Document qk46mk62Mm0vp17Qw65MJg3vj
PLAINTIFF'S EXHIBIT MON-2281
It*
^2^ CONTRACT NO. 09-042-057ef
BETWEEN MONSANTO COMPANY
AND CAJUN INSULATION COMPANY, INC.
DATED OCTOBER 14, 1980
'
i.tf
/' /'
U 31
^ es ,*v
COPY NO.___ l_
3
C 001439
LAM022602
i
1. This Contract is made as of.
CONTRACT October 14, 1980
Contract No. 09-042-0576 Project No.
by and between Monsanto
Company, 800 North Lindbergh Boulevard, St Louis, Missouri 63166 ("Monsanto"), and___CftjUO Ipgqlatiop Company ,
Inc., P. O. Box 3961, Lafayette, Louisiana 70501
. ("Contractor")
for certain work (referred to herein as "Work") to be performed at Monsanto's Plant in Lulinq, Iouisiana (jobsite),
commencing October 20, 1980
2. Said Work shall consist of furnishing all operations, labor, equipment, materials and supplies and doing all things neces sary for the proper performance of the services or construction of the facilities described or defined in Exhibit "A."
3. -For the proper performance of the Work, Monsanto shall pay Contractor on a tiine-and-material basis in
accordance with, the rate schedule in Exhibit "A" or on a firm lump sum basis accepted
by Monsanto's dp.qfgnatrd rppresent.ative.: Payments to be made as follows: Within thirty days following receipt of Contractor's application for payment, Monsanto will pay Contractor a sum equal to 90% of the value of labor and materials which the Representative estimates has been acceotably incorporated into the Work or suitably stored at the job-site, less the total of all previous payments. The balance shall be paid within thirty days after completion and acceptance of the Work by Monsanto. Contractor's application shall be sub mitted within two working days of the close of each month in a form satisfactory to,the Representative. No payments made prior to acceptance of the Work shall be construed to be an acceptance of the Work in whole or in part.
4. The term "Representative" means the employe of Monsanto authorized to represent it with respect to the Work. Con tractor and the Representative are referred to throughout this Contract as if each were of the singular number and masculine gender; Monsanto is referred to as if it were singular and neuter.
5. Any specifications and/or drawings which are attached hereto or referred to herein are a part of this Contract, and the Work shall conform thereto. If ambiguities or conflicts appear in or between specifications and drawings, or if detailed infor mation has been omitted. Contractor shall request interpretation, clarification and/or additional instructions before proceed ing with the Work. Any drawings prepared by Contractor in connection with the Work shall become a part of this Contract when approved by Monsanto; however, such approval by Monsanto of Contractor's drawings shall be construed to apply only to general arrangement and shall not relieve Contractor from entire responsibility for errors of any sort, for correctness of design, details or dimensions, nor for deviation therein from drawings furnished by Monsanto. In the event of conflicts or discrepancies between Contractor's drawings and Monsanto's drawings, the latter shall take precedence and control, unless and to the extent that Monsanto shall otherwise specifically direct in writing.
6. All drawings (including sketches, shop drawings and setting drawings) and specifications, including all copies thereof,
furnished to Contractor, or obtained or prepared by Contractor for the Work, shall be delivered to Monsanto when no longer
required for performance of the Work or when requested by Monsanto, but in any event upon completion or termination of
the Work; except that one copy of each may be retained by Contractor with the permission of Monsanto. All such drawings
and specifications shall be the property of Monsanto at all times and shall not be used for any other work by Contractor, nor
shall Contractor permit such use by others. Contractor shall execute receipts, in a form acceptable to and at any time re
quested by Monsanto, for all such drawings and specifications in his possession.
G-61S
Short-Form Contract Page 1 of 6 1/70:2/72
LAM022603
O 1970, 1972 Monsanto Company All rights ratarvad
001440
JJ
~7. Contractor agrees to comply 1' > all statues, laws, ordinances, codes, rules '1 regulations applicable to the Work, including Monsanto's policies, practi<~* and rules for the jobsite. Contractor shall pa> il sales, use, consumer, service or other similar tax required by the l8w of the place of construction.
8. Contractor agrees to utilize his best skill and judgment in performing the Work and to cooperate with Monsanto in every wav. Contractor agrees to provide competent supervision and direction and to maintain at the jobsite the necessary material, eauipment and skilled workmen to properly prosecute the Work to completion.
