ABERDEEN MONTHLY PROGRESS REPORT NOVEMBER, 1989
VISIA
Safety
There were two first aid and one recordable (RWC) cases reported during November. The recordable case involved a compound unit operator who severed the top of his right index finger when it was caught in the hinge side of a closing door. At month's end, the plant's employees had worked 3,801 days (5,037,551 manhours) since the last lost time injury.
On November 6, the plant's employees reached 5,000,000 manhours without a lost time injury - a Vista record.
Kev Statistical Information PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
November 37.9 90.1 95.9
0.99838 6.5
98.0 4.6
98.6 1.5
89.7 < 9.5> <107.1>
61.9
Y.T.D. 70.8 82.6 96.7
0.9978 13.0 97.9 8.1 99.1 3.0 90.1
< 6.9> <46.6> 136.7
Capacity Utilization Factors Resin Flexible Compound Rigid Compound Plasticizer
103.6 83.3 75.0 80.6
95.2 83.7 65.6 84.9
Waste Reduction Indices (%) Offsite, Hazardous Wastes Recycled, Hazardous Wastes Offsite, Non-Hazardous Wastes Vulnerable By-Products Total Waste Water Air and Water
157.7m 101.9(,)
79.2(,) 93.5n> 105.6n> 78.6(1>
194.1 117.6
91.1 106.4 118.0
85.9
(1) Three-month rolling average.
VAB.0001190269
T. H. Huffman 12/18/89 Aberdeen Monthly Progress Report - November, 1989 Page 2
Operations
Drying of 5415 resin was switched from rotary dryers to the fluid bed dryer to better match drying capacity to product mix. Results were good-acceptable rates were achieved and 5415 quality (contamination levels) has improved.
A two-day test run of three reduced flame and smoke compounds was performed on Line 1. Results were encouraging.
Costs
Variable costs were favorable due to good raw material efficiencies in the resin unit, a favorable product mix variance in the flexible compound unit, partially offset by high raw material use in the rigid compound and plasticizer units.
Fixed costs were unfavorable due to above budget payroll costs, maintenance material costs, and "Miscellaneous" costs.
OMP
1. Sixty-three percent of the plant's natural teams met during November (the highest level for the plant).
2. Twenty-eight "SPC Expert" students were recognized for completing their training in this voluntary course.
3. Plant personnel participated in a meeting at Klockner to review work to date on the 5305 graininess problem. The 10 micron filtration trial did not eliminate graininess; a deionized water test run will be done in early 1990.
Environmental
1. Presentation of 1988 SARA emissions were given to employees.
2. The NESHAPS 200 Valve Survey was completed - no leaks were found.
Doug Skokna Plant Superintendent
rah
VAB.0001190270
DISTRIBUTION
COVER LETTER
ENTIRE REPORT
Houston
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
X
C. J. Matson
X
D. F. Harman
X
H. R. FIamine r
X
R. R. Smith
X
B. J. Bean
X
R. H. Gerlach
X
Austin
R. D. Gamblin R. L. Poe
X
X
H. J. Hall
X
Oklahoma Citv
H. G. Garrison
X
LCVCM Plant LCCP Plant
R. A. Conrad J. Friend
X X
LCLAB Plant
J. W. Ware
X
Baltimore
L. R. Bauer
X
Hammond
J. Pavao
X
Blane Premiere Aberdeen
C. R. Miller
P. L. Foote
RWS/DCS (File Copy), PJK, JEN, MRK, DAM, JEB, HGC, JEL, REP, BLT, RBN, SCH
X X
VAB.0001190271
4
SAFETY - B. L. Trego, J. V. Uptain
First Aid OSHA Recordable
Total Injuries
November
2
1 3
Fiscal Y.T.D. 1990
Fiscal Y.T.D. 1989
43
g0 63
Number of Restricted Workday Cases
1
1
0
Number of Lost Workday Cases
0
0
0
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Rec eiving/Warehous e Office
Totals
00 11
24
00 00
01
36
0 0 3 0 0 0 3
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises S trains/Sprains Stings Other
Totals
Npn-
00 11 01 01 00 01
1
36
1 0 0
2
0 0 0 3
Lost Workday Cases Days Lost
00 32 59
1 14
Safety Record
Last lost time injury - 7/5/79
Days since -
3801
Employee hours since - 5,037,551
On November 30, 1989, the employees of the Aberdeen plant completed 3801 days with no lost time injury.
Topics for plant safety meetings during the month included Reviews of 1989 (Fiscal) Injury Statistics and Weekly Maintenance Safety Feedback Meetings.
The Aberdeen Plant reached 5,000,000 manhours without a lost time accident on November 6, 1989. This is a Vista record that will set the standard foi other locations. Our new goal? Continued improvement!
A
nni
mm
m
PM
VAB.0001190272
SAFETY - Continued
Routine dosimetry results for the month were:
<________________________
Number
VCM Lead Total Particulates
75 98.68 19 100.00
7 100.00
> PEL
Number
Percent
1 1.3 0 0.0 0 0.0
Monthly Injury Summary
Injury Class
FA Maintenance
FA Maintenance
RWC
Compound
Foreign object in left eye.
