Document qdaOq1MOmK8LaRwoZ7Kg2Z16M

^ff *7 P /vo i~0 C_o ^16 c V I P*-f* X^Aw.sfnj T<uk Ks-rot IFT TECHNICAL SERVICES INC. RECEIVED June 12, 1989 JUN 2o lbo^j Sherry M. Carr Mr. Roy Gottesman The Vinyl Institute 155 Route 46 West Wayne, N.J. 07470 Re: Subject: Vinyl Institute Codes IAPMO Code Development Meetings May 1-4, 1989 Reno, Nevada Dear Roy: Several codes and standards changes which may impact PVC resign usage were considered in Reno by IAPMO. Comments on specific items of interest follow. Text of several of the changes are also attached. 1. Changes 1 thru 4. Adopted. Continue combustible construction restrictions on use of plastic pipe. Will continue the restrictive language. 2. Changes 23 and 24. Adopted. Will require listing of PVC pipe in fire resistive assemblies for that purpose. If such listings (beyond current ASTM/NSF listings) are required, a substantial burden will be added for the pipe producers to operate in this construction industry segment which should be a growth area. 3. Changes 34, 35, 36 and 37. Defeated. Proposed by PPFA to remove the combustible construction restrictions and substitute other language to allow the use of plastic pipe in all fire rated buildings. 1 CTL027896 2550 NINTH STREET, SUITE 112, BERKELEY, CA 94710 TELEPHONE 415-548-3451 FAX 415-548-0290 4. Change 52A. Rejected. Proposed by Bob Wilging of BF Goodrich. Related to joining of plastic pipe to other systems. While it is largely editorial it was rejected by the committee. 5. Changes 62-127. Rejected. Re-introduction of polybutylene supply piping in the Uniform Plumbing Code. 6. Changes 153 and 154. Rejected. Similar to other PPFA submissions to remove combustible construction restrictions. 7. Item IV-2-A (2). Approved as revised. Item provides an installation standard for PVC cold water supply and yard piping. Plastic Pipe Ad Hoc Committee minutes were approved. The Committee considered adoption of ASTM F949-86A. (PVC corrugated sewer pipe standard). Refer to Committee to develop an installation standard. Standards Item 4-3-A (1). Refer the PS 8-77 and CSA items to an Ad Hoc Committee. ANSI standard approved. Motion to adopt PS 8-77 and adopt the CSA standard. These would include PVC drairr, waste and vent pipe and pipe fittings along with ANSI A112.14.1. An item calling for adoption of the ASTM D45511 standard (standard related to PVC flexible concealed water containment membranes) was approved. Item V-2-(J). Referred to Ad Hoc Committee. Adoption of NSF Standard 14. Relates to polybutylene water distribution systems. Item V-2-(M). Approved. Motion to adopt ASTM F891. Standard for co-extruded PVC plastic pipe with cellular core. Group of items including ASTM D1785, 2467, 2607, 2661, 2665, 2672, 2846 and F439 and F628 were considered. Approved. All were PPFA sponsored changes to include updates of ASTM Standard. Item V-5-(E). Rejected. Revision to IAPMO installation standard 9-87-PVC-DWV pipe fittings. Submitted by the City of Los Angeles. Change V-5-(F). Adopted. Also deals with Installation Standard 987 (installation of PVC, DWV and fittings). Also deals with expansion joints. CTL027897 2 Seven changes related to Installation Standard 20-85. Four items approved, one withdrawn and two approved as amended. Deal with the installation of CPVC for hot and cold distribution systems. Series of six items submitted by Bob Wilging which were all approved and largely editorial in nature. Joseph B. zicherman, Ph.D. JZ/cg cc: A1 Reventas A:88-76-1.jun CTL027898 3 INTERNATIONAL ASSOCIATION OF PLUMBING ?3=-{ AND MECHANICAL OFFICIALS international association EEB 24 1989 PROPOSED CODE CHANGE TO A SECTION ANflHZW'BBCmaNStomciAi*; OF THE UPC-USPC-USEC LS 104(f) See also sections 401(a)(2) and 503(a) 2 and appendix 01(a) Note: All Code Sections that may be affected by this change must be listed. Nam Ron Peccl Class of Membership A Chairman, Ad-Hoc Comnittee Jurisdiction/Company You Represent on Combustible Construction Data February 21, 19i