9. Contractor warrants that the Work will be of high quality, with workmanship proper and sufficient for the purpose contemplated and in accordance with the best trade practices. Contractor further warrants that the Work shall fulfill the terms of all special guarantees established by the Contract and that the Work shall be free from defects due to faulty mater ials, equipment or workmanship, until the .expiration of one year from the date of final payment or throughout such longer period as may be provided in the Contract. Monsanto will give notice of observed defects with reasonable promptness. Con tractor shall promptly reimburse Monsanto for its costs in remedying such defects or, at Monsanto's option. Contractor shall at his own expense and with all possible speed remedy such defects. In either case, Contractor shall also pay for any resulting damage to other property and work. Any cost for which Contractor is liable under this Contract shall be borne by Contrac tor, and Monsanto, in addition to any other right or rights it may have, may withhold money otherwise due Contractor to cover ar.v such cost,
10. Contractor agrees that he and -his employes shall treat as Monsanto's confidential property and shall not use or disclose to others during or subsequent to the term of this Contract (except as is necessary to oerform the Work hereunder and then onlv with the prior approval of Monsanto and on a confidential basis satisfactory to Monsanto) any information (including any technical information, experience or data) regarding Monsanto's plans, programs, plants, processes, systems, products, costs, equipment, operations or customers (including any similar information Monsanto has received or may receive from third oartiesl which may come within the knowledge of, or which may be developed by. Contractor or his employes in the performance of cr in connection with the Work without in each instance securing the prior written consent of Monsanto. Nothing herein, however, shall prevent Contractor from disclosing to others or using in any manner any information which Contractor can show:
(a) has been published and has become part of the public domain other than by acts or omissions of Contractor or his employes;
(b) has been furnished or made known to Contractor by third parties (other than in connection with the Work) as matter of right and without restriction on disclosure or use; or
(c) was in Contractor's possession on the date of this Contract and was not acquired by Contractor or his employes directly or indirectly from Monsanto or its employes.
For the purposes of this article, no information obtained by Contractor or his employes from Monsanto shall be deemed to be in the public domain or in the prior possession of Contractor or his employes merely because it is embraced by more general information in the public domain or by more general information in the prior possession of Contractor or his em ployes. Contractor shall restrict the knowledge of all information regarding the Work to as few as possible of his employes who are directly connected with performance of the Work and have a definite need for such knowledge. Upon request by Monsanto, Contractor shall cause such persons involved in the Work on Contractor's behalf as Monsanto may designate to sign individual secrecy agreements in a form satisfactory to Monsanto.
11. Contractor shall provide safe and proper facilities for both access to and inspection of the Work by Monsanto. If por tions of the Work are performed off Monsanto's premises. Contractor shall make whatever arrangements are necessary to enable Monsanto to inspect such portions of the Work when requested by the Representative. If the specifications, the Rep resentative's instructions, laws, ordinances or any public authorities require the Work or any portion thereof to be specially tested or approved, Contractor shall give the Representative timely notice of its readiness for inspection and, if the inspection is by an authority other than the Representative, of the date fixed for such inspection, and Contractor shall secure all required certificates of inspection. Any portion of the Work covered up without the approval or consent of the Representative must, if required by the Representative, be uncovered for examination at Contractor's expense.
v/-:
G-eis
Short-Form Contract Pa 2 0( 6 1/70:2/72
C 001441
LAM022604
ii
12. Monsanto may make changes in the specifications or drawings, issue additional instructions or require additions to or deductions from the Work (all o lich are hereinafter referred to as a "changt - "changes"), and the amount payable to Contractor under this Contract shall be adjusted accordingly. The provisions of this Contract shall apply to all such changes to the same extent as*if originally set forth herein, and Contractor shall proceed therewith when so ordered by the Represen tative. If any such change involves extra cost. Contractor shall- so notify Monsanto within ten days after receipt of the order covering the same, and no claim for payment or reimbursement shall be valid unless such notice is given. If any such change is an addition to the Work, and a lump-sum price is not agreed upon. Contractor shall be paid on a unit-price or a cost-plus-apercentage basis that is either attached to this Contract as an exhibit or agreed to in writing by the Representative. When payment is on a unit-price or cost-plus-a-percentage basis. Contractor shall keep an accurate record of all quantities and costs incurred thereby, in such form and supported by Such evidence as the Representative requires. If any such change is a deduc tion from the Work, the value of such change shall be determined on the basis of a reasonable estimate of the cost of said deduction. Except for minor changes not involving extra cost, no changes shall be made except pursuant to a written order from the Representative, and no claim for payment or reimbursement shall be valid without such an order.