Wood splinter in right palm.
Amputation of distal half joint of right index finger. A compound worker allowed a door to close on his finger. This caused a break in the finger tip bone and the loss of flesh and skin from his finger tip when he pulled his hand out of the way through his reflex reaction.
VAB.0001190273
i
QUALITY DEVELOPMENT - M. R. Kane
Twenty-eight SPC Expert students were recognized for completion of the course. This was the second full round of training that was given. In total, there are now forty employees who have been trained in basic and practical SPC techniques through the course. The next course will begin in January and will be revised based on student feedback. Progress was made in Identifying measurement and calibration standards which need to be traceable to the National Bureau of Standards. Weights used on the large product and raw material scales have been certified as NBS traceable as well as some of the primary standards in the lab (temperature and weight). The Plant Manager's Natural Team decided to emphasize and reinforce the team effort by developing some measures related to team progress. The two key measures are the number of teams meeting and the number of team meetings per month. Since effective facilitation is critical to success of inexperienced teams, it will be measured by having the facilitators report their progress to their department head each month. In addition, team leaders will report the progress of their team to their department head. Facilitators will be assigned to each natural team. The teams which have not been trained in team management will be trained as a team using a problem they pick as a case study.
VAB.0001190274
t
A
COST VARIANCES - D. C. Skokna
Variable Costs
Product
PVC Flexible Compound Rigid Compound Plasticizer
1989 Variance. $M
Price
Total
$ 46.7 73.0
< 43.2> <-14,6> $ 61.9
$ 700.0 161.6 233.9 <15.3>
$1080.2
$ 746.7 234.6 190.7 <29.9>
$1142.1
PVC - Faborable raw material use (primarily VCM and initiators) , partially offset by above budget utility use, resulted in the overall favorable variance.
Flexible Compound - The favorable variance was a result of product mix.
Rigid Compound - The unfavorable variance was a result of above budget raw material use and product mix.
Plasticizer - Raw material use was above budget.
Price Variances
- VCM - Resin to Rigid Compound - Resin to Flexible Compound - Electricity - Water > Natural Gas - 610P to Flexible Compound - Alfol Alcohols - Other
Total
$662.4 218.8 184.5 27.0 15.3 14.8
< 18.1> < 18.2> < 6.3> $1080.2
Fixed Cost Variances
- Payroll andBenefits - MM&C - Miscellaneous - TI&D - Clearances
Total
$< 18.3> < 50.4> < 31.3> < 3.5> < 3.6>
$<107.1>
Payroll and Benefits - Salaried and hourly payroll costs were above budget, partially offset by a favorable benefits change,
resulting in an overall unfavorable variance.
M. M. & C, - Parts for incinerator repair caused an unfavorable variance.
VAB.0001190275
COST VARIANCES - Continued
Miscellaneous:
- Travel expenses for VCSM project related training and expenses related to the continuous stripping technology assessment caused this item to be $15.2M over budget.
- This is part of R. Mackey's relocation costs.
Outside Professional Services - was $10.2M favorable.
Unclassified - was $16.6M unfavorable due to VCSM related training costs and physical exams.
Operating Supplies - was $17.4M unfavorable, primarily due to performing a test using 10 micron raw material filters in the resin unit to evaluate the impact on 5305 resin quality.
A
VAB.0001190276
T
VINYL - P. J. Kober, K. W. Birck
Safety
The Vinyl Department did not have any first aid or OSHA recordable injuries during the month of November.
The topics of the monthly safety meeting were SARA, New Unit Turnaround, and Winter Safety Awareness.
General
Production of 5415 resin was switched from the rotary dryers to the fluid bed dryer during the month. This switch lessens rotary dryer bottleneck created bvy increased 5415 (and
5385) production. Results have been favorable: fluid bed rates have averaged between 19,350 to 23,650 pounds per hour and regular analysis for contamination has been below five average total contaminants.
2. Dryer #4 baghouse replacement was completed during the month. This was the last dryer to have its baghouse worked on as part of the Rotary Dryer Baghouse Replacement Project.
3. Production was reduced during the last part of the month to
control VCM inventories.
Minimum sphere levels were
maintained to ensure an adequate VCM level to keep the plant
operating during winter alert, had one occurred.
4. The resin raw materials in the 744 account were valued at $411.2M.
November
YTD
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
Reactor Downtime
37.9 1263.8
103.6 886.0
29.5 90.1 83.5 93.0 95.9
70.8 1060.8
95.2 1666.0
27.3 82.6 79.7 84.4 96.7
Hours
Operational downtime (recovery scheduling conflicts, rinsing chem wash tanks, New Module rinse/charge water conflicts, no place to dump, 0-ring leaks, waiting on Q.C. data before charging, and inclement weather).
