Document qdLN0G6q7DanYNvp3E16jGrzx
UNITED STATES
AGENCY
ENVIRONMENTA
PROTECTION
REGION 1
NEW ENGLAND REGIONAL LABORATORY
NORTH CHELMSFORD, MA 01863
Date:4/17/2024
Subject:Inspection Report
Compliance Sampling Inspection
Tender Corporation d / b / a Adventure Ready Brands'TM
Digitally signed by WILLIAM
From:William Sommer, InspectorWILLIAM SOMMER SOMMER
Field Services Branch (FSB)Date: 2024.04.17 08:52:45 -04'00 '
Laboratory Services and Applied Science Division (LSASD)
Anna Hatke, Life ScientistANNA
LSASD - FSBHATKE
Digitally signed by
ANNA HATKE
Date: 2024.04.17
08:46:49 -04'00 '
Reviewed By:JeLrSoAmSeD K- ee fFeS,B FDia eltde :T e2a0mJ2 EL4Re.OaM0dE4e .Kr1 EE8 sFi Eg0 nD8ie:gd0 i t7ba: yl0 lyJ6
E R-O0M4E' 0 KE0E F'E
To:Newton Tedder, Acting Manager
Water Compliance Section 1
Enforcement and Compliance Assurance Division (ECAD)
CC:Damian Bednarz, Inspector
ECAD - EWC
I. Facility Information
A.Facility Name: Tender Corporation d / b / a Adventure Ready Brands --
B.Facility Location: 944 Industrial Park Road, Littleton, NH 03561
C.Facility Contact(s): John Gaulin, Chief Operating Officer
jgaulin@adventurereadybrands.com (800) 258- 4696,
Patience Marsh, QAIRA Manager,
Anastasia Keats, QC Manager
D.National Pollutant Discharge Elimination System (" NPDES ") ID Number: NHPIU0014
II. Background Information
A.Date and time of inspection: 2/21/2024
Facility entrance: 13:00
ED_019088A_00004336-00001
Tender Corporation d / b / a Adventure Ready Brands -- M (NHPIU0014)
EPA IU Compliance Sampling Inspection
Facility exit: 15:41
B.Weather Conditions: 34 F, sunny, with little cloud cover
C.US EPA Representative(s): William Sommer, Nafisah Ali, Ryan Leo, Anna Hatke
D.State / Local Representative(s): Doug Damko, Director of Public Works, The Town of
Littleton POTW) ddamko@townoflittleton.org, Eric Oliver, Public Works Pre - Treatment
Coordinator, The Town of Littleton POTW eoliver@townoflittleton.org
E.Federally Enforceable Requirements Covered During the Inspection: 40 C.F.R. Part 403,
General Pretreatment Regulations, 40 CFR Part 439.27- Pharmaceutical Manufacturing
Point Source Category Subpart B-Extraction Products 40 C.F.R. Part 455.47- Pesticide
Chemicals Formulating and Packaging Regulations
F.Previous Enforcement Actions: Administrative- Formal
Docket Number: CWA-AO-R01-FY20-29
Enforcement Type: CWA 309A AO For Compliance
III. Disclaimer
Unless otherwise noted, this report describes conditions at the facility / property as observed by
EPA inspector(s), and / or through records provided to and / or information reported to EPA
inspector(s) by facility representatives and as understood by the inspector(s). This report may
not capture all operations or activities ongoing at the time of the inspection. This report does
not make final determinations on potential areas of concern. Nothing in this report affects
EPA's authorities under federal statutes and regulations to pursue further investigation or
action.
IV. Type and Purpose of Inspection
US EPA Region 1 representatives William Sommer, Nafisah Ali, Anna Hatke, Ryan Leo, and
Damian Bednarz (the " EPA Inspection Team ") conducted an announced NPDES Industrial User
(" IU ") pretreatment sampling inspection at Tender Corporation d / b / a Adventure Ready
Brands --, a privately - owned industrial facility (" the facility "), located in Littleton, NH.
The purpose of this inspection was to collect representative effluent wastewater samples and
assess the facility's compliance with the EPA general pretreatment regulations in 40 CFR 403,
the applicable EPA categorical pretreatment standards in 40 CFR 439.27 and 40 C.F.R. Part
455.47, and applicable provisions including but not limited to industrial local limits in the
facility's industrial discharge permit (IDP) issued by the Town of Littleton, NH.