13. Contractor shall promptly, and before.such conditions are disturbed, notify the Representative in writing of:
(a) subsurface or latent physical conditions at the site differing materially from those indicated in this Contract, or
(b) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encoun tered and generally recognized as inherent in work of the character provided for in this Contract.
The Representative shall promptly investigate the above-mentioned physical conditions. If he finds that such conditions do so materially differ and that the same cause an increase or decrease in Contractor's cost of, or time required for, performance of the Work, an equitable adjustment shall be made and the Contract modified in writing accordingly. No claim of Contractor for adjustment hereunder shall be allowed unless he has given notice as herein required.
14. Monsanto may, by giving written notice to Contractor, terminate this Contract at any time. If Monsanto terminates this Contract for reason other than Contractor's breach of any of the provisions hereof, Monsanto shall pay Contractor for all costs previously incurred in connection with the Work, plus a reasonable allowance for overhead and profit. Additionally, Monsanto shall assume and become liable for all contracts, obligations and commitments that Contractor has. in good faith, undertaken or incurred in connection with the Work prior to receiving any termination notice. Contractor shall, as a condi tion precedent to any such payment or assumption by Monsanto, execute and deliver all such papers and take all such steps, including the legal assignment of his contractual rights, as Monsanto may require. Upon any termination as set forth herein Monsanto shall be entitled to defer payment to Contractor to the extent of all bona fide claims it may have against Contrac tor under or arising out of this Contract until such claims have been settled.
15. Contractor agrees that Monsanto may, by oral or written notice, suspend, delay or interrupt all or any part of the Work at any stage of its progress for the period hereinafter provided. Any oral notice given pursuant hereto shall be confirmed in writing within three days thereafter. If the Work is suspended, delayed or interrupted by Monsanto for a period of ninety days, and unless Contractor agrees in writing to a longer period. Contractor may, at any time thereafter and upon not less than sixty days pWor written notice to Monsanto, terminate this Contract and recover from Monsanto for that portion of the Work completed as if Monsanto had terminated this Contract pursuant to article 14 hereof. If Contractor is authorized to resume the Work that was suspended, delayed or interrupted, the Contract shall be equitably adjusted in writing to provide for any necessary increase in the time required for, or the cost properly allocable to, the performance of the Work; provided, however, that Contractor submits a claim for such adjustment within 30 days after such resumption of the Work.
16. Contractor shall defend all suits or claims for infringement of any patent rights arising out of the Work and shall save Monsanto harmless from loss on account thereof; provided, however, that Monsanto shall be responsible for all such loss when it or the Representative specifies any particular equipment, material, the product of a particular manufacturer or a Monsanto process, which is an infringement of a patent; provided, further, however, that if the Contractor has information indicating that any such designated equipment, material, the product of a particular manufacturer or a Monsanto process, or the use thereof, might constitute an infringement of a patent. Contractor shall promptly inform the Representative in writing and unless Contractor does so inform the Representative, Contractor shall be responsible for any loss suffered by Monsanto as a result of such omission.
04 is
Short-Form Contract Page 3 of S 1 /70; 2/72
C 0___0_ _1_ 4_ 4- 2_
LAM022605
4
17. No payment under the Contr -.hall become due and payable until Contra' , if required, has delivered to Monsanto complete releases of all liens and all other claims of whatever nature which have arisen or which could arise as a result of any . operations related to the Work or the Contract, or receipts in full in lieu thereof, and if required in either case, an affidavit that so far as Contractor has knowledge or information the releases and receipts include all operations, labor, equipment, materials and all things for which a lien or other claim could be filed or made. Said releases shall be effective as to liens and claims .; existing as of the date payment is requested. If any lien or other claim remains unsatisfied after all payments are made. Contractor shall refund to Monsanto all moneys that Monsanto may be compelled to pay in discharging such a lien or claim, including all costs and reasonable attorneys' fees.
18. Contractor shall not assign this Contract or sublet it as a whole nor shall Contractor assign any moneys due or to become due to him hereunder, without the prior written consent of Monsanto. Any attempt to so assign or sublet shall be void. Assignment or subletting with such consent shall in no way relieve Contractor of any of his obligations under the Contract.
19. The title to all'Work completed or in the course of construction at the jobsite shall be in Monsanto; title to all materials, supplies and equipment intended for incorporation into the Work shall pass to Monsanto upon delivery at the jobsite; pro vided, however, that such passage of title shall in no way relieve Contractor of any of his obligations under this Contract.