280.8
VAB.0001190277
VINYL - Continued
Reactor Downtime - continued
Maintenance downtime (hydroblast/drill reactors D700 and D745, drill condensers D741, D500 and D600, condenser lid torque/ gasket replacement on D744, changed safety discs on D743, and miscellaneous instruments and valve repairs).
Other (inventory control due to VCM shortage).
Hours 362.5
68.9
Reactor limited production.
Operational downtime (centrifuge plugs, clean dryers, activator transfer problems, power outages (3), product change to 5415 in fluid bed dryer, leak checks and flameouts).
Maintenance downtime (centrifuge repairs, shear pins, exhauster repairs, sparge pipes, screener repairs, and various other activator and centrifuge repairs).
53.9 31.7
14.4
Key Maintenance Woj:]p - J. B. Autrey, J. B. Hegwood
Reactors 500, 600, and 741 were shut down during the month for condenser drilling due to cooling water control problems. Reactors 700 and 745 were also shut down for condenser drilling as part of the contamination control program.
The seal on reactor 745 was changed out because of a plugged lip seal flush line. This seal had been in service for four months.
The condenser lid gasket on reactor 744 was replaced due to a leakage problem.
Numbers 1 and 8 Birds were removed and rebuilt during the month.
The rupture disc on reactor 743 was changed out as part of the annual rupture disc program.
The "A" vacuum pump was changed out during the month because of two seal failures.
VINYL - Continued
Kev Maintenance Work - continued
The motors on #4 exhauster and on the north chem wash pump were replaced during the month. The #4 exhauster motor had a bearing failure and the north chem wash pump motor broke off of the foundation.
There were ten major valves changed out in the reactor area during the month.
A
VAB.0001190279
COMPOUND - J. E. Nickerson, K. G. Akins
A
There was one restricted workday case in the Compound Department during November. A Compound Operator severed the tip of his right index finger when It was caught in the hinge side of a closing
door. The accident team's investigation report is due December 22.
The SARA Title 313 emissions from the Aberdeen Plant were reviewed during the November safety meetings.
General
We continued to build critical inventories during November. Flexible compound inventories rose from 4489M pounds to 5664M pounds in November.
A two-day test run of reduced smoke and flame compounds, using licensed technology, was conducted on Line 1 at the end of the month. One insulation and two jacket formulations were produced.
Problems continued with production of 80273G rigid compound. Based on some preliminary testing, segregation of the master batch may be occurring. Work continues to isolate the problem. We do not believe this is a new phenomena, but the new, more sensitive torque rheometry tests are able to detect it. We are viewing this as an opportunity to improve the quality of our dry blends. No customer problems have been reported.
Operating
Comoound Production
Days
________Production (M Lbs. ) Month Avg./Day Fiscal Y.T.D
Line I
28.5
Line III
28.0
Line V
20.5
Total
% Prime
Capacity Utilization Factor
Downtime
2085 3415
960 6460
98. 0 * 833
73 122
47
Hours
4178 7064 1791 13033
97.9 .837
Line I
- Product Changes - Quality Problems & Control - Miscellaneous Maintenance - Dicer Problems & Maintenance
80 11 39
4
Unp HI
- Product Changes - Quality Problems & Control - Miscellaneous Maintenance
67 13
6
VAB.0001190280
COMPOUND - Continued
Line V
- Product Changes - W-P Maintenance - Miscellaneous Maintenance
40 20
9
Operating
Month
Rigid Compound
28
4600
% Prime
98.6
Capacity Utilization Factor
.75
164
Downtime
Hours
- Quality Problems & Control - Product Changes - Miscellaneous Maintenance
96 44 36
Operating __Davs
Month
Plasticizer
29
% Prime
Capacity Utilization Factor
1693 89.7 .806
Fiscal Y.T.D. 8072 99.1 .656
3374 90.1 .849
J. B. Autrey, J. B. Hegwood
Line I Banbury was shut down for seal replacements during the month, A temporary fill chute was also made for the Banbury to assist with the experimental low smoke, low flame compound run.
The 107 and 185 plasticizer pumps were shut down for the seal replacements and the motors were replaced on each. The motors on each were replaced due to bad bearings and windings.
The Schenk filters were removed for cleaning during the month.
Number two Welex was shut down during the month so that several badly worn seals could be replaced.
The Line III condensate pump was rebuilt and the motor
replaced.
The motor was replaced because of bad
bearings and windings.
A
VAB.0001190281
UTILITIES - J. B. Autrey, J. B. Hegwood Number one boiler was shut down for repairs because of a hot spot that developed on the outer skin. The inner skin had busted causing the hot spot. The boiler was repaired and put back in service. Number two boiler was shut down for a second inspection during the month because of deposits that were found on #3 boiler during its inspection. The same type of deposits that were found in #3 boiler were found in #2 boiler. Because of this finding, the tubes and firebox were hydrobias ted. A two-inch feed water line and the continuous blowdown line were replaced in the steam drum, also.
