Document qaROqB4GVgv9Jp69De3k2ro85
Monsanto
FROM (NAME ft LOCATION) R. H. Munch - R&D Laboratories - South Second Street
DATE SUBJECT
February 18, 1970 CAPACITOR LIFE TEST FACILITY
CC
D. A. Olson P. G. Benignus W. R. Richard
TO H. S. Bergen
Rapidly changing technology and environmental pol lution problems in the capacitor industry make it imperative that we be able to test fluids and addi tives that we propose for use in the industry by incorporating our materials into actual capacitors and making life tests to demonstrate their utility.
We have visited a number of capacitor manufacturers to determine what life testing procedures are used and what equipment is required. Based on our find ings we have made a preliminary design for a facility suitable for the work we believe is essential for Monsanto to do to produce new products for the capaci tor industry. The preliminary estimate for the cost of the equipment is $22,500.
We request approval in principal to proceed with the installation of such a facility. Since delivery time for some of the electrical equipment will be long, we request authority to place orders for these items before a detailed cost estimate is prepared. A detailed cost estimate and formal request for the appropriation will be made in two weeks.
R. H. Munch
hr