20. Except as hereinafter set forth. Contractor agrees to indemnify and save Monsanto and its employes harmless against any and all liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses (including cost of defense, settlement and reasonable attorneys' fees) which any or all of them may hereafter suffer, incur, be responsible for or pay out (whether the same arise out of or are in connection with the Work, or from any operations under or in connection with the Contract) as a result of bodily injuries (including death) to any person or damage (including loss of use) to any property occurring to, or caused in whole or in part by. Contractor (or any of his employes), any of his Subcontractors (or any employe thereof), or any person, firm or corporation (or any employe thereof) directly or indirectly employed or en gaged by either Contractor or any of his Subcontractors. Upon the request of Monsanto, Contractor shall promptly defend any such demand, claim, cause of action or suit.
Except as hereinafter set forth. Contractor agrees to make full reimbursement for any damage, including loss of use, to existing property or property being installed which may arise out of or in connection with the Work or from operations under or in connection with the Contract, and is caused, in whole or in part, by Contractor (or any of his employes), any of his Subcontractors (or any-employe thereof), or any person, firm or corporation for any employe thereof) directly or indirectly employed or engaged by either Contractor or any of his Subcontractors.
Monsanto agrees that Contractor shall not be liable to Monsanto under the Contract for:
(a) loss of use resulting from damage to property of Monsanto under Contractor's care, custody or control;
(b) liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses arising out of bodily injury (including death) to any person or damage (including loss of use) to any property caused by or resulting from the sole negligence of Monsanto, its employes or its agents.
21. Contractor shall not begin the Work under this Contract until: (a) he has obtained all the insurance required herein, (b) he has furnished certificates of insurance satisfactory to Monsanto, and (c) such insurance and the certificates have been approved by Monsanto.
Every contract of insurance providing the coverages required herein shall contain the following clause: "No reduction, cancellation or expiration of this policy shall become effective until ten days from the date written notice is actually received by" (followed by the name and address of the person designated in article 25 hereof as the recipient of notices to Monsanto).
G-SIS Short-Form Contract Page 4 of S 1/70:2/72
C 001443
LAM022606
*1. Contractor shall take out and maintain for the life of this Contract (at his own expense unless otherwise specifically set forth) at least'the following insurance:
Coverage
Limits
(a) Workmen's Compensation
Statutory
(b) Employer's Liability
500,000 each occurrence
(c) Public Liability (Bodily Injury)
200,000 each person 1,000,000 each occurrence
(d) Public Liability (Property Damage)
200,000 each occurrence
(c) Automobile Liability (Bodily Injury)
200.000 each person 500.000 each occurrence
(f) Automobile Liability (Property Damage)
50,000 each occurrence
The public liability insurance specified in subparagraphs (c> and (d) above shall include coverage for all of Contractor's con tractual liability under article 20 with limits not less than those set forth in subparagraphs (b), (c) and (d) above.
% Monsanto agrees, however, that such public liability insurance need not cover: (1) damage, or loss of use resulting from such damage, to property of Monsanto under Contractor's care, custody or control, or (2) liabilities, penalties, demands, claims, causes of action, suits, losses, damages, costs and expenses arising out of bodily injury (including death) to any person or damage (including loss of use) to any property caused by or .resulting from the sole negligence of Monsanto, its employes or its agents.
23. Contractor shall bind all his Subcontractors to the terms of this Contract which arc applicable to the Work sublet.
24. T'ne uLri'.ya.iun* of Contractor under articles 6, 7, 9, 10, 12, 14, 16, 17, 18, 20 and 24 of this Contract shall survive any
termination of the Contract, or the suspension, completion and/or acceptance of the Work or any part thereof, or final
payment to Contractor, it being agreed between Contractor and Monsanto that said obligations shall be of a continuing
nature and effect.
;
25. All notices pertaining to this Contract shall be sufficiently given if delivered in person or sent by registered or certified mail addressed as follows:
(a) If tn Mnnsanio:
Mr. Donald .1. Samaha, Frincipal Encineerino Specialist
Monsanto Company - ______________ :P. O. P.nv 17 L-----------------------------------------------------------------------------------------------------------------
Luling, Louisiana 70070
(b) If to Contractor:_________ Mr. Fritz Duhe ________________ Cajun Insulation Company, Inc.
________________________ P. O. Box 3961____________________ Lafayette, Louisiana 70501
C-CI5 Short Form Contract P*e* S of ( 1/70:2/72
C 001444
LAM022607
Either party, by written notice to the other party, may change the person and/or address to which notice shall be given. Both parties agree to acknowledge in wr' 'ng the receipt of any notice delivered in per;' .