VAB.0001190282
ENGINEERING - R. E. Polk, S. C. Hillman, C. J. McDonald
PROJECTS IN DEVELOPMENT - GENERAL
5305 Graininess Work
A meeting was held at Klockner to discuss work to-date on the graininess problem. Testing at BASF and Klockner showed that the ten micron filtration trial did not eliminate graininess. A D.I. water test run is being planned after the first of the year.
TC Wastewater Compliance
Several alternatives to reduce the total project cost are still being evaluated with results expected by late January. These are:
- The initial trial of EVC clean wall technology.
- A plant-wide test of stripping rinse water in small blend tanks.
- An economic comparison of stripping columns versus UV oxidation.
5415 in the Fluid Bed Drver
The fluid bed dryer has been converted from 5385 to 5415 service for a trial run. Alternatives to increase fluid bed rates with 5415 are being evaluated.
2nd Fiscal Quarter 1990 Capital Budget
The 2nd Fiscal Quarter 1990 Capital Budget was completed and sent to Houston on 12/8/89.
Railcar Hazardous Materials Spill Response Training
Jim Edwards attended an American Association of Railroads seminar on management of hazardous materials spills from railcar accidents. He is one of four people at the plant trained to respond to such a spill.
A
VAB.0001190283
HGI1KKEIIG - k.E. .POLK, S.C. fllLUAl, C.J. UcOOMALD
ATI HUE
.'""N-------
<u cm
67tt
M
1519
m> iw
cm
KH
Nil
9749 9789
n
IT79 6589 6659 6719 6759 6819 6889 JB509
48 j89
1679 1729 H88
1879 1529 1500 8510 1520 1530
psojicT dkchptiox
mm 6is pipilui mcTOi corasn
ran nun own H0C708 C06UK 8iTD BCTCLE
thatwt acid sin hplacbht
PUR UCtUCU ran m raw rhbiutioi ins Irani ramcmss
ns mncftnoi
raw mm rarnon
uu mun is imm udoctioi
ran w mnim of pi taiks
cosora us 3 snu-nu us uidliog
COROW SILO KIRK WHIM COROW BOHN HOWS WRITS
pumran mim si urcs 1,3, is s
UR 5 SAW PIASTICI2H
in MUGDU1 IHGR US11 UPAISIOI RB R.8 OORAHlKttin IS0CTI01
R S.4DIO?.W9SAALUTEBHmIinWCRIODTOICUTIPOU* CUHT
corow ran unsras
lira eu nwcrioi
m SNR GLASS UPUtCRST
pur um ucicu
U9CUHK0S CAPITAL PWJICTS < 1151 PS BARM QA1B0X RPUCBUl PUR AH SYRHf OHNBATIOI PUffiCim ttACTOI AGITATOES raw moral rpucbbr PUR 9SSRR lira IffUCSKR RSI RBIRO HPuranr wi STSTBf CORBSSOl - SPUE COROW UR I 71008 HPAI1 RR RWN miss is anna krimbt
rr nemuioi rpucbut nscnusoas capital projects < 1151 MtflTOB AS OFFICE E00IPMEIT
innm cmiCAl PUR A7R0BD UPim MOJICTS
STATUS
IISTA1LATI0I IS II P806RSS 8RH CORUTIOIII NCBBR.
ctnm fo IIIU CUBBS.
IISIALLATIQI IIII PMRBSS AS PURS 101 CORLRIOI IIIBRA1T.
CU8D TO illli CUIUS.
CEOSD TO lira CURB.
CUMB TO nra CURB.
oorasmn is in cosun as ii pmguss. piojict oomplrioi is pubs in jahaiy.
DURDIK IS IIIH6RS. EKIHRIH 90U STATIOU All TO H SHIPPS II KCBUI.
iBia is ii moqhss im cosunn scums m iobait.
CORBOCnR IS II MORIS RIB CORUTIOI PURS 101 JUDAH.
cuss to pira curs.
comucnoi is scums to ran ii un snnu nn crputioi n jarast.
hrauahoi is scnu to u ooruts ii jour.
in murt is comm so mill u cuss to lira auras ii owns,
nsmunn is sums to ran ii scran vm annum n hat.
warnuruuiioi is n nouns wn coririoi purs si maun.
DKinmiG is scbdoud to ran n
ms coririoi ii jaioait.
nemniK is ii nows vm coririoi purs mb juqar.
oosnoenoi is scums to ran ii Reran ms coririoi n jasoaiy.
CQUTBCtm IS II PMNBSS MITH CRPUTIOI II DKfiW.
ramniH is n pknrss. piojict cqrutim is purs ioi use.
nsuiuim is u Brass win coririoi puns idi nnun.
uruuiioi is orpub kxcept mi nkuir itbs. piojict coRuim is pubs mi ruoaiy
IBUlLATIM IS II PM6RSS. PIOJICT CORUTIOI IS PUHS Ml JtfUH.
DBI6K IS 11 M06RSS. PB0JICT CORUTIOI IS PUHS MI JtfUH.
