Document qaLgQwJdw4DNBQ41gzGJ6029G

or- o PUBLIC SERVICE COMPANY OK COLORADO AKAPAHO^ STu-AM ELECTRIC STATION PLAINTIFF'S EXHIBIT 1955 - 106 UOO K'.V EXTENSION -- UNIT NO. 4 I NKlV YORK PURCHASE ORDERS AND CONTRACTS- GE-90 Nit,-'G-14E-' NERATOR UNIT NY-771001 i r'~tric Company Specification PSCC A-401-TG hydrogen cooled condensing Turbine-Generator Unit consisting of the following _ nc 1' 1>; j \ * y- u-- wnnwA /1aDvvA nnn Lr>w. f an^am wAnumiun^nvuunu/uI , \j+ itcwta \m,jrxl iAuuci t i~pm_ iJia..p..u1ia_e reac<n on * tne condensing turbine No. 101604 designed for a steam condition at the throttle of type gig, 1000F and an absolute back pressure of 1.5 inch hg. The turbine capacity i4UaitioSin guaranteed steam flow of 930 000 lbs/m to throttle is 100 000 kw with 3.5 at h hg absolute back pressure, with 8 stage bleeding for feedwater heating and inCoration; one (1) 90 000 kw nominal rating, 0.8 short circuit ration 3600 rpm fvaP se 60 cycle 14 400 volt hydrogen cooled generator No. 6918184 with capacity of 3 P 754 kva or 100 000 kw at 0.85 power factor and 15. psig hydrogen pressure (rotor 1 No. 827277); one (1) gear connected 330 kw 250 volt self ventilated exciter, llrlli No. 7110500; niren control and seal equipment: V^rogen Seal Oil Unit, Serial No. PL-526E197-GR-1; -eal Pump, type 3, Serial No. B21248, w/3-HP, 1750 rpm Motor, Serial No. SK22559; p -reency Seal Pump, type 3, Serial No. B32912, w/3-HP, 1750 rpm Motor, Serial No? 7197949-XL; i Lectrodryer, type AAG, size 25, Serial No. 14256; ( ,,nor Extractor Pump, type AF, size 4, Serial No. 5308789, w/2-HP, 1160 rpm Motor, I serial No. VL5632; ^teaa driven Turbo-oil Pump, Serial No. 9163276-1; electric Turbo-oil Pump, 1750 gpm, 1750 rpm, size 30C3, w/15-HP, 1745 rpm, Model j 5K326XA130B, Motor Serial No. (VLJ910057; f Turbine Stop Valve, Serial No. 5674; Hecordersi, Regulators, and other Accessories. Account Description Man Labor Hours Cost Material Cost Total Cost 1 Total Contract 2600 36,000.00 2,349,581.84 2,387,581.84 i 312.520 B T G Board 14,512.17 14,512.17 314.201 Turbine 1362 18,835.80 1,211,328.99 1,230,164.79 .202 Generator 916 12,685.46 815,820.69 828,506.15 .203 Exciter 27 375.30 24,136.17 24,511.47 .204 Turning Gear 10 146.09 9,395.06 9,541.15 .207 Gages, etc., Mtd on Unit 1 15.78 1,015.08 1,030.86 .21 Hydrogen Cooling System 40 553.83 35,617.78 36,171.61 .22 Turbine Piping 165 2,284.99 146,950.94 149,235.93 . 23 Turbine Lube Oil 54 753.23 48,441.52 49,194.75 , .4101 Start-up & Suprv. Panel 15 213.43 13,726.04 13,039.47 .4102 Hydrogen Control Panel 10 136.09 8,752.18 8,888.27 315.206 Gen.Neut. Transf. 37.5 kva 1,180.90 1,180.90 .21 Field Regulator 8,957.00 8,957.00 ! .34 Field Circuit Breaker .541 Surge Lightning Arstrs. 5,228.73 492.53 5,228.73 492.53 .812 Current Transformers 4,026.06 4,026.06 Credit for Excess Erection (4,000.00) Material - Base Order Less Freight & Suprv. 2,008,786.00 - Additions to Order 12,782.00 | Escalation 257,224.00 , Freight (actual) 25,214.00 1 Suprv. of Erection 36,000.00 | Credit for Excessive Erection Cost (4.000.00) Purchase Price 2,336,006.00 ! State Tax (2% of material only) 45.575.84 i Total Order 2,381,581.84 87.53% of purchase price 0.55% of purchase price 11.01% of purchase price 1.08% of purchase price 1.54% of purchase price (1.71% of Durchase price) 100.00% of purchase price 1.96% of purchase price WAD01744 n r.ZN;ERATlNG UNI! NY-771002 k ft Wilcox Company --------------------------------------- Specification PSCC A-402-SG team Generating Unit, capable of continuously delivering a3u 000 lb/hr of itl*lt>uUo> -ig 1000"F steam wnen P^ation of both. This burning pulverized Colorado lignite, natural gas, steam generator is of the two-drum radiant divined or a coa,D!1 `"g~2o___M_ iP-fiirroeHd ttyvpnoe, uwnittnn esiui npoerrhhaeaattoenr aannHd a1+tt+eammnpnoraaftao*r, including na1 lIl hnaemcessary turaCting ducts and flues. The services of an erecting superintendent are included c"this order; in ciuded with this order are the following: jso ^ontal continuous tube primary superheater; horizontal continuous tube secondary JlrlZheater; tubular type air preheater having a heating surface of 281.330 sq ft; suprburners; gas burners; electric gas ignition system; dust separator; Diamont caJ- Specialty Corp. soot blower; two (.2) Sturtevant forced draft fans, size i'*eTy_I0 style 57A 3061, Serial Nos. 9A36952 and 9A36953, each driven by an Allis- imers 600-HP 1200 rpm motor, type ANW. Serial Nos. 156546 and 156547, furnished l'ha urchaser (NY-771011); two (21 Sturtevant induced draft fans, size 175-TV-10, W ?e No.57A3159, Serial Nos. 9A37176 and 9A37177, each driven by an Allis-Chalmers Sicn_nP 900 rPm mc>tor, type ANOD, Serial Nos. 156582 and 156586, furnished by chaser (NY-7710111; one (1) Sturtevant recirculation fan, size 1007-TVID, style P-n3104, Serial No. 9A37178, driven by an Allis-Chalmers 75-HP 600 rpm Type AZ motor, ^ rial No. 1-5128-80399-3-1, furnished by purchaser (NY-771011); gage glass; safety De,ves. piping trim; flues; air ducts; supporting steel; stairs; walkways; hand railing; and grating. liation of setting, lagging and insulation by Babcock & Wilcox Company subcon tractors; piping by Midwest Piping Company; balance by Ebasco Services Incorporated. Subcontractors for B&W were: refractory by Stearns-Roger; insulation by B & B Insulation Company; lagging by National Boiler Casing Company. Account Description Man Hours Total Contract 25,794)4 112.204 .21 .222 .224 .225 .310 .311 312.314 .404 .405 .41 .42 .43 .44 .45 .461 .464 .467 .468 .474 .48 .520 .525 .712 .722 .7233 .724 .7253 .727 315.38 Air Ducts to Pulverizers Coal Burners F.D. Fans Ducts-FD Fan to Prehtr. Ducts-Prehtr. to .Vdbx. Gas Lighters Gas Burners Firing Aisle Panel Structural Steel Platforms, Railings, etc. Boiler Pressure Parts Boiler Setting Superheaters Attemporator Air Preheater Soot Blowers Soot Blower Piping 3.B. Contactor Cabinet S.B. Start-up Panels Damper Actuators Economizer B T G Board Transmitter Rack I D Fans Dust Collector Flues-Dust Coll, to ID Fans Flues-Blr.to Preheater Flues-Recirculation Recirculation Fan Starters & Switches 1922 447 24 37 3458 3 25 ... 638 6950)4 506 171 5208 46 78 __ 28 __ __ 980 1023 725 1406 1898 221 -- Material Escalation 11.77 Freight Labor Supervision & Tools Purchase Price State Tax (2> of material only) Rental of Hoist incl. Freight Total Contract Labor Cost Material Cost Total Cost 144,923.11 2 ,414,614.35 2,559,537.46 8,036.36 3,798.20 535.00 830.00 16,616.55 79.00 558.00 __ __ __ 14,210.50 26,277.06 11,130.64 2,590.62 26,659.73 1,034.00 1,779.00 __ __ __ 114.03 __ 5,213.51 5,439.31 3,332.19 6,462.63 9,044.43 1,182.35 -- 1,766.31 104,651.82 21,712.09 33,657.05 84,814.08 3,188.49 22,617.05 204.34 259,614.47 62,472.42 577,235.02 129,763.62 448,813.83 93,104.19 247,625.92 41,944.98 2,197.51 2,247.60 2,653.15 2,190.37 72,152.64 2,478.46 2,086.69 49,441.21 51,316.94 9,948.94 30,538.62 42,897.05 11,108.38 171.11 9,802.67 108,450.02 22,247.09 34,487.05 101,430.63 3,267.49 23,175.05 204.34 259,614.47 62,472.42 591,445.52 156,040.68 459,944.47 95,694.81 274,285.65 42,978.98 3,976.51 2,247.60 2,653.15 2,190.37 72,266.67 2,478.46 2,086.69 54,654.72 56,756.25 13,281.13 37,001.25 51,941.48 12,290.73 171.11 1,995,392.2U 234,870.01 134,544.96 93,475.61 51.447.50 2,509,730.^3 44,605.25 o.201.93 79.51% of purchase price 9.36% of purchase price 5.36% of purchase price 3.72% of purchase price 2.05% of purchase price 100.00% of purchase price 1.78% of purchase price 2,559,537.46 WAD01745 2G4 lONDi'EJJSEB EQUIPMENT NY-771003 yi^ Company Specification PSCC A-403-C sixty-five thousand square feet effective surface two-pass surface Condenser, a 'Tal No. 117324-EA-l, with divided fabricated steel water box, fabricated steel Ser., Muntz metal tube sheets and steel support plates for receiving customers Sn900 7/8" pbosphorized Admiralty tubes, 26 ft 3-1/8 inch total length, spring Supports; orie3 as follows: One (1) steam jet air Pump; one (1) priming ejector; three (3) 'Setag* Worthington 12-QEC-7 vertical turbine type condensate pumps, Serial Nos. j6151461584, and 1461585, each delivering 420 000 lb/hr at 113.6F 420 TDH; one Ml iilis-Chalmers vertical 60x42 Y DBVFM single-stage circulating pump, Serial No. 58364 t0 deliver 65 000 gpm at 87F, 75 ft TDH, with non-removable element. Recount Description TtlTcontract . 313 .321 Boiler Plant Piping Condenser Shell, S/N 117324-EA-l Air Ejector Condensate Pumps, S/N 1461583, 1461584, & 1461585 Air Piping C.W. Pump Material Escalation Freight Labor Supervision purchase Price State Taxes (2% of material only) Total Order Man Hours 768 -- Labor Cost 6,000.00 -- 518 4,047.00 32 252.00 60 -- 158 468.00 -- 1,233.00 248,623.00 21,585.58 ,8,644.55 6 000.00 284,853.13 5,404.17 290,257.30 Material Cost 284,257.30 5,464.80 187,856.62 11,686.91 Total Cost 290,257.30 5,464.80 191,903.62 11,938.91 21,753.52 244.99 57,250.46 22,221.52 244.99 58,483.46 87.30% of purchase price 7.56% of purchase price 3.04% of purchase price 2.10% of purchase price 100.00% of purchase price 1.90% of purchase price BOILER FEED PUMPS NY-771004 Allis-Chalmers Manufacturing Company. Inc. Specification PSCC A-404-BFP Three (.3) nine-stage boiler feed pumps, type BBDH-9 6"x6", Serial Nos. 50825, 50826, 50827, each with capacity of 550 000 lbs/hr baseplate to receive purchaser's motor and equipped with oil system for both pump and motor; One 11) complete Bailey automatic low load by-pass control; One (1) spare rotating element. I Account Description Man Labor Hours Cost Material Cost Total Cost Total Contract 64 750.00 119,674.49 120,424.49 312.50302 Three BF Pumps .61 By-pass Controls .9 Spare Rotating Element 64 750.00 104,328.21 205,078.21 5,039.31 5,039.31 10,306,97 10,306.97 Material Escalation Freight Service Engineer Fhrchase Price State Taxes (2% of Material only) Total Order 115,038.70 None 2,335.02 750.00 lid', 153.72 2,300.77 12(), 424.45 97.39% of purchase price 1.98% of purchase price .63% of purchase price 100.00% of purchase price 1.94% of purchase price WAD01746 265 piPXNG SYSTEM && company. Inc. rsY-771005 specification PSCC A-405-P ower plant piping system furnished, fabricated and erected, and such other worn as directed by the field. Fabricated pipe shall be priced in ac?iPeli^ee*ith "price sheets'1 submitted with order plus freight on pipe only, shop jf aanc Ubr 11nv pipe and fittings at cost plus 15%; hangers at cost plus 10%; field lab< ^ "ius fee of 552,000.00. . cost v ' inscription Man Labor Hours Cost Material Cost Total Cost i^ontract 113,884 <0 V-1* Lawn Sprinkling System 304 1 1512 .153 no2 !-l22 '2il3 n45 ` '111 Fire Protection Yard Drains City tfater Service Water Cooling Tower Basin pipe on Cooling Tower Unwatering Sta. Bldg. Excav. 3043 Pipes in Sta. Bldg. Fdn. 3303 ,392 jQ5 Pipes in Floor Air Cond. 4 Ventilation Sump Pump Drains 396 Sample Table .. /in26 Reclaim Pit Sump Drain ^''lOoSlS Junct. House Sump Drain 410 112% 211 1953 47% 28 10 11 544 182 134 22 53 21 1081 1082 1083 1112 ; 113 .200 .204 .205 Coal Bunker Valves Coal Chutes to Feeders Coal Mill Feeder Ash Sluice Piping Fly Ash Piping Pulverizers Tempering Air Ducts Pulv. Coal Piping 93 271 29 3385% 629% 371% 871% 2598% .207 Mill Panels 211% .21 Coal Burners .311 Gas Burners 99% 85 .312 Gas 4 Purge Piping 2079% .314 Firing Aisle Piping 1448% .315 Gas Shutdown Cabinet 252 .401 Unwatering for Blr. Exc. 4% .41 Boiler 7825% .44 Attemporators 111 .461 Soot Blowers 1146% .4622 Soot Blower Compressors 443 112.464 Soot Blower Piping 1553 .467 Contactor Cabinet 46% .474 Damper Actuators 1912% .47512 Combustion Control Compressor 73 .47514 Fuel Tank Piping 191 .4752 Air Receiver 198 .4753 Air Dryer 4 Filter 213% .4754 Control Air Piping 4859% .5000 3rd Stage F. W. Heater 379% .5001 7th Stage F. W. Heater 320% .5002 10th Stage F. W. Heater 441% .5003 13th Stage F. W. Heater 407% .5004 17th Stage F. <. Heater 288% .5005 18th 4 19th Stage F. W. Htr. 115% .501 Deaerator 925% .5020 Evaporator 301 .5021 Evaporator Preheater .5022 Evap. Drain Receiver 175 -- .5023 Evap. Flash Pipe 257 .50302 Boiler Feed Pumps 334 .50303 BF Pump Aux. Panel 1117% .50312 Low Pr. Htr. Drain Pumps 146% 50352 Chemical Feed Pumps 23% .50362 Evap. Feed Pumps 24 .5041 Intermediate Flash Tank 100 424,209.54 1,154.58 1,516.27 417.93 795.03 7,311.26 172.58 103.01 24.68 41.09 2,013.77 705.73 503.70 84.05 203.35 80.96 341.90 1,021.47 97.80 12,663.55 2,372.99 1,432.41 3,207.11 9,524.61 801.61 367.92 314.08 7,644.65 5,487.71 962.05 16.04 28,683.69 421.83 4,344.89 1,722.66 5,881.69 178.97 7,162.35 275.21 715.22 725.71 788.82 18,088.24 1,419.53 1,191.49 1,635.14 1,511.28 1,068.45 428.56 3,420.88 1,126.16 656.46 -- 956.31 1,255.43 4,143.77 551.16 89.50 126.09 368.61 306,050.18 -- 2,725.20 -- 116.11 10,396.04 -- -- -- -- -- -599.81 -- -- -- -- -- -- 6,976.38 -- -- -- -- -- -- -- 13,525.77 -- -- -- 150.00 -- -- -- 170.56 -- -- -- -- -- -- 59.03 22.72 -- -- -- -- -- -- -- -- 331.94 755.24 -- -- -- -- -- 1,362.05 730,259.72 1,154.58 4,241.47 417.93 911.14 17,707.30 172.58 103.01 24.68 41.09 2,013.77 705.73 1,103.51 84.05 203.35 80.96 341.90 1,021.47 97.80 19,639.93 2,372.99 1,432.41 3,207.11 9,524.61 801.61 367.92 314.08 21,170.42 5,487.71 962.05 16.04 28,833.69 421.83 4,344.89 1,722.66 6,052.25 178.97 7,162.35 275.21 715.22 725.71 788.82 18,147.27 1,442.25 1,191.49 1,635.14 1,511.28 1,068.45 428.56 3,420.88 1,126.16 656.46 331.94 1,711.55 1,255.43 4,143.77 551.16 89.50 126.09 1.730.66 WAD01747 266 ,5-5 ,552 ,61 7L>2 .712 ,727 .22 ,25 .3021 .311 .3122 .313 .321 314.3433 .344 .349 .357 .3627 .3925 .393 .3942 .4012 .402 .404 .4101 .4103 .412 .420 .421 .422 316.20 .234 398.271 .30 .464 Low Pr. Flash Tank Load Flash Tank 17th Stage Drain Receiv. Blow Down Flash Tank Free Blow Tank 5 I C Board Instrument Piping Meters, etc., Purch. Separately Transmitter Rack Water Treating Piping Blr. Plant Piping Breeching Drains induced Draft Fan Recirculation Fan Sleeves in Pedestal Hydrogen Cool. System Turbine Piping Turbine Lube Oil Tank Condenser Air Ejectors Condensate Pumps Condenser Air Piping Circl. Water Pump C. W. Conduit Thiimbles C. W. Steel Piping Diverging Tube C. Vf. Tower Wood Pipe Diffuser River Intake Pumps River Water Piping Pond weirs Oil Batch Tank Oil Pumps Oil Piping Start-up Panel Cond. Aux. Panel Turb. Instr. Piping Gland Seal Tank Gland Seal Return Tank Gland Seal Piping Vacuum Clean. System Station Comp. Air Constr. Water & Steam Remove & Reinstall Starting & Testing Work Orders Man Hours 27 40% 31% 41 -- 4709% 1507 Labor Cost 99.44 149.10 118.46 156.74 -- 17,530.11 5,718.67 1165 516 4,402.34 1,930.14 1121% 4.260.23 40,705 229 69 37 11 152,325.11 864.36 258.37 138.71 39.53 1930 4457 268 7,257.06 16,578.73 993.89 239% 893.59 533% 1,978.88 115 427.00 437 1,609.76 232% 848.36 410% 1,503.17 2433% 9,371.44 556 2,064.30 156 578.19 11 39.79 150 567.09 1931 7,234.29 377% 1,440.11 84 320 309.72 1,196.26 205% 766.48 2% 9.27 981% 3,667.66 ---- 38% 143.31 143% 531.36 986 3,649.26 848% 3,214.17 441% 1,662.86 1422 5,293.34 856% 3,143.97 1428 5,416.55 1192% 3,186.78 Material Cost 1,377.16 2,060.22 529,34 1,621.37 427.84 -- 691.55 -- 291.11 236,828.52 -- -- -- 803.35 1,020.16 -- -- -- 2,751.23 -- -- 769.30 -- -- -- 17,085.29 -- -- 792.99 -333.56 ... 