.....
.
. .A
... ... . . -
26. This Contract (including attached' Exhibitlsl "A"\) sets .forth the entire agreement
between Contractor and Monsanto with respect to the subject matter hereof. All prior negotiations and dealings regarding the
subject matter hereof are superseded by"and merged in this Contract. All time limits stated in this Contract are of the esser.
thereof...
*
27. Special Provisions (if any):
Invoices for work to be done will be mailed to:
Mr. O. G.'Creel'. Monsanto Company P*. 0. Box 174 Luling, Louisiana
70070
In the performance of this contract, contractor agrees to obtain all necessary machinery, equipment, materials, and supplies from Louisiana manufacturers, suppliers and distributors., and to employ Louisiana labor and subcontractors, except where it is not possible to do so without added expense or decreased operational efficiency.
Monsanto's "Supplementary-Conditions" and "Safety Rules for Contractors" are part of .this contract.
"tte hereby agree to incorporate herewith the equal opportunity clause as re quired by Executive Order 11246, as amended."
In witness of their agreement, Contractor and Monsanto, for themselves, their successors, executors, administrators and assigns, have executed this Contract effective as of the date set forth at its beginning.
MONSANTO COMPANY
By. (?. H. THURMAN Title Plant Manager
C -61$ Short Form Contrtct P*e 6 of % l/>4;2/72
CAJUN INSULATION COMPANY, INC. Gn5
LOUISIANA CONTRACTOR PERMIT NO.
<f. XAis, L
By.
Iff
Title.
C 001445
LAM022608
& tee-
r SCOPE OF WORK
EXHIBIT "A" Contract No.09-042-0606 SWR-311 Effective: 1/1/86
(Description of Work to be Performed Under the Contract)
Said work shall consist of general installation and repair of insulation, sand blasting, painting, and carpentry type work throughout the Luling Plant as re quested in written work orders issued by Monsanto's designated representative.
For work requested by Monsanto's designated representative and properly completed by contractor, Monsanto will pay either on a firm, lump-sum basis accepted in the written work order or on a time-and-material basis according to the following rate schedule:
1. Labor - Effective January 1, 1986
Mechanic 1st Class
Mechanic 2nd Class
Mechanic 3rd Class
Mechanic 4th Class
Helper
Base Rate
FICA 7.15%
LUC 6.81%
FUTA 1.1 %
Overhead 10.0%
Profit
7.0%
Insurance 10.0%
Straight Time Overtime
10.16
.73 .69 .11 1.02 .71 1.02
14.44 20.29
9.13
.65 .62 .10 .91 .64 .91
12.96 18.21
8.46
.60 .58 .09 .85 .59 .85
12.02 16.89
7.75
.55 .53 .09 .78 .54 .78
11.02 15.48
5.43
.39 .37 .06 .54 .38 .54
7.71 10.84
Note:
1) Travel Time/Rain-out Time - none. Pay based on actual hours worked in the Luling Plant.
2) Overtime rates apply on actual hours worked in excess of forty (40) hours per work week, and to be charged at time and one-half times the base wage rate for all overtime hours worked.
3) Daily time sheets and material receipts must be prepared in duplicate and be approved by signature of the contact man named by Monsanto's designated representative in the written work order. Monsanto will retain one copy of the time sheet(s) and material receipt(s).
4) The Superintendent and Foreman will be on call 24 hours a day, 7 days a week, with no overtime charged, for a flat rate of $611.90 per week for the Superintendent and $554.88 per week for the Foreman. These rates include all taxes, insurance, profit and overhead.
2. Material
Supplied at published prices, per Price Book dated September 2, 1983, and effective October 1, 1983.
C 001446
LAM022609
SCOPE OF WORK - Continued
EXHIBIT "A" Contract No. 09-042-0606 SWR-311
Effective: 9/1/83 and 10/1/83
3. Equipment
A. The following equipment will be furnished at no extra charge:
3 each - \ ton pickup trucks (includes fuel and maintenance) 1 each - 150' and 40' Warehouse Storage 1 each - Pittsburg Machine 1 each - Fitting Saw 1 each - Foot Shear 1 each - Metal Roller 1 each - Beader and Crimper 1 each - Table Saw 1 each - Port-a-Let