URUUIIOI IS ORKHI1IC1PT Ml FOKHLIST IBU. PIOJICT CORUTIOI IS PUHS Ml JASSY.
nRiiunoi n scums to ran n juuh nn coririoi ii fibduy.
nsriiunn is n noons nn corutioi furs mi jamah.
ram is n prams, psoject corutioi is pubs mi rbrah.
ram is n prams. piojict corutioi is pubs ioi jure,
all piojict nn n ranois mi corutioi ii raran.
cuss to nra cram.
IIRA1UTI0I IS ORPUB EXCEPT Ml POICHIIST ITUS.
TB AGITATORS UR BU lECEIBD. IISTALLATI01 IS PUBS Ml CORUTIOI IIISKUH.
IRSIAlUim IS ORPUB EXCEPT MI P0KHLIST ITBS. IB PB0JKCI WILL U CUSS TO FIELD CHARGES II JAMAH.
IISTALLATI0I IS PURS TO BEGIB IX JAMA1T 9ITH CORUTIOI II BHUH.
CUSS TO IBU CURB.
TB C0RBSS01 IB SCBOOLS 701 DIUBH 11 IBIOAH 1990.
eras to nra cunis'.
IIRILUTIOI IS MS CRP1R1 AS II PIOGIESS. CORUTIOI IS PUBS Ml DICUBEE.
aoss to nra anra.
BQIBSIM IS II PBJ6BSS. PIOJICT CRFUTIOI IS PUBS Ml MID-1991.
EMIIBHM IS II PI06BSS.
B6UBIIW IS II PM6RSS 01 7 P10JECTS.
100IMBT IS BIB GORED.
VAB. OOO1190284
H
4
F. G. Jeanson
Water
All wastewater discharge parameters were met for the month of November. However, we did have a wastewater bypass. The bypass occurred on Sunday, November 19, when an estimated 500 gallons of untreated wastewater went to the storm water system. The bypass was caused by a plugged process sewer. The State was contacted about the incident.
SARA
Presentations on the 1988 SARA emissions were given to all employees at the plant by their respective department head.
Waste
Waste shipments for the month of November included:
Ten drums of stabilizer spill were sent to Technical Environmental Systems in LaPorte, Texas. From this storage facility, the waste will be shipped to Chemical Waste Management's (CWM) Lake Charles facility.
Two bulk loads of API sludge were sent to CWM's Erne lie, Alabama facility.
Two bulk loads of separator oil were sent to Systech in Demopolis, Alabama.
A
The NESHAP 200 Valve Survey was completed during the month. No leaks were found. Results from this survey will be reported to EPA in the next NESHAP quarterly report.
Fiscal year residual VCM numbers were tabulated for 1988 and 1989. The
total pounds emitted from slurry and the average ppm/batch are listed
below:
Total Pounds
Avg.
Total Pounds
Emitted
PPM/Batch
Production
FY88 FY89
73,317 65,841
164 145
446.6MM 454.2MM
This represents a 12% decrease in VCM emissions, even though more PVC was produced in FY1989.
The rotary dryer baghouse project was completed this month. Emissions testing was completed on the baghouse stacks and submitted to the State. The emissions tests were completed on two of the five baghouses. Both baghouses were operating below the manufacturer's emission guarantee.
An application for a new air permit was completed this month. This new
permit, if approved by the State, would allow us to become a minor source.
This permit was reviewed with plant management and will be submitted to the
State next month.
VAB.0001190285
ENVTBONMgMTAT- - Continued
Toxjjg.ity
I discussed with the State the effect this regulation would have on our plant and Inquired about an extension for wastewater. The State said they did not have the authority to grant an extension beyond what was called out In the regulation.
Miscellaneous
I attended the Mississippi Manufacturers Association Environmental Committee meeting this month. The Aberdeen Plant contributed $1500 toward their hazardous waste public education campaign.
A guide for training requirements for environmental coordinators was completed.
I surveyed other manufacturer's methods of storage for EPA required documents (disc or hardcopy) for VCSM team.
Surveys and Reports Completed
- CMA survey of wastes shipped to Alabama
- Monthly NPDES report
Waste Minimization
1 attended a waste minimization conference held by MISSTAP (Mississippi Technical Assistance Program).
The waste minimization three-year plan was completed.
SARA-air) decreased due to the completion WRI for last three months. 52.85% WRI for FY90)
A waste paper baler was included in the third quarter capital budget. Approximately 10-15% of our solid non-hazardous waste, in the form of waste paper and cardboard, will be recycled when this baler is installed.
A project to reduce slurry residual VCM by 50% was also included in the fourth quarter capital budget.
