Document qaOdXdNnymyLoNwyp8aNr6mL5
OPERATOR'S NAME:
DATE:
|CHECK ACTION STEPS (Capital letters) and Comments (Small letters)
1. CHECK THE PUMP TO BE SURE IT IS PROPERLY ASSEMBLED.
2. OPEN THE I" KYNAR BLEED ON THE DISCHARGE. CLOSE THE DISCHARGE VALVE.
3. TURN THE SHAFT ON THE PUMP TO BE SURE IT IS NOT FROZEN.
4. OPEN PRIMING WATER TO THE SUCTION POT. Note: Make sure the seal is not leaking. The pump will not hold the prime with a leaking seal.
5. START UP THE PUMP ON MANUAL AND PUMP OUT OF THE KYNAR BLEED.
6. START CLOSING OFF THE PRIMING WATER AND WATER THE KYNAR BLEED TO BE SURE THE PUMP IS HOLDING PRIME.
7. WHEN THE PUMP IS PRIMED, OPEN THE DISCHARGE VALVE AND CLOSE THE DISCHARGE BLEED.
8. RETURN THE SWITCH TO AUTOMATIC
sz.
10734
CONFIDENTIAL* Subject to Protective order
of 14 th Judicial lust net Ho. 91-11*5