Mailing Address 1231 I Street, Room 200_______________________________________________ City SacramentoState CaliforniaZip 95814 THE FOLLOWING AMENDMENT IS SUBMITTED: Section 104 (f) Combustible Construction - For the purpose of this code, combustible construction is a structure in which any member of its structural framework will ignite and bum at a temperature of 1392 F or less. (Re-letter remaining sections) REASON FOR CODE REVISION: The general membership referred this item to the ad-hoc committee on combustible construction during the 1987 conference held in Salt Lake City, Utah and again at the 1988 conference held in Seattle, Washington. The conmittee recommends approval as submitted. CTL027899 Use additional sheets if necessary CODE CHANGE COMMITTEE'S RECOMMENDATION Oo not write betow inis t'ne NO. 11-87 INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC--USEC Section 104 () New Section Note: All Code Sections that may be affected by this change must be listed. Name John MeachatnClass of MembershiD IAPMO Staff Jurisdiction/Company You Represent Combustible Construction Conun. Qate 3/1/8 9 Mailing Address 20001 Walnut Drive South City WalnutSlate CA9JL7J39.. _ THE FOLLOWING AMENDMENT IS SUBMITTED: See Attached REASON FOR CODE REVISION: 'Jse accno'Mi h ni>cessa-v CODE CHANGE C1X027900 COMMITTEE'S RECOMMENDATION NO. SECTION 104<f> ' f > Combustab 1 e Co ns true 11 on - F or. J- he purpose combust lb le tons true 11 on 13 a structure ijn wh 1 eh its structura 1 T -.0 meworwill ionite and burn t 1393 degrees F 1 755.5 degrees CJ_ or. 1 o_ss.._ of this --.ode . no-/ member r ompeature of This section is the same -<s submitted in l':Oi .and r=ferred to the Combostsb1e Construction 1 ommittce. The committee -oted to leave the submittal imcnanoso. CTL027901 r INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC--USEC 'HffFRWfllONM. ASSOCIMIOW 322 FEB 241989 Note: All Code Sections that may be affected by this chan^jjfg^ 0FFVC\M-S Name Ron Pecci Jurisdiction/Company You Represent Class of Membership Chairman, Ad-Hoc Corrmittee on Combustible Construction______ Date February 21. 1989 Mailing Address 1231 - I Street, Room 200 City Sacramento State California Zio 95814 THE FOLLOWING AMENDMENT IS SUBMITTED: Section 322 - Fire Resistive Construction Plumbing installed within or penetrating fire resistive assemblies shall have been tested against nationally recognized standards and listed suitable for the purpose. (Re-number existing 322 to 323) REASON FOR CODE REVISION: The general membership referred this item to the ad-hoc conmittee on combustible construction during the 1987 conference held in Salt Lake City, Utah, and again at the 1988 conference held in Seattle, Washington. The committee reconmends approval. Use additional sneeis >i necessary CODE CHANGE COMMITTEE'S RECOMMENDATION CTL027902 Od not write No. i- ^ APMO CC *9 -3 INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC--USEC Section 322 New Section Note: All Code Sections that may be affected by this change must be listed. Name John MeachamClass of Membership IAPMO Staff Jurisdiction/Company You Represent Combustible Construction Comm. Date 3/1/89 Mailing Address 20001 Walnut Drive South City Walnut State CAZip 91789 THE FOLLOWING AMENDMENT IS SUBMITTED: See Attached REASON FOR CODE REVISION: Use additional sheets >1 necessary CODE CHANGE >iMC opr ; su COMMITTEE S RECOMMENDATION CTL027903 Do not 'VM|c oc'o No. Section 3g Plumbing instaI led within or penetrat 1 ng fire resistive jc = eir b11es shal1 have been tested against nationallv recongni:e standards and 1isted suitable for the purpose. This proposal is the same as submitted m 186 with the e::ceptio of deleting the word "Combustible" at the start of the paragraph The previous submittal read "Combustible plumbing installe within ............" This code change is the result of the work of the Combustibl Construction Committee. Renumber the rest of the Chapter accord mo 1v. CTL027904 INTERNATIONAL