640.13 836.21 -- -- -- -- Total Cost 1,476.60 2,209.32 647.80 1,778.11 427.84 17,530.11 6,410.22 4,402.34 1,930.14 4,551.34 389.153.63 864.36 258.37 178.31 39.53 8,060.41 17,598.89 993.89 893.59 1,978.88 427.00 4,360.99 848.36 1,503.17 10,140.74 2,064.30 578.19 39.79 567.09 24,319.58 1,440.11 309.72 1,196.26 1,559.47 9.27 3,667.66 333.56 143.31 1,171.49 4,485.47 3,214.17 1,662.86 5,293.34 3,143.97 5,416.55 3,186.78 Material Purchase Price Freight State Taxes (2% of Material only) Total Material 293,491 .45 10,042 .62 2.516 .11 95. 90% of purchase price 3. 28% of purchase price 0. 82% of purchase price Gross Payroll Contributing to Benefit Fund Taxes Insurance Subsistance Misc. - Mileage Allowance Fee Total Erection 351,531.47 7,274.17 6,563.82 3,739.86 2,622.00 224.00 52.254.22 424,209.54 (107,25734 man hours plus 6,626-3/4 premium hours) Total Contract 730,259.72 WAD01748 267 tor NY-771006 tr,, corporation Specification PSCC A-407-D al feedwater Deaerator, Serial No. 1461397, with guarantee maximum of 005 V* oaf o___x__y,.ag.eAnn aA+t 90*37 r0s 0A0A0rt l1bKsM //hkr., horizonta1l stor__a__g___e__i._t___a__n__1k. _w___!iXthU 1X 5f 0r-y 0AO00A lb. cc/11.tyt internal direct contact vent condenser with stainless steel tubes and tube :pafa all designed for 52 psig maximum working pressure; and accessory equipment. sheet3* Description Man Hours Labor Cost Material Cost Total Cost Deaerator -- 43,460.80 43,460.80 40,529.00 95.02% of purchase price KreiSht Price ^'tate^axes (296 of material only) Total Order 2.121.22 42|650.22 810.58 43,460.80 4.98% of purchase price 166.60% of purchase price 1.90% of purchase price rEEDMTER HEATERS NY-771007 r.riscow-Russell Company Specification PSCC A-408-EH (2) 3rd stage high pressure feedwater Heaters No. 24-286-GR, Serial Nos. 55026A and 55027A, type LSU for vertical installation to contain desuperheating, condensing and subcooling zones with 5/8 OD 70/30 CuNu tubing; Tvo (2) 7th stage high pressure feedwater Heaters No. 22-228-GR, Serial Nos. 55009A and 55010A, type LSU for vertical installation to contain condensing and subcooling zones with 5/8 OD 70/30 CuNi tubing and stainless steel impingement baffles; Two (2) 10th stage high pressure feedwater Heaters No. 22-258-GR, Serial Nos. 55028A and 55029A, type LSU for vertical installation to contain condensing and subcooling zones with 5/8 OD 70/30 CuNi tubing and stainless steel impingement baffles; Two (2) 13th stage high pressure feedwater heaters No. 22-261-GR, Serial Nos. 55011A and 55012A, type LSU for vertical installation to contain condensing and subcooling zones with 5/8 OD 70/30 CuNi tubing and stainless steel impingement baffles; One (1) 17th stage low pressure feedwater Heater No. 24-232-GR, Serial No. 55030A, type GSU for horizontal installation, with 5/8 OD arsenical copper tubing and stain less steel baffle; une (1) 18th and lyth stage low pressure feedwater Heater in one shell for installa tion in the condenser neck. Serial No. 55031A. Account Description Man Hours Labor Cost Material Cost_____ Total cost total Contract 153,562.44 153,562.44 312.5000 .5001 .5002 .5003 .5004 .5005 Two 3rd-stage Heaters Two 7th-stage Heaters Two lOth-Stage Heaters Two 13th-stage Heaters One 17th-stage Heater One 18th & 19th stage Heater 37,751.36 27,163.99 28,853.00 29,099.47 8,102.48 22,592.20 37,751.30 27,163.99 28,853.00 29,099.47 8,102.48 22,592.20 Material Escalation Freight Purchase Price State Taxes (2% of Material only) 148,999.00 (1,519.96) 3.197.78 150,676.82 2.885.62 98.89% of (1.01% of 2.12% of 100.00% of 1.92% of purchase purchase purchase purchase purchase price price) price price price Total Order 153,562.44 WAD01749 263 ^ARATION PLANT NY-771008 CA& iiiVn- Corporation Rliii----- ^Toal preparation plant to handle 145 OOO lb/hr of crushed 3/4 Inch maximum - *Picteenit* crushed to a fineness of 99% through 50 mesh and 75.5% through 200 k%i*e 1Xreen and deliver to coal burner when supplied with 184 000 lb/hr 550F *?* air' t includes the following; iquiP-en 14) Atrila Series 550 duplex hammer ark attrition horizontal mills, Serial (i Four ^qo, 1301, 1302 and 1303, with primary coal breaker drying and segregating Ns*ions, exhauster fans, pressure lubrication and tungsten carbide faced pulver izing and brea^er elements, flexible couplings and guards (motors not included); . ht (y) drum type feeders with Reeves variable speed transmission (motors not included); Twelve (12) I4" .375 walls steel coal pipes to connect mills to coal burner (.c) ^Qnections with four three-way distributing valves; isary air duct system insulated and lagged from mills to terminal points of id) Lgbcock & Wilcox ducts approximately 15 ft above mill floor and 22 ft from center- line of mills; Insulation applied by local help hired by Riley; Lagging applied by Floyd D. Whicker. account Description ^""contract ii2 1083 J 200 204 205 8 Coal Feeders 4 Pulverizers Primary Air Ducts Coal Pipe to Burners Material Escalation Freight Labor - Insulators & Laggers Purchase Price State Taxes (2% of material only) Total Order Man Hours Labor Cost Material Cost Total Cost 2135 5,058.00 241,277.81 246,335.81 2135 5,058.00 32,423.30 155,538.29 13,111.68 40,204.54 32,423.30 155,538.29 18,169.68 40,204.54 220,829.00 6,330.47 9,575.13 5.058.00 241,792.60 4.543.21 246,335.81 91.32% of purchase price 2.62% of purchase price 3.96% of purchase price 2.10% of purchase price 100.00% of purchase price 1.88% of purchase price testing services New York Testing Laboratories. Inc. Test Flexicore slabs. Account 399.11 Description Three Tests Man Hours Labor Coj3^_ NY-771009 Material Cost____ 844.52 Total Cost 844.52 STATION AUXILIARY MOTORS Allis-Chalmers Manufacturing Company. Inc. Acconnt Description Toteil Contract 311.392 1-Air Conditioning Pump, 40 HP 1760 rpm 440-v Motor, S/N 1-5126-80399-5-1 312.10283 2-Coal Hopper Feeder Motors ID, IF, 7.5/3.75 1750/870 rpm, 440-v Motor, S/N 1-5124-80399-8-1 & -2 NY-771011 Specification PSCC A-464 Material Cost 238,338.97 Total Cost 238,338.97 810.87 810.87 757.55 757.55 WAD01750 pparription A_Coal Hopper Feeder Motors, -^7o284 7.5/3.75 1750/870 rpm, 440-v Motor, S/N 1-5124-80399-8-3, -4, -5, & -6 i-Conveyor 6b, 2U HP, 175U .1032 rnm, 440-V Motor, S/N 1-5124-80399-10-1 1-Conveyor 6A, 10 HP, 1750 1024 rpa 440-V Motor, S/N 1-5124-80399-11-1 .1044 1-Crusher, 150 HP, 870 rpm, 440-v Motor, S/N 1-5128-80399-9-1 .1045 1-Screener, 10HP, 1750 rpm, 440-v Motor, S/N 1-5124-80399-9-1 .1064 1-Conveyor 7, 75 HP, 1750 rpm, 440-v Motor, S/N 1-5128-80399-12-1 .1071 2-Conveyors 8A 1 8B, 15 HP, 870 rpm, 440-v Motor, S/N 1-5124-80399-13-2 & 1-5124-80399-13-1 .1083 8-Coal Mill Feeders, 3/4 HP, 1160 rpm, 440-v Motor, S/N 1-5122-80399-21, -22, -23, -24, -25, -26, -27, & -28 .200 4-Pulverizers, 500 HP, 890 rpm, 220-v Motor, S/N 158508, 156510, 156511, & 156524 .223 2-FD Fan Driver, 600 HP, 1200 rpm, 2200-v Motor, S/N 156546 & 156547 .50302 3-BF Pumps, 1750 HP, 3600 rpm, 2200-v Motor, S/N 156564, 156565, 156599 .50312 2-LP Heater Drain Pump, 60 HP, 1800 rpm, 440-v Motor, S/N 1-5128-80399-4-1 & 1-5128-80399-4-2 .713 2-ID Fan Drivers, 1250 HP, 900 rpm, 2200-v Motor, S/N 156582 & 156586 .727 1-Recirc. Fan, 75 HP, 580 rpm, 440-v Motor, S/N 1-5128-80399-3-1 314.3122 3-Condensate Pumps, 125 HP, 1760 rpm, 440-v Motor, S/N 1-5128-80399-1-1, -2, & -3 .322 1-CW Pump, 1500 HP, 450 rpm, 2200-v Motor, S/N 156589 314.355 11-CW Cool. Tower Fans, 60/15 HP, 1750/1870 rpm, 440-v Motor S/N 1-5128-80399-1 thru -11 .3025 2-River Intake Pumps, 60 HP, 1150 rpm, 440-v Motor, S/N 1-5126-88587-1-1, & 1-5128-88587-2-1 .3985 2-River Pond Pumps, 25 HP, 1150 rpm, 440-v Motor, S/N 1-5128-88587-2-2 & i-5126-88587-1-2 Material Escalation Freight Purchase Price State Taxes (2# of material only) Total Order Material Cost 269 Total Cost 1,515.09 457.84 305.91 4,932.44 305.91 1,818.43 1,515.09 457.84 305.91 4,932.44 305.91 1,818.43 1,097.70 1,097.70 573.66 573.66 28,459.91 12,962.33 76,411.26 28,459.91 12,962.33 76,411.26 1,519.80 1,519.80 34,458.16 34,458.16 3,164.03 3,164.03 6,969.07 35,492.07 6,969.07 35,492.07 18,948.35 18,948.35 5,145.81 5,145.81 229,334.34 none 4,41b.10 233,752.44 4,586.53 238,338.97 2,232.78 2,232.78 98.11% of purchase price 1.89% of purchase price 100.00% of purchase price 1.96% of purchase price WAD01751 270 . pOlV^a TRANSFORMER NY-771012 hr..ag Electric Corporation Specification PSCC A-456 120 000 KVA, FOA 3-phase, 60 cycles, 13 800 volt delta to 110 000 volt TraAs^c/N 6530378, with 2- 2346 full capacity taps above normal and 2- 2M06 below fye> , taps high volt side. nor3-1 Description Mein Hours Labor Cost Material Coat Total Cost Main Transformer 249,325.32 249,325.32 Escalation Freight haSe Price Prg"ate Taxes (2% of material only) Total Order 219,319.07 19,947.00 5,273.93 244,540.00 4,785.32 249,325.32 89.7096 of Purchase Price 8.1596 of Purchase Price 2.1596 of Purchase Price 100.0096 of 1Purchase Price 1.9694 of 1Purchase Price COMBUSTION & FEEDWATER CONTROLS AND INSTRUMENTS Meter Company Recount Description Total Contract 312.207 Mill Panels .311 Gas Burner ' 312 Gas Piping ,316 Gas Control Station ,474 Damper Actuators .4753 Control Air Filter ,50303 B.F. Pump Aux. Panel .505 Feedwater Regulator .520 B T G Board .523 Boiler Instruments .525 Transmitter Rack Gages .526 Relay Panel Instruments .61 Boiler Plant Piping 314.413 Turbine Instruments 398.464 Starting 8: Testing Material Labor - (Supervision) Freight Purchase Price State Taxes (2% of Material only) Total Order Man Hours 496 40 4 Labor Cost 2,906.16 234.08 23.41 27 8 87 310 158.48 46.95 509.32 1,816.87 20 57,817.72 2,906.16 837.87 61,561.75 1,152.49 62,714.24 117.05 NY-771013 Material Cost Total Cost 59,808.08 62,714.24 78.69 2,440.51 15,803.87 572.15 8,841.86 9,172.00 16,353.41 617.09 3,198.81 1,911.59 818.10 234.08 23.41 78.69 2,440.51 15,962.35 572.15 46.95 8,841.86 9,681.32 18,170.28 617.09 3,198.81 1,911.59 818.10 117.05 93.9296 of Purchase Price 4.7296 of Purchase Price 1,3696 of Purchase Price 100.0096 of Purchase Price 1.87% of Purchase Price reverse current valves Atwood 8c Morrill Company Account Description 312.61 7 Valves Material Freight Purchase Price State Taxes (2% of material only) Total Order 5,764.58 88.42 5,853.00 117.06 5,970.06 *o o oo NY-'771014 Material Cost Total Cost 5,970.06 5,970.06 98.49% of Purchase Price 1.51% of Purchase Price Purchase Price 2.00% of Purchase Price WAD01752 GENERATOR lubricating oil system equipment 271 NY-771015 eClnCj. 