V. Facility Description
According to the facility's website, Tender Corporation d / b / a Adventure Ready Brands was
established in 1975. The facility manufactures pharmaceutical and pesticide products for
Page 2 of 10Inspection Date: 2/21/2024
ED_019088A_00004336-00002
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
external or internal human consumption, primarily in the form of ampoules, tablets, capsules,
vials, ointments, medicinal powders, solutions, and suspensions. Specific brands and products
produced by this facility include After Bite, Ben's and Natrapel insect repellant, first aid kits
from Adventure Medical Kits, Easy Care First Aid --, survival products from Survive Outdoors
Longer, Rapid
outdoor water purifiers, bear spray from Counter
, and newly
acquired LuminAID that provides solar powered lanterns.
According to a prior facility inspection report, one discharge point is present in the facility,
" Outfall 1 ", which discharges to the Littleton Publicly Owned Treatment Works (" POTW ")
(NPDES Permit No. NH0100153). Two processing lines are present at the facility, one
pharmaceutical processing line and one pesticides processing line. " Outfall 1 " is located at the
end of the pharmaceutical processing line. According to John Gaulin, Chief Operating Officer of
the facility, there is no discharge from the pesticide processing line to Littleton POTW. The
facility's Significant Industrial User (" SIC ") Codes are 2834 (Pharmaceutical Preparations), and
2879 (Pesticides and Agricultural Chemicals, Not Elsewhere Classified).
VI. Inspection
On 2/6/2024 Damian Bednarz announced the inspection to the facility. On 2/21/24 the EPA
Inspection Team entered the facility at approximately 13:00.
VI.A. Opening Conference
At 13:10, the EPA Inspection Team held an opening conference with Doug Damko and Eric
Oliver from the Town of Littleton POTW (the " Local Representatives "), and facility
representatives John Gaulin, Patience Marsh, and Anastasia Keats (the " Facility
Representatives "). Mr. Sommer and Mr. Bednarz presented credentials to the facility and Local
Representatives. Mr. Sommer explained the purpose of the wastewater sampling inspection.
Mr. Gaulin explained that Tender Corporation d / b / a Adventure Ready Brands -- employs 78 full-
time employees and 2 part - time employees in manufacturing. The facility has two ten - hour
operating shifts on Monday through Thursday.
Mr. Gaulin explained that the facility has an automated wastewater pretreatment system that
batch discharges to the Littleton POTW. Wastewater sent to the pretreatment system is
generated from the facility's pharmaceutical processing line. The pesticide processing line
present at the facility does not discharge to the facility's pretreatment system and does not
discharge to the POTW. All floor drains present in the pesticide process line room are plugged.
Mr. Gaulin explained that in the past, Veolia, a third - party contractor, was hired for wastewater
removal from the facility's pesticide processing line. Mr. Gaulin explained the facility recycles
rinsate through the facility pesticide processing line and removal is no longer necessary. Veolia
is now utilized for disposal of expired key product returns.
Page 3 of 10
Inspection Date: 2/21/2024
ED_019088A_00004336-00003
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
Mr. Gaulin explained that in November through December of 2022, the facility underwent
renovations. A new dividing wall was installed between the pharmaceutical process line and
the pretreatment room. This addition was included in the updated facility schematic.
Mr. Gaulin explained two emergency stop buttons were installed, one of which is located at the
automatic sump pump in the pharmaceutical pretreatment room. Ms. Ali asked if the addition
of the emergency stop buttons were included in the updated facility schematic. Mr. Gaulin
explained they were not included on the updated facility schematic. Ms. Ali asked if " Outfall 1 "
is labeled on the updated facility schematic. Mr. Gaulin explained that " Outfall 1 " is not labeled
on the updated facility schematic.
Ms. Hatke asked if emergency shutoff valves are present at the facility. Ms. Marsh explained
that the facility requires employees to attend training for use of facility shut off valves upon
hiring and during document changes.
Mr. Gaulin explained grab samples are collected from " Outfall 1 " by facility personnel once a
week for pH measurements.