ASSOCIATION OF PLUMBING, INATIONAL ASSOCIATION AND MECHANICAL OFFICIALS FEB 28 1939 ) PROPOSED CODE CHANGE TO A SECTION AND^WdOTONSAL OFFICIALS OF THE UPC-USPC--USEC 503 (a) 2 See also Section 401 (a) 2 and Appendix D1 (a) Note: All Code Sections that may be aflected by this change must be listed. Name Paul Shpparrl Class of Membership D-1 skiXiXdDCMao/Company You Represent P las t ic Pipe & Fittings Asso. Date 2/23/89 Mailing Address 800 Roosevelt Road. Building C, Suite 20 City Glen Ellvn.State . Illinois?in 60137 THE FOLLOWING AMENDMENT IS SUBMITTED: Chapter 5, Section 503-Materials (a) Vent piping shall be cast iron, galvanized steel,galvanized wrought iron, lead, copper, brass, Schedule AO ABS DWV, Schedule AO PVC DWV, extra-strength vitrified clay pipe, or other approveo materials having smooth uniform bore except that: (1) No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least six (6) inches (152.A mm) above ground. 2^-ABS-and-PVG-9WV-piping-*nstailafeiens-shaii-be-limited tg-tRese-stFuetuses-wheFe-eenbysfeible-eenstsuefeien-is allewed-r See attached sheet for continuation of "The Following Amendment Is Submitted" REASON FOR CODE REVISION: 1. Protection of structures is addressed in the Building Codes. 2. This protection is for all consequences. Earth quake, snow loading, rain loading, wind resistance, and noncombustible or combustible construction. 3. ICBO adopted additional language, last year (1988), to chapters 1,7,9,17, and A3 of the UBC which gives further structural protection,with regards to penetrations,for all piping materials. See attached sheet for continuation CTI* use additional sheets it necessary of "Reason For Code Revision" Oo nol wnie below tn>s ii COOE CHANGE COMMITTEE'S RECOMMENDATION NO. tt-88 INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS * PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC-USPC--USEC 503 (a) 2 See also Section ACH (a)2 and ftppendix D1 (a) Note: All Code Sections that may be affected by this change must be listed. Name Paul__Shgpard Class of Membership D-1 JiKtedtetisH/Company You RenresentPlast ic Pipe & Fittings Asso. Dale 2/23/89 Mailing Address 800 Roosevelt Road. Building C, Suite 20 city Glen Ellyn,state Illinoiszip 60137* 5 THE FOLLOWING AMENDMENT IS SUBMITTED: Continued from preceding page (2) Where piping is installed and penetrates required fire resistive construction the fire resistive integrity of the construction shall be as required by the Administrative Authority, or when not established by the building code, by qualified testing methods approved by the Administrative Authority. Approval shall be obtained prior to installing any such piping. Remainder of section is unchanged. REASON FOR CODE REVISION: A. All major Model Building Codes contain similar language for protection of structures. 5. There is no reason for discriminatory restrictive language in the UPC, seeing that the structure is protected by the Building Codes. CTL027906 Use additional sheets i( necessary Oo not write below ini* i CODE CHANGE COMMITTEE'S RECOMMENDATION NO. INTERNATIONAL ASSOCIATION OF PLUMBING WlTIOtMI. ASSOCIATION AND MECHANICAL OFFICIALS FEB 28 J9S9 PROPOSED CODE CHANGE TO A SECTION /'U/mbing & Mrc;t'"-M nr, AND/OR SECTION^'1- 2O3FFidAU OF THE UPC--US PC -- USEC 503 (a) 2 See also Section 401 (a) 2 and Appendix 01 (a) Note: All Code Sections that may be affected by this change must be listed. Name Paul Shepard._______________________________ Class of Membership D- i JOXiXC(DC/Company You RepresentPlastic Pipe & Fittings Asso. Date 2/23/8? Mailing Address 800 Roosevelt Road. Building C, Suite 20 CityGlen Ellyn.State. IllinoisZin 60137 THE FOLLOWING AMENDMENT IS SUBMITTED: % Chapter 5, Section 503-Materials (a) vent piping shall be cast iron, galvanized steel,galvanized wrought iron, lead, copper, brass, Schedule ao ABS DWV, Schedule AO PVC DWV, extra-strength vitrified clay pipe, or other approved materials having smooth uniform bore except that: (1) No galvanized wrought iron or galvanized steel pipe shall be used undergrpund and shall be kept at least six (6) inches (152.A mm) above ground. 