4 Figure 832-P4 dry type turbine oil conditioner, Stock No. 351017, with 0,, (J;lteriag units and vent fan, S/N 869187 w/ 1/20-HP G. E. Motor, 1725 rp, S/N '^H25AG325A* having capacity of 1080 gpa; n figure 841-A gear rotary puMp, S/N 4GAU, and 1%-HP 850 rpM, 440-v G. E. Motor, ^S/N SK-22614; n) Figure 841-A gear rotary pump, S/N 6GAU, and 3-HP 1750 rpM, 440-v G. E. Motor, 0Ds/* TM"i6068; ` /i) 9 000 gallon* 2 compartaent oil storage tank 72" high, 120" wide, and 255" On* , Figure No. 363, having 2 vent fans, S/N 868995 & 89519, w/ 1/20-HP, 1725 rpM, G E.' Motors, S/N SKH25AC & SKH25A, heating coil and level gages; (2) sight overflows. in* Description total Contract ,I4 4012 ,402 *403 j404 Batch Tank Two Puwps Purifier Oil Pipe Fittings Material Freight Discount Purchase Price State Taxes (2% of Material only) Total Order Man Hours Labor Cost Material Cost Total Cost 9,505.17 9,505.17 4,705.25 703.31 3,944.88 151.73 4,705.25 703.31 3,944.88 151.73 8.796.25 622.70 ( 89.70) 9.329.25 175.92 9,505.17 94.29% of purchase price 6.67% of purchase price ( 0.96% of purchase price) 100.00% of purchase price 1.88% of purchase price CONTROL AIR COMPRESSOR NY-771016 f.ardner-Denver Company One (1) 9x9 Model RXC horizontal, single-stage double-acting water cooled air conpressor, S/N 180595, intake silencer, V-belt drive and guard, capacity 152 CFM at 100 psig; One (1) Model D-102 Aftercooler and drain trap; One (1) 36" dia x 8 ft vertical air receiver for 125 psig; One (1) 20" dia x 6 ft horizontal air receiver for 125 psig; One (1) Model M330 Continental 6-cyl, 4" bore by 4-3/8" stroke gasoline engine, S/N 16632. Account Description Total Contract 312.47512 Gas Driven Conpressor .4752 Two Receivers Material Freight Purchase Price State Taxes (2% of Material only) Total Order Man Hours Labor Cost Material Cost Total Cost 5,329.14 5,329.14 4,735.77 593.37 4,735.77 593.37 4,938.00 292.38 94.40% of purchase price 5.60% of purchase price 5,230.38 98.76 5,329.14 100.00% of purchase price 1.89% of purchase price WAD01753 hIScale gage NY-771017 inscription One Miniscale Gage uateriai * Freight DisCount i hac6 Price ,vr-tate Taxes (2% of material Man Hours 404.50 4.23 ( 1.99) 406.74 8.05 414.79 Labor Cost Material Cost Total Cost 414.79 414.79 99.45% of purchase price 1.04% of purchase price ( 0.49% of purchase price) 100.00% of purchase price 1.98% of purchase price DRAFT GAGES ||]n^0 R Tiernan Company. Inc. AcCount Description 312.520 7 Draft Gages Material Freight Purchase 1'rice itate Taxes t2% of material only) Total Order 525.00 13.91 538.91 10.50 549.41 NY-771018 Specification ME-INS-3 Material Cost Total Cost 549.41 549.41 97.42% of purchase price 2.58% of purchase price 100.00% of purchase price 1.96% of purchase price OIL CIRCUIT BREAKERS NY-771019 .estinghouse Electric Corporation Specification PSCC A-461 iwo (2) oil circuit breakers, 115 KV, 1200 amp, 5000 mva interrupting capacity specification PSCC A-461, S/N 1-32Y3422 & 1-32Y6102. Account Description 343.312 Two 0 C B Haterial Freight Purchase Price State Taxes (.2% of material only) Total Order 66,265.82 1.407.18 67,673.00 1,325,32 68,998.32 Material Cost Total Cost 68,998.32 68,998.32 97.92% of purchase price 2.08% of purchase price 100.00% of purchase price 1,96% of purchase price REINFORCING BARS NY-771020 the Colorado Builders' Supply Company Furnish, fabricate and deliver reinforcing steel, base price $5.89 cwt, freight al lowed to jobsite, plus extra for size, bending and listing. Account Description Total Contract 311.121 .131 .153 .2102 .2122 .2412 .3032 .3042 .3052 Reinforcing Steel Lbs. 867,012 233 257 1,089 24 1,252 6,567 27,949 6,335 22,531 Material Cost 59,392.60 17.21 18.55 80.02 1.76 89.53 483.00 1,904.09 462.89 1,619,95 WAD01754 273 ^count Description .3062 Reinforcing Steel .3302 .3402 .4122 .415 312.10222 .1028122 .10301 .10304 .1031 .1060 .1102 .11211 .201 \ 221 4032 .4060 .4061 .407 .4621 .4651 .47511 .50301 .50311 .50351 .50361 .50401 .511 .701 .711 .726 314.122 . 132 314.21 .3121 . 3432 . 344 .3522 .3622 . 3022 .303 .3942 .3982 . 4uli ol5.2011 .2013 .2041 .321 Pi .bo .711 o42.121 343.101 .111 .1212 .2222 .225 .228 .311 . o o 11 . o321 ,o34l . 7100 Transferred iron Zuni Transferred to Cherokee Material Freight Discount Purchase Price State Taxes (3% of material only) Total Order Lbs. 873 48,473 2,317 11,924 7,607 33,992 36,687 Material Cost 65.62 3,552.79 91.65 793.83 480.20 2,294.06 2,482.02 10,301 1,456 15,792 6,835 3,310 12,793 2,744 73,457 12,765 1,519 7,633 208 8 1,084 5,243 270 309 204 667 1,037 7,981 5,983 1,832 53,585 112,872 320 867 145,696 1,64? 77,423 2,335 16,645 477 1,211 9.7b4 2,643 2,u8b o2 4,530 968 46 2,598 496 la4 2,901 716 2,851 3,173 ^8 2,085 2,983 1,480 88? 916 3,463 ( 51,882) 713.07 97.14 1,066.12 484.37 217.24 844.56 184.68 4,884.34 880.43 112.10 563.55 15.16 .58 80.09 362.50 21.37 21.29 14.65 48.80 72.48 533.01 418.02 123.78 3,471.66 7,498.62 21.58 bl.92 10,140.45 119.27 5,b09.22 167.50 1,716.00 34.50 89.61 84.03 183.19 150.20 3.82 294.04 69,54 2.59 ly3.04 36.11 11.06 73.02 51.21 198.06 219.54 5.75 154.22 214.19 54.07 60.76 118.89 253.34 ( 3,419.03) 79,405 5,250.81 54,940.17 95.03% of purchase price 3,157.37 5.45% of purchase price ( 274.69)( 0.48% of purchase price 57,822.83" 100.00% of purchase price 1.569.75 2.72% of purchase price 59,392.60 WAD01755 271 pu./ER TRANSFORMER XlLlA KI NY-771021 |rn'n Transformer Company Specification PSCC A-457 rl0e rpin^OCgO.CO/Al 2-455070, KVA, OA/FA 3-phase, S/N 27543-1 60 cycle, 13 200-v delta to 2400-v delta, spec. ^ccouni 315-2012 Transformer ^hflse Price P^tate Taxes (2% of material only) Total Order 42.083.00 1,033.00 43.116.00 841.66 43,957.66 Material Cost Total Cost 43,957.66 43,957.66 97.60% of purchase price 2.40% of purchase price 100.00% of purchase price 1.95% of purchase price recording instruments & Northrup Company Recount Description Total Contract 312.520 '522 .523 jll!413 315.751 5 Recorders Thermocouples, etc. 2 Recorders Thermocouples Iron Constantan Thermocouple Wire Material Freight Purchase Price State Taxes (2% of material only) Total Order 11,234.22 52.01 11,286.23 224.70 11,510.93 NY-771022 Material Cost_____ 11,510.93 7,202.36 328.99 2,831.51 554.85 Total Cost 11,510.93 7,202.36 328.99 2,831.51 554.85 593.22 593.22 99.54% of purchase price 0.46% of purchase price 100.00% of purchase price 2.00% of purchase price LOW PRESSURE HEATER DRAIN PUMPS NY-771023 Ingersoll Rand Company Specification PSCC A-410-MP Two (2) Model 2% CHW Centrifugal Pumps, 268 gpm, 1760 rpm, S/N 05543129 and 05543123, cast iron casing and bronze impeller, complete with extended base. 1 Account Description 312.50312 Two Pumps Man Hours Material Cost_____ 6,334.79 Total Cost 6,334.79 .Material Freight Purchase Price State Taxes(2% of material only) Total Order 5,934.00 282.11 6,216.11 118.68 6,334.79 95.45% of purchase price 4.55% of purchase price 100.00% of purchase price 1.91% of purchase price MAIN STRUCTURAL STEEL The Midwest Steel & Iron Works Company Account Description Total Contract 311.3033 Column Plates .310 Main Steel .311 Miscellaneous Steel i Lbs. 1,081 333 36 388 1,038 844 4 730 NY-771024 Material Cost 142,747.09 4,778.65 137,167.89 620.51 Total Cost 142,747.09 4,778.65 137,167.89 620.51 WAD01756 n^.'Ker Plates gf iai debase V Order of material only) Lbs. 1,371 138,611.00 138,611.00 4,136.09 142,747.09 Material Cost Total Cost 180.04 180.04 100.00% of purchase price 100.00% of purchase price 2.98% of purchase price NY-771025 j omrrnr Corporation Jli2----- bottom and fly ash system to operate in conjunction with existing ash handl;oPlete ten including: Two (.2) ash pit hoppers made of 3/8 steel plate with water ing SJ,st top, each with hydraulically operated door and refractory cement lining; sealf?) 20" XCen clinker crushers with 3-HP electro-fluid gear Motors, S/N YG-1037 t* ,,cgoi- 8" I.D. Durite Conveyor Pipe and fittings; One (1) 8" Jetpulsion Pump; and p, Durite Conveyor Pipe for fly ash. 5" l tnmatic operation of the six dust collector intakes will be performed by NuvaThetrol p,,aannee-*l. < furnished with Unit #3. ;cc0unt Description ^""contract Material Cost 39,988.11 Total Cost 39,988.11 1112 Ash Piping ' " 11212 Hoppers 1122 Lining ' j 123 Clinker Crushers 113 Fly Ash Piping Material Freight 'urchase Price State Taxes (.2% of material only) Total Order 37,126.00 2.119.79 39,245.79 742.32 39,988.11 3.177.53 23,613.80 2,706.14 3,587.10 6.903.54 3.177.53 23,613.80 2,706.14 3,587.10 6.903.54 94.62% of purchase price 5.38% of purchase price 100.00% of purchase price 1.89% of purchase price VALVES NY-771026 The Chapman Val-ve Manufacturing Company 1500# standard - cast chrome moly steel Account Description 312.61 Valves Material Escalation Freight Discount Purchase Price State Taxes (2% of material only) Total Order 35,385.48 484.00 1,265.35 ( 742.74) 36,392.09 702.56 37,094.65 Specification PSCC A-414-V Material Cost Total Cost 37,094.65 37,094.65 97.23% of purchase price 1.33% of purchase price 3.48% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 1.93% of purchase price VALVES Crane Company 300# cast carbon steel 150# cast carbon steel 200# bronze NY-771027 Specification PSCC A-416-V WAD01757 Valves ,count u1 price rcWse Taxes (2% of material only) 1 ^tal order 4,293.51 112.62 ( 88.91) 4,317.22 85.85 4,403.07 Material Cost Total Cost 4,403.07 4,403.07 99.46% of purchase price 2.60% of purchase price ( 2.06% of purchase price) 100.00% of purchase price 1.99% of purchase price VihVE5 -ocket tiavwell & Moore. Inc. - 2" and smaller. ,;count Description ^f^ontract 312 .464 .522 .552 .61 314.32! .313 .404 .412 .422 Valves Material Freight Discount purchase Price State Taxes 1,2% of Total Order erial only) 25,878.85 498.75 ( 260.76) 26,116.84 512.12 26,628.96 NY-771028 Specification PSCC A-417-V Material Cost Total Cos t 26,628.96 26,628.96 163.15 28.58 1,858.67 1,942.35 19,763.79 70.48 22.73 645.48 1,220.93 912.80 163.15 28.58 1,858.67 1,942.35 19,763.79 70.48 22.73 645.48 1,220.93 912.80 99.09% of purchase price 1.91% of purchase price ( 1.00% of purchase price) 100.00% of purchase price 1.96% of purchase price VALVES The Ohio In.jector Company Medium Pressure - cast steel. Account Description Total Contract 312.312 .464 .61 314.313 .404 .422 Valves Material Freight Discount Purchase Price State Taxes (2% of material only) Total Order 23,317.81 767.55 ( 481.72) 23,603.64 456.50 24,060.14 NY-771029 Specification PSCC A-415-V Material Cost Total Cost 24,060.14 24,060.14 221.98 491.35 21,777.35 1,353.49 148.96 67.01 221.98 491.35 21,777.35 1,353.49 148.96 57.01 98.79% of purchase price 3.25% of purchase price C 2.04% of purchase price) 100.00% of purchase price 1.93% of purchase price VALVES The Will jam Powell Company 125# standard - cast iron. NY-771030 Specification PSCC A-418-V WAD01758 277 ngscripti on tract Valves ^ freiBP1 niScount J,,,e price rotate Taxes (2% of material only) 3 Total Order 4,924.39 422.36 ( 104.74) 5,242.01 98.55 5,340.56 Material Cost Total Cost 5,340.56 5,340.56 81.78 205.81 83.09 850.75 1,739.82 360.31 2,019.00 81.78 205.81 83.09 850.75 1,739.82 360.31 2,019.00 93.94% of purchase price 8.06% of purchase price ( 2.00% of purchase price) 100.00% of purchase price 1.88% of purchase price NY-771031 ... Company standard - Cast Chrome Moly Steel. ;cCount Description Total Contract 395 Valves 4183 -i2 1026 1112 4754 ' 522 61 514.313 .344 .393 .393 34o.225 Uaterial escalation Freight Discount liirchase Price otate Taxes (2% of material only) Total Order 10,020.73 133.80 202.04 ( 205.88) 10,150.69 201.76 10,352.45 Specification PSCC A-413-V Material Only Total Cost 10,352.45 10,352.45 24.72 26.72 52.77 153.06 141.38 223.92 9,547.84 4.42 74.08 19.27 77.09 7.18 24.72 26.72 52.77 153.06 141.38 223.92 9,547.84 4.42 74.08 19.27 77.09 7.18 98.71% of purchase price 1.32% of purchase price 1.99% of purchase price ( 2.02% of purchase price) 100.00% of purchase price 1.98% of purchase price CIRCULATING WATER VALVES genry Pratt Company. Inc. i-5-? Standard Steel - motor operated. Recount Description Total Contract 314.344 349 1 42" M. 0. Valve 3 Motors for Exist. 36" Valves Serial freight Purchase Price State Taxes(.2% of material only) Total Order 8,649.00 94.18 8,743.18 172.98 8,916.16 NY-771032 Material Cost 8,916.16 4,567.90 Total Cost 8,916.16 4,567.90 4,348.26 4,348.26 98.92% of purchase price 1.08% of purchase price 100.00% of purchase price 1.97% of purchase price WAD01759 0 dISCONNECT switches NY-771033 Fl..ipaent Company po*e. Specification PSCC A-463 Type GT-22 115 kv, 200 amp, 3 PST outdoor manually gang operated disconnecting 3 ^tebes GT-22 23 kv, 1200 amp, 3 PST outdoor manually gang operated disconnecting ir 1 s.itcb* noscription iccdHSi tract Totai CoD .5222 315 3*3 3313 |3323 .3343 One Disconnect Switch Four Disconnect Switches Two Disconnect Switches Two Disconnect Switches yaterial Freight hase Price l'ur|tate Taxes (2% of material only) 21,333.47 1.096.89 22,430.36 426.67 Material Cost Total Cost 22,857.03 22,857.03 839.86 10,239.22 5,119.61 6,658.34 839.86 10,239.22 5,119.61 6,658.34 95.13% of purchase price 4.87% of purchase price 100.00% of purchase price 1.90% of purchase price Total Order 22,857.03 CONDENSER tubes NY-771034 -rr.,iii Manufacturing Company. Inc. 10 900 Condenser Tubes phosphorized Admiralty ASTM Spec. B-lll, Type D, 7/8" OD iHBWG, 26 ft 3-1/8 in long; total weight, 141 333 lbs. V Account? 314.3022 description 10 900 Condenser Tubes Material Discount Purchase Price State Taxes (2% of material only) Total Order 80,277.15 ( 409.41) 79,867.74 1.605.55 8l|473.29 Material Cost_____ Total Cost 81,473.29 81,473.29 100.51% of purchase price ( 0.51% of purchase price) 100.00% of purchase price 2.01% of purchase price EVAPORATOR AND PREHEATER NY-771035 The Lummus Company Specification PSCC A-409-E One (.1) size 66234 V-tube Evaporator, with a net vapor output of 27 000 lbs/hr and effective heating surface of 1067 sqft, single effect type Tubes 1" OD x 18 6GW 90-10 cupro-nickel; One (1) Cochrane vertical tray external vent condenser type Preheater, S/N A-20856, with stainless steel tubes and tube sheets having a capacity of 35 000 lbs/hr. Account Description Total Contract 312.5020 Evaporator .5021 Preheater 398.464 Engineering for Rerating Material Escalation Freignt Engineering Purchase Price State Taxes (2% of material only) Total Order Paid on Cherokee Unit 1 check 16,701.00 584.52 715.13 903.00 18,903.65 345.71 19,249.36 ( 903.00) 18,346.55^ Material Cost Total Cost 19,249.36 19,249.36 13,849.80 4,496.56 903.00 13,849.80 4,496.56 903.00 88.38% of purchase price 3.07ft of purchase price 3.78% of purchase price 4.77% of purchase price 100.00% of purchase price 1.83% of purchase price WAD01760 279 VALVES NY-771036 Company --T^yne 30-RS-0BS Stock Equipment Company coal valves installed at bottom of L.,ur with 1-B63 sheaves and 19-ft. chains. -J ,fll bias noscription Material Cost_____ Total Cost >1 Four 30" coal valves W*erial FreiShpt rice Hjrcnase ^axeg Q2?b of material only; -'`total Order 4,667.52 208.18 4,875.70 93.35 4,969.05 4,969.05 4,969.05 95.72% of purchase price 4.28% of purchase price 100.00% of purchase price 1.91% of purchase price y5 FOR existing switchboard .