Mr. Bednarz explained, upon review of facility records, that the facility reported weekly and
monthly averages for pH and monthly averages for flow. He explained that there was one
periodic report for compliance (" PRC ") that did not have discharge representative pH data, and
that flow is typically reported as one representative month of flow out of the 6-month
operational duration of the PRC.
Mr. Gaulin explained the facility uses Chemserve, a contract laboratory, for facility sample
analysis. Samples collected by facility personnel are sent to Chemserve within 24 hours of
collection.
The Facility Representatives announced that the wastewater pretreatment system would not
be discharging during the sampling. The Facility Representatives explained sanitized water
would have to be fed into the wastewater pretreatment system to generate effluent.
Mr. Sommer asked if the facility wanted split samples. Mr. Gaulin declined.
VI.B. Plant Inspection
At 14:04, the Local Representatives departed the facility for the day. The Facility Representatives
lead the EPA Inspection Team to the personal protective equipment outfitting room and the EPA
Inspection Team donned Tyvek suits, gloves, safety glasses and hair nets. The EPA Inspection
Team, except for Mr. Bednarz, and the Facility Representatives, except for Mr. Gaulin, walked to
the facility pretreatment system. Mr. Gaulin and Mr. Bednarz agreed to conduct an inspection of
the remainder of the footprint of the Facility while sampling was conducted in the pretreatment
room.
Page 4 of 10
Inspection Date: 2/21/2024
ED_019088A_00004336-00004
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
At the pretreatment system, the EPA Inspection Team observed the emergency stop for the
automatic sump - pump (Photo 1) and the 300 and 1,000-gallon pharmaceutical mix tanks. The
EPA Inspection Team observed two floor drains, one on the upper level, and one on the lower
level beneath the tanks, both of which lead to the sump. Ms. Marsh and Ms. Keats showed the
EPA Inspection Team the pH neutralization unit which is attached to the sump. They explained
that a digital meter attached to the pretreatment system depicts flow and pH. The station also
has a paper flow meter attached to the pretreatment system (Photo 2). The EPA Inspection Team
observed a valve, labeled " Outfall 1 ", where Mr. Gaulin said the facility samples treated
wastewater is sampled (Photo 4).
The EPA Inspection Team began sampling set up at approximately 14:34 at " Outfall 1 ". To trigger
the batch discharge from the pretreatment system Ms. Marsh fed a sanitized water line hose to
a port in the " wastewater " pipeline (Photo 3). Samples were collected from the " Outfall 1 " valve
on the " Treated Water " pipeline. Prior to sample collection, the valve was opened and allowed
to run for proximately 30 seconds into a catch bucket to purge the line. Grab and duplicate
sample collection occurred at 15:00. Details of the sampling event can be found in Section VII:
" Wastewater Sampling ".
The EPA Inspection Team rejoined Mr. Gaulin and Mr. Bednarz in front of a packaging room after
completion of the sampling event.
VI.C. Closing Conference
At approximately 15:20, the EPA Inspection Team and Facility Representatives reconvened for
the closing conference.
Mr. Bednarz stated he witnessed a spill during his tour of the pesticide process line, due to the
overfilling of a mixing tank. Mr. Gaulin stated that the material from the spill clean - up will be
stored in 55-gallon drums, as well as the mop heads used to clean up the spill. Ms. Marsh stated
that an email would be sent to Mr. Bednarz outlining the volume of water used to wash out
tanks in the pesticide process room.
Mr. Bednarz reiterated that pH and flow data ought to be representative of every instance
where discharge is occurring to the POTW.
Ms. Ali and Mr. Sommer requested an updated schematic from the facility to include e - stops,
drains, and " Outfall 1 ".
The EPA Inspection Team departed at 15:41.
VII. Wastewater Sampling
Page 5 of 10
Inspection Date: 2/21/2024
ED_019088A_00004336-00005
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
The sampling activities were conducted in accordance with the FSB Standard Operating
Procedure (SOP) for Collection of NPDES Water and Wastewater Samples contained in FSBSOP-
NPDESWATERSOP, Revision 2, 2020, and the signed Sampling and Analysis Plan (SAP).
