Document qdpaw1X2EbYY5qw90x6q6gB4x

COMPANY CONFIDENTIAL ^ JC5 SO. 002-102S GSNESAL crriCiS P. 3. HoWgcs ' K. J. Holaapfel W. B. Pap.-.george J. R. Savage ANNISTON J. r. cii J. L. Drown J. L. Coriirr V. R. Hcupc ** G. L. lessee ! L. C. I'ahman J. C. I-ancit/ehr A. C. HcCarcy C.W.Miller/T.E..LLaacckk-cy/J.E. Mund-. R. 0. Scvjr'.fn PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON. ALABAMA PLANT REPORT UO. 2 DATE July 21, 1970 TITLE: OBJECTIVE: Anniston Plant. Also, co report all data on Aroclor residues in Che _ Snow Creek - ChoccoLocco Creek VaCLrahed. To summarize progreaa Co dace on Aroclor clean-up efforts ac Anniacon. PERSONNEL: l. G. Wright. (J. T. Bell) r REPORTED ST: SUMMARY: ruiUHE work: E. G. Wright ' Aroclor losses from the Anniator Plane for the period April 13 through Jun* 30, 1970, averaged *16 lba./day. This i> a conaiderable improvement over the losses ofX250 lba./day for a comparable period during 1969. Thia reduction has been primarily achieved by an education program and by changing operating habits. However, projects art beiug installed and evaluated which will further reduce these losses toward the Business Croup goal of 10 ppb. 1. Continue aawpling and analyzing for Atoclor lotaea on a routine b.-.sis. 2. Continue to aanplc and analyze grub samples from Snow and Choccclocco Croeka for Aroclor concent. 3. Sample end enalyze ambient air for Aroclor content. 6. Sample and analyze tank vents in Che Aroclor department to pinpoint atmoapheric loss points. 5. Collccu additional aquatic sampl es irorn Choccoloceo Creek Via cershwd. 6. Issue periodical reports on Anniston Plant losses and progress toward 10 ppb goal. MCNS 056663 E. G. Wright HARTOLDMON0034523 Anniston Plane i'rcgrcss ilcport 0002-1025 (2) . ?zzc 2 DISCUSSION ' I. Aroclor Department Severs A. HC1 Sever Since Che installation of a catch tank In Che !IC1 gas line and a coalescer in the acid scream, the Aroclor concent in the waste acid stream has beon grtady reducod (i.e.. Approximately 200 pounds of organic material is being removed by these two projects.). During Che sampling period, this icver averaged 13.0 ppb of Aroclor. (See D*CJ Shcec I.) 3ased on this data, the decision was made noc to route thla stream to the uap presently being installed. This reaulced in a aubatantial aavinga on installing the lump. However, it times, the apent carbon from the HC1 carbon towers is dumped into this sewer. Alternate methods are being evaluated to eliminate chia aituaclon. 3. Chlorinator and Still Room Sewers . At times these severs had a two phase flow. The quantity of the Aroclor phase could noc be determined. Hovever, these two sewer3 are being routed through the Aroclor sump. When the sump is completed snd [xiC into operation, the Aroclor phaae can then be quantified. The sump will, also, provide a means for recovering this second phese, which under present conditions eventually makes its way out of the plant. When the suerp la installed in these severs, a daily sample will be taken and enalyted to determine the efficiency of the sui.ip. OtheT projects are also schedul'ed which should result in a reduction of Aroclor in this process stream. C. Warehouse Sever The major losses from this sewer ire due to spills while drumming or flaking. These