Document qdLrLz2OMNO4Bo0ZK8YNRGr5j

- Monsanto k Cm nam{ 4 lCKa' C*** - - ------------------------- R . A HprnanHpy. - Texas City. Texas December 10, 1979 HOURLY SAFETY COMMITTEE MEETING TUESDAY, OCTOBER 31, 1979 OA-2 Plant Manager's Safety Board SHAC Committee Hourly Safety Committee: J. R. Bessire 19/24 D. Barnhill AB Hugh Bowen SS-6 Greg Bryan 51D Andrew Caine SS-26 Joe Lowe SS-9 i Dudley Packard SS-11 ! 0. C. Patterson 15/16 I i ; A. Old Business j 1. A concern was re-expressed about Asbestos Handling, ! especially by Contractors. Although we do a good job of handling it while removing it, our precautions breakdown when transporting the used material from the work site to the disposal site (littering the streets) and handling it at disposal site. 2. I advised the Committee tha t as a result of their past concerns, a SHAC notic e would be forthcoming alerting the plant about do ing a good job on decontaminating small pieces of equipment and such unob- 1 trusive items as scaffold b oards, insulation, etc. (notice has been issued). / (S /l`/- /- V l / ; tf- / A suggestion was re-express ed about the possibility of installing signs throughout the plant on fundamental action to take in case of a plant emergency. This would be aimed more at new employees and contractors, I advised our principal thr ust in this area should be more in the continued empha sis on training and communieating for all new people. t />. At*- Business The following SHAC notices were reviewed! IP What to do if Breathing Air Becomes Contaminated. Change of Emergency All-Clear. Loss Reduction on Motor Bearing Failures. SC 17132 LAM025384 Hourly Safety Committee -2- December 10, 1979 B. New Business - cont'd. 2. The enforcement of Traffic Control, especially with regards to Contractor Vehicular Traffic, was dis cussed. Plant Security has been placing more emphasis on the control of traffic within the last few months; however, it takes all of us doing our parts in correct ing unsafe acts and/or bringing up violations to the attention of Plant Security. 3. A concern was expressed about a portable pipe cutting machine in the Main Shop, specifically the potential damage to the electrical cord as it is not in conduit. Work is currently underway in correcting the situation. 4. The question was brought up of when is the best time to train new employees on Fire Fighting and should not truck drivers and fork lift operators also take this training? 5. Hazards with "Bic" lighters as possible explosion devices, especially while welding, was brought to light. Although lighters are not allowed in the plant, this could be a hazard outside the plant. (A bulletin has since been issued by Safety concerning the hazards of these lighters.) R. A. Hernandez SHAC Chairman SC 17133 LAM025385