Mr. Sommer, Ms. Ali, and Mr. Leo collected all the samples described below. Grab samples
(" Tender-01 ") were collected from Outfall 1 valve on the " Treated Water " pipeline for the
analysis of Volatile Organic Analytes (VOAs), acetone and methylene chloride. A field duplicate
sample (" DUP-01 ") was collected for each analysis during the sampling inspection. An
instantaneous grab sample was collected for the in - situ measurement of pH and Total Residual
Chlorine (" TRC "). The sample was field tested for pH using an Oakton " pH tester " pH meter. The
pH reading was 8.44 S.U. The pH meter was calibrated prior to the inspection by Ms. Hatke on
2/20/24, using National Institute of Standards and Technology traceable standards.
TRC was analyzed in the field using a HACH " DR300 " colorimeter by Ms. Ali. The TRC reading
was 0.00 mg / L. The Hach DR300 colorimeter was verified according to manufacturer specifications,
prior to the inspection using SpecCheck DPD chlorine standards by Ms. Hatke on 2/20/2024.
The VOA samples were collected in 40-mL amber vials and preserved with hydrochloric acid to
attain a pH of less than 2 S.U. After collection, all samples were placed in coolers with ice to
maintain an internal temperature of less than 4 degrees Celsius and delivered to the EPA New
England Regional Laboratory in North Chelmsford, MA to be analyzed.
VIII. EPA Sampling and Analytical Results
The table below provides a summary of the laboratory analytical results and field parameters
collected during the inspection. For a full list of compounds analyzed for each parameter and
their results, refer to the laboratory reports that are attached to this inspection report,
Attachment A.
Table 1: Summary of Field Parameters and Laboratory Analytical Results for Inspection of
Tender Corporation d / b / a Adventure Ready Brands -- on February 21, 2024
Pretreatment
SampleStandards for 40 CFR
EPA Analytical Results
Sample Date Sample pH TRCPart 439.27
(mg / L unless
#andType (S.U.) (mg / L)DailyMonthly
otherwise noted)
TimeMaximum Average
(mg / L)(mg / L)
Tender- 2/21/24 Grab 8.44 0.00 VOCs 0.011 20.7 8.2
01 15:00acetone
VOCs ND 3.0 0.7
methylene (<.001)
chloride
Page 6 of 10Inspection Date: 2/21/2024
ED_019088A_00004336-00006
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
DUP-01 2/21/24 Dup. of N / A N / A VOCs0.012 20.7 8.2
15:00 Grabacetone
VOCs ND 3.0 0.7
Footnotes:
methylene (<.001) 1
chloride
1. Reporting Level
Compounds that were analyzed but not listed in Table 1 are Not Detected above Reporting
Limit (ND). The trip blanks were prepared prior to the mobilization.
IX. Appendices
A: Photos
Emergency
sewer shut - off
2024/02/21
15:24
Photo 1: Emergency shut off button located in the facility's pretreatment room.
Page 7 of 10Inspection Date: 2/21/2024
ED_019088A_00004336-00007
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
Paper
flow
Electric
flow
and pH
monitor
2024/02/21
15:26
Photo 2. Facility's pretreatment system with paper flow monitor, and electronic flow and pH
monitor. The categorical sampling location for " Outfall 1 " is located on the bottom right above
the catch bucket.
TREATED
WATER
INTA
INVITUVO
CategoricalPort where
sampling
sanitized water
location forhose was
Outfall 1connected
2024/02/21
15:26
Page 8 of 10Inspection Date: 2/21/2024
ED_019088A_00004336-00008
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
Photo 3. The port where the sanitized water hose was connected to is located on the right-
hand side, on the " Wastewater " pipe. The categorical sampling location for " Outfall 1 " is
located on the left over the catch bucket.
GUTFALL!
Treated water line
2024/02/21
15:27
Photo 4. The categorical sampling location for " Outfall 1 " which is connected to the " treated
Water " line and from where sampling occurs.
B. Laboratory Analysis
Page 9 of 10
Inspection Date: 2/21/2024
ED_019088A_00004336-00009
Tender Corporation d / b / a Adventure Ready BrandsTM (NHPIU0014)
EPA IU Compliance Sampling Inspection
End of Report
Page 10 of 10
Inspection Date: 2/21/2024
ED_019088A_00004336-00010