2}-ABS-and-PVG-0WV-0ipiR-instaliatieRS-shall-fee-4iwited tg-these-stsuatuses-whese-eemfeustible-aenstsuetieR-is allawed-r Remainder of section is unchanged REASON FOR CODE REVISION: 1. Protection of structures is addressed in the Building Codes. 2. This protection is for all consequences. Earth quake, snow loading, rain loading, wind resistance, and noncombustible or combustible construction. 3. ICBO adopted additional language, last year (1988), to chapters 1,7,9,17, and A3 of the UBC which gives further structural protection,with regards to penetrations,for all piping materials. See attached sneet for continuation useaddiiionisheeisiinecessary of "Reason For Code Revision" CTL027907 00notwntebe'o.vihi. CODE CHANGE COMMITTEE'S RECOMMENDATION NO. INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC-USPC--USEC 503 (a) 2 See also Section aqi (a)2 and Appendix D1 (a) H | Note: All Code Sections that may be affected by this change must be listed. Nama Paul Shpoard Class of Membership D-l JlKtedtatisn/Company You RepresentPlastic Pipe & Fittings Asso. Date 2/23/8? Mailing Address 800 Roosevelt Road, Building C, Suite 20 r.ity Glen Ellyn,state Illinois?jn 60137* 4 5 THE FOLLOWING AMENDMENT IS SUBMITTED: REASON FOR CODE REVISION: 4. All major Model Building Codes contain similar language for protection of structures. 5. There is no reason for discriminatory restrictive language in the UPC, seeing that the structure is protected by the Building Codes. CTL027908 Use additional sheets if necessary COOE CHANGE COMMITTEE'S RECOMMENOATION Oo not wnte 5e<0" tnis NO. n as INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS NATIONAL association FEB 28 1989 PROPOSED CODE CHANGE TO A SECTION ANDf<5$WfctlN8iCAl. official OF THE UPC--USPC-USEC 401 (a) 2 See also Section 503 (a) 2 and Appendix 01 (a) Note: All Code Sections that may be affected by this change must be listed. Name Paul Sheoard Class of Membership D~ 1 JUtMitaft/ComDanv You Represent Plastic Pipe & Fittings Asso. Dale 7/7-WR9 Mailing Address 800 Roosevelt Road, Building C, Suite 20________________________ City Glen Ellyn,state IllinoisZip_^2_L2Z___ THE FOLLOWING AMENDMENT IS SUBMITTED: Chapter A, Section 401-Materials (a) Drainage piping shall be cast iron, galvanized steel, galvanized wrought iron, lead, copper, brass, Schedule 40 AES DWV, Schedule 40 PVC OWV, extra-strength vitrified clay pipe, or other approved materials having smooth and uniform bore except that: (1) No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least six (6) inches (152.a mm) above ground. 2}_ASS-aAd-PVG-9WV-oipiR-insfeallafe4gns-shali-be-limited ^g-febese-sfcfuefcufes-whese-aembusfeibie-aensfesuefcien-is aliawed-r See attached sheet for continuation of "The Following Amendment Is Submitted" REASON FOR COOE REVISION: 1. Protection of structures is addressed in the Building Codes. 2. This protection is for all consequences. Earth quake, snow loading, rain loading, wind resistance, and noncombustible or combustible construction. 3. ICBO adopted additional language, last year (1988), to chapters 1,7,9,17, and 43 of the UBC which gives further structural protection,with regards to penetrations, for all piping materials. CTL027909 See attached sheet for continuation Use additional sheets il necessary pf "Reason For Code Revision" Oonotwriieoetowih.il. CODE CHANGE COMMITTEE'S RECOMMENDATION NO. u.88 INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC--USEC ixQ 1 (a) 2 See also Section 503 (a)2and Appendix D1 (a) Note: All Code Sections that may be affected by this change must be listed. Name____ Paul 5heoard Class of Membership P-1 iurtediottOM/Company You Represent Plastic Pine h Fittings Assn. Date 7/?3/ft9 Mailing Address--aCLQ . Roose ve 11 Road. Building C. Suite 7.0 CityGlen. ..11 yn,State Illinois Zip. 60137 THE FOLLOWING AMENDMENT IS SUBMITTED: Continued from preceding page (2) Where piping is installed and penetrates required fire resistive construction the fire resistive inteqrity of the construction shall be as required by the Administrative Authority, or when not established by the buildinq code, by qualified testinq methods approved by the Administrative Authority. Approval shall be obtained prior to installing any such piping. Remainder of section is unchanged. REASON FOR CODE REVISION: 6. All major Model Building Codes contain similar language for protection of structures. 