Document qdR54EoBEoa5K9v6z3evG7MEM

Federal Register / Vol. 51, No. 119 / Friday, June 20, 1986 / Notices 22585 normally make a final determination reasonable specificity. Contentions shall addressed to George W. Knighton: unless it receives a request (or a. be limited to matters within the scope of petitioner's name and telephone hearing. the amendment under consideration. A number; date petition was mailed; plant Comments should be addressed to the petitioner who. fails to file such a name; and publication date and page Rules and Procedures Branch. Division supplement which satisfies these number of this Federal Register notice. of Rules and Records, Office of requirements with respect to at least one A copy of the petition should also be Administration, U.S. Nuclear Regulatory contention will not be permitted to sent to the Executive Legal Director, Commission, Washington, DC 20555. participate as a parly. U.S. Nuclear Regulatory Commission, By July 21,1980, the licensee may file Those permitted to intervene become Washington, DC 20555, and to Nicholas a request fur a hearing with respect to parties to the proceeding, subject to any S. Reynolds. Esq., Bishop, Liberman. issuance of the amendment to the limitations in the order granting leave to Cook, Purcell and Reynolds, 1200 subject facility operating license and intervene, and have the opportunity to Seventeenth Street, NW,, Washington. any person whose interest may be participate fully in the conduct of the DC 20036. affected by this proceeding and who hearing, including the opportunity to Nontimely filings of petitions for leave wishes to participate as a parly in the present evidence nnd cross-examine to intervene, amended petitions, proceeding must file a written petition for leuve to intervene. Request for a hearing and petitions for leuve to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board Panel, will rule on the request and/ar petition and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order. As required by 10 CFR 2.714, a petition for leave to intervene shall set witnesses. if a hearing is requested, the Commission will make final determination on the issue of no significant hazards consideration. The final determination will serve to decide when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and muke it effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment. Normally, the Commission will not issue the amendment until the expiration of the 30-day notice period. supplemental petitions and/or requests for hearing will not be entertained absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board, that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)('l)(i)-r(v) and 2.714(d). For further details with respect to this action, see the application for amendment which is available for public inspection at the Commission's Public Document Room. 1717 H Street. NW.. Washington. DC, and at the Tomlinson Library, Arkansas Tech University, Russellville. Arkansas 72801. forth with particularity the interest of However, should circumstances change Dated at Duthesda. Maryland, this t7lh day the petitioner in the proceeding, and during the notice period such that failure of )une 1986. how that interest may be affected by the to act in a timely way would result, for For the Nuctcur Regulatory Commission. results of the proceeding. The petition example, in derating or shutdown of the George VV. Knighton, should specifically explain the reusons facility, the Commission may issue the Director, PIVR Project Directorate Ato. 7. why intervention should be permitted license amendment before the Division of PWR Licensing--B. with particular reference to the expiration of the 30-day notice period, [FR Doc. 86-13999 Filed 6-19-86; 8:45 am) following factors: (1) Thd nature of the petitioner'sright under the Act to be provided that its final determination Is that the amendment involves no BILUMO COOS 75SO-OI-4* made a party to the proceeding; (2) the significant hazards consideration. The nature and extent of the petitioner's property, financial, or other interest in the proceeding: and (3) the possible final determination will consider all public and State comments received. Should the Commission take this action, PENSION BENEFIT GUARANTY CORPORATION effect of any order which may be entered in the proceeding on the ' petitioner's interest. The petition should also identify the specific'aspect(s) of the it will publish a notice of issuance and provide for opportunity for a hearing after issuance. The Commission expects that the need to take this action will Arbitration o< Disputes In Multiemployer Plans; PBGC-Approved Arbitration Procedure subject matter, of the proceeding as to. which petitioner Wishes to intervene. occur very infrequently. A requost for a hearing or a petition AGENCY: Pension Benefit Guaranty Corporation. Any person who has filed a petition for leave to intervene or who has been for leave to intervene must be filed with the Secretary of the Commission, U.S: ACTION: Notice of approval. admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above. Not later than fifteen (15) days prior to the first prehearing.conference scheduled in the proceeding, a petitioner Shall file a supplement to the petition to intervene which must include a lint of Nuclear Regulatory Commission, . Washington, DC 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission^ Public Document Room, 1717 H Street, NW., Washington, DC, by the above date. Where petitions are filed during the last ten (10) days of the notice period, it is requested thut the petitioner promptly so inform the Commission by a toll-free telephone call to Western Union at (800) 325-6000 (in Mjssouri (800) 342-6700). summary: This notice advises employers, mulliemployer pension plan sponsors and other interested parties that the Pension Benefit Guaranty Corporation has apporved an alternative procedure for the arbitration of withdrawal liability disputes arising between employers and mulliemployer pension plan sponsors. EFFECTIVE DATE: This approval is effective June 20,1986. the contentions which are sought to be . The Western Union operator should be FOR FURTHER INFORMATION CONTACT: litigated in the matter, and the bases for given Datagram Identification Number Renae R. Hubbard, Special Counsel. each contention set forth with 3737 and the following message Corporate Policy and Regulations GLEASON-000850