-MJJH1 Electric Company ,cc0unt Description Total Contract _38 One Potential Transformer J .4101 Meters, Relays, Etc. ..ater ial Freight urchase Price ;tate Taxes (2% of material only) Total Order 3,493.76 31.30 3,525.06 69,88 3,594.94 NY-771037 Specification PSCC A-458 Material Cost Total Cost 3,594.94 3,594.94 49.78 3,545.16 49.78 3,545.16 99.11% of purchase price 0.89% of purchase price 100.0096 of purchase price 1.98% of purchase price FQLTPMENT for existing switchboard NY-771038 estinghouse Electric Corporation Specification PSCC A-458 Pitches, Relays, Meters, Minalities, etc., for existing Switchboard; jifitch for new Switchboard; Light Lenses Three (o) generator surge protection Capacitors, 23 KV, .25 fd.. Style No. 1634819. Account Description Total Contract 113.38 .4101 .4102 .531 Switches & light lenses Switchboard equipment Switch Three Capacitors Material freight furcnase Price State Taxes(2% of Total Order material only) 2,293.73 62.55 2,356.28 45.86 2,402.14 Material Cost_____ Total Cost 2,402.14 2.402.14 119.28 1,385.81 34.20 862.85 119.28 1,385.81 34.20 862.85 97.35% of purchase price 2.65% of purchase price 100.00% of purchase price i.9-i% of purchase price 2400 VOLT SWITCHGEAR NY-771039 -enera* Electric Company Specification PSCC A-465 and A-472 Switchgear No. 4A and 4B, 2400-v; 2 000 Amp. Bus Duct; Reactor, 2000 Amp., 2400-v. WAD01761 inscription Cootract Switchgear 4A - 4B gas Duct Heactor .... price f^^tate Taxes (2$ of Material only) Total Order 115,266.52 2.066.48 117,333.00 2.305.33 119,638.33 Material Cost Total Cost 119,638.33 119,638.33 105,723.03 10,008.58 3,906.72 105,723.03 10,008.58 3,906.72 98.24$ of purchase price 1.76K of purchase price 100.00*. of purchase price 1.96% of purchase price CDit BINS mr--771040 l^aated Western Steel Division .(^ states Steel Corporation (4) circular steel coal bins, 23* 10" dia. x 73* O' Drawing 132678. ^count Description ^^1080 Four Bins, 364,260 lbs Material Escalation freight Purchase Price State Taxes (2$ of Material only) Total Order 29,242.72 229.00 4.950.31 34,422.03 589.43 35,011.46 Material Cost Total Cost 35,011.46 35,011.46 84.96% of purchase price 0.66$ of purchase price 14.40$ of purchase price 11)0.00$ of purchase price 1.71$ of purchase price hlEVATOB NT-771041 ;estinghonse Electric Corporation Specification PSCC A-561 ^latfora - 4 ft x 5 ft Capacity - 1200 lbs ) Speed - zOO ft per nin ) -- Macnine No. 1, with 15--HP, type ST-DC, 750/850 rpn, S/N iravel Distance - 96 ft ) 17S14B2311M-5310-02 Landings - 7 ) Account 311.390 Description Elevator Man Hours 1104 Labor Cost 4,384.00 Material Cost 13,884.00 Total Cost 18,268.00 VALVES NT-771042 The Kennedy Valve Manufacturing Conpany 42" Gate Valves 125# 18" Gate Valves 125# Account Description Total Contract 314.344 6 -42" gate valves M. 0. .393 2 -18" gate valves .3943 3 -18" gate valves, 1 M. 0 Material Freight Discount Purchase Price State Taxes (2$ of Material only) Total Order 22,350.61 1,383.43 438.07 23,725.10 Material Cost Total Cost 23,725.10 23,725.10 20,377.44 876.98 2,470.68 20,377.44 876.98 2,470.68 95.98$ of purchase price 5,94$ of purchase price il.92$ of purchase price) 00.00$ of purchase price 1.88$ of purchase price WAD01762 281 CO NT ?t'L BOARD 9 ! g-Honevwell Regulator Company -Generator Control Board. inscription ic c^iiG--C ontract ^^ J\ J- B T G Control Board Freight on Instrument al ^'Freight ,jrchase trice 21 a t e Taxes (.2% of material only) total Order 29,996.30 481.23 3o,477.53 599.95 31,077.48 NY-771043 Specification i'SCC A-459 Material Cost Total Cost 31,077.48 31,077.48 31,069.08 8.40 31,069.08 8.40 98.42% of purchase price 1.58% of purchase price 100.00% of purchase price 1.97% of purchase price .-mansion JOINTS NY-771044 \;oiss nn Packing & Rubber Company itops. u-count Description Total Contract 312.61 314.344 ,544 o - 12 x 12 expansion Joints 5 - 42 x 12 Expansion Joints 5 sets Limit Stops Material Freight Discount lurchase Price otate Taxes (2% of material only) Total Order 3,702.49 82.51 ( 75.70) 3,709.30 74.19 3,783.49 Material Cost Total Cost 3,783.49 3,783.49 509.80 3,123.75 149.94 509.80 3,123.75 149.94 99.81% of purchase price 2.23% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 2.00% of purchase price TifO COOLING TOWERS NY-771045 The Marley Company. Inc, service Water Cooling Tower: One (1)'Marley Model 2-18SB6 single-flow, induced draft cooling tower of redwood construction with wood filling, guaranteed to be capable of cooling 3000 gpm of service water from 104.ST to 83.1F with a wet bulb of 63F, tower to consist of two 12) cells each equipped with 144" aluminum bladed fan, reduction gear, AllisChalmer 20/5 HP 1800/900 rpm, 440-v, 3-phase motors, S/N l-ol24-87347-l-l and 1-5124-87347-1-2; two (.2) 14" inlet pipes and distribution valves; Tower size is 57' long, 31'-8" wide and 24' 7" basin curb to fan deck. Circulating Water Cooling Tower: One (1) Marley Model 11-24E2 double-flow, induced draft cooling tower of redwood construction with wood filling, guaranteed to be capable of cooling 65 0t)0 gpm of circulating water from 101.7F to 2.0F with a wet bulb of 63F, tower to consist of eleven cells, each equipped with 264" aluminum bladed fan, reduction gear (motors by purchaser), 42" inlet pipe, reducing to 56" for last eight cells and distribution valves; also two (2) special 16"x20' long steel pipe headers for measuring water flow to cell No. 11 shall be provided; steel frames for motors and speed reducers shall be Neoprene coated with N-10 prime coat. Tower size is 265' long, 63' wide and 34'2" high, basin curb to fan deck. The price is for nine (9) cells only, and the material for two (2; cells were furnished by Marley at no charge and a credit for erection allowed, to correct deficiency in tne twelve (12) cells of two towers previously installed for Arapahoe Units Nos. 1, 2 and 3. WAD01763 2S2 inscription ;ract .fater Cooling Tower: Tower Motors Fans & Reducing Gears Piping on Tower Man Hours 760 * Labor Cost ( 3,160.00) Material Cost 159,460.08 125 650.00 14,571.33 84 434.00 9,726.21 11 58.00 1,314.47 26 137.00 3,054.79 4 21.00 475.86 Total Cost 156,300.08 15,221.33 10,160.21 1,372.47 3,191.79 496.86 pnscription ing Water Cooling Tower: Tower Fans & Reducing Gears Piping on Tower Credit for Erection of Two Cells Man Hours 635 390 221 24 Labor Cost Material Cost ( 3,810.00) 1,988.46 1,137.71 123.83 ( 7,060.00) 144,888.75 88,647.56 50,720.58 5,520.61 Total Cost 141,078.75 90.636.02 51,858.29 5,644.44 ( 7,060.00) Note: Erection Supervisor - 81 days; Service Engineer - 14 days; equals 760 man hours. Service Vfater Cooling Tower: iinterial Freight Supervision of Erection Purchase Price State Taxes (2% of material only) Total Order 13,646.49 646.51 650.00 14,943.00 278.33 15,221.33 91.33% of purchase price 4.32% of purchase price 4.35% of purchase price 100.00% of purchase price 1.87?6 of purchase price Circulating .rater Cooling Tower: Material Freight Supervision of Erection Credit for Erection of 2 Cells Purchase Price State Taxes (2% of material only) Total Order 132.242.43 10,141.57 3,250.00 ( 7.060.00) 138,574.00 2.504.75 141,078.75 95.46% of purchase price 7.33% of purchase price 2.35% of purchase price ( 5.14% of purchase price) 100.00% of purchase price 1.81% of purchase price TOTAL ORDER: Material Freight Supervision of Erection Credit for Erection of 2 Cells Purchase Price State Taxes (2% of material only) TOTAL ORDER 145,888.92 10,788.08 3,900.00 ( 7,060.00) 153,517.00 2,783.08 156,300.08 95.05% of purchase price 7.01% of purchase price 2.54% of purchase price ( 4.60% of purchase price) 100.00% of purchase price 1.81% of purchase price COAL HANDLING EQUIPMENT NY-771046 Robins Engineering Division Of Hewitt-Robins Incorporated Specification PSCC A-412-CH Design, furnish, deliver and erect complete extension to and modification of the existing coal handling system including the following: One (1) car shakeout with hoist; Two (2) track hoppers ID and IF; two 1.2) apron feeders ID and IF; changed to conveyor 2A to increase capacity to 600/ton/hr and extend at foot end to permit receiving coal from conveyor 6C; changes to apron feeders 1A and 1C to increase capacity to 200 ton/hr and adapt for two speed drive. Changes to drive for reciprocating plate feeders IB and IE to adapt for two speed drive. WAD01764 283 _ ton/hr crusher and screen with splitter gate at discharge of 2A conveyor (1) t for delivery of coal to conveyor 7; enlarge crusher house; new incline ^ and cbutC7 from crusher house to tripper conveyors 8A and 8B; Merrick weightoneter; coa',e^rconveyors 8A and 8B including trippers; increase capacity of conveyor 5 to friPPe^s/ixr; reclaim hopper, Duplex reciprocating plate feeder 6A chutes, etc. , ,, conveyor 6B with open belt, open walkway, co nsvtaeycoKriu66_C. Man Labor supports, etc.; Material Reclaiming inscription j-oufli ;T"Tal Contract r0o Crusher House Steel 311 413 414 416 417 Crusher House Siding Crusher House Roof Crusher House Doors and Windows Hours 13,414 1225 368 14 65 Cost 51,380.73 4,642.53 1,607.91 53.68 245.77 Cost 235,413.16 22,090.38 3,298.39 360.83 1,003.15 Total Cost 286,793.89 26,732.91 4,906.30 414.51 1,248.92 1023 Reclaim Pit Hopper 312 1024 Conveyor 6A 1025 Reclaim Pit Steel 1027 Reclaim Pit Grating 102822 Track Hoppers 102823 Feeders ID, IF 10283 Grating 10284 Revamp Feeders 10293 Car Shakeout 10294 Shakeout Hoist 1031 Conveyor 6B Bent 1032 Conveyor 6B 1033 Conveyor 6C 1034 Hoppers and Chutes 1037 Revamp Conveyor 2A 1042 Crusher House Hoppers 312 1044 Crusher 1045 Screens 105 Scale 10611 Conveyor No. 7 Bents 10612 Conveyor No. 7 Steel 1062 Siding 1064 Conveyor No. 7 1071 Conveyor 8A and 8B 182 234 195 286 312 234 508 29 325 130 15 586 169 89 221 169 949 352 317 637 1146 1081 1448 833 690.79 888.02 739.33 1,085.25 1,184.36 888.02 1,926.80 111.52 1,228.83 493.57 57.83 2,223.14 642.26 336.62 839.48 642.26 3,598.55 1,335.12 2,047.71 2,415.19 4,343.06 4,097.30 5,478.89 3,156.63 3,268.20 5,132.29 3,497.57 4,163.65 5,617.92 4,164.27 9,117.53 800.12 5,947.10 2,402.71 173.32 10,643.29 3,191.30 1,583.97 3,873.34 3,007.92 17,037.29 6,367.44 9,351.09 11,477.10 20,579.42 19,511.12 23,854.29 14,585.64 3,958.99 6,020.31 4,236.90 5,248.90 6,802.28 5,052.29 11,044.33 911.64 7,175.93 2,896.28 231.15 12,866.43 3,833.56 9,920.59 4,712.82 3,650.18 20,635.84 7,702.56 11,398.80 13,892.29 24,922.48 23,608.42 29,333.18 17,742.27 1072 1U73 1074 1091 1093 Trippers Hoppers Conveyor Scale Revamp Conveyor r'5 enclosure for Conv. #5 769 260 52 17 197 2,912.94 986.13 197.23 64.01 220.00 12,993.52 4,555.00 1,009.00 125.00 630.00 15,906.46 5,541.13 1,206.23 189.01 850.00 Material Freight Superintendence of Erection Erection Labor Labor Escalation Purchase Price State Taxes (2% of Material only; Total Order 215,560.31 15,541.64 5,500.00 44,324.00 1,556.73 282,482.68 4,311,21 286.793.89 76.32% of purchase price 5.49% of purchase price 1.94% of purchase price 15.70% of purchase price 0.55% of purchase price 100.00% of purchase price 1.52% of purchase price VALVE Republic Flow Meter Company Boiler Feed Discharge System Throttling Valve. Account. Description Total Contract 312.523 .61 Draft Gage M.0. 