A
VAB.0001190286
-i
A
Nov-89
WASTE REDUCTION INDEX SHEET
OVERALL EXCLUDING "TOTAL WASTE WATER"1 NON-RECYCLED WASTE RECYCLED/SOLD WASTE
3 MONTH
90.96% 85.41% 94.85%
%HRI 90 YTD
103.54% 96.94%
108.17%
1989FY
103.51% 94.96%
109.51%
I. Offsite, Hazardous Wastes
157.71%
194.12%
100.68%
a. Land Ban Wastes b. Hazardous Solids c. Non-Hazardous Treated as Hazardous
0.00% 125.84% 169.80%
0.00% 40.66% 246.65%
244.74% 111.19%
95.77%
II. Recycled Hazardous Wastes
101.86%
117.64%
103.51%
III. Offsite, Non-Hazardous Waste
a. Recycled b. Non-Recycled
79.18%
91.15%
95.95% 77.28%
109.35% 89.09%
95.37%
98.39% 95.03%
IV. Vunerable By-Products
93.50%
106.36%
111.36%
V. Total Waste Water
VI. Air & Water
a. SARA - Air b. SARA - Water c. Non-SARA - Air d. Non-SARA - Water
105.55%
118.00%
95.01%
*
76.92%
75.10%
91.90%
87.13% 1139.94%
67.37% 82.46%
87.41% 1274.36%
52.85% 90.99%
88.05%
592.12%
96.30%
87.24% VAB.0001190287
4
A
Nov-89
WASTE RECTION INDEX SHEET
Offsite, Hazardous Wastes a. Land Ban Wastes
1. Phthalic Anhydride
b. Hazardous Solids 1. Stabilizer Spill 2. Floor Sweep
c. Non-Hazardous Treated as Hazardous 1. Plast. Filter Cake 2. Lead Bags 3. API Sludge 4. Pit #1 Solids
Recycled Hazardous Wastes a. Recycled
1. Separator Oil 2. Safety Kleen Solvent
1988FY
321409 2412 2412
79068 16989 62079
239930 61670 68640 29620 80000
653226 653226 651700
1526
POUNDS
1989FY
90 YTD
329304 6006 6006
98907 0 0
89465 22425 67040
5097 5097
0
233833 56573 67880 29380 80000
93810 0
13900 66540 13370
688080 688080 686210
1870
121815 121815 121340
475
3 Month
124902 0 0
24517 5097
19420
100385 0
13900 66540 19945
163946 163946 163340
606
Offsite, Non-Hazardous Waste a. Recycled
1. Drums 2. Pallets 3. Aluminum Cans 4. Scrap Metal
b. Non-Recycled 1. Landfill
Vunerable By-Products a. PVC
1. Culls 2. Vacuum Vent Dust 3. Sifter Overflow 4. Pond Resin 5. Pit #2 Reain
Total Waste Water a. Effluent
1. Pond 6
VI. Air & Water
a. SARA - Air 1. VCM
2429430 247201 49600 145600 0 52000
2182229 2182229
2357718 247500 49600 145600 300 52000
2110218 2110218
351053 42853 10950 22812 400 8690
308200 308200
473996 58446 10950 34032 500 12964
415550 415550
3597456 3597456
471409 329480 801007 1915560
80000
4076656 4076656
330521 541016 504106 2621013
80000
606575 606575
26520 84297 24836 457552 13370
828835 828835
57180 124847
38561 587302
19945
4424987560 4278245861 827694426 1150836733 4424987560 4278245861 827694426 1150836733
4424987560 4278245861 827694426 1150836733
646617 73316 73316
604682 65694 65694
76981
122547
10159
15740
10159VAB.OO$g?388
+
A
Nov-89
WASTE RECTION INDEX SHEET
1988FY
POUNDS
1989FY
90 YTD
3 Month
b. SARA - Water 1. VCM 2. Di-n-octyl Fhthalate
c. Non-SARA - Air 1. Particulates 2. Sulfur Dioxide
d. Non-SARA - Water 1. BOD 2. TSS 3. COD 4. NH3
55 22 33
264206 263300
906
309040 43669 66392
195581 1378
333 21
312
264290 263300
990
274364 46750 53140
173276 1199
112 4
108
22136 21965
171
44574 11659
8530 24304
81
155 6
150
43858 43606
252
62794 15346 11527 35779
142
VAB.0001190289
ENERGY CONSERVATION - D. A. Moore
November. 1989
Fiscal Y.T.D.
I.
A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU
-9.1% -9.5% 2689.0 135.8
-6.1%
-6.9% 2615.0
248.8
(1) Plant electrical usage is an estimate because an additional meter was added during the Electrical Upgrade Project and was not read. This will be reconciled in the December energy numbers. j
II. Plant Energy Conservation Program
A. Maintenance
There were sixteen energy related items completed in October, 1989. Ten of these items were steam leak repairs. The remaining six were steam trap repairs.
III. Boiler Operation
Boiler
No. 1 No. 2 No. 3
83.3% 83.3% 83.1%
83.5% 83.4% 83.1%
VAB.0001190290
w
NQVBMPEfti 1999 J. E. Beall Employment None Promptions/Transfers None
None
A
wmmmtmmmmmmmmmmrnmmmmmmmm
wmp
VAB.0001190291
mu
-Ti
m
cn
K) N3 DoO oCD D oDQ>
MP UPMHMf
l
w^ow
04
>o
m
fO o ae m
Om
tn^o
cn
4
VAB.0001190292
-
*
ABERDEEN, MISSISSIPPI
Salaried Employees Hourly Employees Total Employees
NOVEMBER, 1989
MONTHLY PERSONNEL REPORT
79* Minority Employees #, %
172
Salaried
EL
251
Hourly
66
Total
72 29%
A
New Employees
0
Hourly Min. Hired
0
Terminations
0
% Min. Hired
0
Hourly Min. Term
2
% Min. Term
2
DEPARTMENTS PAR #EMPLOYEES MIN. EMP. %MIH. NEW HIRES YTD TERM. YTO. TURNOVER YTP.