spills are then swept to the sewer during floor clean up. Freaently, clean-up la accomplished by use of Du-3ois steam cleaning which considerably raised the solubility of Aroclor in water. Alttrna.ce mathods of clean-up end disposal are presently being evaluated. D. Total Plant Effluent During the period April 15 to June 30, 1970, the cotal plant losses averaged 1C lbs./day. This Is excluding the period April 21 to June 20, 1970, when chc acid neutralization pit was being cleaned out. During this period, the losses ran very high (See Data Sheet V.) due to the fact that the Aroclor which was trapped in the pit was being stirred and entrained into the plant effluent. The discrepancy between the 1.7 lbc./d.-.y letcci frer. the rover: .-.r.d the 16 lhs./day losses reported from the plant effluent may possibly be due to tvo thing:: 1) Samples from the sewers did not include any of the Aroclor phase and 2) Due to the mixing and the velocity at the plant effluenc sampler, ccme of the Aroclor was being entrained and therefore HUNS OSfcbfch HARTOLDMON0034524 Anniston Plant Progress Report 002-1026 (2>) P^Se 3 giving higher results. A closer correlation is hoped for when an accurate measure of the Aroclor pliasc can lie accomplished. Close observation of the simp'should provide this information. E. Miscellaneous Samples (Data Sheet VII) , These samples were collected from Snow and Clioccolocco Crcelcs at various times. They show that Aroclors are present in the Choccolocco Creak. vn abova where the Monsanto effluent enters the creek. They also indicate significant amount* of Aroclor in the mud and water of Choccolocco and Snow Creuks a considerable distance (15-20 miles) downstream from the Anniston Plant. In fact, Aroclor concentrations can probably be found in the Coosa P.iver system. Data Sheet VII contains a complete list of all the data to date on Snow and Choccolocco Creek*. Attached is a map of the watershed showing the cample location with respect to the plant. COMPANY CONFIDENTIAL KCNS 056665 HARTOLDMON0034525 DAT.*, SUKKT I Sauplc Location: HC1 Depni'Crjcnc Sewer Avenge Tlou: 200 C?M .. Da ce 4/15 4/16 4/17 4/20 4/21 4/22 4/23 4/24 4/27 4/28 4/29 5/3 5/4 Avenge: Aroclor Concenera cion (PP3) 12 7.8 8.3 18.5 6.2 16.4 10.6 20.4 15.0 13.1 18.7 10.5 11.3 Aroclor Losses ftf/dev) 0.030 0.019 0.020 0.044 0.015 0.039 0.025 0.050 0.036 0.031 0.045 0.025 0.027 13.0. 0.031 cor. .JIMT1AL *QNS C56666 HARTOLDMON0034526 7V.TA SHEET II Sample Location: Warehouse Sever Average I-'lov: 65 CFM (Eacinaced) Pn te 4/22 4/23 4/24 4/27 4/28 4/29 5/3 5/4 Aroclor Concentracion otb) 2,800 2,860 1,250 1,520 1,300 2,130 1,320 1,480 Aroclor Losses /day) 2.18 2.23 0.98 1.18 1.02 1.66 1.03 ' 1.15 Average: 1,833 1.43 .company confidential HCHS 056667 HARTOLDMON0034527 DATA SHEET III Sample Location: Aroclor Still Room Sever Aver.-ige Flow: 150 C?M (Estimated) Do te 4/22 4/23 4/24 4/27 4/28 4/29 5/4 5/6 5/S Aroclor Concentration (PPB) 12,500* . 13.a 30.0 17.0 12.2 4.8 20.0 11.0 23.4 Aroclor Losses (*/dav) 0.025 0.054 0.036 0.022 0.009 0.036 0.020 0.042 Avertge: 16.5 0.031 *Contauinsced sample - not included in sverige. COMPANY CONFIDENTIAL MOtiS C56666 HARTOLDMON0034528 I rv-.T' Si IF. ITT IV S.Ttcplc Location: Aroclor Clilorinacor Srwcr Average flow: 275 C?M (Esrievtced) Da te i/22 i/23 4/24 4/27 4/28 4/29 5/3 5/4 5/6 Average: Aroclor Concentration (??3> 80.0 46.5 35.0 51.0 56.5;-. 