5. There is no reason for discriminatory restrictive language in the UPC, seeing that the structure is protected by the Building Codes. CTL027910 Use additional sheets if necessary CODE CHANGE COMMITTEE'S RECOMMENDATION Do not write Oetow this tir NO. r INTERNATIONAL ASSOCIATION INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS FEB 2 8 1989 PLUMBING A MECHANICAL OFFIC'Al PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC --USEC 401 (a) 2 See also Section 503 (a) 2 and Appendix 01 (a) Note: All Code Seclions that may be allecled by this change must be listed. Name Paul Sheoard Class o( Membership 0-1 XXKMfrfcKMK/Company You Represent Plastic Pipe & Fittings Asso. Date 7/71/R9 Mailing Address 800 Roosevelt Road. Building C, Suite 20 r.ity Glen Ellvn.state Illinois 7in 60137 THE FOLLOWING AMENDMENT IS SUBMITTED: Chapter 4, Section 401-Materials (a) Drainage piping shall be cast iron, galvanized steel, galvanized wrought iron, lead, copper, brass, Schedule 40 AES OWV, Schedule 40 PVC DWV, extra-strength vitrified clay pipe, or other approved materials having smooth and uniform bore except that: (1) No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least six (6) inches (152.4 mm) above ground. 2}-ABS-aRd-PVS-OWV-pipiRg-instaliatians-shall-be-limited fcg-fchssa-sfcrusfcufes-wheFe-eapRbwsfcibie-eaRsferuetien-is ailawed-r Remainder of section is unchanged REASON FOR CODE REVISION: 1. Protection of structures is addressed in the Building Codes. 2. This protection is for all consequences. Earth quake, snow loading, rain loading, wind resistance, and noncombustible or combustible construction. 3. ICBO adopted additional language, last year (1988), to chapters 1,7,9,17, and 43 of the UBC which gives further structural protection,with regards to penetrations,for all piping materials. See attaches sheet for continuation U$ additional sheets il necessary of "Reason For Code ReviS-On1 CTL027911 Do not wnie 0< COOE CHANGE COMMITTEE'S RECOMMENDATION NO. # INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED CODE CHANGE TO A SECTION AND/OR SECTIONS OF THE UPC--USPC--US EC 401 (a) 2 See also Section 503 (a)2and Appendix 01 (a) Note: All Code Sections that may be affected by this change must be listed. Name Paul Shepard Class of Membership n- 1 iorisdiottca/Company You Represent P1 a st-i c Pipp ft Fittings. Assn. Date 7/75/R9 Mailing Address__ 800 Roosevelt Road. Building Cf Suite 70 City Glen Ellyn.State Illinois Zip -6013.7* * 4 5 THE FOLLOWING AMENDMENT IS SUBMITTED: REASON FOR CODE REVISION: 4. All m*Jo Model Building Codes contain similar language for protection of structures. 5. There is no reason for discriminatory restrictive language in the UPC, seeing that the structure is protected by the Building Codes. CTL027912 Use additional sheets it necessary CODE CHANGE COMMITTEE'S RECOMMENDATION Oo no< wftie oe'ow ihts i NO. INI tHNAI IUNAL ASSUUIAIIUN UF PLUlffUINU hn AND MECHANICAL OFFICIALS nternational association FEB 24 1989 Name PROPOSED CODE CHANGE TO A SECTION AND/OR OTlbf^CHANICAl 0FF,CIAL OF THE UPC--USPC--USEC Uniform Plumbing Code Section 804 (f) (Also IS 20-85 Section 804.1) Note: All Code Sections that may be affected by this change musl be listed. Robert C. Wilging Class of Membership. Jurisdiction/Company You Represent BFGoodrich Co. Date 2/20/89 Mailing Address6100 Oak Tree Blvd.; City Cleveland State OhioZip 44131 . THE FOLLOWING AMENDMENT IS SUBMITTED: Section 804--Special