Warehouse i 6
Gen. Plant 13
Maintenance 41
24
Compound
40
Vinyl
33
11
16 41 23 39 33
aa
a
5 31 7 7 0 0 0
12 24 0 0 0
2
00
2
26 67 0 0 0 0 0 2
10 30 0 0 0 0 0 0
Plasticiser 5
5
1 40 2 0 0 0 0 0
Number of Applicants:
Month 0
Year To Date
APPLICANT BREAKDOWN:
# Minority 2 % Minority
# Female
0 % Female
Hires (Hourly):
Month
Year To Date
Terminations (Hourly):
Month __q
Year To Date
Overall Turnover
2
Projected Annual Turnover
Z
Z
VAB.0001190293
Safety
There were no safety instances this month.
Cost Savings
Savings due to competitive bidding were $44,179 for November, and $44,482 for FY1990.
Savings due to prompt payment discounts were $1831 for November, and $4215 for FY1990.
Warehouse - Finished Goods Inventory
Offgrade inventories remain a serious problem; Fred Williams.
will discuss with
FY1988
FY1989
November
Flexible Compound Rigid Compound Resin
142.7 49.7 28.6
477.0 64.4 83.7
566.3 120.7
52.0
Meetings
11/02/89 11/03/89
Judy Frossard attended the Payroll Team Meeting in Houston. Discussion Included conversion to VMS, PMS conversion to software, direct deposits, etc.
MMS PC
11/28/89
Mike Swierc attended a CQIP meeting in
Hous ton.
Focus was primarily
stainless steel gate globe, and check
valve testing.
VAB.0001190294
4 Ullllll CIUICU PLAIT SlIPPIR IIIITSIS 107IBM III)
SOffTI
-SHPKIITS 1! PMMCT8-
PlllIC in/m IICI1NI
ttsuiiu usunciuit
11,411,111 7,997,299 919,199
9 9
IU11IU C0BF9IIM9U
1,374,556
fUlIIU CMPMU-PICKMO 2,912,217
929,499 111, HI
1
9
tun couom-iiu
Hill CORPMH-PICIMII
2,197,431 14,111
111,111
12,999
9 9
A
7T9
PVIMC IfT/ITC I1CUMI
99,999,479 19,994,949 749,974 111,HI
9 9
1,141,HI 2,999,999 9,114,999 291,129
9 9
1,111,141 4M.S1I
999,199
11,IH
9 9
PUSTICISI1
lii.iii 114,111
9
997,999 II1.4N
9
TOTAL
27,919,961 1,141,411
9
13,111,111 11,SSI,411
9
-SHNIITS I! MR-
Bill:
*10711111* mil KillIII C0IP09II mu comm ruiiiciiii
UllCil
CRTOIII CWM PICtIP cutiit
122 22 78 12 3 9
19 2 19 1 94
TOW
229 15 29 5
TOTAL I0TKHIII
151 27 99
269
tim
mu PMI1UK COIPOIIB IIG1I COIPOIIB pusTicim
258 52 145 26 3 5 99 7 29 4 97
455 34 69 11
mu in
927 92 177
HI
NCUlil:
Ofllltt* mil ruirni COOPOWI mu etiNm PU6TIC11II
lomiotuiii
CKTOIII P1C1IP
CHIN cmitt
9 14 23 95 04 99
32 93
tore comtiu ill/IFS
99 19 91 99
5 3 9 9
11
1
TOTAL
m
29 92 5 9
125
*!!l*
^ mil
IMIIMI COHPOIII
mn mrom runiciui
.i *
Tom TTI
13 28 9 9 49 143 l 9 i 18 9 1 9 9 99
53 187
1
m
12 4 1 1
53 188 18
1
VAB.00(#fe0295
lI Il
Hi i HII II
fIlI Ittl
1
II II1
II
tiiiII iiiIIi
i
Mi i
r--* w
"T
LABORATORY - H. G. Coleman
A. Safety - The Laboratory operated injury-free in November. Harold Coleman led the monthly safety meeting which included a review of FY89 safety statistics, the Vista/Aberdeen film, and a SARA presentation.
B. Customer Contacts - None.
Customer O.C.
Reports
11/8
Chicago Magnet Wire Corporation
reported failure of their strip force
adhesion test with 35851, lot 39N02.
The problem was traced to something
which affected melt flow;
42,000
pounds of material were returned -
another 51,000 pounds in inventory were
downgraded.