- Hand tools
B. Rental Equipment - If required, rental equipment will be charged at current rental rates.
C. If requested by Monsanto's designated representative, the following equipment will be supplied at the following rates:
Equipment
Rate per week, day, hour
Compressor Pick-Up Truck, 1/2 ton Flat Bed Truck, 1-ton Portable Welding Machine Change Houses Portable toilet facilities Scaffolding Pitch Pot Fitting Saw Caulking Guns - power driven Airless Spray Unit
$80.00/week $58.00/week + $0.10/mile $87.50/week + $0.12/mile $72.00/week $50.00/month $46.90/month (See attached schedule) $10.00/week $23.50/week $10.00/week $37.50/week
D. Miscellaneous Small Tools & Supplies
Drill Bits Drop cloths, 9x2 Extension cords and buls Electric Drills Pop Rivet Guns Tarpaulins and Visqueen Power Saws
$ 2.15 each $ 8.90 each $ 8.15 each $13.10 each $23.30 each $18.20 roll $38.95 each
E. Scaffolding - Per attached Rental Rate Schedule.
C 001447
LAM022610
Itr ` ' '
>
.
_ S' \ Ji
NSULATIQN C
INC.
E. SCAFFOLD FATES FOR MONSANTO LULING PLANT EFFECTIVE MARCH 3, 1 986
SWR-311 Exhibit "A" Contract No.09-042-0606 Effective: 3/3/86
PART #
ITEM
NEW PRICE
SYSTEM HORIZ.:
SBF: 3'
HOR` IZ .
SBF: 45" HORIZ.
SBF: 5'
HORIZ.
SHR 6' "-- HORIZ.
SHR 7 7
HORIZ.
SHR 8'
HORIZ.
SHR 9'
HORIZ.
SHR 10' HORIZ.
3 95" 5' 6' 7' 87 9' 107
$0 - 66 ' $0.99
$1.1 0 $1.32 $1.38 $1.32 $1.71 $1 .76
SYSTEM VERT. POST:
SVP 3'
VERT. POST
SVP 7 7
VERT. POST
SVP 10 7 VERT. POST
3'S" 77 1076"
$1.38 $1.76 $2.48
DIAGONALS:
SDC 9 '
DIAGONAL 9 7
$2.20
SYSTEM STSJ 1 ssc SBK 24 SBK 33 SBK 36 STR 7
ACC. : SCREW JACK STARTER COLLAR SIDE BRACKET Eh" SIDE BRACKET 33" SIDE BRACKET 36" STAIR UNIT
$1.1 0 $1.1 0 $5.23 $5.39 $5.50 $11.88
BOARDS: SB 6 ' SB S' SB 1 0 ' SB 12' SB 14' SB 16'
SCAFFOLD SCAFFOLD SCAFFOLD SCAFFOLD SCAFFOLD SCAFFOLD
BOARD BOARD BOARD BOA)F:D BOARD BOARD
67 S' 10: 12: 14-' 16'
$0.9v $1.38 $1.65 $1.93 $2.26 $2.5^
TUBES: ST A' ST 6' ST 8' ST 10' ST 13' ST 16'
GAL1.1. GALV. GAL7. GALV. GALV. GALV.
TUBE 4' TUBE 67 TUBE B7 TUBE 10' TUBE 13' TUBE 16'
$0.50 $0.55 $0.61 $0.66 $0.83 $0.94
LADDERS SAU 6' SAU 3'
LADDERS 6 ' LADDERS 3'
$1.93 $1.38
c 001448
LAW10?.;i6H
fcr.-
I
I) Ji
E. SCAFFOLD RATES (Contd.)
5AU BF; LADDER BFu-iCEb
CLAMF'S: CF;a RT CF;A SW
F: I6HT ANGLE lLAMF SWIVEL CLAMP
FRAMES Z FM 37 FM A 7 FM 5' FM 6' OF'FM 67 B-7E B-73 CP
ACCES. : FRAME 37 FRAME A FRAME .57 FRAME 6' OPEN END FRAME CROSS BRACE 77 CROSS BRACE 57 COUPLING PIN
6'
$1.56 $1.56 $1.56 $1.56 $1.56 $O.E>m$0.2m M/C
SWR-311 Exhibit "A" Contract No.09-042-0606 Effective: 3/3/86
MONSANTO COMPANY
BY: TITLE:
<^7- r^-
JoMn M. Tissue Manager, SVJ Regional Purchasing
CAJUN INSULATION COMPANY. INC
BY: < J- LJL: JL TITLE: X\hjLA^(k*J-
c 001449
LAM022612