10" Valve Man Hours Labor Cost NY-771047 Material Cost 5,178.24 84.37 5,093.87 Total Cost 5,178.24 84.37 5,093.87 WAD01765 T . I v'fr'Jli*t ice I tvr^H raxes of material only) : jt?otal Order 4,999.00 79.2b 5,07b.26 99.98 5,178.24 98.44% of purchase price 1.5b% of purchase price 100.00% of purchase price 1.97% of purchase price 264 .ipculting 1'IPE NY-771048 |r*,,i Products Company 6^- "TTTjnd Deliver Circulating Water Pipe as shown on drawing 132590, Rev. 2. Fur?ish 0X10 . irCOUjli ------ ITT 314.3'' Description -----------circulating Water Pipe ^chose Price `^tute Taxes (3% of material only) Total order 8.573.67 8,573.67 257.21 8,830.88 Material Cost Total Cost 8,830.88 8,830.88 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price FORCED AIR COOLING EQUIPMENT NY-771049 ... in-house Electric Corporation Forced tir cooling equipment for existing transformers. .ccount Description '15.2014 Forced Air Cooling Equipment Material Freight lurchase Price state Taxes(2% of material only) Total order 2,934.15 41.85 2,976.00 58.68 3,034.68 Material Cost Total Cost 3,034.68 3,034.6o 98.59% of purchase price 1.41% of purchase price 100.00% of purchase price 1.97% of purchase price GENERATOR MAIN LEADS I T E Circuit Breaker Company Account Description Total Contract 315.206 .5214 .712 .713 .714 .716 .811 Gen. Neutral Cubicle Air Break Switch Bus Insulators Alum. Bus Support Spec. Accessories Isolated Phase Indoor Bus Potential Transformers Material Freight Purchase Price State Taxes (2% of material only) Total Order 38,659.38 1,031.22 39,690.60 771.32 40,461.92 DUPLEX CONTROL SWITCHBOARD The Monitor Controller Company A Division of Ultra Sonic Corporation NY-771050 Specification PSCC A-46b Material Cost Total Cost 40,461.92 40,461.92 1,427.27 6,116.87 407.79 984.82 1,347.75 22,954.42 7,223.00 1,427.27 6,116.87 407.79 984.82 1,347.75 22,954.42 7,223.00 97.40% of purchase price 2.60% of purchase price 100.00% of purchase price 1.94% of purchase price \ NY-771051 Specification PSCC A-460 WAD01766 rwscription Switchboard ,<S &S (* * " i r\wHar 38,824.09 319.91 39,144.00 776.48 39,920.48 Material Cost Total Cost 39,920.48 39,920.48 99.18% of purchase price 0.82% of purchase price 100.00% of purchase price 1.98% of purchase price .JOR^E BATTERY NY-771052 trin Storage Battery Company Specification PSCC A-469 ampere-hour, Exide Tytex, Type FOE-19, 19 plates. ^rount 315.822 Description Storage Battery ^terial Freight Purchase Price ^State Taxes (2% of material only) Total Order 5.548.29 278.00 5.826.29 110.97 5,937.26 Material Cost_____ Total Cost 5,937.26 5,937.26 95.23% of purchase price 4.77% of purchase price 106.00% of purchase price 1.90% of purchase price MISCELLANEOUS tanks NY-771053 '..rinaii Steel and Iron Works, Inc. Erection by Construction Service Company. Account Description Total Contract 312.50402 Condensate Storage Tank 314.420 Gland Seal Tank Material Labor Escalation Purchase Price State Taxes (3% of material only) Total Order Man Hours Labor Cost Material Cost Total Cost 405 1,164.26 3,401.06 4,565.32 405 1,164.26 3,063.22 337.84 4,227.48 337.84 3,137.74 1,164.26 130.35 4,432.35 132.97 4,565.32 70.75% of purchase price 26.30% of purchase price 2.95% of purchase price 100.00% of purchase price 2.99% of purchase price MOTOR-GENERATOR SET AND PANEL NY-771054 The Electric Products Company Specification PSCC A-470 Diverter Pole MG Set for Battery Charging. One (1) Fram 50-D 15 kw, 140/129 volt diverter pole generator direct connected to a 15-HP 440-volt 3 phase 1800 rpm Motor; Unit S/N 75500. ^ One (1) DC Distribution and Charging Panel per drawing A-132787, 30" x 72" steel. Account Description Total Contract 315.823 .824 Motor-Generator Set Control Panel Material Freight Purchase Price State Taxes (2% of material only) Total Order 4,103.13 61.87 4,165.00 82.06 4,247.06 Material Cost Total Cost 4.247.06 4.247.06 1.934.06 2,313.00 1.934.06 2,313.00 98.52% of purchase price 1.48% of purchase price 100.00% of purchase price 1.98% of purchase price WAD0176 7 286 5EOR.MER rs>Nj NY-771055 ,ilVSrtriC CoiBpany ijSfi^^^TTTcooling Equipment for existing Transformers forced Air Description ireQiifii -^7\yi4 forced Air Cooling Equipment Material Cost 3,170.79 Total Cost 3,170.79 height hAse Price P^'tate Taxes (2% of material only) Total Order 3,052.00 57.75 3,109.75 61.04 3,170.79 98.14% of purchase price 1.86% of purchase price 100.00% of purchase price 1.96% of purchase price mI5Cellaneous steel ..iran Steel and Iron Works. Inc. iccount Description lotal Contract -11.310 J *3X1 ^3303 .3312 312.404 Structural Steel Miscellaneous Steel Floor Frames Floor Plates Boiler Structural Steel Material Purchase Price State Taxes (3% of material only) Total Order 24.125.00 24,125.00 723.75 24,848.75 GAGES Manning. Maxwell and Moore, Inc. Account Description Total Contract 312.523 .61 314.413 Gages Pipe Wells Gages Material Freight Discount Purchase Price State Taxes (2% of material only) Total Order 4,992.29 16.35 ( 49.92) 4,958.72 98.89 5,057.61 2400 VOLT SWITCHGEAR Westinehouse Electric Corporation Account Description Total Contract 315.310 .312 .321 .322 .3231 .3232 Voltmeter and Grounding Resistors 2400 Volt Switchgear Equipment Voltmeter Voltmeter Voltmeter Voltmeter NY-771056 Material Cost Total Cost 24,848.75 24,848.75 9.270.00 6,308.75 1.236.00 927.00 7.107.00 9.270.00 6,308.75 1.236.00 927.00 7.107.00 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price NY-771057 Material Cost Total Cost 5,057.61 5,057.61 3.768.81 100.98 1.187.82 3.768.81 100.98 1.187.82 100.67% of purchase price 0.34% of purchase price ( 1.01% of purchase price) 100.00% of purchase price 1.99% of purchase price NY-771058 Material Cost 20,099.64 622.94 19,068.78 101.98 101.98 101.98 101.98 Total Cost 20,099.64 622.94 19,068.78 101.98 101.98 101.98 101.98 WAD01768 <&;rlce ,^rcHase faxes (2% of material oinlv) ' Order 19,081.46 636.54 19,718.00 381.64 20,099.64 96.78% of purchase price 3,22% of purchase price 100.00% of purchase price 1.93% of purchase price VOLT POWER CENTER NY-771059 , ?!pctric Company ^nersr---7--5U kva dry type Transformers, ^0. PSCC A-466; 2400/480 volt, Specification PSCC A-466 S/N C173356 and C173357, Spec. o) control centers 4A and 4B - 3 cubicles. r*o (~) AcCOUnt Description ^HTcontract - 3111 Tw0 750 kva Trans:forniers Power Centers 4A and 4B Material Freight purchase Price State Taxes (.2% of material only) Total Order 31,230.28 903.72 32,134.00 624.59 32,758.59 Material Cost_____ Total Cost 32,758.59 32,758.59 17,434.03 15,324.56 17,434.03 15,324.56 97.19% of purchase price 2.81% of purchase price 100.00% of purchase price 1.94% of purchase price ROOF SCUTTLE rAngt.riiction Specialties Inc. Account Description 311.342 Roof Scuttle llaterial Freight Discount liirchase Price State Taxes (.2% of material only) Total Order NY-771060 96.49 6.51 ( 1.03) 101.97 1.91 103.68 Material Cost_____ Total Cost 103.88 103.88 95.63% of purchase price 5.38% of purchase price ( 1.01% of purchase price) 100.00% of purchase price 1.88% of purchase price DUST REMOVAL - COAL BUNKER NY-771061 American Air Filter Company, Inc. size No. 14, type D, Roto-clone, 4500 cfm, S/N 54919, 2/7%-HP Robbins and Myers, Type C, TEEC, S-0, S/N 1746 DS. Account Description 312.1085 Rotoclone Material Freight Purchase Price State Taxes (2% of material only) Total Order 1,624.00 99.96 1,723.96 32.48 1,756.44 Material Cost Total Cost 1,756.44 1,756.44 94.20% of purchase price 5.80% of purchase price 100.00% of purchase price 1.88% of purchase price WAD01769 ventilation fans it'rioN Ni-77106<i p|ir^o Company Specification PSCC A-554-PF 42" Design 80 type NV, 17,500 cfm Fan, w/2-HP Wagner Motor, 1745 rpm, JDe^15Koo4l390 ; Buffalo 20" Design "A" type NV, 5000 cfm Fans, w/3/4-HP, 1750 rpm ,Vagner rnre'jH S/N G, E, and K; nuffalo 12" Design "A" type NV, 750 cfm Fan, w/ 1/20-HP, 1140 rpm Wagner t-ne (1i S/N H3II20597; potor. ..a Buffalo 12" Design "A" type NV Fan w/ 1/20-HP, 1160/115, 1150 rpm TE Stock jne 1 _ inscription ro tal Contract -11.3392 J .4184 Fans Fan jjaterial Freight chase Price Djr5tate Taxes (2% of material only) Total Order 1,093.25 46.53 1,139.78 21.87 1,161.65 Material Cost Total Cost 1,161.65 1,161.65 1,093.82 67.83 1,093.82 67.83 95.91% of purchase price 4.09% of purchase price 100.00% of purchase price 1.92% of purchase price PO.VER ROOF EXHAUST VENTILATORS NY-771063 ' F. Hinrichsen. Inc. Specification PSCC A-553-RV Three (3) Davidson Size 22 Fans Nos. 64680, 64681, and 64682, 2/Aluminum Housings and Bird Screens, V-belt connected to 1/3-HP 1-0 G. E. Motors, 1725 rpm, S/N XKL, ZKL, and XIL; One (1) Davidson Size 28 Fan No. 64682-A, w/Aluminum Housings and Bird Screen, V-belt connected to 1-HP, 1720 rpm G. E. Motor, S/N 5K203E27. Account Description 311.392 Roof Ventilators Material Freight Purchase Price State Taxes (,2% of material only) Total Order 1,059.34 82.76 1,142.10 21.18 1,163.28 Material Cost Total Cost 1,163.28 1,163.28 92.74% of purchase price 7.26% of purchase price 100.00% of purchase price 1.85% of purchase price STATION VENTILATION AIR WASHER NY-771064 Air and Refrigeration Corporation One (.1) Air .Vasner, type 8-8CL, S/N 2096, with: Specification PSCC A-551-CW One 11) Ingersol Rand Pump - Type 3KRVS-5, 320 gpm, S/N 08546516; and One (1) Ingersol Rand Motor, Type JX, 5-HP, 3510 rpm, S/N 2082254. Account Description 31i.392 Air Washer Material Freight Purchase Price State Taxes (.2% of material only) Total Order 4,316.44 324.56 4,641.00 86.33 4,727.33 Material Cost Total Cost 4,727.33 4,727.33 93.00% of purchase price 7.00% of purchase price 100.00% of purchase price 1.86% of purchase price WAD01770 289 and ventilation unit heati^ -|r.iric Corporation - NY-771065 Specification PSCC A-555-HV use bize 18a6 air handling unit Heating Coil Section. Description tract Con A_ir F_ an Unit Heating Coil Ul?Yelght ice rc,lJSe Taxes (2% of material only; 1 j-otal Order 927.17 115.85 1041.00 18,54 1059.54 Material cost Total Cost 1,059.54 1,059.54 205.02 854.52 205.02 854.52 89.09% of purchase price 10.91% of purchase price 100.00% of purchase price 1.78% of purchase price ,aTion HEATING units Electric Corporation Division tar ^count Description Heating Units atonal ,'reight urchase Trice tate Taxes (2;b of material only) Total Order NY-771066 Specification PSCC A-557-VH 510.48 51.12 561.60 10,21 571.81 Material Cost_____ Total Cost 571.81 571.81 90.90% of purchase price 9.10% of purchase price 100.00% of purchase price 1.82% of purchase price TATION VENTILATION UNITS NY-771067 ~ne Trane Company Specification PSCC A-552-CF .-.e tl) Trane Model 21 size No. 66B1 Centrifugal Fan, model 2-1, S/N 2-5025; .ie (l; Unit consisting of three (5) high 52" x 120" Trane Type SD series 54 steam coils. Account Description Total Contract 311.391 Steam Coils .392 Fan Material Freight Discount Turchase Price otate Taxes (2% of material only) Total Order 2,286.58 184.62 ( 24.95) 2,446.07 45.71 2,491.78 Material Cost Total Cost 2,491.78 2,491.78 1,125.61 1,568.17 1,125.61 1,568.17 95.49% of purchase price 7.55% of purchase price ( 1.02% of purchase price) 100.00% of purchase price 1.87% of purchase price Mansion PLATES Hipan Brother, Tnr. iount 312.501 Description Lubrite Plates NY-771068 Material Cost 559.11 Total Cost 559.11 WAD01771 ,ri.al aiiCu"rice rchase taxes (2% of material only) ' ='?0Ul 0rder 540.00 13.82 ( 5.40) 548.42 10.69 559.11 97.58% of purchase price 2.52% of purchase price ( 0.10% of purchase price) 100.00% of purchase price 1.95% of purchase price 290 ^ BUe cowbessob NY-771069 fnr rnrporation Specification PSCC A-421-SBC /orthington 15 x 6 x 12 type DC-2 horizontal duplex two-stage heavy duty cooled air Compressor, S/N L-63101, 504 cfm at 500 psig: direct connected 150-HP, 300 rpm 50 C rise, unity power factor synchronous vi>Me otor, S/N 156649; I, Motor generator set, 5 kw, type SKV.', G. E. Gen. Serial No. 7-5324-23349-2-1, "uh 7,5-HP G" E* Motor type AP> 1740 rPmi S/N 7-5124-23349-3-1; Aftercooler with separator; One U) Air Maze - 18u Filter silencer. One Ui ,cCOunt Description Man Hours Labor Cost Material Cost Total Cost Total Contract -10 4622 Air Compressor J ".*4652 M. G. Set 92 420.40 92 420.40 17,577.51 16,681.59 895.92 17,997.91 17,101.99 895.92 Material Labor freight Purcnase Price state Taxes (2% of material only! Total Order 16,588.16 420.40 657.58 17,666.14 331.77 17,997.91 93.89% of purchase price 2.38% of purchase price 3.73% of purchase price 100.00% of purchase price 1.87% of purchase price WATER SOFTENER UNIT NY-771070 The Permutit Company Specification PSCC A-422-ZS One (1) Permutit 0 Sodium Zeolite Water Softener Unit provided with 23.5 cu ft of Zeolite; capacity 60 gpm, S/N BK-176624. Account Description 512.551 Water Softener Material Freight Purchase Price State Taxes (2% of material only) Total Order 1,867.30 195.05 2,062.35 37.35 2,099.70 Material Cost_____ Total Cost 2,099.70 2,099.70 90.55% of purchase price 9.45% of purchase price 100.00% of purchase price 1.81% of purchase price 18th and 19th STAGE EXTRACTION PIPING Joseph Hopperman and Sons C/0 Alpha Engineering Specialty Company Account 312.61 Description Piping NY-771071 Material Cost_____ 880.00 Total Cost 880.00 WAD01772 291 v:-' eri al ,'reiB (it 1 rice 'urdtate Taxes (2% of material only) l-otal order 812.26 51.49 863.75 16.25 880.00 94.U4% of purchase price 5.96% of purchase price 100.00% of purchase price 1.89% of purchase price f OPERATORS for disconnecting switches yOldK NY-771072 i ,-Star Electric Division Outdoor motor raecuanism type SF-2 for use with existing MK-39 3-pole group disconnecting Switches; Operator includes 1/3-HP 125 volt DC Motor for rev- QfSihie operation. Material i cC0Unt Description Cost_____ Total Cost i ' 1 J* Three Operators vat oriai Freight 2,830.12 54.88 2,921.60 2,921.60 98.78% of purchase price 1.22% of purchase price urchase Trice itate Taxes (2% of material only) 2,865.00 56.60 100.00% of purchase price 1.98% of purchase price Total Order 2,921.60 CUtl'ICAL FEED SYSTEM NY-771073 airnn Roy Company !no (21 Sulphite Pumps 3.4 gpm, Model MD1-24-36, S/N 35756-3 and 35756-4; with ris0 (2) Master Motors, 1/4-HP, type PA, 1725 rpm, S/N BX-18826 and BX-18827; r,o (2) Phosphate Pumps, 9.4 gph, Model MDI-74-100SM, S/N 35756-1 and 35756-2; with Two (2) Master Motors, 1%-HP, type PB, 1725 rpm, S/N BY-2810 and BY-2811. Account Description Total Contract '12.50352 Phosphate & Sulphate Pumps .534 Tanks Material Freight i'urchase Price State Taxes (2% of material only) Total Order 3,211.00 125.89 3,336.89 64.22 3,401.11 Material Cost Total Cost 3,401.11 3,401.11 2,449.52 951.59 2,449.52 951.59 96.25% of purchase price 3.75% of purchase price 100.00% of purchase price 1.93% of purchase price LIQUID LEVEL ALARMS Cnergy Control Company. Inc. Account Description 315.38 Liquid Level Alarms Material Freight Discount Purchase Price State Taxes(2% of material only) Total Order NY-771074 3,217.80 17.18 ( 32.18) 3,202.80 63.72 3,266.52 Material Cost Total Cost 3,266.52 3,266.52 100.46% of purchase price 0.54% of purchase price ( 1.00% of purchase price) 100.00% of purchase price 1,99% of purchase price WAD01773 , sttEL AND SCRIPS rVTA**' and Iron Works Company inscription Hoist Frame Screens Screen ur Vaterial .Jr.ce urc:ttate Taxes (3% of material only; " rotal Order 2,552.00 2,552.00 76.56 2,62B.56 "7 .'