mch ,NAHt,L0T,0N, paui B. Hod ge g - E1SF General Offices
DATE SUBJECT REFERENCE
TO
June 1, 1972
EPA POLICY ON PCB's
PBH, 4/28/72 "PCB's Allowable Discharge From Pro ducing/Using Plants"
G. L. Bratsch A. E. Leisy P. E. Heisler G. A. Hippe R. M. Blowers C. F. Buckley
C. Engman E. E. Stewart R. M. MeCutchan F. J. Holzapfel
D. B. Hosmer J. R. Savage W. B. Papageorge R. J. Kozacka
E1SF B2SL B2NA F4WA
In conjunction with the report "Polychlorinated Biphenyls and the Environment" recently released by the federal "Task Force bn PCB's", EPA has sent guidelines to the regional offices stating policy on discharges of PCB's from manufacturers/users. Bill Papageorge obtained a copy of these guidelines and they are attached for your use. Please use them with discretion as they are not documents for the general public.
In general, these guidelines fit our expectations from the conference in Y/ashington 4/13/72 (see reference minutes of that conference). Critical points:
(1) Water quality limit of 0.01 ppb - not to be monitored directly, but to be based on fish studies if water is less than 0.01 ppb, fish will not exceed 5 ppm.
(2)
. ^
Allowable discharges - policy is stepwise re
duction to no "knowing" discharge. From a
more practical standpoint, discharges will be
limited to that amount which will not result in
more than 0.01 ppb in the stream at mean annual
flow, assuming complete mixing. Effects of
background levels relative to this discharge
limit are not discussed, so we don't know whether
or npt we can discharge the full allowance for
the Mississippi River (9.7#/day 180,000 cu ft/sec).
In the 4/13/72 Washington meeting, EPA had indi
cated that about 2-4#/day appeared reasonable
from us.
.
SW 310817
STLCOPCB4070803
2 (3) Effects of previous discharges of PCB's to the
environment are recognized along with acknow ledgment that considerable time will be involved in the diminution of these effects. Strategy for dealing with federal authorities in the near future (and probably Illinois authorities later) needs to be developed. We suggest that the WGK Plant arrange for a meeting at which this strategy can be discussed.
Paul B. Hodges /ms Att