11/14
Intex Plastics reported a bridging prob1em trying to unload a 5305 railcar. No moisture or res in flow discrepancies were found.
11/29
Blane Polymers rejected a 5395 railcar
for metal contamination. This car was
produced during a previously identified
problem.
We have begun testing
railcars for metal prior to shipment.
D. Requests for Corrective Action - None.
E. Product Waivers
Customer
Product
Reason
No.
H&W - Export Rustique
5385-3 435-30 WHT 111
Contamination 40 Mesh
1 R/C 1 H/T
mm
RVCM of In-Process Samples
The following is a summary of residual VCM results on inprocess samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of November, 1989.
Number of Samples Average RVCM, ppm
&
Reactor Slurries
888 138
________Drier
5265
5305
29 0.527
70 0.595
VAB.0001190296
LABORATORY - Continued
RVCM of Shipment Samples
The following is a summary of the residual VCM analysis of shipment samples for the month of November, 1989.
Product
Average RVCM. ppm
5265 5305 5385 5395 5415 5465 Dry Blend Debox Pond
33 98 41
0 62
0 61 13
8
0.150 0.247 0.324
0.153 0 0.084 0.350 5.114
G * (based on dryer "regulars")
5265
530?
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Dryt ime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10)
1.52 0.78
--
5.75 6.00 2.67 1.93
--
0.74
--
--
--
--
1.33 0.90 0.43 3.08 3.50 2.50 1.72
--
0.79
--
--
--
--
Average particle size, microns
134
136
H. Flexible Compound Quality Summary
5385
2.67 0.93
4.11 ---2.50 2.67
--
1.70 1.67
--
21.8
157
5415
1.37 0.55
------------------- -------
4.33
--
6.33 4.00 0.67 3.69 2.00 1.93 1.10 2.6
174
Hardness Color/Clarity Hard Particles Contamination Dicing
Totals
Adjustments M Lbs. . m
7.0
-------- --
7.0
(0.11) -- -- -- --
(0.11)
Rejections M Lbs
4.5 24.1 46.4
4.5 25.5 105.0
(0.07) (0.37) (0.72) (0.07) (0.39) (1.63)
A
VAB.0001190297
LABORATORY - Continued
Torque Rheometry
Total
26.0 (0.57^ 26.0 (0.57)
1. Our new Brabender PL2000 torque rheometer was commissioned
for service this month.
All rigid compound Q.C.
technicians were trained.
2. H. G. Coleman participated in an Open House for the Aberdeen High School teachers. This was a kick-off for the Aberdeen/Vista Partners in Education Program.
3. Effective 12/1/89, Harold Coleman is being transferred to R&D in Austin as Senior Group Leader for PVC resins. Richard Williams will handle the duties of Chief Chemist until a replacement is named.
VAB.0001190298
A
RESIN
r
Ship Date
11/02/89 11/03/89 11/07/89 11/19/89 11/14/89 11/14/89
11/16/89
#
11/22/89 11/28/89 11/28/89
11/30/89
SAMPLE SHIPMENTS NOVEMBER 1989
Product 5415 5415 5305 5385 5415
Pond Resin 5305 Pond Resin 5415 Pond Resin Pond Resin
Amount 100 lbs. 100 lbs. 5 lbs. 10 lbs. 100 lbs. 5 lbs. 50 lbs. 5 lbs. 50 lbs. 2X5 lbs 50 lbs.
Customer ELECTRO CONDUCTORES C.A. ELECTRO CONDUCTORES C.A. General Cable Co. Carter Footwear Co. Twitchell Sun Polymers
*
GLASSIDUR, S. A. Sun Polymers INYECCIONES INDUSTRIALES Wexford International JOSE M. TELLES
COMPOUND Ship Date 11/02/89 11/03/89 11/09/89 11/10/89 11/16/89 11/16/89
11/28/89
Product
35451 NAT
35451 NAT
416-74-1 NAT
38525 NAT
38525 blk 240-183C NAT 240-184 NAT 38201 GRY 573 38901 GRY 573
Amount
100 lbs
300 lbs.
50 lbs.
250 lbs.
300 lbs
150 lbs. 150 lbs. 200 lbs. 200 lbs
Customer ELECTRO CONDUCTORES C.A. ELECTRO CONDUCTORES C.A. Vista - Austin Times Fiber Comm'ns Inc. Communication Cable Inc. Prestolite Wire Corp.
Carlon Company
DRYBLEND Ship Date 11/28/89
Product RP-200 WHT 111
Amount 50 lbs.
Customer OMNI PRODUCTS
VAB.0001190299
'i
A
A9tRDttN CHEMICAL PUNT INJURIES
(Twelve Month Running Totals) 40
35
30
25
NUMBER OF INJURIES
15
10
s.
O
J*B7F MAMJJASON OJ'SBF MAMJJASON DJ`B9F MAMJJASON
TOTAL INJURIES
O OSHA RECORDABLE
VAB.0001190300
ERDEEN ENERGY CONSUMPTION
en/ma
VAB.0001190301
MONTHLY
--------- 12 MO