70.0 81.6 73.0 85.3 Aroclor Losses Cf/Hav) 0.264 0.153 0.115 0.168 0.1S6 0.233 0.262 0.241 0.281 . 64.3 0.212 COMPANY CONFIDENTIAL KCNS 056665 HARTOLDMON0034529 DATA SlKJvT V Sample Location: T012I rianc Ki/luenc Average Flew: 900 C7H Da to 4/15 4/16 4/17 4/21 4/22 4/23 4/27 5/4 5/5 5/6 5/7 5/10 5/12 5/20 5/25 6/2 6/3 6/5 6/6 6/7 6/8 6/9 6/10 6/11 6/12 6/13 6/14 6/15 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6 /in /.vcroce : Aroclor Concentration __________(P?3) ___________ 98 150 . 3.300 10,800 | 16,000 675 13,750 16,000 3,300- r 9,750 9,900 3,300 1,327 2,650j 68 216 880 148 360 ' 950 315 3,100 ` 400 760 . 1,540 . 1,875 85 820 520 1,820 490 3,500 3,825 800 720 1.920 1,620 1,460 2,940 680 3,966 3,200 ' a, 1 nn ' . 1,460 Aroclor Losses ___ _ii/davJL__ 1.08 1.65 36.30 119.00" 176.00 9.62 131.00 198.00 36.30 10 7.00 109.00 36.30 14.60 29.207 0.75 2.36 9.70 1.63 3.96 10.45 3.46 34.10 4.40 8.35 . 16.90 20.60 0.94 9.00 5.72 20.00 5.40 38.50 42.00 - 8.80 7.92 21.10 17.80 16.10 32.40 7.47 43.60 35.20 iA 20 15.74 KOhS 05067 HARTOLDMON0034530 1 U.\ta SHEET VI Sample Location: Snow Crock Sampling Station Date 4/13 4/16 4/17 4/18 4/19 4/20 4/21 4/22 4/23 4/24 4/25 4/26 4/27 4/28 4/29 3/1 5/2 5/7 5/8 5/9 3/10 5/11 5/12 5/13 5/14 5/18 5/19 5/20 5/21 5/22 3/23 5/24 5/29 5/30 5/31 6/1 6/2 6/3 6/4 6/5 6/6 6/7 6/8 6/0 Aroclor Concentration (PPM 1,300.0 233.0 124.0 . . 499.0 5,435.0 1,950.0 1,220.0 'i 2,550.0 3,200.0 3,750.0 3,300.0 2,166.0 1,860.0 - 860.0 2,800.0 2,800.0 1,450.0 . 1,320.0 1,760.0 1,840.0 9,600.0 1,740.0 3.8 1,566.0 1,325.0 ' 1,920.0 2,400.0 1,320.0-/ 3,000.0 1,500.0 - 800.0 1,540.0 12.5 5.0 14.8 25-0 16.4 35.0 14.0 1,320.0 140.0 240.0 1C4.0 4:0.0 HCHS 056671 HARTOLDMON0034531 DATA SHEET VI - coadnuod n*tr 6/12 6/13 6/14 6/15 6/16 6/17 6/19 6/20 6/21 ArocLar Concencrnuion fprs) 630.0 760.0 254.0 1.470.0 41.5 110.0 216.0 ' ' 272.0 ' 480 . 0 / Average: 763.0 *Lie*tone piE bing cleaned out - Data not included in average. COMPANY CO.wiGdNTIAL wans 056672 HARTOLDMON0034532 DATA SHEET VII Simple No. Da cc Sami: Location Aroclor Concentration (PPB) Hud Water 1 10-8-69 Snow Creek tt Clmaddie 2.36 x 107 23.3 2 10-8-69 3 10-8-69 4 10-3-69 5 10-8-69 6 11-23-69 Choccolocco Creek at Boiling Spring* (upatreaa froca Honianco'* effluent) Choccolocco Creek *e City Treatment ?lanc (1 block below confluence of Snow and . Choccolocco Creek*) Choccolocco Creek at Jackaon Shoal* (-20 ailea down*tree*) Choccolocco Creek it Eureka Bridge (25 ail** downaextra, south of Choccolocco into Cooaa liver) Snow Creek - 1 block below plant 78 738,000 7,300 3,240 2.19 x 106 8.1 < 2.0 3.8 < 2.0 20,300 7 11-23-69' Snow Creek at Cl middle 1.84 x 106 1,435 8 11-23-69 Choccolocco Creek it Hlgliway 9 . (-15 alia* upatreaa froa the - confluence of Snow and Choccolocco Creak*) 9 11-23-69 Choccolocco Creek it Boiling Spring* (upatreaa froa Hcnaanto '* effluent) 10 11-23-69 Choccolocco Creek at City Treatment Plant (1 block below confluence of Snow and Choccolocco Crieki) 11 11-23-69 Choccolocco Creek it Jackaon Shoali ( -- 20 mile* dovnetream) 1,536 ' 11 26 10 58 470 10 COMPAiNf CONFIDENTIAL HONS 056673 HARTOLDMON0034533