) five channel Gaitronics system, (3) public address system, and (4) telephone. B. Fire Fighting There are fire extinguishers located throughout the plant. Fire fighting equipment is listed in Section 1.23 of the PVC Health and Safety Manual. C. Spill Cleanup For a list of available spill cleanup equipment, refer to Appendix A of the S.P.C.C. Plan. rah/RAF disc/7-86 VAB.0001224229