.,9 NY-771075 Material Cost Total Cost 2,628.56 2,628.56 430.54 1,855.03 342.99 430.54 1,855.03 342.99 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price lJAD FREQUENCY control equipment NY-771076 ^^nri Northrup Company iCCount Description r-tJl Contract 4101 Frequency Control Equip. .4103 Service Engineer vaterial Labor Freight iurchase Price State Taxes (2% of material only) Total Order Man Hours Labor Cost Material Cost Total Cost 20 193.20 2,952.58 3,145.78 20 193.20 2,952.58 2,952.58 193.20 2,879.02 193.20 15.98 3,088.20 5758 3,145.78 93.23% of purchase price 6.25% of purchase price 0.52% of purchase price 100.00% of purchase price 1.87% of purchase price LIQUID LEVEL GAGES Jerguson Gage and Valve Company tccount Description Total Contract 312.5000 . 3u01 .3002 . 3 003 .5004 .3041 .5042 . yj43 .323 oo4 ol4.420 .421 Gages Material Freight ourcnase Price State Taxes 12% of material only) Total uraer POWER CABLE The Kerite Company Account oi.5.733 Description Power Cable NY-771077 728.24 20.51 748.75 14.56 763.31 Material Cost Total Cost 763.31 763.31 168.30 112.67 58.50 58.50 30.23 30.23 30.23 30.23 31.99 123.28 58.92 30.23 168.30 112.67 58.50 58.50 30.23 30.23 30.23 30.23 31.99 123.28 58.92 30.23 97.26% of purchase price 2.74%, of purchase price 100.00% of purchase price 1.95% of purchase price Material Cost 39,136.85 NY-771078 WAD01774 Toted. Cost 39,136.85 01 ,rcfjse Price r-ixes U% of material only) ,v tjte v, " ?otal Order 36,235.87 2,363.05 ( 180.51) 38,418.41 718.44 39,136.85 94.33% of purchase price 6.14% of purchase price ( 0.47% of purchase price) 100.00% of purchase price 1.87% of purchase price 293 TUBULAR bus and copper bar -cri'-S . r.-ipctrical SuddIy Company, Inc. ----------- inscription ucSSiSC. ontract ` -.I Copper Bus Bar "Is 713 Copper BUS Bar Discount ^r?tate Taxes (2% of material only) Total Order 3,293.85 156.72 ( 17.30) 3,433.27 65.88 3,499.15 NY-771079 Material Cost Total Cost 3,499.15 3,499.15 548.10 2,951.05 548.10 2,951.05 95.93% of purchase price 4.57% of purchase price ( 0.50% of purchase price) 100.00% of purchase price 1.92% of purchase price 'DOLING TOWER POWER CENTER NY-771080 ,-onpral Electric Company Specification PSCC A-471 & -478 .ne (ij outdoor control center with 12 sections, 91 -5" x 23' -9" x 4' --0", Spec. " PsCC A-471; ine (1) 750 kva 240U/480 volt, 3-phase transformer, S/N 9J-41724. ucount Description Total Contract 315.2042 Transformer .321 Control Center \iaterial Freight ,urchase Price State Taxes (.2% of material only) Total Order 19,746.79 816.49 20,563.28 394.94 20,958.22 Material Cost Total Cost 20,958.22 20,958.22 7,335.33 13,622.89 7,335.33 13,622.89 96.02% of purchase price 3.98% of purchase price 100.00% of purchase price 1.92% of purchase price INSULATORS AND LINE HARDWARE Ohio Brass Company Account Description Total Contract 343.7102 .7112 .7113 .72 .77 Line Hardware Material Freight Purchase Price State Taxes (2% of material only) Total Order 5,632.03 447.30 6,079.33 112.61 6,191.94 NY-771081 Material Cost 6,191.97 Total Cost 6,191.97 5,078.60 615.72 377.26 11.79 108.60 5,078.60 615.72 377.26 11.79 108.60 92.64% of purchase price 7.36% of purchase orice 100.00% of purchase price 1.85% of purchase price WAD01775 -T STONE TRIM U,,nnfacturing; Company nosr.ription Precast Trim t t>rl W hise Price ,'urC!'t.te Taxes 13% of material only) 3 a! Order 1.174.00 1.174.00 35.22 1,209.22 294 NY-771082 Material Cost_____ Total Cost 1,209.22 1,209.22 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price ORATED asbestos siding jted Asbestos Contractors Recount Description Total Contract -11.3232 Corr. Asbestos Siding 312,40912 Material Freight Discount Purchase Price State Taxes (.2% of material only) Total Order NY-771083 3,868.27 718.73 ( 91.74) 4,495.26 75.53 4,570.79 Material Cost Total Cost 4,570.79 4,570.79 2,709.25 1,861.54 2,709.25 1,861.54 86.04% of purchase price 16.00% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 1.68% of purchase price PRECAST roof slabs NY-771084 Flexicore Company of Colorado Account Description Total Contract 311.3407 .416 312.4093 Flexicore Slabs Material Discount Purchase Price State Taxes (3% of material only) Total Order 11,301.92 ( 232.68) 11,069.24 332.08 11,401.32 Material Cost_____ Total Cost 11,401.32 11,401.32 8,709.06 402.71 2,289.55 8,7U9.06 402.71 2,289.55 97.90% of purchase price ( 2.10% of purenase price) loo.00% of purchase price 3.00% of purchase price VALVES NY-771085 Rockwell Manufacturing Company For Gas Piping. Account Description Total Contract 312.321 .316 Lub Cock Valves and Wrenches Material Freight Discount Purchase Price State Taxes(2% of material only) Total order 2,819.55 114.81 ( 58.68) 2,875.68 55.67 2,331.35 WAD01776 Material Cost Total Cost 2,931.35 2,931.35 l,116.ul 1,815.34 1,116.01 1,815.34 98.05% of purchase price 3.99% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 1.94% of purchase price T 295 NY-771UB6 ,,ic Company of New York, Inc. --^Tvaives for Gas System. *QOrr pogeription ^xc<c2r2\;!oli ntr"a7c7t `t8 ^ Lub RiuS Valves and irenches WtFerreiaigj htt jjscount rice rcMJ-'c ,tuto Taxes (.2'% of material only) lota 1 Order 6,550.76 309.49 ( 137.21) 6,723.04 128.27 6,851.31 Material Cost Total Cost 6,851.31 6,851.31 2,799.43 13.12 3,704.26 288.94 45.56 2,799.43 13.12 3,704.26 288.94 45.56 97.44% of purchase price 4.60% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 1.91% of purchase price 5TRAlNliR Company, Inc. \ccount Description 312.61 Twin Strainer Material Freight purchase Price ~tate Taxes (.2'>o of material only; Total Order NY-771087 1,225.00 55.00 1,280.00 24.50 1,304.50 Material Cost Total Cost 1,304.50 1,304.50 95.70% of purchase price 4.30% of purchase price 100.00% of purchase price 1.91% of purchase price QUICK NY-771088 Hie Denver Sewer Pipe and Clay Company \ccount Description 311.320 Lirick Material Discount Purchase Price State Taxes (.3% of material only) Total Order 3,770.96 ( 83.49) 3,687.47 78.06 3,765.53 Material Cost Total Cost 3,765.53 3,765.53 97.74% of purchase price ( 2.26% of purchase price) 100.00% of purchase price 2.07% of purchase price iTCAM TRAPS Advance lingineering Company Account Description Total Contract 312.552 Steam Traps .61 I NY-771089 Material Cost 972.65 159.31 813.34 Total Cost 972.65 159.31 813.34 WAD01777 2% of material only) 946.17 25.29 ( 17.59) 954.07 IB. 58 972.65 99.1696 of purchase price 2.66% of purchase price ( 1.82% of purchase price) 100.00% of purchase price 1.95% of purchase price 206 wall siding CONV^8 lLjJ__ProdUCtS_ piaj UCOJIsi 111'3233 Description Plasteel Siding Material, Freight discount nse Price ^State Taxes (2% of material only) Total Order NY-771090 3.396.94 526.06 ( 19.62) 3,903.38 67.57 3.970.95 Material Cost Total Cost 3,970.95 3,970.95 87.05% of purchase price 13.45% of purchase price ( 0.50% of purchase price) 100.00% of purchase price 1.73% of purchase price T(lRM0MtTERS and wells p.imer Thermometers, Inc. (ccount Description Total Contract 312 523 61 314,413 Thermometers Wells Thermometers Material Freight purchase Price state Taxes (2% of material only) Total Order 1,328.78 24.97 1,353.75 26.58 1,380.33 NY-771091 Material Cost Total Cost 1,380.33 1,380.33 1,206.54 56.91 116.88 1,206.54 56.91 116.88 98.16% of purchase price 1.84% of purchase price 100.00% of purchase price 1.96% of purchase price VALVES NY-771092 Fisher Governor Company Steam Pressure Reducing and Liquid Level Control Valves. Specification PSCC A-420-CV Account Description Total Contract Material Cost 21,293.86 Total Cost 21,293.86 311.2102 312.316 .4753 .53 .61 314.422 Control Valve - City Water Control Valve - Gas Pipe Control Valve - Air Reducing Stations Boiler Plant Piping Control Valve - Gland Seal 178.33 333.21 224.80 2,290.98 17,273.86 992.68 178.33 333.21 224.80 2,290.98 17,273.86 992.68 Material 20,561.05 98.45% of purchase price Freight 426.02 2.04% of purchase price Discount ( 102.90) ( 0.49% of purchase price) Purchase Price 20,884.17 100.00% of purchase price J State Taxes (2)6 of material only) Total Order 409.69 21,293.86 1.96% of purchase price WAD01778 ^',*Lves 11 and Moore. Inc. t ngacription ,cco2Z-----<Tco^rct Tot *j ^3i 464 \ 552 ,61 TrWoO RUCeJ- lief Valves --One nR1eliioeff VVaatlvtrea Four Relief Valves Nine Relief Valves freight Discount .hloSe Price Jf~tate Taxes (.296 of material only) i.tii Order 297 NY-771093 1,094.57 15.37 I - 11.11). 1,090.83 21.75 1,120.58 Material Cost Total Cost 1,120.58 1,120.58 49.01 42.32 296.51 732.74 49.01 42.32 296.51 732.74 99.63% of purchase price 1.38% of purchase price (. 1.01% of purchase price) 100.00% of purchase price 1.98% of purchase price i#XTCHYARD steel NY-771094 ^feogee. Iron Works furnish, fabricate, galvanize, and deliver steel shown on drawings 132722, 132723 and 132724. iccount Description Total Contract 343.112 .122 .3312 .3322 .3342 .7101 Tower at Gen. Bay Tower at Feeder Bay Support for Air Break Switch Support for Air Break Switch Support for Air Break Switch Supports for Bus Material Freight purchase Price State Taxes (2% of material only Total Order Lbs. 7930 18574 7506 3789 3754 6797 7,535.06 268.94 7,804.00 150.70 7,954.70 Material Cost 7,954.70 1,304.72 3,005.89 Total Cost 7,954.70 1,304.72 3,005.89 1,235.00 1,235.00 623.41 623.41 617.50 1,168.18 617.50 1,16b,18 96.56% of purchase price 3.44% of purchase price 100.00% of purchase price 1.93% of purchase price BUS AND CABLE FITTINGS Usco Power Equipment Corporation Account Description Total Contract 315.723 343.7103 .7113 Fittings Material Freight Purchase Price State Taxes(2% of material only) Total Order NY-771095 1,887.38 76.76 1,964.14 37.75 2,001.8 Material Cost Total Cost 2,001.89 2,001.89 57.25 1,917.43 27.21 57.25 1,917.43 27.21 96.0996 of purchase price 3.91)6 of purchase price 100.00% of purchase price 1.9396 of purchase price WAD01779 0lT INSULATED cable and bare cable 0O- and Cable Company ontrol, grounding and lighting cable. k 2 rDescription }^i contract Wire heroKee ^,ateersiacai lation rreight urchase Price State taxes {2% of material only ) Total Order 39,221.87 277.14 2,559.64 41,857.37 790.00 42,647.37 u NY-771096 Material Cost Total Cost 42,647.37 42,647.37 31.37 68.61 1,535.73 36.78 47.06 12.75 19.61 167.22 2.45 254.39 14.70 15,027.11 23.058.83 763.58 134.22 1,030.03 156.23 286.70 31.37 68.61 1,535.73 36.78 47.06 12.75 19.61 167.22 2.45 254.39 14.70 15,027.11 23,058.83 763.58 134.22 1,030.03 156.23 286.70 93.70% of purchase price 0.66% of purchase price 6.12'#) of purchase price .100.00% of purchase price 1 89Tb of purchase price TREADS AND NOSINGS NY-771097 imprican Abrasive Metals Company ;tair Treads and Hosings shown on Drawings: 132662, Rev. 2; 132664, Rev. 1 i 132667, Rev. 1; 132669, Rev. 1; 132670, Rev. 1; 132702, 132715, .Rev. 0; 132703, Rev. 0; 132704, Rev. 0; 132711, Rev. 0; 132713, Rev. 0; Rev. 0; 132717, Rev. 0 Account Description Material Cost Total Cost Total Contract 3,061.23 3,061.23 311.3313 Sta.Bldg. Stair Treads, etc. 312.405 Boiler Stairway Nosings 3,043.42 17.81 3,043.42 17.81 V.aterial Freight riirchase Price State Taxes (2% of material only Total Order 2,581.00 428.61 3,009.61 51.62 3,061.23 85.80% of purchase price 14.20% of purchase price 100.00% of purchase price 1.72% of purchase price INSULATED CABLE NY-771098 Arkansas Power and Lizht Company Electric Cable. Account Description j15.751 Control Cable Material Freight Discount Purchase Price State Taxes (2% of material only) 7,010.44 384.33 ( 35.05) 7,359.72 139.51 7,499.23 Material Cost Total Cost 7,499.23 7,499.23 95.25% of purchase price 5.23% of purchase price ( 0.48% of purchase price) 100.00% of purchase price 1.90% of purchase price WAD01780 c. o rKA,NSFCRMERS NY-771099 ll tfir Corporation . , HEB-1 completely self protected 480 to 12U/60 volt, 1 phase, S/N (.1) 55" C Rise Transformer with two (2) external lightning arresters for out- -T-ll3s5ervice,,., door kva type AE, 480 to 120/60 volt, 1 phase, 80 C Rise Transformers, S/N -4a 6f' , -47, _-/4I U8, _-_4A9ll , aarnt drl -_50A , f^ortrrt iinndAoao/inr srt/evmrvr-tic/veis ; jne ^24140 kva for type AE, 480 to 120/60 utdoor service; volt, 1 phase, 80 C Rise Transformer, S/N . voltage outdoor bushing for use on 480-v neutral of the 750 kva coal . ne nan dling transformer. _ount Description Material Cost Total Cost ^^Icontract 2,678.42 2,678.42 0(J42 315'"2()055 .208 542.I23 Neutral Bushing Six Station Lighting Transf. Coal Hopper Lighting Switchyard Lighting Transf. Material Freight Mr-chase Price state Taxes (2% of material only) Total Order 2,528.49 99.37 2,627.86 50.56 2,678.42 200.72 1,933.91 150.33 393.46 200.72 1,933.91 150.33 393.46 96.20ft of purchase price 3.80ft of purchase price 100.00ft of purchase price 1.93ft of purchase price iCUP PUMPS NY-771100 -hirago Pump Company -amp Pumps and explosion proof float switches as follows: -tation Building Duplex Sump Pump Set, each pump consisting of: One (1) type VASCO 5-0 vertical submerged non-clog pump for 7 ft deep pit, cast iron casing, bronze impeller, 125 gpm at 30 ft JDH capacity direct connected to a 2-HP 440-volt 3 phase, 1800 rpm vertical, drip proof motor, S/N 54K32721 and S/N 54K32722; Crusher House Sump Pump, Little Giant style B for 3 ft deep pit, cast iron casing, bronze impeller, 15 gpm at 12 ft JDH capacity direct connected to a 1/4-HP, 120-v, single phase, IbOo rpm, vertical fully enclosed motor, S/N 8818; Coal Reclaiming Pit Duplex Sump Pump Set, each pump consisting of one (1) Little Giant, style B, S/N 8al6-l and 8816-2, for 3 ft 6 inch deep pit, cast iron casing, bronze impeller, 25 gpm at 12 ft JDH capacity direct connected to a 1/4-HP, 120 volt, single phase 1800 rpm, vertical fully enclosed motor, S/N AY 27oO and AY3908. Account Description Total Contract 311.395 .4183 312.1026 Sta. Bldg. Sump Pumps Crusher House Sump Pump Reclaim. Hopper Sump Pumps Material Freight Discount Purchase Price State Taxes (2ft of material only) Total Order 1,530.50 88.47 ( 30.61) 1,588.36 29.99 1,618.35 Material Cost Total Cost 1,618.35 1,618.35 1,029.67 170.56 418.12 1,029.67 170.56 418.12 96.36ft of purchase price 5.57ft of purchase price ( 1.93ft of purchase price; 100.00ft of purchase price 1.89ft of purchase price PIPE HANDRAILING United Steel and Iron Works Handrailing shown on Drawings: 132962, Rev. 0. NY-771101 132713, Rev. 1; 132717, Rev. 0; 132960, Rev. 1; WAD01781 stat,on Building Handrailing 3l2 rrusner House Railing 4l3 Declaim. Hopper Handrailing 1d25 Junct. House Handrailing lu-1J,,iver intake Railing i* 3^-4 3^4 settling Pond Intake Railing ferial " s,,c<-ep PArivcve yrC te Taxes (3% of material only) 'l?otal Order 5.972.60 5.972.60 179.18 6,151.78 30 Material Cost Total Cost 6,151.78 6,151.78 5,769.25 54.38 22.25 51.91 119.27 134.72 5,769.25 54.38 22.25 51.91 119.27 134.72 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price ; U>Lt- TRAfi NY-771102 vccount Description Cable Trays llaterial Freight Discount rv>rchase Price State Taxes (2% of Total Order material only) 1,613.91 146.19 ( 8.80) 1,751.30 32,28 1,783.58 Material Cost_____ Total Cost 1,783.58 1,783.58 92.15% of purchase price 8.35% of purchase price ( 0.50% of purchase price) 100.00% of purchase price 1.84% of purchase price rTEPL FLOOR GRATING AND GRATING TREADS NY-771103 Knox Company. Equipment Division Account Description Total Contract 311.3311 .3313 312.701 .714 314.336 .3924 Station Bldg. Floor Gratings Station Bldg. Stair Treads Breeching Platform I.D. Fan Platform Grating Intake Grating River Intake Grating Material Freight Discount Purchase Price State Taxes (2% of Total Order material only) Lbs. 32,850 846 1,357 1,708 980 60 6,755.13 920.54 ( 77.87) 7,597.80 135.11 7,732.91 Material Cost 7,732.91 Total Cost 7,732.91 6,611.96 204.03 219.95 364.66 214.48 117.83 6,611.96 204.03 219.95 364.66 214.48 117.83 84.53% of purchase price 16.50% of purchase price ( 1.03% of purchase price) 100.00% of purchase price 1.78% of purchase price LIGHTING PANELS NY-771104 Continental Electric Equipment Company Specification PSCC A-474 Station Lighting Cabinets and one Breaker for freeze protection: LC 303 Indoor 24 circuits 401 Indoor 20 circuits 403 Indoor 19 circuits with emergency DC Section 405 Indoor 16 circuits 406 Indoor 18 circuits with remote switch section 407 Indoor 20 circuits with emergency DC Section Coal Tunnel Lighting Cabinet: LC 410 Outdoor 10 circuit with emergency D C Section WAD01782 ,1 Lignting Cabinet: itcbyar" ,tlioor Bottom Section 12 circuits ,0" Middle Section 8 circuits Top Section Emergency DC inscription clUHl ------ ^tT^Contract rot Station Lighting Cabinets -o7 Coal Tunnel Lighting Cabinet Switchyard Lighting Cabinet -42.1-- wtferreiaiglht Discount H*se Price urC,;fe Taxes (.2% of material only) ,M order 2,210.36 53.64 ( 45.16) 2,218.84 43.31 2,262.15 301 Material Cost Total Cost 2,262.15 2,262.16 1,452.92 358.66 450.57 1,452.92 358.66 450.57 99.62% of purchase price 2.42% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 2.00% of purchase price CIRCULATING 'JATER AND EVAPORATOR FEED SYSTEM PUMPS NY-771105 | nn tarkson Company Specification PSCC A-423-MP ( ') type IN TU! Bilton Evaporator Feed Pumps, S/N N305821 and N305822, complete 3-HF 6 pnase 60 cycle, 440-volt 3600 rpm totally enclosed motors, S/N 2390920 and 2J90921, capacity 30 gpm, i30 ft TDH; 'wo (-) No. 13 KaL River later Pumps, S/N 305819 and 305820, vertical, single stage, turbine type with enclosed lineshaft water lubricated bearings, capacity 2000 gpm, 40 it TDH; Two (2) N'o. b Rl Cooling lower Make-up Pumps, S/N 305817 and 305818, vertical single stage turbine type with open lineshaft, water lubricated bearings, capacity 4000 gpm, 45 ft TDH. Account Description Total contract j12.50362 Evaporator Feed Pump 514.3925 River Intake Pumps .3985 Settling Basin Pumps Material Freight Purchase Price State Taxes (2% of material only) Total Order 5,562.61 308.18 5,870.79 111.45 5,982.24 Material Cost_____ Total Cost 5,982.24 5,982.24 556.03 2.236.60 3.189.61 556.03 2,236.60 3,189.61 95.51% of purchase price 4.49% of purchase price 100.00% of purchase price 1.90% of purchase price CONTROL AIR SYSTEM DRYER NY-771106 The C. M. Kemp Manufacturing Company One (1) Kemp Model 150-E air cooled Oriad Tower air Dryer, S/N 1685, charged with sorehead desiccant and arranged for embedded electric reactivation and full auto matic operation; One (1) Kemp Model PF 10 Prefilter S/N 35026 charged with Beaxite Aluminal. Account Description 312.4753 Air Dryer Material Freight Purchase Price State Taxes (2% of material only) Total Order 3,145.00 143.81 3,288.81 62.90 3,351.71 Material Cost_____ Total Cost 3,351.71 3,351.71 95.63% of purchase price 4.37% of purchase price 100.00% of purchase price 1.92% of purchase price WAD01783 ttLEMTERISG AND CUNTHUL Corporation Tone Channelizing Equipment, uidi ^ount description Telemetering Equipment nase Price ,rC"3te Taxes (2% of material only) .t.i Order 2,117.6a 12.32 2,130.00 42,60 2,172.60 3U2 NY-771107 Material Cost_____ Total Cost 2,172.60 2,172.60 94.22% of purchase price 5,78% of purchase price 100.00% or purchase price 2.00% of purchase price 5TbEL SASH NY-771108 Thorn Company JiJL Fabricate and Oeliver Sash shown on Drawings: lev, 1 132652, Rev 0; 132687, Rev, 1; 132691, .ccount Description Total Contract 311.351 btation building Sash 312.4092 Boiler Enel. Sash Material Freight purchase Price State Taxes (2% of material only) Total Order 557,57 51.43 609.00 11.15 620.15 Material Cost Total Cost 620.15 620.15 18.60 601.55 18.60 601.55 91.55% of purchase price 8.45% of purchase price 100.00'% of purchase price 1.85% of purchase price MISCELLANEOUS STEEL NY-771109 The Midwest Steel and Iron Yorks Company Fabricate and Deliver Miscellaneous Steel shown on the following Drawings: 132688, 132698, 132700, 132704, 132708-Rev. 1, 132713, 132714. Account Description Lbs. Material Cost Total Cost Total Contract 14,981.35 14,981.35 311.3063 Trench Frames 1295 .307 Checker Plate 2416 .311 Station Bldg. Misc. Steel 8108 . 3303 Imbedded Frames for Floors 1343 .3312 Grating 172 .392 Frame for Vent Fans 1362 312.1028123 Imbedded Steel for Junct. House 70 .102813 Junct. House Steel 115 .10292 Car Shake-Out Support 9974 .1073 Conveyor 8A and 8B chutes 5236 .1082 Coal Pipes - Bunkers to Feeders 5951 .1085 Supports for Rotoclone 545 .1102 Frames for Ash Trench 5337 .1103 Ash Trench Covers 12075 312.113 Supports for Fly Ash System 294 .405 Boiler Platform 3131 .4096 Boiler Enclosure Louvre Frames 4272 .5042 Flash Tank Supports 830 .714 Platforms at I. D. Fan 2455 314.23 Sup.for Turbine Lube oil Tankl465 244.11 397.58 2,208.32 470.71 30.90 515.00 10.30 56.65 1,635.64 1,181.41 1,343.12 136.99 1,003.22 1,984.81 62.83 496.46 1,906.53 167.89 940.39 188.49 244.11 397.58 2,208.32 470.71 30.90 515.00 10.30 56.65 1,635.64 1,181.41 1,343.12 136.99 1,003.22 1,984.81 62.83 496.46 1,906.53 167.89 940.39 188.49 WAD01784 nrice Taxes (.396 of material only) ^tal Order 14,545.UP 14,545.00 436.35 14,981.35 100.0096 of purchase price 100.0096 of purchase price 3.0096 of purchase price 303 ft"res pi ortric Supply Company e rjii- -- fixtures and other Misc. Electric Supplies US1(it ^ Description ^Tcontract ,-o Yard Lighting AL* g ser. Water Cool. Tower Lights "ojj Control Room Lights '3y4 Station Bldg. Lights iisl Crusher House Lights /i026 Reclaim. Pit Lights ^"1(J28i3 Junction House Lights 'iu307 Coal Tunnel Lights iu32 Conveyor 6B Lights 'lo6o Conveyor 7 Lights ' io9o Conveyor 5 Lights 4b7 soot Blower Cabinet Lights 'gj Winterizing -jiloob C. >. Cool. Tower Lights J !j927 River Intake Light ^38 Miscellaneous Switches Cable Trays 542] 122 Switchyard Lights -j43.72 Shield lire Fittings Material rreight Discount purchase Price State Taxes (.3% of material only) Total order 7,978.84 370.59 (. 201.03) 8,148.40 242.20 8,390.60 NY-771110 Material Cost Total Cost 8,390.60 8,390.60 46.92 72.30 361.57 4,601.66 301.93 109.05 57.67 41.32 235.14 383.49 15.97 2.99 48.16 355.78 4.17 262.88 460.15 983.22 46.23 46.92 72.30 361.57 4,601.66 301.93 109.05 57.67 41.32 235.14 383.49 15.97 2.99 48.16 355.78 4.17 262.88 460.15 983.22 46.23 97.91% of purchase price 4.56% of purchase price ( 2.47% of purchase price) 100.00% of purchase price 2.97% of purchase price ROLLING STEEL DOOR The Kinnear .\ianufacturing Company One (,1) rolling steel Uoor. Account Description 311.350 Rolling Door Material Freight Purchase Price State Taxes (3% of material only) Total Order 1,005.79 295 21 1,301.00 31.77 1,332.77 NY-771111 Material Cost_____ Total Cost 1,332.77 1,332.77 77.31% of purchase price 22.6996 of purchase price 100.00% of purchase price 2.43% of purchase price Kotor control equipment NY-771112 Continental Electric Equipment Company Specification PSCC A-467 480-volt AC and 125-volt DC Motor Control Centers and push button stations. WAD01785 'ontract , ontrol Center 4A trol Center 4B "liirol Center 4C ioutrol Center 4D Control Center 4E Valve Control Center \dd to Pump House Control Ctr. \dd to Pump House Valve Control Switches, Starters, etc. Cost to rectify faulty workman ship. Paid by Continental Electric 15.3231 -r .VfO .3233 .3234 Charged from ,V. 0. to Capital Accts. Charged from .V. 0. to Capital Accts. Charged from VI. 0. to Capital Accts. Charged from ,V. 0. to Capital Accts. material Kreignt Discount ..rchase Price Atate Taxes (.2% of material only) Order 21,720.96 1,009.13 ^8.15) 22,721.94 433.97 23,155.91 Material Cost 23,155.91 4,385.12 2,037.04 2.411.78 4,516.96 1,605.48 1,013.93 4,119.27 1.059.78 2,006.55 304 Total Cost 23,155.91 4,385.12 2,037.04 2.411.78 4,516.96 1,605.48 1,013.93 4,119.27 1.059.78 2,006.55 955.48 477.74 119.43 119.44 119.43 119.44 95.60% of purchase price 4.44% of purchase price ( 0.04% of purchase price) 100.00% of purchase price 1.91% of purchase price 3R'SCKING AND BREECHING SUPPORTS NY-771113 iicsnnri Boiler and Sheet Iron .Vorks 3reeching and Supports as shown on Drawings: G-132693, Rev. 0; G-132694, Rev. 0; G-132695, Rev. 0. Account Description Total Contract 701 702 7232 7233 7252 7253 Supports Breeching Supports Flues Supports Recircl. Supports 2,400^ 113,UOO# 3,900# 28,000# 3,100# 12,500# Material Freight Purchase Price State Taxes (2% of material only) Total Order 25.436.00 2,176.00 27.612.00 508.72 28,120.72 Material Cost_____ Total Cost 28,120.72 28,120.72 3,440.24 17,373.28 559.12 4,382.28 444.03 1,921.77 3,440.24 17,373.28 559.12 4,382.28 444.03 1,921.77 92.14% of purchase price 7.86% of purchase price 100.00% of purchase price 1.84% of purchase price MUTOR CONTROL CENTER EQUIPMENT NY-771114 t'estinghouse Electric Corporation 125-volt, DC Valve Control Center, miscellaneous starters and breakers. Account Description Material Cost_____ Total Contract 2,977.65 Total Cost 2,977.65 WAD01786 ion for Coal Handling Ctr. for Vent. Control Ctr. pump House Center Control Center for Valves of material only) ,2,823.41 07.77 2 021.18 56.47 2,977.65 Material Cost Total Cost 1,152.65 109.65 225.27 1,085.59 404.45 1,152.65 109.65 225.27 1,085.59 404.45 96.64% of purchase price 3.34% of purchase price 100.00% of purchase price 1.93% of purchase price t iNCOUS GAGc. BOARDS ill .rtnl Electric equipment Company NY-771115 n gage boarcls shown on Drawing G-132619, Rev. 3, namely: 4 mill panels, 1 ufirrinng a|sie panel, 1 boiler feed pump auxiliary panel, and 1 condenser auxiliary panel i lodes panel structure, mounting equipment, internal wiring and piping. Inc ,cc0unt description Material Cost Total Cost ^iTcontract 6,829.39 6,829.39 o ->u7 Milt Panels '"'514 Firing Aisle Panel o0303 B. F. Pump Auxiliary Panel ji-tillUo Condenser Auxiliary Panel 1,936.49 1,804.87 1,778.35 1,309.68 1,936.49 1,804.87 1,778.35 1,309.68 Material Freight archase Price jtate Taxes (2% of material only) Total Order 6,413.00 288.13 6,701.13 128.26 6,829.39 95.70% of purchase price 4.30% of purchase price 100.00% of purchase price 1.91% of purchase price ORNAMENTAL RAILING NY-771116 Metal Fabricators, Inc. Furnish and Deliver Ornamental Railings shown on following Drawings: G-1327u4, Rev. 0; G-132b67, Rev. 1; G-132664, Rev. 3; G-132644, Rev. 0. Account Description 311.312 Ornamental Railings Material