Joints (f) Plastic Pipe to Other Materials--When connecting plastic pipe to other types of piping use only approved types of fittings and adapters -designed* suitable for the specific transition intended. REASON FOR CODS REVISION: The most widely, used transition fittings are male threaded adapters. I believe every manufacturer of plastics fittings makes them and has them listed in the IAPMO Directory of Research Recommendations. While they are not unique in design since they meet standard pipe thread tolerances, they have certainly been proven to be suitable for connecting plastic piping to other materials. CTL027913 Us* additional sheets If necessary Oo not write below this line CODE CHANGE COMMITTEE'S RECOMMENDATION NO. 11-S8 r ^v INTERNATIONAL ASSOCIATION OF PLUMBING^Ss- : ` AND MECHANICAL OFFICIALS - ** - ; PROPOSED STANDARD CHANGE(S) ~~ OT VvOri . Standard Number & Title IATMO IS 9-87 Section Numbers) 802.3 Note: All Sections that may be affected by this change must be listed. Name---- Phil BeaufordClass of Membership City Of Los Angeles Jurisdiction/Company You Represent _Date B 2-27-39 Mailing Address 1143 Knollwood Drive_____________________________________________________ Newbury Park City StateZip CA 91320 THE FOLLOWING AMENDMENT IS SUBMITTED: 802.3 Threaded Joints Listed adapter fittings shall be used for the transition to threaded connections* No threaded female- FVC fitting(s) or joint(s) shall be located in a non-accessible location. The joint between the PVC pipe and adapter fitting shall be of the solvent cement type. Only thread tape or thread lubricant, specifically intended for use with plastics, shall be used. Conventional pipe thread compounds, putty, linseed oil base products and unknown mixtures shall not be used. Pipe and fittings which have come in contact with the above non-approved mixtures shall be removed and replaced with new materials. ''there a threaded joint is made, obtain tightness by maximum hand tightening plus additional tightening with a strap wrench not to exceed one full turn. REASON FOR REVISION**To provide access for both male and female threaded fittings and joints. Use additional sheets if necessary INTERNATIONAL ASSOCIATION MAR 1 1989 PLUMBING S MECHANICAL OFFICIALS COMMITTEE'S RECOMMENDATION CTL027914 JonoHPnTSTO^^'S tin* No. INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS PROPOSED STANDARD CHANGE(S) ^ ^ S-- tfj TWTERNATIONAL association JAN 2 5 1989 IAPMO IS_9..-87----------------------------------------------PlllMBIWG-tMECHANICAlOFFICIALS Standard Number S Title Installation Standard for PVC Building Draini Waste -and--Vent -Pipe and Fittings--------------------------! Section Numberts) 806.1 Prohibited Fittings and Connections_____; Note: All Sections that may be affected by this change must be listed. Name Fady Mattar, P.E. Class of Membership____A Jurisdiction/Company You Represent Los Angeles County Date January 5 f 1 gag Mailing Address 900 So. Fremont Avenue City__AlhambraState_G&Zip____________________________________9.1803-1311____ THE FOLLOWING AMENDMENT IS SUBMITTED: Add new section: 806.1 - Prohibited Fittings and Connections (a) Drainage System--Any fitting or connection which has an enlargement, chamber or recess with a ledge, shoulder or reduction of pipe area, that offers an obstruction to flow through the drain is pro hibited. (b) No fitting or connection that offers abnormal obstruction to flow shall be used. The enlargement of a three (3) inch (76.2mm) closet bend or stub to four (4) inches (101.6mm) shall not be considered an obstruction. REASON FOR REVISION: 1. To reinforce the installation standard with good code language. 2. Similar language is proposed in the IS 6 Installation Standard for Hubless Cast Iron Sanitary and Rainwater Systems. 3. To develop uniformity with the installation standards for the various DWV piping materials. CTL027915 Use additional sheets it necessary COMMITTEE'S RECOMMENDATION Do not write below Imr NO. 11-88