Purchase Price state Taxes (2% oi material only) Total order 1,115.69 1,115.69 22,31 1,138.00 Material Cost_____ Total Cost 1,138.00 1,138.00 100,00% of purchase price loO.OO% of purchase price 2.0o% of purchase price TRANSFORMER YARD STEEL Muskogee iron Works Furnish ana Deliver structural steel shown on Drawing G-132728. Account Description Total Contract 315.11 Surge Protection Enclosure .5221 Aux. Trans. Steel Support Lbs. 2415 410 Material Cost 4,499.86 941.93 74.96 oY-771117 Total Cost 4,499.86 941.93 74.96 WAD01787 jw>grription Bus Supports Xower At Main Transformer ;jlrrcieht . e i^rC?ttjJte T, anxre-sHpr of material only) Lbs. 4898 8994 4,142.81 274.19 4,417.00 82.86 4,499.86 306 Material Cost_____ Total Cost 1,303.97 2,179.00 1,303.97 2,179.00 93.78% of purchase price 6.22% of purchase price 100.00% of purchase price 1.87% of purchase price ND COARSE SCREENS - RIVER INTAKE NY-771118 feel and Supply Company ^terjjjh intake hoist structure anad screens per Drawing G-132721, Rev. 0, and Drawing dated January 28, 1955. ucount Description To tal Contract 3923 Screens 16,940# 3H 3926 Hoist Structure 2,364# material discount Purchase Price State Taxes (3% of material only) Total Order 2,829.55 ( 14.58) 2,814.97 84.45 2,899.42 Material Cost Total Cost 2,899.42 2,899.42 2,392.97 506.45 2,392.97 506.45 99.48% of purchase price ( 0.52% of purchase price) 100.00)4 of purchase price 3.00% of purchase price DOOPS AND HARDWARE NY-771119 ,illiamsburg Steel Products Company Hollow Metal Doors; door Frames; Saddles and Hardware: 20 single doors; 3 pr double doors; 5 frames; 21 saddles. Account Description Material Cost Total Cost Total Contract I I t 311.350 .417 Doors 312.1026 .4097 4,025.53 2,665.46 248.47 121.25 990.35 4,025.53 2,665.46 248.47 121.25 990.35 Material 3,726.67 94.32% of purchase price Freight 224.33 5.68% of purchase price Purchase Price 3,951.00 100.00% of purchase price i State Taxes (2% of material only) 74.53 1.89% of purchase price Total Order 4,025.53 COAL HANDLING POWER CENTER NY-771120 Continental Electric Equipment Company Specification PSCC A-479 & A-480 750 kva 2400/480-v, OA 3-phase Transformer, S/N 9J-41724; Center; 10 kw 480/60/120-v 1-phase Lighting Transformer; Two (2) Reversing Starters class 11-216-NY15. 480-v Coal Handling Power Account Description Material Cost Total Cost Total Contract 11,913.61 11,913.61 WAD01788 30 t ^2----'r, ;Xo 3'-s npscription 750 kva Transformer io kva Transformer rower Center Two Starters 'jterDrnicsi.aciol;ullnt t urc base ,tate Price Taxes (2% of Total Order material only) 11,268.81 490.19 ( 69.38) 11,689.62 223.99 11,913.61 Material Cost Total Cost 7,500.08 378.29 3,464.41 570.83 7,500.08 378.29 3,464.41 570.83 96.38% of purchase price 4.22% of purchase price ( 0.6U% of purchase price) luO.OO% of purchase price 1.92% of purchase price FtEL SHUT OFF AND PURGE PROTECTION RELAY CABINET NY-771121 ^inr^r. Switch Company v cabinet 19" by 33" by 10" dust tight with equipment as shown on Drawing A:ei52787, sheets 63 and 63X; Two (2) 3-way Solenoid operated Valves; Two (2) 2-way Solenoid operated Valves. u^count Description Total Contract "12.312 Four Valves ""'315 Relay Cabinet Vaterial Freight Purchase Price State Taxes (2% of material only) Total Order 837.47 12.22 849.69 16.75 866.44 Material Cost Total Cost 866.44 866.44 239.73 626.71 239.73 626.71 98.55% of purchase price 1.45% of purchase price 100.00% of purchase price 1.97% of purchase price HAND chain hoists NY-771122 Chisholm - Moore Hoist Division Columbus McKinnon Chain Corporation Hand operated chain Hoists and Trolleys: Three (3) 2-ton, One (1) 4-ton, and one (1) 8-ton. I Account Description Material Cost_____ Total Cost 316.30 Five Chain Hoists 2,191.91 2,191.91 Material Freight Discount Purchase Price State Taxes (2% of material only) Total Order 2,025.37 170.83 ( 43.92) 2,152.28 39.63 2,191.91 94.12% of purchase price 7.92% of purchase price ( 2.04% of purchase price) 100.00% of purchase price 1.84% of purchase price MISCELLANEOUS STEEL NY-771123 United Steel and Iron Works Company Furnish and Deliver the Miscellaneous Steel on Drawings: G-132713, Rev. 1; G-132717, Rev. 0; G-132729, Rev. 0 -- (Generator Lead Supports only). WAD01789 I neHcri ptio n ^ \ Co ntract y-tJC/r Fab. Steel -t1.3A0 Fab. Steel '1 .311 9 7,f Fab. Steel .51jJ i 1 no -3U 29lrr Fab. Steel 1526,-/ Fab. Steel X0a3,r Fab Steel 1X32// Fab. Steel price rcha?f Taxes (3% of material rtate ^ 308 Material Cost Total Cost 2,636.00 21 b36.OU 1,607.15 264.42 20.00 45.00 220.00 319.43 160.00 1,607.15 264.42 20.00 45.00 220.00 319.43 160.Oo 100.00% of purchase price 100.00% of purchase price 3.00% of purchase price H0U33 GAGS BOARD ANNUNCIATOR u^tn Call Company m) ANG 1-5 Lamp Annunciator; '.^.e (5) Lamp Relays; ne (1) Auxiliary Relay. ccount Description 31-4.413 Annunciators vatcr ial freight purchase Price jtate Taxes (2% of material only) Total Order NY-771124 189.00 2.88 191.88 3.78 195.66 Material Cost_____ Total Cost 195.66 195.66 98.50% of purchase price 1.50% of purchase price 100.00% of purchase price 1.98% of purchase price transformer fire protection NY-771125 irinnell Company Specification PSCC A-477 Purnish installed a Fire Protection System, Specification PSCC A-477, Rev. 1, for transformers and lubricating oil systems, including Automatic Sprinkler Corporation Sir Pump model 79-900C, S/N 3940, with 1/20-HP G. E. Motor, 1760 rpm, size HQC, S/N 1765C. Account Description Total Contract 314.241 . 242 .243 .244 .245 315.2013 343.225 Unit #4 Reservoir and Conditioner Unit #3 Reservoir and Conditioner Unit tf-2 Reservoir Unit #1 4 #2 Batch Tank and Conditioner Unit #1 Reservoir Auxiliary Transformer Main Transformer Man Hours 1208 174 170 172% 144 163 142 242% Labor Cost 9,949.62 1,432.94 1,401.16 1,421.07 1,184.22 1,342.12 1,170.22 1,997.89 Material Cost 18,892.88 2,248.80 2,412.59 2,940.84 2,458.49 2,780.05 2,521.79 3,530.32 Total Cost 28,842.50 3,681.74 3,813.75 4,361.91 3,642.71 4,122.17 3,692.01 5,528.21 Material Labor Purchase Price State Taxes (3% of material only) Total Order 18,342.60 9,949.62 28,292.22 550.28 28,842.50 64.83% of purchase price 35.17% of purchase price 100.00% of purchase price 1.95% of purchase price WAD01790 T 309 tKSUUTIN - VARIOUS SYSTEMS NY-771126 P^iip Carey Manufacturing Company --~~T^7tor to B & B ENGINEERING & SUPPLY COMPANY ^tjco------------------------------------ Specification PSCC A-425-HI ish, Deliver (fob freight allowed), unload, haul and apply heat insulation, ^otective covering and weatherproofing in accordance with Specification PSCC ^425-W- count Description tal Contract Coal Piping to Burners Air Preheater 3rd Stage Feedwater Htrs. 7th Stage Feedwater Htrs. 10th Stage Feedwater Htrs. 13th Stage Feedwater Htrs. 17th Stage Feedwater Htrs. 18th & lath Stage Feed- water Htrs .501 Deaerator ,5020 Evaporator .5021 Evaporator Preheater .5022 Evap. Drain Receiver 50302 Boiler Feed Pump 50312 Low Pr- Htr. Drain Pump .5041 Int. Pr. Flash Tank .5042 Low Pr. Flash Tank .5043 Low Load Flash Tank .5044 17th Stage Drain Receiver .513 Free Blow Tank .62 Boiler Plant Piping Insul. .63 'Winterizing .702 Breeching .7233 Flues-Dust Collect, to I.D. Fans .7253 Recirculation Flues 314.22 Turbine Piping .313 Air Fiping from Condenser .404 Lubricating Oil Piping 398.271 Temporary Steam Lines S. 0. Work Orders Material Labor Freight Purchase Price State Taxes (2% of material only) Total Order Man Hours 13761 504)6 16 232)6 134 180 141 b3% Labor Cost 33,328.46 1,191.54 59.10 548.73 316.28 425.55 418.95 149.88 Material Cost 35,629.95 1,529.53 640.65 422.61 465.26 358.29 146.66 Total Cost 68,958.41 2,721.07 59.10 1,189.38 738.89 89U.81 777.24 29b.54 26 556 149 45% 12 89 23 17% 17% 18% 11% 10% 8094% 227 2010 61.42 1,373.03 352.10 107.79 28.02 209.98 54.60 40.95 40.95 99.39 27.30 25.25 19,640.25 535.79 4,805.58 59.97 1,254.88 330.70 116.83 31.16 199.96 53.31 39.98 39.98 39.98 26.66 24.65 23,690.49 695.55 3,457.31 121.39 2,627.91 682.80 224.62 59.18 409.94 107.91 80.93 80.93 139.37 53.96 49.90 43,330.74 1,231.34 8,262.89 743 373 14 9% 18 12% 12 1,754.88 881.90 33.31 22.22 42.26 29.20 52.26 1,243.55 583.63 36.09 24.08 45.79 31.64 40.76 2,998.43 1,465.53 69.40 46.30 88.05 60.84 93.02 31,684.81 33,328.46 3.396.15 68,409.42 548.99 68,958.41 46.32% of purchase price 48.72% of purchase price 4.96% of purchase price 100.00% of purchase price 0.80% of purchase price PRESSURE SWITCHES FOR ANNUNCIATION NY--771127 The Mercoid Corporation Eleven (11) Mercoid pressure control Switches. Account Description 315.38 11 Switches Material Freight Discount Purchase Price State Taxes (2% of material only) Total Order i 161.38 4.88 ( 1.61) 164.65 3.20 167.85 Material Cost Total Cost 167.85 167.85 98.02% of purchase price 2.96% of purchase price ( 0.98% of purchase price) 100.00% of purchase price 1.94% of purchase price WAD01791 ^jOCBAPHIC examination of main steam piping field welds t|.jal X-Rav Incorporated Indus 50 .'/elds, Visual Inspection of Welding. X-Ray nescription cCiiSi ^Contract Man Hours 54554 4.22 51754 28 Labor Cost 4,905.00 4,653.00 252.00 310 NY-771128 Total Cost 4.905.00 4.653.00 252.00 rATER NY-771129 -Providence, Inc. 14) 4" model PRF Propeloflo Meters; one (1) 8" model PRF Propeloflo Meter; one 2" model PRF Propeloflo Meter. account Description :otal Contract -il '102 One 2" Water Meter -i?'Iil2 Four 4" V/ater Meters 314*393 One 8" Water Meter Material Freight purchase Price State Taxes (2% of material only) Total Order 1,665.00 29,60 1,694.60 33.15 17727.75 Material Cost Total Cost 1,727.75 1,727.75 186.66 1,038.23 502.86 186.66 1,038.23 502.86 98.25% of purchase price 1.75% of purchase price 100.00% of purchase price 1.96% of purchase price SURGE PROTECTION ENCLOSURE BUSHINGS NY-771130 Lapp Insulator Company. Inc, Three (3) roof bushings, 15 kv for outdoor vertical mounting. Account Description 315.722 Three Roof 3ushings Material Freight Purchase Price State Taxes (2% of material only) Total Order 114.36 4.89 119.25 2.29 121.54 Material Cost_____ Total Cost 121.54 121.54 95.92% of purchase price 4.08% of purchase price 100.00% of purchase price 1.91% of purchase price CONVEYOR GALLERY FLOOR FORMS NY-771131 franco Steel Products Company Cofor steel forms for floor of Conveyor Gallery and concrete reinforcing. ^0U1\1 Description ^12.1062 Floor Forms and Reinforcing Material height Discount Purchase Price fjte Taxes (2% of material only) Total Order 1,122.00 106.34 l5*612 1,222.73 22.33 1,245.06 Material Cost Total Cost 1,245.06 1,245.06 91.76% of purchase price 8.70% of purchase price ( 0,46% of purchase price) lo0.00% of purchase price 1.83% of purchase price WAD01792 'V~L gag:: for gasoline storage system used for control -\^CLINE DRIVE COMPRESSOR STORAGE TANK oil NY-771132 ^meter Corporation type RR Liquid Level Gages and Fittings. t .inscription ,.L-oiunS------ iiA- 14 Two Liquid Level Gages -i:<i'01 UtFreiSht discount urc hase State Price Taxes (2% of material only) Total Order 86.50 2.63 ( 0.43) 88.70 1.72 90.42 Material Cost Total Cost 90.42 90.42 97.52% of purchase price 2.97% of purchase price ( 0.49% of purchase price) 100.00% of purchase price 1.94% of purchase price I.sTRASIT*2 telephone communications parts NY-771133 ^^tic Sales Corporation ve (5) call monophones; two (2) outdoor monophones; five (5) accousti booths; 5000 rlft twisted pair telephone wire No. 17 A'.VE; and eleven (11) single stroke bells. Recount Description Total Contract -16.221 3 !221 7 phones and telewire 11 signal bells Material Freight ,-urchase Price State Taxes (2% of material only) Total Order 1,259.35 36.36 1,295.71 25.29 1,321.00 Material Cost Total Cost 1,321.00 1,321.00 1,012.72 308.28 1,012.72 308.28 97.19% of purchase price 2.81% of purchase price 100.00% of purchase price 1.95% of purchase price FREEZE PROTECTION PANEL NY-771134 Federal Pacific Electric Company Freeze Protection Panel, Drawings SKE-5090-48 and SKE-5090-49; Four (4) one ohm, 100 watt, adjustable Resistors; Four (4) Pilot Lights. Account Description Total Contract 312.476 Resistors and Pilot Lights 313.3239 Freeze Protection Panel Material Freight Purchase Price State Taxes Total Order (2% of material only) 347.91 4.89 352.80 6.97 359.77 Material Cost Total Cost 359.77 359.77 47.74 312.03 47.74 312.03 98.61% of purchase price 1.39% of purchase price 100.00% of purchase price 1.98% of purchase price FREEZE PROTECTION HEATING CABLE NY-771135 (elson Electric Manufacturing Company 362 ft 2/c 0.039 in dia, 600 V, #90 alloy mineral insulated cable, seamless copper sheathing. WAD01793 tc 3l2-63 ngscriptioa 1062 ft heating caole 0^X ice urctiaS Taxes (2% of material only) ' 5t?otal Order Labor Cost Material Cost Total Cost 528.32 528.32 515.23 5.44 ( 2.60) 518.07 10.25 528.32 99.45% of purchase price 1.05% of purchase price (. 0.50% of purchase price) 100.00% ol purchase price 1.98% of purchase price PROTECTION heating cable fSE^ NY-771136 ^ral Cable Corporation , ft 2/c, 16 A'.VG, 600 v mineral insulated cable, seamless copper sheathed. v^ount 312.63 Description 500 it heating cable material Freight Discount purchase Price State Taxes (2-,o of material only) Total Order 159.40 4.26 ( 80) 162.86 3.17 166.03 Material Cost_____ Total Cost 16b.03 166.03 97.87% of purchase price 2.62% of purchase price ( 0.49% of purchase price) 100.00% ol purchase price 1.95% of purchase price WAD01794